Você está na página 1de 1

PROVISIONS OF CONSTRUCTION WORK

FOR WHP-E1 FOUR SLOTS EXTENSION

PROCEDURE NO.: Report No.:


BLASTING AND PAINTING Sheet:
INSPECTION REPORT
Date:

CLIENT: JAPAN VIETNAM PETROLEUM COMPANY


PROVISIONS OF CONSTRUCTION WORK FOR WHP-E1 FOUR SLOTS
PROJECT NAME:
EXTENSION
CONTRACT FOR COMPANY RESPONSIBLE PERSON

PAINT WORK BY POS QC POS or tên


COATING SYSTEM theo matrix
SUPPLIER OF PAINT MATERIALS ghi theo cert sơn
REFERENCE AREA theo matrix
COATING PROCESS DESCRIPTION & MATERIAL IDENTIFICATION:

Chỗ này ghi đại loại Metal abrasive blast (bắn bằng vật liệu gì)

WORK AREA AMBIENT CONDITIONS: SURFACE PREPARATION:

Date & Time taken Preparation grade (ISO 8501-1/ SSPC10):

Air temperature (oC) Sa 2.5

Relative humidity (%) Type of abrasive use: metal abrasive (coal slag,
Surface profile (roughness, mm): theo spec nhé
Surface temperature (oC) standard hình như là 30 - 45 mils khoảng dưới
75 micron
Dew point (oC) Final cleaning: acc

COAT REQ'D DFT ACTUAL RECOAT


PAINT NAME COLOR THINNER BATCH NO.
NO. (mm) WFT (mm) DFT (mm) TIME (H)

primer tên loại sơn theo matrix theo matrixtheo matrixtheo matrix
midle
top

APPLICATION METHOD:spray, roller, brush

COMMENT/ REMARK:

Inspected by: Reviewed by: Approved by:

Signature: Signature: Signature:

Name: Name: Name:

Date: Date: Date: