"MEJORAMIENTO DE LOS SERVICIOS DE AGUA PARA EL SISTEMA DE RIEGO EN EL CENTRO POBLADO DE SANTO DOMINGO DE NAUYAN DEL DISTRITO DE HUANUCO,
PROYECTO :
PROVINCIA DE HUANUCO - HUANUCO"
FECHA : Feb-19
LUGAR : STO. DOMINGO DE NAUYAN, HUANUCO - HUANUCO - HUANUCO
MONTO: 492,907.20
Página 1 de 36
CALENDARIO VALORIZADO DE OBRA MENSUAL
"MEJORAMIENTO DE LOS SERVICIOS DE AGUA PARA EL SISTEMA DE RIEGO EN EL CENTRO POBLADO DE SANTO DOMINGO DE NAUYAN DEL DISTRITO DE HUANUCO,
PROYECTO :
PROVINCIA DE HUANUCO - HUANUCO"
FECHA : Feb-19
LUGAR : STO. DOMINGO DE NAUYAN, HUANUCO - HUANUCO - HUANUCO
MONTO: 492,907.20
02.01.05.02 TUBERIA DE PVC SAL DE 4" m 6.36 30.81 195.95 0.00 195.95
02.01.06 CARPINTERIA METALICA 0.00
02.01.06.01 SUMINISTRO E INSTALACION DE TAPA METALICA 0.60X0.60 und 1.00 198.52 198.52 0.00 198.52
02.01.07 CERCO PERIMETRICO 0.00
02.01.07.01 CERCO PERIMETRICO CON ALAMBRE DE PUAS m 55.70 23.77 1,323.99 0.00 1,323.99
02.01.07.02 PUERTA DE ALAMBRE DE PUAS PARA CERCO und 1.00 312.44 312.44 0.00 312.44
02.02 CAJA DE VALVULAS - RESERVORIO EXISTENTE 0.00
02.02.01 OBRAS PRELIMINARES 0.00
02.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 0.77 1.03 0.79 0.00 0.79
02.02.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 0.77 2.95 2.27 0.00 2.27
02.02.02 MOVIMIENTO DE TIERRAS 0.00
02.02.02.01 EXCAVACION MANUAL EN TERRENO NORMAL m3 0.62 31.88 19.77 0.00 19.77
02.02.02.02 NIVELACION Y COMPACTACION MANUAL m2 0.77 6.33 4.87 0.00 4.87
02.02.02.03 ELIMINACION DE MATERIAL EXCEDENTE C/CARRETILLA m3 0.74 10.01 7.41 0.00 7.41
02.02.03 OBRAS DE CONCRETO 0.00
02.02.03.01 SOLADO DE CONCRETO E=4" C:A 1:12 m2 4.46 29.30 130.68 0.00 130.68
02.02.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 3.69 37.52 138.45 0.00 138.45
02.02.03.03 CONCRETO F'C=175 KG/CM2 m3 0.24 348.80 83.71 0.00 83.71
02.02.03.04 ACERO DE REFUERZO FY=4200 KG/CM2 kg 3.08 4.65 14.32 0.00 14.32
02.02.04 REVOQUES ENLUCIDOS Y MOLADURAS 0.00
02.02.04.01 TARRAJEO DE MUROS m2 3.16 21.05 66.52 0.00 66.52
02.02.05 CARPINTERIA METALICA 0.00
02.02.05.01 SUMINISTRO E INSTALACION DE TAPA METALICA 0.35X0.60 und 1.00 138.33 138.33 0.00 138.33
02.02.06 TUBERIAS Y ACCESORIOS 0.00
02.02.06.01 VALVULA DE PASO DE 10" und 1.00 2,891.15 2,891.15 0.00 2,891.15
02.02.06.02 TUBERIA DE PVC SAL DE 10" m 3.00 79.55 238.65 0.00 238.65
03 LINEA DE CONDUCCION
03.01 OBRAS PRELIMINARES
03.01.01 LIMPIEZA DE TERRENO MANUAL m2 1,073.66 1.03 1,105.87 737.25 368.62 0.00
03.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 1,073.66 2.95 3,167.30 2,111.53 1,055.77 0.00
03.02 MOVIMIENTO DE TIERRAS
Página 2 de 36
CALENDARIO VALORIZADO DE OBRA MENSUAL
"MEJORAMIENTO DE LOS SERVICIOS DE AGUA PARA EL SISTEMA DE RIEGO EN EL CENTRO POBLADO DE SANTO DOMINGO DE NAUYAN DEL DISTRITO DE HUANUCO,
PROYECTO :
PROVINCIA DE HUANUCO - HUANUCO"
FECHA : Feb-19
LUGAR : STO. DOMINGO DE NAUYAN, HUANUCO - HUANUCO - HUANUCO
MONTO: 492,907.20
Página 3 de 36
CALENDARIO VALORIZADO DE OBRA MENSUAL
"MEJORAMIENTO DE LOS SERVICIOS DE AGUA PARA EL SISTEMA DE RIEGO EN EL CENTRO POBLADO DE SANTO DOMINGO DE NAUYAN DEL DISTRITO DE HUANUCO,
PROYECTO :
PROVINCIA DE HUANUCO - HUANUCO"
FECHA : Feb-19
LUGAR : STO. DOMINGO DE NAUYAN, HUANUCO - HUANUCO - HUANUCO
MONTO: 492,907.20
Página 4 de 36
CALENDARIO VALORIZADO DE OBRA MENSUAL
"MEJORAMIENTO DE LOS SERVICIOS DE AGUA PARA EL SISTEMA DE RIEGO EN EL CENTRO POBLADO DE SANTO DOMINGO DE NAUYAN DEL DISTRITO DE HUANUCO,
PROYECTO :
PROVINCIA DE HUANUCO - HUANUCO"
FECHA : Feb-19
LUGAR : STO. DOMINGO DE NAUYAN, HUANUCO - HUANUCO - HUANUCO
MONTO: 492,907.20
05.02.05.03 CODO PVC SAP 4" und 1.00 23.83 23.83 0.00 23.83
05.02.05.04 NIPLE PVC SAP 4" C-10 C/RM und 4.00 71.21 284.84 0.00 284.84
05.02.05.05 VALVULA COMPUERTA DE 4" und 2.00 437.46 874.92 0.00 874.92
05.02.05.06 TEE PVC SAP 4" C-10 C/RH und 1.00 40.49 40.49 0.00 40.49
05.02.05.07 CANASTILLA DE SALIDA 6"x4" und 1.00 286.58 286.58 0.00 286.58
05.02.05.08 TUBERIA PVC 4" C-10 m 11.50 7.74 89.01 0.00 89.01
05.02.05.09 CONO DE REBOSE PVC DE 6"x4" und 1.00 87.78 87.78 0.00 87.78
05.03 CERCO PERIMETRICO
05.03.01 CERCO PERIMETRICO CON ALAMBRE DE PUAS m 72.00 23.77 1,711.44 0.00 0.00 1,711.44
05.03.02 PUERTA DE ALAMBRE DE PUAS PARA CERCO und 1.00 312.44 312.44 0.00 0.00 312.44
06 CAPACITACION Y ASISTENCIA TECNICA
06.01 CAPACITACION A LAS AUTORIDADES glb 1.00 1,000.00 1,000.00 0.00 0.00 1,000.00
06.02 CAPACITACION Y SENSIBILIZACION A LOS POBLADORES glb 2.00 1,000.00 2,000.00 0.00 0.00 2,000.00
07 SEGURIDAD Y SALUD
07.01 EQUIPO DE PROTECCION INDIVIDUAL und 20.00 262.70 5,254.00 5,254.00
07.02 EQUIPO DE PROTECCION COLECTIVA glb 1.00 740.00 740.00 740.00
07.03 CAPACITACION DE SEGURIDAD Y SALUD glb 1.00 850.00 850.00 310.00 300.00 240.00
08 PLAN DE MANEJO AMBIENTAL
08.01 MANEJO DE ALMACEN
08.01.01 IMPLEMENTACION DE BOTIQUIN und 1.00 196.25 196.25 196.25 0.00
08.01.02 DEPOSITOS RECOLECTORES DE PLASTICOS Y RESIDUOS ORGANICOund 1.00 60.00 60.00 0.00 0.00 60.00
08.01.03 INSTALACION DE TACHOS DE BASURA CON MENSAJES ALUSIVOS und 1.00 52.79 52.79 52.79 0.00
08.02 SEÑALIZACION AMBIENTAL
08.02.01 LETREROS AMBIENTALES und 2.00 59.02 118.04 118.04 0.00
08.02.02 LETREROS DE SEÑALIZACION (1.00mx0.50m) und 2.00 59.02 118.04 118.04 0.00
08.03 PLAN DE REFORESTACION
08.03.01 LIMPIEZA DE TERRENO MANUAL m2 1,020.50 1.04 1,061.32 0.00 0.00 1,061.32
08.03.02 PREPARACION DE TERRENO PARA PLANTONES m2 1,020.50 5.21 5,316.81 0.00 0.00 5,316.81
08.03.03 TRANSPORTE Y COLOCACION DE PLANTONES und 60.00 76.45 4,587.00 0.00 0.00 4,587.00
08.04 EDUCACION AMBIENTAL
08.04.01 CHARLAS PARA EL PERSONAL DE OBRA glb 1.00 250.00 250.00 250.00 0.00
Página 5 de 36
CALENDARIO VALORIZADO DE OBRA MENSUAL
"MEJORAMIENTO DE LOS SERVICIOS DE AGUA PARA EL SISTEMA DE RIEGO EN EL CENTRO POBLADO DE SANTO DOMINGO DE NAUYAN DEL DISTRITO DE HUANUCO,
PROYECTO :
PROVINCIA DE HUANUCO - HUANUCO"
FECHA : Feb-19
LUGAR : STO. DOMINGO DE NAUYAN, HUANUCO - HUANUCO - HUANUCO
MONTO: 492,907.20
08.04.02 CHARLAS PARA LA COMUNIDAD glb 2.00 250.00 500.00 500.00 0.00
08.04.03 POLOS CON LOGOTIPO AMBIENTAL und 20.00 17.00 340.00 340.00 0.00
08.04.04 CARTILLAS INFORMATIVAS und 20.00 50.00 1,000.00 1,000.00 0.00
08.04.05 MANEJO DE DEPOSITO DE MATERIAL EXCEDENTE m3 216.52 12.50 2,706.50 0.00 0.00 2,706.50
08.05 CLAUSURA DE SERVICIOS PROVICIONALES
08.05.01 CLAUSURA DE SERVICIOS PROVISIONALES glb 1.00 300.00 300.00 0.00 300.00
Página 6 de 36
RESUMEN DE PAGOS EFECTUADOS
PROYECTO : #REF!
FECHA : #REF!
LUGAR : #REF!
PRESUPUESTO : #REF!
II VALORIZACION
Costo Directo 1 + Utilidad + GG #REF! #REF! #REF! #REF!
II REAJUSTES Y REINTEGROS
Reajuste del mes S/. - S/. - S/. - S/. -
X RETENCION
Retención por Fiel Cumplimiento (10%) (-) S/. - #REF! #REF!
9,939.18 10,580.41
2,208.76 3,169.10
1,759.45
80775.74 1183.28 1178.6 954.11
8874.8
877.97
4487.28
3509.55
2245.2
1100.56
1144.64
69655.74 1183.28 1178.6 954.11
1465.37
1136.4
1937.96
799.77 1183.28 1178.6 954.11
1015.85
48670
14630.39
47710.13 17690.13 55665.56
29038.49
1981.46
1875.33
10790.71
3300.25
723.89
12998.92 17331.89
4691.21 25019.81
6270.95
3527.46
152.81
3362.64
24575.25 3723.51 11011.84
3132.84 3535.55
3535.55
3132.84
187.96
68.61
119.35
21442.41
4507
2945.31
1561.69
16596.62
851.31
15745.31
338.79
338.79
11011.84
7914.36
1823.38
1274.1
94762.69 414012.88 134433.81
6921.14
2859.02
2078.29
1983.83
76276.84 113501.34
5525.65 5327.53
2790.61 5327.53
2735.04
70751.19 108173.81
21670.41 77394.34
49080.78 30779.47
24851.34
24851.34
11455.39
1547.67
11848.28
2332.79 15376.58
13563.69
4269.33
6648.83
2645.53
2332.79 1812.89
1369.05
1686.59 443.84
646.2
3469.57 13226.13
2773.06 7189.02
2459.7
3597.25
2773.06
1132.07
6037.11
1509.78
2072.9
2454.43
696.51
151.44
257.91
212.91
74.25
9231.92 32764.36
26021.85
6749.92
7794.81
11477.12
1311.96
327.21
461.71
523.04
9231.92 5430.55
5430.55
4550.28
4681.64
244.14 11519.13
4996.05
1224.78
1785.31
1985.96
6523.08
921.98
3163.46
2437.64
244.14
63.27
97.32
83.55
11086.98 62046.37
6016.28 62046.37
20883.36
6016.28 12032.55
29130.46
1304.8
404.86
508.11
391.83
3765.9
1238.13
1456.09
1071.68
4168.5 32448.88
11384.02
4168.5 8337
4960.1
7767.76
3495.03
1794.15
1226.05
474.83
490.64
122.03
58.94
21.97
244.63
26.91
16.16
205055.06 14702.66
83315.05 14702.66
47404.85
71242.17
3092.98
3725.8 19420.72
17337.76
17337.76
490.25
490.25
3235.55 1941.33
3235.55 1941.33
141.63
141.63
7221.64 3097.44 55564.15
1637.96 45865.91
161.43 1452.83
212.75 6169.62
213.2 6609.34
173.42 5029.2
594.38 17236.89
3644.63
107.54 2043.33
175.24 3680.07
9698.24
3933.03
2463.46
3301.75
7221.64 793.55
214.7
908.27
2380.64 793.55
1296.12
2024.85
128.02
145.63
123.41
600.51
600.51
65.42
65.42
554.85 14796.44
554.85
14796.44
39714.12 28233.3
20869.67
17358.81
2367.99
1142.87
24811.62
23264.89
307.84
296.82
942.07
14902.5 7363.63
5866.63
990.27
6448.77
238.56
885.31 295.1
472.96 2995.39
4073.14
7152.47
3269.51
349.97
1763.99
1019.96
135.59
3882.96
3882.96
16560.25
16560.25
15375.33
1105.8
79.12
1766.61 3724.62 19075.75
1766.61 3724.62 19075.75
3180
253.32
291.3
19075.75
1766.61
2174.17
1540.9
633.27
1839.72 13677.75
84.38 2105.66
2105.66
1382.63
723.03
84.38
53.68
30.7
1234.27 5949.74
4636.26
1602.42
3033.84
1220.69
213.33
1007.36
1165.6
1165.6
147.88
147.88
13.58
13.58
1910.11
1910.11
407.16 1093.75
329.76
1093.75
77.4
113.91 2618.49
113.91
2618.49
24602.37
22430.25
2172.12
770.58 2094.43 16666.58
832.86
334.88
321.64
176.34
162.05
54.98
107.07
594.59
274.92
72.56
247.11
1055.59
606
179.43
270.16
14711.51
14711.51
770.58 504.93 899.48
367.6
770.58
137.33 686.63
212.85
2098.04
2098.04
13649.25
12679.5
969.75
21165.36
15042.49
13964.38
6403.59
1028.99
2460.79
3296.11
774.9
1078.11
1058.97
11.68
7.46
3396.52
1992.96
1403.56
515.98
515.98
653.28
573.25
55.94
24.09
1250.54
1250.54
306.55
306.55
538.77 751.13
538.77
751.13
3365.66 26918.6 15770.31
5821.61
1390.2
539.01
1109.36
922.04
106.82
567.14
1047.6
139.44
7468.8 526.77
1792.66
543.69
730.62
518.35
1283.59
279.55
261.25
582.73
160.06
526.77
138.69
323.88
64.2
467.95
39.56
211.76
154.74
61.89
3924.6
3924.6
5043.76 748.28
1442.16
1442.16
1177.9
264.96
258.75
66.18
312.3
153.28
122.43
365.98
36.4
27.05
18.2
33.12
11.72
88.79
56.34
17.56
7.57
5.03
23.16
41.04
1100.99 712.95
219.9
195.6
469.76
272.09
308.04
81.24
131.76
83.97
51.58
956.73 35.33
126.93
829.8
35.33
54.37 1387.53 6351.41
6351.41
3305.4
1962.77
1083.24
54.37 1387.53
22.95
31.42
1387.53
3311.29 1549.82
1144.52 410.46
99.84
97.5
182.26
30.86
355.98
338.33
415.12
35.09
724.34
111.72
38.98
21.55
55.5
18.5
21.55
108.2
44.89
21.16
84.42
197.87
1442.43 109.95
109.95
630.9
342.9
102.91
201.72
32.8
65.6
65.6
1029.41
924.1
105.31
11468.69 2322.24
3393.53
273.81
250.99
22.82
3119.72
3119.72
1610.33
75.61
75.61
1534.72
61.77
232.85
559.96
109.54
570.6
5977.26 2322.24
1203.95 1251.07
1203.95
1251.07
4773.31 1071.17
846.88
3198.16 355.35
728.27
419.31
296.51
348.55
107.79
100.73
140.03
139.02
46.34
92.68
282.48
282.48
1262.41
909.68
202.76
149.97
3343.7
2332.44
712.01
299.25
8753.56
1556.17
3642.32
2448.07
605.95
501.05
3235.72 2734.76
2536.92
3235.72
197.84
3935.25
956.25
744.75
744.75
744.75
744.75
3693.08 860.1
860.1
1050.08
470.58
625.56
1307.13
239.73
13441.67
1334.77
12106.9
171.28 171.28
171.28
171.28
1919.3
1222.1
697.2
2336
2336
2082.9
2082.9
2743.28
428.24
389
642
1284.04
11553.07 2666.26 1471.6 2601.64
2733.76 2666.26
1366.88 1333.13
1366.88 1333.13
3004.96
1342.48
1662.48
3421.94
2292.94
346.4
782.6
750
750
1642.41 650
899.4
247.67
495.34
650
1007.48
1007.48
1471.6 944.16
1471.6 944.16
148.2
878.8
592.8
265.44
132.72
397.8
34019.59
5042.02
11716.75
2632.55
1299.78
7708.48
5620.01
01.01 CARTEL DE 529.25
01.02 ALMACEN Y 2,323.00
01.03 FLETE TERR 5,633.56
01.04 TRANSPORTE 2,871.28
01.05 TRANSPORTE 2,340.16
02.01.07.02.01 E 197.39
02.01.07.02.02 REF 65.34
02.01.07.02.03 EL 153.74
02.01.07.03.01.0 1,002.60
02.01.07.03.02.0 150.21
02.01.07.03.02.0 4.17
02.01.07.04.01 CE 9,889.37
02.01.07.05.01 PI 697.98
02.02.01.03.01 CO 46.48
02.02.01.06.01 SU 66.56
02.02.01.06.02 SU 187.8
02.02.01.07.01 SU 195.32
02.02.01.07.02 SU 506.64
02.02.01.07.03 SU 185.32
02.02.01.08.01 COD 24
02.02.01.08.02 COD 70
02.02.01.08.03 ADA 8
02.02.01.08.04 ADA 20
02.02.01.08.05 TEE 12
02.02.01.08.06 TEE 12
02.02.01.08.07 CAN 120
02.02.01.08.08 CON 32
02.02.01.08.09 ACC 256
02.02.01.08.10 NIP 25
02.02.01.08.11 NIP 8
02.02.01.08.12 INS 1,085.50
02.02.01.10.01.0 3,228.07
02.02.01.10.02.0 384.49
02.02.01.10.03.0 T 600
02.02.01.10.03.0 603.58 86.23
02.02.01.10.03.0 CONTROL ESTATICO 397.36 137.3
02.05.02.01 EXCAV. MANUAL T/NATURAL P/TUB AGUA A=0.7M H=1.0 37,202.68 3,455.99
02.05.02.02 REFINE Y NIVELACION DE FONDO DE ZANJA T/NORMAL A 5,326.02 494.77
02.05.02.03 CAMA DE ARENA MANUAL E=0.10M A=0.7M 23,355.02 2,169.59
02.05.02.04 RELLENO DE ZANJA MATERIAL PROPIO COMPACTADO C/ 11,224.40 1,042.70
02.05.02.05 SUMINISTRO E INSTALACIÓN DE TUBERÍA PVC C-10 Ø 20 9,888.92 918.64
02.05.02.06 PRUEBA HIDRAULI + DESINFECCION TUBERIA 3,004.83 279.14
04.04.01 EXCAV. MANUAL T/NATURAL P/TUB AGUA A=0.7M H=1.0 M EN TERRENO NO 8,661.51
04.04.02 REFINE Y NIVELACION DE FONDO DE ZANJA T/NORMAL A=0.70M 1,240.00
04.04.03 CAMA DE ARENA MANUAL E = 0.10 m A E = 0.60 m 480.33
04.04.04 SUMINISTRO E INSTALACIÓN DE TUBERÍA PVC UF S-25 Ø 150 mm 386.28 55.18
04.04.05 SUMINISTRO E INSTALACIÓN DE TUBERÍA PVC UF C-5 Ø 100 mm 852.29
04.04.06 SUMINISTRO E INSTALACIÓN DE TUBERÍA PERFORADAS PVC UF C-5 Ø 100 mm 7,645.73
04.04.07 FILTRO DE GRAVA D: 15-25mm 36,464.69
04.04.08 RELLENO DE ZANJA MATERIAL PROPIO COMPACTADO C/EQUIPO A=0.70M, H=1.00M 2,613.26
04.10.04.01 CERCO CON MALLA OLIMPICA GALVANIZADA Y ALAMBRE DE PUAS SEGUN DISEÑO H=2.00 25,820.80