ve N Fo CEMINDO GEMILANG SCOPE OF WORKS (SOW) POWER PLANT DEPARTMENT SCOPE: Annual Inspection Primary Air Fan RPM: 1480 kw: 1250 ‘A. Work Instruction 1. Discouple fan from driver Visual check inside fan Check the bearing and lubrication conditions Check the fan centering NDT the journal shaft of fan Adjust as per requirements Alignment the fan and motor Provide the reports yer anewn Running test B. Work Time Working hours for this job is from 08:00 ~ 08:00 every day (long shift). The annual inspection for 1 unit primary air fan, must be inish on 1. day (11x 24 hours). C. Sparepart Raplacement 1. Bearing Sparepart ready (replacement if needed) 2. Shaft and fan : Sparepart not ready (nothing replacement) 3. Another part : Will be determined after the fan dismantled Note: All sparepart will be support from owner Page | 1 oe 7 9 CEMINDO GEMILANG SCOPE OF WORKS (SOW) POWER PLANT DEPARTMENT SCOPE: Annual Inspection Secondary Air Fan RPM: 1480 kW: 900 Poge | 2 A. Work Instruction 41. Discouple fan from driver Visual check inside fan Check the bearing and lubrication conditions Check the fan centering NDT the journal shaft of fan Adjust as per requirements Alignment the fan and motor Provide the reports Running test B, Work Time ‘Working hours for this job is from 08:00 ~ 08:00 every day (long shift). The annual inspection for 1 unit secondary air fan, must be finish on 1 day (1x 24 hours). C. Sparepart Raplacement 1. Bearing Sparepart ready (replacement if needed) 2. Shaft and fan : Sparepart not ready (nothing replacement) 3. Another part Will be determined after the fan dismantled Note: All sparepart will be support from owner ee N GEMII Ey CEMINDO GEMILANG SCOPE OF WORKS (SOW) POWER PLANT DEPARTMENT SCOPE: Annual Inspection ID Fan RPM: 1480 kw: Poge | 3 ‘A. Work Instruction 1. Discouple fan from driver 2. Visual check inside fan 3. Check the bearing and lubrication conditions 4, Check the fan centering 5, NDT the journal shaft of fan 6. Adjust as per requirements 7. Alignment the fan and motor Provide the reports 9. Running test B. Work Time ‘Working hours for this job is from 08:00 - 08:00 every day (long shift). The annual inspection for 2 Unit ID fan, must be finish on 2 days (2 x 24 hours). C. Sparepart Raplacement 1. Bearing : Sparepart ready (replacement if needed) 2. Shaft and fen : Sparepart not ready (nothing replacement) 3. Another part Will be determined after the fan dismantled Note: All spareport will be support from owner

Você também pode gostar