Description of
Task/ Activity: METHOD STATEMENT FOR REPLACMENT OF SCATS CONVEYOR
Project Name:
Company:
Document Reference:
Prepared By:
Contractor Project
Manager Review:
Position: Site Manager Date:
DL Discipline
Engineer/Manager Review:
Position: Construction Manager Date:
WPF Review:
Page 1 of 9
METHOD STATEMENT
Key Materials
N/A
Required:
Specific Identified
Residual Hazards:
(or refer to the task N/A
specific risk
assessment(s))
Hot Works, Riggers, Working at Height, Crane Operators etc.
Specific Staff Training
Requirements:
Fall Protection
Measures: Exclusion zone with barricade, signage and flag man.
(W here work at height
cannot be eliminated -
consider both Personnel
& Materials)
Hazardous (i.e.: Lubricants/Solvents/Flammable Materials/Refrigerants/Welding Gases etc)
Substances:
(Attach COSHH
Assessments and
MSDS) Very Toxic
Dangerous
Harmful/ Corrosive Oxidising Highly Explosive
Irritant for the flammable
environment
Applicable: No No No No No No No
Page 2 of 9
METHOD STATEMENT
(Detail any limits on the loadings applicable to temporary plant/equipment or fixed elements of the structure where
the work is taking place.)
SWL's:
OTHER:
1: Coveralls
Yes
High Welder Face Shield Fall Arrest Disposable Goggles
Visibilit Shield Mask
y
Emergency The duties, responsibilities, and names of employees assigned with rescue and
Procedures: medical tasks.
Page 3 of 9
METHOD STATEMENT
Responsibilities 3. The supervisor must ensure that this procedure is fully complied with.
9. Helpers- These are to assist the technicians for the technical Works,
cleaning etc.
10. Welders- the qualified welders will give production joints as per
approved welding procedure specification.
11. Ensure that Hoisting and Rigging accessories are free from damage.
12. Surveyors report is required for the setting out, center line etc.
Safety
Refer to the Standard Operating Procedures
Page 4 of 9
METHOD STATEMENT
5. Measure length of steel member required, making due all allowance for
any welds thickness. Cut the steel member to the measured length and
ensure that the ends are cut to the required angle.
10. Arrange all tools, materials and equipment orderly near to the work
area.
11. Carry out plant checks and associated paperwork, record the data on the
daily plant check sheets if not completed already.
12. Supervisors to assess/review workers have full PPE in procession and its
fit for purpose.
16. Monitor all welding and related works by approved supervisors and QC
inspector
Page 5 of 9
METHOD STATEMENT
Page 6 of 9
METHOD STATEMENT
NAME
DATE TRADE
PRINT SIGNATURE