Você está na página 1de 4

Republic of the Philippines

CENTRAL BICOL STATE UNIVERSITY OF AGRICULTURE


San Jose, Pili, Camarines Sur 4418
Website: www.cbsua.edu.ph
Email Address: op@cbsua.edu.ph
Trunkline: (054) 871-5531-33 Local 101
CBSUA-PIL-F-ESD-02
EXTENSION SERVICES DIVISION
EXTENSION PROJECT PROPOSAL

___________________________
Name of the College/Campus
Project Title
Proponent
Collaborating Agency/ies
Project Site/s
Target
Clients/Stakeholders
Date of Implementation
Date of Completion
Proposed Budget

RATIONALE
Background information on the training
Importance why the training needs to be conducted

Objectives The objectives of the title are the following:


1.
2.
3.
4.
5.

Methodologies/ (Hints and Example…)


Strategies/ Logical
framework  Rapid Community Appraisal for
 (Benchmarking and Need Assessment)

 Proposal Preparation and its approval


 Implementation with built-in M&E

 Capability Building
 Participants

 Knowledge Transfer

 Post Project Evaluation

Knowledge transfer refers to sharing or disseminating of


Effectivity Date: April 2, 2018 Rev.:0 Page 1 of 4
Republic of the Philippines
CENTRAL BICOL STATE UNIVERSITY OF AGRICULTURE
San Jose, Pili, Camarines Sur 4418
Website: www.cbsua.edu.ph
Email Address: op@cbsua.edu.ph
Trunkline: (054) 871-5531-33 Local 101
CBSUA-PIL-F-ESD-02
knowledge and providing inputs to the emerging issues
need to resolve. Informal and participative method will be
used on transferring of knowledge.

Expected Outcome Quantified description of output


(i.e. generation of Ex. At the end of the project at least:
employment, gain in 1. 25 pax acquired KS through
knowledge and skills, training/mentoring/technical advisory/techno-
increased income, etc.) demo, farmers’ field school, etc.
2. 10% of the clientele adopted the KS and
technologies in their farm or business
3. 10% of the adopting partners obtained additional
income (ROI/IRR=15%)

WORKPLAN

DESCRIPTION
BUDGET
(Process- AGENCIES
(Php)
ACTIVITY Indicator) INVOLVED
PRE-IMPLEMENTATION PHASE
1. Rapid Community Appraisal for
Benchmarking and Need Assessment
2. Inception meeting with LGU partner,
Implementers, Technical Working
Group and Director of Extension
Services
3. Preparation and Revision of the
Proposal
4. MOA signing with partner agency/ies
5. Procurement of Training Materials, etc.
SUB-TOTAL
IMPLEMENTATION PHASE (Note: Separate Training Proposal must be attached on
appendices including the specific budgetary requirements)
1. Development Intervention (Techno-transfer) Description
Taro
Pili
Pigeon Pea
Swine
Native Chicken/Poultry
Mushroom
Honey Bee
Vetiver
Cacao
2. Capability Building(Training, Mentoring,
Technical Advisory, Business, IEC, with
Values Reformation/Reorietation
Effectivity Date: April 2, 2018 Rev.:0 Page 2 of 4
Republic of the Philippines
CENTRAL BICOL STATE UNIVERSITY OF AGRICULTURE
San Jose, Pili, Camarines Sur 4418
Website: www.cbsua.edu.ph
Email Address: op@cbsua.edu.ph
Trunkline: (054) 871-5531-33 Local 101
CBSUA-PIL-F-ESD-02
Entrepreneurial/Financial
Management
Gender and Development
Community Organizing/Cooperative
Development
DRRM and Climate Change

SUB-TOTAL
RESULT BASED MONITORING AND EVALUATION
1. Evaluation
a. Evaluation During
Implementation
b. Post Evaluation
2. Monitoring
SUB-TOTAL
REPORT PREPARATION AND
SUBMISSION

POST-PROJECT EVALUATION/IMPACT ASSESSMENT


SUB-TOTAL
Sustainability Plan

GRAND TOTAL BUDGET

CALENDAR OF THE ACTIVITIES

DURATION
ACTIVITIES No
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Dec
v
1. Rapid Community
Appraisal for
Benchmarking
2. Inception meeting
3. Preparation and revision of
the Proposal
4. MOA signing with partner
agency/ies
5. Procurement of Training
Materials, etc.
6. Native Poultry Production
7. Swine Production
8. Taro Production
9. Entrepreneurial/Financial
Management
10. Gender and Development

Effectivity Date: April 2, 2018 Rev.:0 Page 3 of 4


Republic of the Philippines
CENTRAL BICOL STATE UNIVERSITY OF AGRICULTURE
San Jose, Pili, Camarines Sur 4418
Website: www.cbsua.edu.ph
Email Address: op@cbsua.edu.ph
Trunkline: (054) 871-5531-33 Local 101
CBSUA-PIL-F-ESD-02
11. Community
Organizing/Cooperative
Development
12. Training on DRRM and
Environmental
Stewardship and
Sustainability
13. Monitoring and Evaluation
14. Report Preparation And
Submission

Prepared by:

_____________________
Proponent

Noted by:

_____________________
Dean of the College

_____________________
Director for Extension Services

Recommending Approval:

_____________________
Vice President for REPED

Approved:

_____________________
SUC President III

Effectivity Date: April 2, 2018 Rev.:0 Page 4 of 4

Você também pode gostar