HARGA
NO BAHAN / MATERIAL SPESIFIKASI BAHAN SAT SATUAN HARGA
KONTRAKTUAL
A. Agregat Kasar, Bahan Perekat & Bahan Jadinya
I. BAHAN KACA
K. BAHAN PERPIPAAN
N. BAHAN MEKANIKAL
O. BAHAN ELEKTRIKAL
Kabel NYA 1 x 1.5 Prima (
1 ROLL
1 rol = 50 m' ) 158.361,23 174.197,36
Kabel NYA 1 x 2.5 Prima (
2 ROLL
1 ml = 50 m' ) 241.995,91 266.195,50
Kabel NYM 2 x 1.5 Prima (
3 m'
1 ml = 50 m' ) 7.574,72 8.332,19
Kabel NYM 3 x 1.5 Prima (
4 m'
1 rol = 50 m' ) 9.563,76 10.520,13
Kabel NYM 2 x 2.5 Prima (
5 m'
1 ml = 50 m' ) 12.552,73 13.808,00
Kabel NYM 3 x 2.5 Prima (
6 m'
1 rol = 50 m' ) 15.488,55 17.037,40
Kabel NYM 4 x 2.5 Prima (
7 m'
1 ml = 50 m' ) 8.978,19 9.876,01
Kabel NYM 2 x 4 Prima ( 1
8 m'
rol = 50 m' ) 7.553,08 8.308,39
Kabel NYM 3 x 4 Prima ( 1
9 m'
rol = 50 m' ) 18.832,15 20.715,36
Kabel NYM 4 x 4 Prima ( 1
10 m'
rol = 50 m' ) 25.413,99 27.955,39
Kabel NYM 2 x 6 Supreme
11 m'
( 1 rol = 50 m' ) 13.538,55 14.892,40
Kabel NYM 3 x 6 Supreme
12 m'
( 1 rol = 50 m' ) 17.813,88 19.595,26
Kabel NYM 4 x 6 Supreme
13 m'
( 1 ml = 50 m' ) 29.317,76 32.249,53
Kabel NYM 2 x 10
14 m'
Supreme (1 rol = 50 m') 22.374,23 24.611,65
Kabel NYM 3 x 10
15 m'
Supreme (1 rol = 50 m') 29.642,29 32.606,52
Kabel NYM 4 x 10
16 m'
Supreme (1 rol = 50 m') 32.635,02 35.898,52
Kabel NYM 4 x 16
17 m'
Supreme (1 rol = 50 m') 44.605,94 49.066,54
Kabel NYY 2 x 4 Supreme
18 m'
( 1 rol = 50 m' ) 13.538,55 14.892,40
Kabel NYY 3 x 4 Supreme
19 m'
( 1 rol = 50 m' ) 20.624,12 22.686,53
Kabel NYY 4 x 4 Supreme
20 m'
( 1 ml = 50 m' ) 30.438,09 33.481,90
Kabel NYY 2 x 6 Supreme
21 m'
( 1 rol = 50 m' ) 13.396,03 14.735,64
Kabel NYY 3 x 6 Supreme
22 m'
( 1 rol = 50 m' ) 26.580,42 29.238,46
Kabel NYY 4 x 6 Supreme
23 m'
( 1 rol = 50 m' ) 27.647,13 30.411,85
Kabel NYY 2 x 10
24 m'
Supreme ( 1 rol = 50 m') 23.799,34 26.179,27
Kabel NYY 3 x 10
25 m'
Supreme ( 1 rol = 50 m') 32.492,51 35.741,76
Kabel NYY 4 x 10
26 m'
Supreme ( 1 rol = 50 m') 50.119,66 55.131,63
Kabel NYY 4 x 16
27 m'
Supreme ( 1 rol = 50 m') 63.559,91 69.915,90
28 NSFB FUJI EA - 100 A bh
1.254.096,80 1.379.506,48
29 NSFB FUJI EA - 150 A bh
2.565.198,00 2.821.717,80
Rumah Panel 30 x 60 cm (
30 unt
Kosong ) 213.766,50 235.143,15
31 Skring Kas 2 grop Biasa unt
267.337,47 294.071,21
32 Skring Kas 3 grop Biasa unt
327.380,22 360.118,24
33 Skring Kas 5 grop Biasa unt
672.134,55 739.348,01
34 MCB 1 PAS bh
71.255,50 78.381,05
35 MCB 3 PAS bh
86.931,71 95.624,88
36 Tahanan 50 A Merk Fuji bh
766.709,18 843.380,10
Saklar Broko Tunggal
37 bh
Standard ( 1 Phase ) 26.649,09 29.314,00
Saidar Broko Seri
38 bh
Standard ( 1 Phase ) 29.508,71 32.459,58
Stop Kontak Broko
39 bh
Standard ( 1 Phase ) 29.217,11 32.138,82
Stop Kontak Broko 3
40 bh
Phase (Out Bow) 121.134,35 133.247,79
Stop Kontak Broko 3
41 bh
Phase ( In Bow) 205.215,84 225.737,42
Stop Kontak Handle 3
42 bh
Phase 119.709,24 131.680,16
Instalasi Titik Lampu /
43 Stop Kontak (Upah dan ttk
Alat) 179.600,00 197.560,00
Lampu pijar 25 Watt s/d
44 bh
100 Watt 13.519,73 14.871,70
Lampu Neon Phillips 20
45 bh
Watt 45.246,07 49.770,67
Lampu Neon Phillips 40
46 bh
Watt 62.272,13 68.499,35
47 Trapo TL 20 W (Phillips) bh
67.692,73 74.462,00
48 Trapo TL 40 W (Phillips) bh
71.255,50 78.381,05
49 Trapo TL 20 W (Sinar) bh
35.627,75 39.190,53
50 Trapo TL 40 W (sinar) bh
42.753,30 47.028,63
51 Stater Neon Phillips bh
7.125,55 7.838,11
52 Stater Neon Biasa bh
4.987,89 5.486,67
Rumah TL In Bow / Out
53 Bow 2 x 20 W (kosongan bh
178.138,75 195.952,63
Sonora)
54 Down Light + SL 25 W bh
413.281,90 454.610,09
55 Lampu SL Philip 25 W bh
178.138,75 195.952,63
Lampu Sirkel TL 20 W
56 bh
Lengkap 149.636,55 164.600,21
57 Lampu Mercuri 80 W bh
171.746,92 188.921,61
Lampu Taman + Tiang +
58 bh
Lampu 1 Buah 541.541,80 595.695,98
Lampu Baret 30 cm +
59 bh
Neon 285.022,00 313.524,20
Lampu Neon Arcrilik 2 x
60 bh
40 W Lengkap 1.054.581,40 1.160.039,54
61 Jarum Penangkal Petir 16 bh
135.385,45 148.924,00
62 Kawat BC ( Tembaga ) kg
57.004,40 62.704,84
Pentanahan Penangkal
63 ttk
Petir 598.546,20 658.400,82
64 Pentanahan Panel ttk
256.519,80 282.171,78
65 Balk TL 1 x 18 W bh
1.061.372,54 1.167.509,80
66 Balk TL 1 x 36 W bh
1.116.999,81 1.228.699,79
67 TKO TL 1 x 18 W bh
43.360,03 47.696,03
68 TKO TL 2 x 18 W bh
58.866,92 64.753,61
69 TKO TL 1 x 36 W bh
91.698,07 100.867,87
70 TKO TL 2 x 36 W bh
115.491,76 127.040,94
71 Kabel NYGBY ml
155.147,92 170.662,71
Panel ACB 4 Pase ACB Jenis Tarik 1000 A
72 bh
Ml0H1 4P Tanpa Unit Trip MG 31.393.254,34 34.532.579,77
Panel ACB 4 Pase ACB Jenis Tetap 1000 A
73 bh
Ml0H1 4P Tanpa Unit Trip MG 31.238.580,52 34.362.438,57
Panel ACB 4 Pase ACB Jenis Tetap 1250 A
74 bh
Ml0H1 4P Tanpa Unit Trip MG 31.038.670,04 34.142.537,04
Panel ACB 4 Pase ACB Jenis Tetap 1250 A
75 bh
Ml0H1 4P Tanpa Unit Trip MG 32.030.419,61 35.233.461,57
Panel ACB 4 Pase ACB Jenis Tetap 2500 A
76 bh
Ml0H1 4P Tanpa Unit Trip MG 55.250.752,76 60.775.828,04
Panel ACB 4 Pase ACB Jenis Tetap 2500 A
77 bh
Ml0H1 4P Tanpa Unit Trip MG 56.244.971,58 61.869.468,74
Panel ACB 4 Pase ACB Jenis Tetap 1000 A
78 bh
Ml0H1 4P Tanpa Unit Trip MG 31.474.344,51 34.621.778,96
Panel ACB 4 Pase ACB Jenis Tetap 3200 A
79 bh
Ml0H1 4P Tanpa Unit Trip MG 60.870.271,91 66.957.299,10
Panel MCCB 3 Pase 125 - 160 A, 36 KA
80 bh
MCCB (NS160N) MG 4.392.795,75 4.832.075,33
Panel MCCB 3 Pase 50 - 63 A, 25 KA
81 bh
MCCB (NS100N) MG 4.334.422,68 4.767.864,95
Panel MCCB 3 Pase 40 - 50 A, 25 KA
82 . bh
MCCB (NS100N) MG 1.088.149,09 1.196.964,00
Panel MCCB 3 Pase 32 - 50 A, 25 KA
83 bh
MCCB (NS100N) MG 790.160,00 869.176,00
Panel MCCB 3 Pase 32 - 50 A, 10 KA
84 bh
MCCB (NC45H) MG 6.026.254,01 6.628.879,41
Panel MCCB 3 Pase 20 - 10 A, 10 KA
85 bh
MCCB (NC45H) MG 3.970.060,15 4.367.066,17
Panel MCCB 3 Pase 160 - 200 A, 36 KA
86 bh
MCCB (NS250N) MG 3.997.616,98 4.397.378,68
Panel MCCB 3 Pase 80 - 100 A, 26 KA
87 bh
MCCB (NS100) MG 2.477.250,37 2.724.975,41
Panel MCCB 3 Pase 20 - 25 A, KA (NS100)
88 bh
MCCB MG 397.549,25 437.304,18
Panel MCCB 3 Pase 13 - 16 A, KA (NS100)
89 bh
MCCB MG 405.036,02 445.539,62
Panel MCCB 3 Pase 16 A, 5 KA (NC45a)
90 bh
MCCB MG 344.628,28 379.091,11
Panel MCCB 3 Pase 10 A, 5 KA (NC45a)
91 bh
MCCB MG 319.313,53 351.244,89
Panel MCCB 3 Pase
92 6 A, 5 KA (NC45a) MG bh
MCCB 159.602,44 175.562,69
Panel MCCB 3 Pase 25 A, 25 KA (NS100N)
93 bh
MCCB MG 87.608,99 96.369,89
Panel MCCB 3 Pase 16 A, 5 KA (NS100N)
94 bh
MCCB MG 3.761.260,37 4.137.386,41
Panel MCCB 3 Pase
95 32 A, 25 KA MG bh
MCCB 3.801.558,53 4.181.714,38
Panel MCCB 3 Pase 80 - 100 A, 25 KA
96 bh
MCCB (NS100) MG 585.212,25 643.733,48
Panel MCCB 3 Pase
97 50 - 63 A,(NS100) MG bh
MCCB 549.101,94 604.012,13
Panel MCCB 3 Pase 350 - 500 A / 70 KA / 3
98 bh
MCCB Pole NS630 bN/H/L 583.651,68 642.016,85
Panel MCCB 3 Pase 224 - 320 A / 70 KA / 3
99 bh
MCCB Pole NS400 bN/H/L 560.944,46 617.038,91
Panel MCCB 3 Pase 175 -.250 A / 70 KA / 3
100 bh
MCCB Pole NS250 bN/H/L 564.964,40 621.460,84
Panel MCCB 3 Pase 160 - 300 A / 70 KA / 3
101 bh
MCCB Pole NS400 bN/H/L 569.201,63 626.121,80
Panel MCCB 3 Pase 64 - 80 A / 70 KA / 3
102 bh
MCCB Pole NS100 bN/H/L 549.753,82 604.729,20
Panel MCCB 3 Pase 44 - 63 A / 70 KA / 3
103 bh
MCCB Pole NS100 bN/H/L 639.170,30 703.087,33
Panel MCCB 3 Pase 32 - 40 A / 70 KA / 3
104 bh
MCCB Pole NS100 bN/H/L 651.990,65 717.189,71
Panel MCCB 3 Pase 400 A / 3 Pole LCI -
105 bh
Contraktor F3304 1.648.718,23 1.813.590,05
Panel MCCB 3 Pase 250 A / 3 Pole LCI -
106 bh
Contraktor F1504 2.485.082,83 2.733.591,11
Panel MCCB 3 Pase 200 A / 3 Pole LCI -
107 bh
Contraktor F1154 560.025,90 616.028,49
Panel MCCB 3 Pase 160 A / 3 Pole LCI -
108 bh
Contraktor F1154 571.048,63 628.153,50
16 A, 5 KA (NC45a)
109 Panel MCB 3 Pase MCB bh
MG 401.993,90 442.193,29
10 A, 5 KA (NC45a)
110 Panel MCB 3 Pase MCB bh
MG 396.452,90 436.098,19
111 Panel MCB 3 Pase MCB 6 A, 5 KA (NC45a) MG bh
260.329,50 286.362,45
10 A, 6 KA, 10 A, 6 K
112 Panel MCB 3 Pase MCB bh
MG 260.329,50 286.362,45
50 A, 10 A (NC100H)
113 Panel MCB 3 Pase MCB bh
MG 591.209,00 650.329,90
16 A, 6 KA (NC45aD)
114 Panel MCB 3 Pase MCB bh
MG 260.329,50 286.362,45
6 A, 6 KA (NC45aD)
115 Panel MCB 3 Pase MCB bh
MG 311.831,00 343.014,10
63 A, 10 KA (NC100H)
116 Panel MCB 3 Pase MCB bh
MG 591.209,00 650.329,90
32 A, 10 KA (NC100H)
117 Panel MCB 3 Pase MCB bh
MG 302.659,50 332.925,45
16 A, 8 KA (NC10014)
118 Panel MCB 3 Pase MCB bh
MG 301.650,64 331.815,70
16 A, 5 KA (NC45N)
119 Panel MCB 3 Pase MCB bh
MG 302.038,66 332.242,53
16 A, 10 KA (NC100H)
120 Panel MCB 3 Pase MCB bh
MG 301.340,22 331.474,24
25 A, 8 KA (NC45N)
121 Panel MCB 3 Pase MCB bh
MG 285.353,59 313.888,94
40 A, 8 KA L (NC45N)
122 Panel MCB 3 Pase MCB bh
MG 262.149,69 288.364,66
10 A, 8 KA (NC45N)
123 Panel MCB 3 Pase MCB bh
MG 283.491,07 311.840,17
20 A, 10 KA (NC45N)
124 Panel MCB 1 Pase MCB bh
MG 130.609,22 143.670,14
10 A, 8 KA (NC45N)
125 Panel MCB 1 Pase MCB bh
MG 62.860,05 69.146,06
6 A, 8 KA (NC45N)
126 Panel MCB 1 Pase MCB bh
MG 55.029,00 60.531,90
20 A, 8 KA (NC45N)
127 Panel MCB 1 Pase MCB bh
MG 55.029,00 60.531,90
20 A, 5 KA (NC45Na)
128 Panel MCB 1 Pase MCB bh
MG 62.860,05 69.146,06
10 A, 5 KA (NC45Na)
129 Panel MCB 1 Pase MCB bh
MG 64.955,39 71.450,92
6 A, 5 KA (NC45Na)
130 Panel MCB 1 Pase MCB bh
MG 65.809,04 72.389,94
25 A, 5 KA (NC45Na)
131 Panel MCB 1 Pase MCB bh
MG 71.862,23 79.048,45
16 A, 5 KA (NC45Na)
132 Panel MCB 1 Pase MCB bh
MG 65.653,83 72.219,21
16 A, 5 KA (NC45N)
133 Panel MCB 1 Pase MCB bh
MG 65.110,60 71.621,65
6 A, 6 KA (NC45aD)
134 Panel MCB 1 Pase MCB bh
MG 65.809,04 72.389,94
20 A, 8 KA (NC45N)
135 Panel MCB 1 Pase MCB bh
MG 65.809,04 72.389,94
10 A, 8 KA (NC45N)
136 Panel MCB 1 Pase MCB bh
MG 65.809,04 72.389,94
16 A, 5 KA (NC45N)
137 Panel MCB 1 Pase MCB bh
MG 65.809,04 72.389,94
6 A, 5 KA (NC45N)
138 Panel MCB 1 Pase MCB bh
MG 158.857,44 174.743,18
25 A, 5 KA (NC45N)
139 Panel MCB 1 Pase MCB bh
MG 156.529,29 172.182,21
50 A, 10 KA (NC100H)
140 Panel MCB 1 Pase MCB bh
MG 656.383,09 722.021,40
1 Aspal Bitumen kg
47.974,00 52.771,40
Aspal ( ESO ) 1 Drum 155
2 kg
kg 13.404,50 14.744,95
3 Aspal Emulsi kg
16.106,55 17.717,21
4 Aspal Curah kg
18.173,68 19.991,05
Aspal Concrete / Laston
5 ton
(AC -WC) 1.624.815,89 1.787.297,47
Aspal Threated Base (
6 ton
ATB ) 1.580.320,00 1.738.352,00
Lataston / Hot Rolls Sheet
7 ton
( HRS ) 1.855.465,00 2.041.011,50
Tangki Horisontal GE -
50 unit
5000 H (Volume 550 Liter) 16.600.415,00 18.260.456,50
51 Bak KM Fiber 60 x 60 bh
352.750,00 388.025,00
52 Bak Taraso WC 40 x 40 bh
70.550,00 77.605,00
53 Bak KM Taraso 60 x 60 bh
203.184,00 223.502,40
T. ALAT TUKANG
1 Palu 0.5 kg bh
90.304,00 99.334,40
2 Cangkul bh
97.359,00 107.094,90
3 Singkup bh
90.304,00 99.334,40
4 Sekrop bh
97.359,00 107.094,90
5 Pengki bh
21.165,00 23.281,50
6 Linggis bh
97.359,00 107.094,90
Rool Meter 30 meter (
7 bh
Bahan Plastik ) 128.401,00 141.241,10
Rool Meter 5 meter (
8 bh
Bahan Besi ) 36.686,00 40.354,60
Selang Plastik untuk
9 m
Water Pas dia. 0.5cm 2.822,00 3.104,20
Water Pas Alumunium 60
10 bh
cm 60.673,00 66.740,30
1 Minyak Tanah lt
28.220,00 31.042,00
Kayu Bakar dari Kayu
2 m3
Karet 98.770,00 108.647,00
3 Bahan Bakar Residu lt
8.466,00 9.312,60
4 Minyak Solar lt
8.500,00 9.500,00
5 Bensin Premium lt
9.000,00 9.900,00
6 Plus Oil lt
56.440,00 62.084,00
7 Oil Mesran 40 SAE lt
56.440,00 62.084,00
8 Elpiji / botol 15 kg
173.553,00 190.908,30
15.1
9 Asitilin / Botol
kg btl 148.155,00 162.970,50
10 Angin ( 02 ) / botol btl
98.770,00 108.647,00
11 Karbit kg
17.637,50 19.401,25
12 Minyak Bekisting ltr
48.456,56 53.302,22
13 Rapidrant Gln
27.704,99 30.475,48
14 Soda Api kg
41.285,86 45.414,45
15 Sabun kg
10.104,17 11.114,59
16 Arang Kayu kg
10.973,35 12.070,68
17 Kawat Las bh
35.275,00 38.802,50
V. BAHAN PAGAR
1 Panel Beton Pracetak lbr
183.430,00 201.773,00
2 Kolom Beton Pracetak btg
406.368,00 447.004,80
Y. BIDANG PERTAMANAN
1 Aglonema batang
63.914,86 70.306,34
2 Bambu krisik/jepang batang
63.914,86 70.306,34
3 Furadan kg
28.356,87 31.192,55
4 Kompos/pupuk kandang karung
32.050,87 35.255,95
5 M atoa (2 m) batang
44.762,56 49.238,82
Palm (botol, ekor tupai,
6 batang
putri, dll) tinggi 2 m 135.156,87 148.672,55
7 Philo batang
96.695,83 106.365,41
Pohon pelindung
8 (angsana, mahoni, batang
kamboja dll) tinggi 2m 29.117,40 32.029,14
Pohon perdu (kaca piring,
9 batang
puring, mawar, melati, dll) 16.948,93 18.643,83
10 Rumput gajah mini m2
21.294,81 23.424,29
Z. BIDANG PENGAIRAN
1 Batu Belah 10 - 15 cm M3
216.997,69 238.697,46
2 Batu Pecah 5 - 7 cm M3
282.200,00 310.420,00
3 Batu Pecah 0,5 - 1 cm M3
292.570,85 321.827,94
4 Batu Pecah tersaring A M3
241.097,57 265.207,33
5 Batu Pecah tersaring B M3
233.294,74 256.624,21
6 Timbunan Pilthan M3
198.132,62 217.945,88
7 Makadam M3
114.079,35 125.487,29
8 Kayu Damar Laut M3
7.231.248,01 7.954.372,81
9 Kayu Klas I M3
5.974.794,84 6.572.274,32
10 Kayu Klas III M3
2.671.333,42 2.938.466,76
11 Kayu Kano 4/6 BTG
72.497,18 79.746,90
12 Papas 2/20 x 4 LBR
91.461,02 100.607,12
13 Balok Kayu 6 - 8 - 10 /4 m BTG
399.327,11 439.259,82
14 Batang Kelapa 13TG
576.125,41 633.737,95
15 Lempengen rumput M2
48.002,22 52.802,44
16 Triplek tb. 3 mm LBR
67.492,83 74.242,12
17 Triplek tb. 4 mm LBR
84.895,17 93.384,68
18 Triplek tb. 6 mm LBR
64.906,00 71.396,60
19 Triplek tb. 9 mm LBR
125.579,00 138.136,90
20 Multiplek 12 mm LBR
177.687,23 195.455,95
21 Seng gelombang BJLS 30 LBR
33.864,00 37.250,40
22 Seng Plat 3 x 6 BWG 30 M2
49.385,00 54.323,50
23 Conblock M2
53.928,42 59.321,26
24 Batako PSPM BH
5.432,35 5.975,59
Pipa Beton Tidak
25 M'
Bertulang dia 0,50 m 151.710,72 166.881,79
Pipa Beton Tidak
26 M'
Bertulang dia 0,60 m 183.712,20 202.083,42
Pipa Beton Tidak
27 M'
Bertulang dia 0,80 m 261.246,65 287.371,32
Pipa Beton Tidak
28 M'
Bertulang dia 1,00 m 339.077,41 372.985,15
Pipa Beton Bertulang dia
29 M'
0,50 m 160.698,79 176.768,67
Pipa Beton Bertulang dia
30 M'
0,60 m 205.441,60 225.985,76
Pipa Beton Bertulang dia
31 M'
0,80 m 399.919,73 439.911,70
Pipa Beton Bertulang dia
32 M'
1,00 m 265.493,76 292.043,14
Besi Beton U24 dia. 14
33 BTG
mm 125.536,67 138.090,34
Besi Beton U24 dia. 22
34 BTG
mm 287.321,93 316.054,12
Besi Beton U24 dia. 25
35 BTG
mm 366.634,24 403.297,66
Besi Beton U32 dia. 10
36 BTG
mm 228.158,70 250.974,57
Besi Beton U32 dia. 12
37 BTG
mm 130.376,40 143.414,04
Besi Beton U32 dia. 16
38 BIG
mm 167.711,46 184.482,61
Besi Beton U32 dia. 19
39 BIG
mm 266.185,15 292.803,67
Besi Beton U32 dia. 22
40 BIG
mm 336.805,70 370.486,27
Besi Beton U32 dia. 25
41 BTG
mm 380.264,50 418.290,95
42 Besi Beton Ulir 10 BIG
103.412,19 113.753,41
43 Besi Beton Ulir 12 BIG
135.216,13 148.737,74
44 Besi Beton Ulir 16 BTG
201.490,80 221.639,88
45 Besi Beton Ulir 19 BIG
270.432,26 297.475,49
46 Besi Beton Ulir 22 BIG
366.140,39 402.754,43
47 Besi Beton Ulir 25 BTG
475.182,47 522.700,72
48 Baja U 24 KG
77.336,91 85.070,60
49 Baja U 32 KG
36.544,90 40.199,39
50 Baja U 36 KG
82.966,80 91.263,48
51 Baja U 42 KG
115.363,36 126.899,70
52 Wermes 06 M2
244.455,75 268.901,33
53 Wermes 08 M2
461.749,75 507.924,73
54 Wermes 10 M2
597.558,50 657.314,35
55 Besi Pofil 4x4 KG
26.075,28 28.682,81
56 Besi Struktur H- Beam KG
29.235,92 32.159,51
Besi C macam-macaw
57 KG
ukuran 16.297,05 17.926,76
Besi L macam-macam
58 KG
ukuran 22.815,87 25.097,46
59 Pipa Galvanis 2,5" BTG
309.643,95 340.608,35
60 Pipa Galvanis 3" BTG
543.235,00 597.558,50
61 Pipa Galvanis 4" BTG
706.205,50 776.826,05
62 Kawat Bronjong 3 mm KG
87.213,91 95.935,30
63 Kawat Bronjong 5 mm KG
125.339,13 137.873,04
64 Stempet / Gemuk KG
54.224,73 59.647,20
65 0li SAE 140 LTR
66.274,67 72.902,14
66 Oli SAE 90 LTR
71.114,40 78.225,84
67 Oli SAE 20 LTR
45.730,51 50.303,56
68 Laston SPC TONNE
1.303.764,00 1.434.140,40
69 Cat (untuk besi profil) KG
54.817,35 60.299,09
70 Meni KG
30.915,01 34.006,51
71 Glass Bead KG
14.124,11 15.536,52
Cat Marka Jalan (thermo
72 5 KG
pastic) 119.511,70 131.462,87
73 Kapur Hidrasi M3
9.235,00 10.158,49
74 Pipa PVC dia 5" BTG
554.099,70 609.509,67
75 Pipa PVC dia 12" BTG
1.035.702,22 1.139.272,44
Saluran Beton (Uditch)
76 M'
Stu 50/50 - 120 1.303.764,00 1.434.140,40
Saluran Beton (Uditch)
77 M'
Stu 60/60 - 120 1.521.058,00 1.673.163,80
Saluran Beton (Uditch)
78 M'
Stu 80/80 - 120 2.814.945,00 3.096.439,50
Saluran Beton (Uditch)
79 M'
Stu 100/100 - 120 4.291.556,50 4.720.712,15
80 Box Culvert BC 50-50-100 M'
1.097.758,00 1.207.533,80
81 Box Culvert BC 60-60-100 M'
1.207.533,80 1.328.287,18
82 Box Culvert BC 80-80-100 M'
2.650.704,60 2.915.775,06
Box Culvert BC 100-100-
83 M'
100 3.230.766,70 3.553.843,37
Karet Penyambung Piga
84 BH
dia 50 cm 83.954,50 92.349,95
Karet Penyambung Piga
85 BH
dia 60 cm 105.387,59 115.926,35
Karet Penyambung Pipa
86 BH
dia 80 cm 146.673,45 161.340,80
Karet Penyambung Pipa
87 BH
dia 100 cm 239.023,40 262.925,74
88 Plat Penjepit 12x4x8 mm LBR
2.879.145,50 3.167.060,05
Besi UNP 20 (200x80x7,5
89 BTG/ 6 m
mm) 706.205,50 776.826,05
90 Besi Essentaal 1,5-64 mm KG
59.755,85 65.731,44
91 Kuningan 3" KG
157.044,30 172.748,73
92 Bambu BH
31.507,63 34.658,39
93 Baud 1,5 BH
11.161,01 12.277,11
94 Baud Uk 3/4 - 7 cm BH
40.693,24 44.762,56
95 Baud Uk 3/4 - 17 cm BH
34.075,65 37.483,22
96 Cat Glotek Hitam (setara) KG
51.557,94 56.713,73
97 Cat Glotek Biru (setara) KG
53.138,26 58.452,09
98 Amplas LBR
5.531,12 6.084,23
99 Prasasti 40 can x 60 cm BH
651.882,00 717.070,20
100 Prasasti 20 cm x 30 cm BH
543.235,00 597.558,50
Tambahan Harga Bahan
Bahan Pabrikasi