No Bahan Satuan Harga (Rp)

1 Dolken Kayu Ø 8-10/400 cm Btg Rp 8,500.00


2 Semen Kg Rp 1,500.00
3 Pasir Halus M³ Rp 115,000.00
4 Batu Pecah 10-15 M³ Rp 350,000.00
5 Kayu 4/6 M³ Rp 1,965,000.00
6 Paku Biasa 2"-5" Kg Rp 20,500.00
7 Residu Lt Rp 58,400.00
8 Kayu Papan Bengkirai 3/20 M³
9 Besi Profil Kg Rp 13,500.00
10 Pasir Pasang M³ Rp 115,000.00
11 Seng Plat Lbr Rp 49,900.00
Bak Mandi (Bathtube) dengan shower lux Bh Rp 3,250,000.00
Kaca Polos 3 mm M² Rp 130,000.00
Kunci Tanam Biasa Bh Rp 55,000.00
Plywood 4 mm Lbr Rp 115,000.00
Pasir Urug M³ Rp 115,000.00
Batu Belah 15/20 cm M³ Rp 335,000.00
Batako 15 x 30 x 7 Bh Rp 1,600.00
Bak mandi teraso Bh Rp 220,000.00
Tiang Pancang ( Mini Pile/ Ready Mix ) uk. П 20x20, 8 D 13 K 350 - Btg Rp 1,410,000.00
Batu Pecah 15 - 20 cm M³ Rp 335,000.00
Floordrain Bh Rp 55,000.00
Bak cuci stainless steel Bh Rp 500,000.00

Parket
Minyak Bekisting Lt Rp 10,000.00
Besi Beton polos Kg Rp 7,900.00
Kawat Beton Kg Rp 20,000.00
Ubin 60x60 cm Kotak Rp 319,500.00
Ubin 40 x 40 cm Kotak Rp 243,000.00
Ubin 20X20 cm Kotak Rp 73,000.00
Plint Ubin 10x30 cm Bh Rp 2,700.00

Engsel Pintu bh Rp 27,500.00


Engsel Jendela Bh Rp 18,800.00
Door holder Bh Rp 5,000.00
Kaca Wireglass 5 mm M² Rp 90,000.00
Cat Meni Kg Rp 18,000.00
Wastafel putih (KIA) set Rp 139,150.00
Plamir Kg Rp 18,000.00
Roll Kuas Bh Rp 8,500.00
Cat Tembok Kg Rp 25,000.00
Cat Water Proofing Kg Rp 78,500.00
Kuas 3,5" bh Rp 8,000.00

Amplas Lbr Rp 3,000.00


Kuas 2,5'' Bh Rp 5,000.00
Thinner Ltr Rp 22,100.00
Kloset Duduk Porselen Bh Rp 224,600.00
Skrup Gypsum Kg Rp 48,300.00
Semen Nat 40Kg Rp 52,500.00
Kran Air Bh Rp 32,500.00
Sealm Tape Bh Rp 3,000.00
Pipa PVC 1" Btg Rp 22,500.00
Pipa PVC 4" Btg Rp 116,900.00
Batu Kerikil M³ Rp 55,000.00
Besi Beton M³ Rp 78,600.00
Genteng Bubung Palentong Bh Rp 7,500.00
Genteng Beton Bh Rp 4,420.00
Kayu Profil Btg Rp 10,700.00
Paku plafon Bh Rp 600.00
Gypsum board Lbr Rp 42,000.00
Ubin Keramik 30x30 cm Kotak Rp 74,600.00
Semen Warna Kg Rp 6,000.00
Paku Beton Kg Rp 31,400.00
Septic tank + Resapan Bh Rp 2,500,000.00
Genteng metal Zinc Alume type Roof Lbr Rp 193,000.00
Nok atas (U) type Prime Roof (110x5x6) cm Bh Rp 35,000.00
Nok pinggir (P) type Prima Roof Bh Rp 40,000.00
semen putih 40Kg Rp 52,500.00
kasa gypsum Roll Rp 10,000.00
Tepung Gypum Kg Rp 3,500.00
List profil gypsum lebar sampai 6-10 cm M1 Rp 8,000.00
Kaca buram/ kaca es 3mm M2 Rp 275,000.00
paku gypsum Kg Rp 20,000.00
paku skrup Kg Rp 10,000.00
tusuk kontak 2 kutub dengan pembumian (tanam) Bh Rp 12,000.00
fitting duduk Bh Rp 11,625.00
pasang instalasi / titik Titik Rp 85,000.00
Lampu pijar 5watt Bh Rp 2,275.00
Saklar Seri IB Bh Rp 17,550.00
Sekering Bh Rp 2,100.00
Kusen Aluminium Silver M Rp 75,000.00
Saklar Double setara Panasonic Bh Rp 24,000.00
Kop Skring Bh Rp 7,000.00
Daftar Harga Bahan

No Bahan Satuan Harga (Rp)

1 Dolken Kayu Ø 8-10/400 cm Btg Rp 8,500.00


2 Semen PC Zak Rp 75,000.00
3 Pasir Halus M³ Rp 115,000.00
4 Pasir Pasang M³ Rp 115,000.00
5 Pasir Urug M³ Rp 115,000.00
6 Batu Belah 15/20 cm M³ Rp 335,000.00
7 Batu Pecah 15 - 20 cm M³ Rp 335,000.00
8 Batu Pecah 10-15 M³ Rp 350,000.00
9 Batu Kerikil M³ Rp 55,000.00
10 Kayu 4/6 M³ Rp 1,965,000.00
11 Kayu Papan Bengkirai 3/20 M³ Rp 6,000,000.00
12 Kayu Profil Btg Rp 10,700.00
13 Besi Profil Kg Rp 13,500.00
14 Besi Beton polos Kg Rp 7,900.00
15 Besi Beton M³ Rp 78,600.00
16 Plywood 4 mm Lbr Rp 115,000.00
17 Batako 15 x 30 x 7 Bh Rp 1,600.00
18 Tiang Pancang ( Mini Pile/ Ready Mix ) uk. Btg Rp 1,410,000.00
19 Residu Lt Rp 58,400.00
20 Kawat Beton Kg Rp 20,000.00
21 Ubin 60x60 cm Kotak Rp 319,500.00
22 Ubin 40 x 40 cm Kotak Rp 243,000.00
23 Ubin 20X20 cm Kotak Rp 73,000.00
24 Ubin Keramik 30x30 cm Kotak Rp 74,600.00
25 Plint Ubin 10x30 cm Bh Rp 2,700.00
26 Parket
27 Seng Plat Lbr Rp 49,900.00
28 Genteng Bubung Palentong Bh Rp 7,500.00
29 Genteng Beton Bh Rp 4,420.00
30 Genteng metal Zinc Alume type Roof Lbr Rp 193,000.00
31 Nok atas (U) type Prime Roof (110x5x6) cm Bh Rp 35,000.00
32 Nok pinggir (P) type Prima Roof Bh Rp 40,000.00
33 Gypsum board Lbr Rp 42,000.00
34 List profil gypsum lebar sampai 6-10 cm M1 Rp 8,000.00
35 Kaca Polos 3 mm M² Rp 130,000.00
36 Kaca Wireglass 5 mm M² Rp 90,000.00
37 Kaca buram/ kaca es 3mm M2 Rp 275,000.00
38 Pipa PVC 1" Btg Rp 22,500.00
39 Pipa PVC 4" Btg Rp 116,900.00
40 Bak Mandi (Bathtube) dengan shower lux Bh Rp 3,250,000.00
41 Bak mandi teraso Bh Rp 220,000.00
42 Floordrain Bh Rp 55,000.00
43 Bak cuci stainless steel Bh Rp 500,000.00
44 Kloset Duduk Porselen Bh Rp 224,600.00
45 Kran Air Bh Rp 32,500.00
46 Wastafel putih (KIA) set Rp 139,150.00
47 Septicktank Biosel kap. 6,00 m3 Unit Rp 2,500,000.00
48 Engsel Pintu bh Rp 27,500.00
49 Engsel Jendela Bh Rp 18,800.00
50 Door holder Bh Rp 5,000.00
51 Paku Biasa 2"-5" Kg Rp 20,500.00
52 Paku gypsum Kg Rp 20,000.00
53 Paku skrup Kg Rp 10,000.00
54 Paku Beton Kg Rp 31,400.00
55 Skrup Gypsum Kg Rp 48,300.00
56 Paku plafon Bh Rp 600.00
57 Kunci Tanam Biasa Bh Rp 55,000.00
58 Kuas 2,5'' Bh Rp 5,000.00
59 Kuas 3,5" bh Rp 8,000.00
60 Amplas Lbr Rp 3,000.00
61 Thinner Ltr Rp 22,100.00
62 Roll Kuas Bh Rp 8,500.00
63 Sealm Tape Bh Rp 3,000.00
64 Semen putih 40Kg Rp 52,500.00
65 Kasa gypsum Roll Rp 10,000.00
66 Tepung Gypum Kg Rp 3,500.00
67 Semen Warna Kg Rp 6,000.00
68 Semen Nat 40Kg Rp 52,500.00
69 Minyak Bekisting Lt Rp 10,000.00
70 Cat Tembok Kg Rp 25,000.00
71 Cat Water Proofing Kg Rp 78,500.00
72 Cat Meni Kg Rp 18,000.00
73 Plamir Kg Rp 18,000.00
74 Tusuk kontak 2 kutub dengan pembumian (t Bh Rp 12,000.00
75 Fitting duduk Bh Rp 11,625.00
76 Pasang instalasi / titik Titik Rp 85,000.00
77 Lampu pijar 5watt Bh Rp 2,275.00
78 Saklar Seri IB Bh Rp 17,550.00
79 Sekering Bh Rp 2,100.00
80 Kusen Aluminium Silver M Rp 75,000.00
81 Saklar Double setara Panasonic Bh Rp 24,000.00
82 Kop Skring Bh Rp 7,000.00

No Tenaga Sat Harga


1 Pekerja Oh Rp 100,000.00
2 Tukang Batu Oh Rp 120,000.00
3 Tukang Cor Oh Rp 120,000.00
4 Tukang Besi Oh Rp 120,000.00
5 Tukang Gali Oh Rp 120,000.00
6 Tukang Cat Oh Rp 120,000.00
7 Tukang Kayu Oh Rp 120,000.00
8 Tukang Tembok Oh Rp 120,000.00
9 Kepala Tukang Oh Rp 145,000.00
10 Mandor Oh Rp 155,000.00
11 Supir Truk Oh Rp 115,000.00
12 Kenek Truk Oh Rp 80,000.00
No Jenis Pekerjaan Sat Indeks

I PEKERJAAN PERSIAPAN
A. Pembersihan Lahan (m²)
Tenaga
Pekerja Oh 0.400
Mandor Oh 0.020
Sub Total
B. Pemasangan Pagar Sementara dari Kayu tinggi 2 m (m¹)
Bahan
Dolken Kayu Ø 8-10/400 cm Btg 1.250
Semen PC Zak 5.000
Pasir Halus M³ 0.005
Batu Pecah 10-15 M³ 0.009
Kayu 4/6 M³ 0.072
Paku Biasa 2"-5" Kg 0.060
Residu Lt 0.400
Tenaga
Tukang Kayu Oh 0.200
Pekerja Oh 0.400
Kepala Tukang Oh 0.020
Mandor Oh 0.020
Sub Total
C. Memasang Bouwplank (m¹)
Bahan
Kayu 4/6 M³ 0.120
Paku Biasa 2"-5" Kg 0.020
Kayu Papan M³ 0.007
Tenaga
Tukang Kayu Oh 0.100
Pekerja Oh 0.100
Kepala Tukang Oh 0.010
Mandor Oh 0.005
Sub Total
D. Memasang Papan Nama Proyek 80x120 cm (Bh)
Bahan
Kayu Meranti Btg 0.035
Paku Biasa 2"-5" Kg 0.600
Seng Lembaran 90 cm M¹ 1.400
Batu Pecah 10-15 M³ 0.041
Semen PC Zak 16.800
Pasir Halus M³ 0.027

Tenaga
Tukang Kayu Oh 1.000
Tukang Batu Oh 0.018
Tukang Cat Oh 1.000
Pekerja Oh 2.100
Mandor Oh 1.005
Sub Total

II PEKERJAAN TANAH
A. Galian Tanah Biasa sedalam 1 m (m³)
Tenaga
Pekerja Oh 0.400
Mandor Oh 0.040
Sub Total
B. Urugan Kembali (m³)
Tenaga
Pekerja Oh 0.192
Mandor Oh 0.019
Sub Total
C. Urugan Pasir Bawah Pondasi (m³)
Bahan
Pasir Urug M³ 1.200
Tenaga
Pekerja Oh 0.300
Mandor Oh 0.010
Sub Total

III PEKERJAAN PONDASI


D. Pasangan Pondasi Batu Kali 1 Pc: 5 Ps (m³)
Bahan
Batu Belah 15/20 cm M³ 1.100
Semen Portland Kg 136.000
Pasir Pasang M³ 0.544
Tenaga
Pekerja Oh 1.500
Tukang Batu Oh 0.600
Kepala Tukang Oh 0.060
Mandor Oh 0.075
Sub Total

IV PEKERJAAN DINDING
A. Pasangan Tembok ½ Batako 1Pc:4Ps (Trasraam) (m²)
Bahan
Batako press 15x30x7 cm Bh 70.000
Semen PC Kg 11.500
Pasir Pasang M³ 0.043
Tenaga
Pekerja Oh 0.320
Tukang Batu Oh 0.100
Kepala Tukang Oh 0.010
Mandor Oh 0.015
Sub Total
B. Pasangan Tembok ½ Batako 1Pc:3Kp:10Ps (m²)
Bahan
Batako press 15x30x7 cm Bh 70.000
Semen PC Kg 4.500
Pasir Pasang M³ 0.050
Tenaga
Pekerja Oh 0.320
Tukang Batu Oh 0.100
Kepala Tukang Oh 0.010
Mandor Oh 0.015
Sub Total

PEKERJAAN PLESTERAN DINDING


V A. Plesteran Dinding 1Pc:3Ps (m²) tebal 20 mm
Bahan
Semen Portland Kg 10.800
Pasir Pasang M³ 0.026
Tenaga
Pekerja Oh 0.250
Tukang Batu Oh 0.200
Kepala Tukang Oh 0.020
Mandor Oh 0.013
Sub Total
B. Plesteran Dinding 1Pc:3Kp:10Ps (m²) tebal 15 mm
Bahan
Semen Portland Kg 1.840
Pasir Pasang M³ 0.014
Tenaga
Pekerja Oh 0.200
Tukang Batu Oh 0.150
Kepala Tukang Oh 0.015
Mandor Oh 0.010
Sub Total
Sub Total

PEKERJAAN BETON
VII A. Membuat sloof Beton Bertulang (200Kg besi+bekisting) (m³)
Bahan
Kayu Terentang M³ 0.270
Paku Biasa 2"-5" Kg 2.000
Minyak Bekisting Lt 0.600
Besi Beton polos Kg 200.000
Kawat Beton Kg 3.000
Semen Portland Kg 323.000
Pasir Beton M³ 0.520
Koral Beton M³ 0.780
Tenaga
Pekerja Oh 4.850
Tukang Batu Oh 0.350
Tukang Kayu Oh 1.560
Tukang Besi Oh 1.400
Kepala Tukang Oh 0.331
Mandor Oh 0.170
Sub Total
B. Membuat Kolom Beton Bertulang (300Kg besi+bekisting) (m³)
Bahan
Kayu Terentang M³ 0.400
Paku Biasa 2"-5" Kg 4.000
Minyak Bekisting Lt 2.000
Besi Beton polos Kg 300.000
Kawat Beton Kg 4.500
Semen Portland Kg 323.000
Pasir Beton M³ 0.520
Koral Beton M³ 0.780
Kayu Borneo Balok M³ 0.150
Plywood 9 mm Lbr 3.500
Dolken Kayu Ø 8-10/400 cm Btg 20.000
Tenaga
Pekerja Oh 7.300
Tukang Batu Oh 0.350
Tukang Kayu Oh 3.300
Tukang Besi Oh 2.100
Kepala Tukang Oh 0.570
Mandor Oh 0.250
Sub Total
C. Membuat Ring Balok Beton Bertulang (10X15cm) (m³)
Bahan
Kayu Albasiah M³ 0.003
Paku Biasa 2"-5" Kg 0.020
Besi Beton polos Kg 3.600
Kawat Beton Kg 0.050
Semen Portland Kg 5.500
Pasir Beton M³ 0.009
Koral Beton M³ 0.015
Tenaga
Pekerja Oh 0.100
Tukang Batu Oh 0.033
Tukang Kayu Oh 0.033
Tukang Besi Oh 0.033
Kepala Tukang Oh 0.010
Mandor Oh 0.005
Sub Total
D. Membuat Kuda-Kuda Beton Bertulang (10X15cm) (m³)
Bahan
Kayu Albasiah M³ 0.003
Paku Biasa 2"-5" Kg 0.020
Besi Beton polos Lt 3.600
Kawat Beton Kg 0.050
Semen Portland Kg 5.500
Pasir Beton Kg 0.009
Koral Beton M³ 0.015
Tenaga
Pekerja Oh 0.100
Tukang Batu Oh 0.033
Tukang Kayu Oh 0.033
Tukang Besi Oh 0.033
Kepala Tukang Oh 0.010
Mandor Oh 0.005
Sub Total
E. Membuat Plat Beton 1Pc:2Ps:3Kr (m³)
Bahan
Semen Portland Kg 232.000
Pasir Beton M³ 0.520
Koral Beton M³ 0.780
Tenaga
Pekerja Oh 1.650
Tukang Batu Oh 0.250
Kepala Tukang Oh 0.025
Mandor Oh 0.080
Sub Total
F. Pembesian Besi Polos dan Ulir plat beton(Kg)
Bahan
Besi Beton (Polos/Ulir) Kg 1.050
Kawat Beton Kg 0.015
Tenaga
Pekerja Oh 0.007
Tukang Besi Oh 0.007
Kepala Tukang Oh 0.001
Mandor Oh 0.000
Sub Total
G. Pasang Bekisting untuk Plat Beton (m²)
Bahan
Kayu Terentang M³ 0.040
Paku Biasa 2"-5" Kg 0.400
Minyak Bekisting Lt 0.200
Balok Kayu borneo M³ 0.015
Plywood tebal 9 mm Lbr 0.350
Dolken Kayu galam Ø 8-10/4 m Btg 6.000
Tenaga
Pekerja Oh 0.320
Tukang kayu Oh 0.330
Kepala Tukang Oh 0.033
Mandor Oh 0.006
Sub Total

PEKERJAAN PENUTUP ATAP


VIII A. Pasang Genteng Bubung Palentong (m¹)
Bahan
Genteng Bubung Palentong Bh 5.000
Semen Portland Kg 8.000
Pasir Pasang M3 0.032
Tenaga
Pekerja Oh 0.400
Tukang Kayu Oh 0.200
Kepala Tukang Oh 0.020
Mandor Oh 0.002
Sub Total
B. Pasang Atap Genteng Beton (m²)
Bahan
Genteng Beton Bh 11.000
Paku Biasa 2" - 5" Kg 0.030
Tenaga
Pekerja Oh 0.200
Tukang Kayu Oh 0.100
Kepala Tukang Oh 0.010
Mandor Oh 0.010
Sub Total

PEKERJAAN PLAFON
IX A. Pasang List Langit-langit Kayu Profil (m¹)
Bahan
Kayu Profil M¹ 1.100
Paku plafon Kg 0.010
Tenaga
Pekerja Oh 0.050
Tukang Kayu Oh 0.050
Kepala Tukang Oh 0.005
Mandor Oh 0.003
Sub Total
B. Langit-langit Asbes (m²)
Bahan
Pelat Asbes tebal 6mm M² 1.100
Paku plafon Kg 0.010
Tenaga
Pekerja Oh 0.030
Tukang Kayu Oh 0.070
Kepala Tukang Oh 0.007
Mandor Oh 0.002
Sub Total

PEKERJAAN PENUTUP LANTAI DAN DINDING


X A. Pekerjaan Urug Pasir Bawah Lantai (m³)
Bahan
Pasir Urug M³ 1.200
Tenaga
Pekerja Oh 0.300
Tukang Gali Oh 0.000
Kepala Tukang Oh 0.000
Mandor Oh 0.010
Sub Total
B. Pasang Lantai Keramik 33X33 cm (m²)
Bahan
Ubin Keramik 33X33 cm Bh 10.000
Semen Portland Kg 11.380
Pasir Pasang M³ 0.042
Semen Warna Kg 1.500
Tenaga
Pekerja Oh 0.620
Tukang Batu Oh 0.350
Kepala Tukang Oh 0.035
Mandor Oh 0.030
Sub Total
C. Pasang Lantai Keramik 10X20 cm (m²)
Bahan
Ubin Keramik Artistik 10X20 cm Bh 50.000
Semen Portland Kg 11.380
Pasir Pasang M³ 0.042
Semen Warna Kg 1.500
Tenaga
Pekerja Oh 0.620
Tukang Batu Oh 0.350
Kepala Tukang Oh 0.035
Mandor Oh 0.030
Sub Total
D. Pasang Lantai Ubin Pc Abu-Abu 20X20 cm (m²)
Bahan
Ubin Abu-Abu 20X20 cm Bh 26.500
Semen Portland Kg 10.400
Pasir Pasang M³ 0.014
Tenaga
Pekerja Oh 0.270
Tukang Batu Oh 0.130
Kepala Tukang Oh 0.013
Mandor Oh 0.014
Sub Total
E. Pasang plint ubin pc abu-abu ukuran 10x30 cm (m²)
Bahan
Plint Ubin 10x30 cm Bh 3.530
Semen Portland Kg 1.560
Pasir Pasang M³ 0.003
Tenaga
Pekerja Oh 0.060
Tukang Batu Oh 0.030
Kepala Tukang Oh 0.003
Mandor Oh 0.003
Sub Total
PEKERJAAN KUNCI DAN KACA
XI A. Pasang Kunci Tanam Biasa (Bh)
Bahan
Kunci Tanam Biasa Bh 1.000
Tenaga
Pekerja Oh 0.010
Tukang Kayu Oh 0.500
Kepala Tukang Oh 0.010
Mandor Oh 0.005
Sub Total
B. Pasang Engsel pintu (Bh)
Bahan
Engsel Pintu Bh 1.000
Tenaga
Pekerja Oh 0.005
Tukang Kayu Oh 0.500
Kepala Tukang Oh 0.005
Mandor Oh 0.000
Sub Total
C. Pasang Engsel Jendela Kupu-kupu (Bh)
Bahan
Engsel Jendela Bh 1.000
Tenaga
Pekerja Oh 0.010
Tukang Kayu Oh 0.100
Kepala Tukang Oh 0.010
Mandor Oh 0.001
Sub Total
D. Pasang Pegangan Pintu/Door holder (Bh)
Bahan
Door holder Bh 1.000
Tenaga
Pekerja Oh 0.050
Tukang Kayu Oh 0.500
Kepala Tukang Oh 0.050
Mandor Oh 0.003
Sub Total
E. Pasang Kaca tebal 3 mm (m²)
Bahan
Kaca tebal 3 mm M² 1.100
Tenaga
Pekerja Oh 0.015
Tukang Kayu Oh 0.150
Kepala Tukang Oh 0.015
Mandor Oh 0.001
Sub Total
F. Pasang Kaca wireglass tebal 5 mm (m²)
Bahan
Kaca Wireglass 5 mm M² 1.100
Tenaga
Pekerja Oh 0.015
Tukang Kayu Oh 0.150
Kepala Tukang Oh 0.015
Mandor Oh 0.001
Sub Total

PEKERJAAN PENGECATAN
XII A. Pengecatan Kayu (m²)
Bahan
Cat Meni Kg 0.200
Kertas Gosok Lbr 0.400
Plamir Kg 0.150
Cat dasar Kg 0.170
Cat penutup 2 kali Kg 0.260
Minyak Cat Ltr 0.150
Kuas 3" Bh 0.050
Tenaga
Pekerja Oh 0.070
Tukang Cat Oh 0.009
Kepala Tukang Oh 0.006
Mandor Oh 0.003
Sub Total
B. Pengecatan Tembok Baru (m²)
Bahan
Plamir Kg 0.100
Kertas gosok LBR 1.000
Cat Dasar Kg 0.100
Cat Penutup 2x Kg 0.260
Tenaga
Pekerja Oh 0.020
Tukang Cat Oh 0.063
Kepala Tukang Oh 0.006
Mandor Oh 0.003
Sub Total

PEKERJAAN INSTALASI LISTRIK


XIII A. Penyambungan Listrik PLN 2400 watt (LS)
ALS Penyambungan PLN LS 1.000
B. Pemasangan Lampu SL 25 Watt (Bh)
ALS Lampu SL 25 Watt Bh 1.000
C. Pemasangan Sekering Group (Bh)
ALS Sekering Group Bh 1.000
D. Pemasangan Stop Kontak (Bh)
ALS Stop kontak Bh 1.000
E. Pemasangan Sakelar Tunggal (Bh)
ALS Sakelar Tunggal Bh 1.000
F. Pemasangan Sakelar Ganda (Bh)
ALS Sakelar Ganda Bh 1.000

PEKERJAAN SANITASI
XIV A. Memasang Kloset Jongkok Porselen (Bh)
PERWALI Bahan
No 16 Tahun 2017 Kloset Jongkok Porselen Bh 1.000
Semen Portland Kg 6.000
Pasir Pasang M3 0.010
Tenaga
Pekerja Oh 1.000
Tukang Batu Oh 1.500
Kepala Tukang Oh 1.500
Mandor Oh 0.160
Sub Total
B. Memasang Bak Mandi Bata Bata, Vol 0.3 M³ (Bh)
PERWALI Bahan
No 16 Tahun 2017 Batu Bata Bh 250.000
Semen Portland Kg 120.000
Pasir Pasang M 3
0.300
Porselen (11x11) Cm Bh 360.000
Semen Nat Kg 6.000
Tenaga
Pekerja Oh 6.000
Tukang Batu Oh 3.000
Kepala Tukang Oh 0.300
Mandor Oh 0.300
Sub Total
C. Memasang Kran Air Ø ½" atau ¾" (Bh)
PERWALI Bahan
No 16 Tahun 2017 Kran Air bh 1.000
Sealm Tape Bh 0.500
Tenaga
Pekerja Oh 0.010
Tukang Batu Oh 0.100
Kepala Tukang Oh 0.010
Mandor Oh 0.005
Sub Total
D. Memasang pipa PVC tipe AW Ø 1" (m¹)
PERWALI Bahan
No 16 Tahun 2017 Pipa PVC m¹ 1.200
Perlengkapan 35 % harga pipa 0.350
Tenaga
Pekerja Oh 0.081
Tukang Batu Oh 0.135
Kepala Tukang Oh 0.014
Mandor Oh 0.004
Sub Total
E. Memasang pipa PVC tipe AW Ø 4" (m¹)
PERWALI Bahan
No 16 Tahun 2017 pipa pvc m¹ 1.200
Perlengkapan 35 % harga pipa 0.350
Tenaga
Pekerja Oh 0.081
Tukang Batu Oh 0.135
Kepala Tukang Oh 0.014
Mandor Oh 0.004
Sub Total
F. Memasang Bak kontrol Pas batako press 40x20 (Bh)
PERWALI Bahan
No 16 Tahun 2017 batako press 40x20 M3 0.250
Semen Portland Kg 77.000
Pasir Pasang M 3
0.130
Batu kerikil M 3
0.020
beton k125 M3 0.090
Tenaga
Pekerja Oh 1.420
Tukang Batu Oh 0.473
Kepala Tukang Oh 0.047
Mandor Oh 0.071
Sub Total
Harga Satuan (Rp)
Total Harga Satuan
Bahan Upah (Rp)

100,000.00 40,000.00
155,000.00 3,100.00
43,100.00

8,500.00 10,625.00
75,000.00 375,000.00
115,000.00 575.00
350,000.00 3,150.00
1,965,000.00 141,480.00
20,500.00 1,230.00
58,400.00 23,360.00

120,000.00 24,000.00
100,000.00 40,000.00
145,000.00 2,900.00
155,000.00 3,100.00
625,420.00

1,965,000.00 235,800.00
20,500.00 410.00
6,000,000.00 42,000.00

120,000.00 12,000.00
100,000.00 10,000.00
145,000.00 1,450.00
155,000.00 775.00
302,435.00

1,687,000.00 59,045.00
20,500.00 12,300.00
49,900.00 69,860.00
350,000.00 14,350.00
75,000.00 1,260,000.00
115,000.00 3,105.00

120,000.00 120,000.00
120,000.00 2,160.00
120,000.00 120,000.00
100,000.00 210,000.00
155,000.00 155,775.00
2,026,595.00

Você também pode gostar