Você está na página 1de 5

Manpower Status Tools & Tackles

C u t n g m ac h in e s;
H igh S p e e d d rill
W e ld in g M / C ; 0

cab le jac ks ; 0
B o o m lif ; 0

G rin d e rs; 0
B re ake r ; 0
JCB; 0

m ac h in e ; 0
0 0 0 0 0 0 0 0

0
MEP Drawing status
Quality Report OEM Status Total Submitted Approved
12
Deviatons / quality defects 0 12 MEP Submittal statu
10
10
8
NCR / Memo issued 0 8
6
6

Test reports / Inspecton reports 0 4


4
2
2
0
0

Column F Column G Column F Column G Column F Column G C


120% 120% 120% 120%

100% 100% 100% 100%

80% 80% 80% 80%

60% 60% 60% 60%

40% 40% 40%


40%
20% 20%
20% 20%
0% 0%
0% 0%
60% 60% 60% 60%

40% 40% 40%


40%
20% 20%
20% 20%
0% 0%
0% 0%

Column F Column G Column F Column G Column C Column D


120% Column H 120% 12
100% 100% 10
80% 80% 8
60% 60% 6
40% 4
40%
20% 2
20%
0% 0
0%
JCB; 0

B re ake r ; 0
Tools & Tackles

W e ld in g M / C ; 0

B o o m lif ; 0

H igh S p e e d d rill
m ac h in e ; 0

C u t n g m ac h in e s;
0

10
12

0
2
4
6
8

20%
40%
60%
80%
100%
120%

0%
G rin d e rs; 0

cab le jac ks ; 0
MEP Submittal status

C ab le p u llars; 0
Total

Column F
Submitted

M e g gar ; 0
Approved

Ear t h te ste r; 0
Column G

P re ssu re te stn g
m ac h in e s ; 0
60%
40%
20%
0%

Project

Doc Title

Report No

Duraton

Prepared by

Reviewd by
Project: DPR No: 01
LOI Date: Completon Date:
Weather: Sunny / Cloudy / Rainy / Heavy Rain/ with few spells of rains Count Down (In Days) -43557
Work date: Report Date No. of Days Elapsed

Manpower Status
Planned Actual Short fall / Manpower Status
Category(Nos) strength deployed Surplus Plann next day Remarks

Project Manager
0
Site Engineer 0
Safety Officer 0
Supervisor 0
Mason 0
Male coolies 0
storekeeper 0
Driver 0
Helper 0
welder 0
Plumber 0
Electrician 0
Total 0

Tools & Tackles Tools & Tackles


Sr.No Category Planned Actual Short fall / Plann next day Remark
deployed Surplus
1 JCB 0
2 Breaker 0
3 Welding M/C 0
4 Boom lif 0
5 High Speed drill machine 0
6 Cutting machines 0
7 Grinders 0

Cut ng m a chine s ;
8 cable jacks 0

H ig h S pe e d drill
W e lding M /C; 0

Ca ble pulla rs ; 0

Pre ss ure te st ng
ca ble ja cks ; 0

Ea rth te ste r; 0
B oom lif ; 0
B rea ke r ; 0

G rinde rs; 0

M eg ga r ; 0
JCB ; 0

m a chine s ; 0
9 Cable pullars 0

m a chine ; 0
10 Meggar 0
11 Earth tester 0
Pressure testing

0
12 machines 0

Quality Report
Quality Report Deviatons / quality defects 0
Till Remarks
Descripton previous day Today Till date cum. NCR Status
NCR / Memo issued 0
Closed Open
Deviations / quality defects 0
NCR / Memo issued 0 Test reports / Inspecton reports 0
Test reports / Inspection reports 0

(A). Status of OEM

Date Factory Handing Date Testng & Date of Remark /reason


S.No OEM Descripton Commssioni Delivery at site
of PO testng over Dates of PDI for short fall
ng
1 Pumps (For HVAC and Fire Fighting)
2 Air handling units
3 Ventilation fans
4 VRV Indoor / Outdoor units
5 UPS System
6 Compressors

(B). Status of approval of Drawings & Submittals MEP Drawing status


Sr No MEP Drawing status Total Submitted % Submitted Approved % Approved Total Submitted Approved
1 ELECTRICAL #DIV/0! #DIV/0! 12
2 FIRE FIGHTING #DIV/0! #DIV/0!
3 UTILITY #DIV/0! #DIV/0! 10
4 PLUMBING #DIV/0! #DIV/0! 8
5 HVAC #DIV/0! #DIV/0!
Sr No MEP Submittal status Total Submitted % Submitted Approved % Approved 6
1 ELECTRICAL #DIV/0! #DIV/0!
4
2 FIRE FIGHTING #DIV/0! #DIV/0!
3 UTILITY #DIV/0! #DIV/0! 2
4 PLUMBING #DIV/0! #DIV/0!
Total Submitted Approved
MEP Submittal status

0
5 HVAC #DIV/0! #DIV/0!

Floor Project Unit Estmated Executed Qty weightage % Done Icons


Qty Bars Remark

Ground Floor 97%


HVAC 100% 100% 100%
Supports Nos 15% 20% 20%
Duct 20% 8% 8%
Insulation 10% 9% 9%
AHU 20% 5% 5%
pipes 15% 5% 5%
valves 10% 5% 5%
Air Terminals 10% 10% 10%
Fire Fighting 100% 81% 81%
Plumbing 100% 100% 100%
Utility 100% 100% 100%
Electrical 100% 100% 100%
Exhaust system 100% 100% 100%
Mezzanine Floor HVAC 100% 100% 100%
Fire Fighting 100% 100% 100%
Plumbing 100% 100% 100%
Utility 100% 100% 100%
Electrical 100% 100% 100%
Exhaust system 100% 100% 100%
HVAC 100% 100% 100%
Fire Fighting 100% 100% 100%
First Floor Plumbing 100% 100% 100%
Utility 100% 100% 100%
Electrical 100% 100% 100%
HVAC 100% 100% 100%
Fire Fighting 100% 100% 100%
Second Floor Plumbing 100% 100% 100%
Utility 100% 100% 100%
Electrical 100% 100% 100%
HVAC 100% 100% 100%
Fire Fighting 100% 100% 100%
Third Floor Plumbing 100% 100% 100%
Utility 100% 100% 100%
Electrical 100% 100% 100%
HVAC 100% 100% 100%
Fire Fighting 100% 100% 100%
Fourth Floor Plumbing 100% 100% 100%
Utility 100% 100% 100%
Electrical 100% 100% 100%
HVAC 100% 100% 100%
Fire Fighting 100% 100% 100%
Fifh Floor Plumbing 100% 100% 100%
Utility 100% 100% 100%
Electrical 100% 100% 100%

Você também pode gostar