Você está na página 1de 2

Input Requirement

Sl. No
1)
2)
3)
4)
5)
6)
7)
8)
9)
10)
13)
Note:
1)
Input Requirement
Description
Gas SLD, GTP, TTR , O&M etc.
Equipment layout drawings including location of LCC panels, Walkways & Maintenance Platforms.
Earthing Calculation for Outdoor GIS and Equipment earthing philosophy.
Foundation location drawings with Loads to be considered
Considering Outdoor GIS, if any Crane or special handling tool required for Maintenance of GIS.
Cable Sepcfication & BOM (for cables between GIS to LCC) if the same is to be supplied by M/s KEC.
Cable Trench/ raceway interface point.
AC / DC Load Details including Trip Coil/ Close Coil rating.
Any specific deviation/ clarification with respect to the Tender Specifications
Division of Responsibility Matrix (between GIS OEM & KEC)
Outdoor Gas insulated Busduct layout.

Above list is applicable for all Voltage levels.