PLANILLA DE METRADO

Obra: Puruchuco
Fecha: 18/01/19 Hecho por :Roberto Oporto

2 8mm 3 4 5 6 8 9 10 11
N° de N° Pzs/ Long 1/4" 8mm 3/8" 1/2" 5/8" 3/4" 1" 1 1/8" 1 1/4" 1 3/8" TOTAL
ITEM Descrip. Ø #
veces Elmto (ml) 0.249 0.395 0.560 0.994 1.552 2.235 3.973 5.034 6.215 7.520 (Kg)

FRENTE 06
SARDINEL
S1 Vertical 3 3/8" 1 1 40 0.80 17.92
S1 horizantelas 3 3/8" 1 1 1 9.00 5.04
S2 Vertical 3 3/8" 1 1 34 0.80 15.23
S2 Horizontal 3 3/8" 2 1 2 9.00 20.16
Total Long (Ml) 0.00 0.00 45.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00
% De Desperdicio 0% 0% 10% 0% 0% 0% 0% 0% 0% 0%
# Varillas 0.00 0.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
FRENTE 06 Peso Parc 0.00 0.00 25.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.26
% DESPERDICIO 7%
SEGÚN PLANOS PRESUPUESTO CONTRACTUAL SALDO item tipo de acero total según planos STOCK pedido
FRENTE
METRADO KG METRADO KG % desperdicio PARCIAL KG METRADO KG 1 1" 5.00 0 5
2 FRENTE 03 Err:509 61.4 1.07 65.7 Err:509 3 1/2" 10.00 0 10
3 FRENTE 06 25.3 1,191.1 1.07 1,274.5 1,249.2 4 3/8" 13.00 0 13
5 FRENTE 08 Err:509 170.1 1.07 182.0 Err:509
6 FRENTE 11 300.5 7.2 1.07 7.7 -292.7
7 FRENTE 13 0.0 1.07 0.0 0.0
TOTAL Err:509 1,429.8 1,529.9 Err:509

SEGÚN PLANOS PRESUPUESTO ADICIONAL SALDO


FRENTE
METRADO KG METRADO KG % desperdicio PARCIAL KG METRADO KG
8 FRENTE 04 Err:509 Err:509 1.07 Err:509 Err:509
9 FRENTE 05 0.00 1.07 0.0 0.0
TOTAL Err:509 Err:509 Err:509