Você está na página 1de 4

UN Triangular Partnership Project Version

for African Rapid Deployment of Engineering Capabilities Number:


Project Title Date: Sep. 9, 17
Page: 1 of 4

ACTIVITIES RESOURCE REQUIREMENTS


1. DESCRIPTION OF PROCESS OUTPUT
It is the output of Estimate Activity Resources process. Appendage – A.
The Activity Resource Requirements describe the type and amount of resources needed to complete
the project work. Features include people, equipment, supplies, supplies, etc. You can use a list to
consolidate this information, or insert it directly into the management software.

2. RESOURCE BREAKDOWN STRUCTURE


It is another output of the Estimate Activity Resources process. Appendage – B.
It is a hierarchical structure used to organize resources by type and category.

3. REVIEW PROCESS AND FREQUENCY


Describe how the Activity Resource Requirements will be reviewed:
- Which tools and techniques will be used?
- What is the frequency of the review?
- What will be covered in the project reviews?

4. ADMINISTRATION OF THE SCOPE MANAGEMENT PLAN


Define those responsible for the Activity Resource Requirements.

5. REVISION HISTORY
[Provide information on how the development and distribution of the Activity Resource
Requirements was controlled and tracked. Use the table below to provide the version number, the
author implementing the version, the date of the version, the name of the person approving the
version, the date that particular version was approved, and a brief description of the reason for
creating the revised version.]
Version Implemented Revision Approved Approval
# By Date By Date
<Author name> <mm/dd/yyyy <name> <mm/dd/yyyy>
1.0 Position > Title
Reason <reason>
<Author name> <mm/dd/yyyy <name> <mm/dd/yyyy>
2.0 Position > Title
Reason <reason>

6. AUTHORITY SIGNATURES [Last version]


Prepared by: Signature
_____________________________________
Name
Position

1/4
UN Triangular Partnership Project Version
for African Rapid Deployment of Engineering Capabilities Number:
Project Title Date: Sep. 9, 17
Page: 2 of 4

Date
_____________________________________
Name
Position
Date
Aprproved by: Signature
_____________________________________
Name
Title
Date
_____________________________________
Name
Title
Date

2/4
UN Triangular Partnership Project Version
for African Rapid Deployment of Engineering Capabilities Number:
Project Title Date: Sep. 9, 17
Page: 3 of 4

Appendage - A - ACTIVITY RESOURCE REQUIREMENTS


Project Title: Date Prepared:

WBS ID Type of Resource Quantity Assumptions

Comments

3/4
UN Triangular Partnership Project Version
for African Rapid Deployment of Engineering Capabilities Number:
Project Title Date: Sep. 9, 17
Page: 4 of 4

Appendage - B - RESOURCE BREAKDOWN STRUCTURE


Project Title: Date Prepared:

2. Project
2.1. People
2.1.1. Quantity of Role 1
2.1.1.1. Quantity of Level 1
2.1.1.2. Quantity of Level 2
2.1.1.3. Quantity of Level 3
2.1.2. Quantity of Role 2
2.2. Equipment
2.2.1. Quantity of Type 1
2.2.2. Quantity of Type 2
2.3. Materials
2.3.1. Quantity of Material 1
2.3.1.1. Quantity of Grade 1
2.3.1.2. Quantity of Grade 2
2.4. Supplies
2.4.1. Quantity of Supply 1
2.4.2. Quantity of Supply 2
2.5. Locations
2.5.1. Location 1
2.5.2. Location 2

4/4