General Cleaning Program Action Plan

The Schedule
Periode: Ramadhan / August 1 - 30, 2011
Base on Room Boy section
Target Date & Day
No Description Program Total Rooms / Target Remark
Rooms Day Days Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Living Room / Bed Room
1 Wooden Door Cleaning / Polishing 123 41 3 √ √ √
2 Swich Lamp Dusting / Spotting 123 41 3 √ √ √
3 Wardrobe Cleaning / Polishing 123 41 3 √ √ √
4 Kitchen Set Cleaning / Polishing 123 41 3 √ √ √
5 Decoration Wall / Art work Cleaning / Polishing 123 41 3 √ √ √
6 Head Board Cleaning / Polishing 123 41 3 √ √ √
7 Wall & wooden Skirting Dusting / Spotting 123 61.5 2 √ √
8 Refrigerator Dusting / Spotting 123 61.5 2 √ √
9 Sofa Vacuuming / Spotting 123 61.5 2 √ √
10 Chairs Dusting / Spotting 123 61.5 2 √ √
11 Balcony Chairs & Table Dusting / Spotting 123 61.5 2 √ √
12 Rubish Bin Cleaning / Polishing 123 123 1 √
Bath Room
13 Wall Washing / Spotting 123 61.5 2 √ √
14 Window Glass Washing 123 61.5 2 √ √
15 Piping Under Wash Basin Polishing 123 61.5 2 √ √
16 Toilet Bowl Washing / Polishing 123 61.5 2 √ √
17 Wash Basin Washing / Polishing 123 61.5 2 √ √
18 Exshaus Grill Dusting 123 123 1 √
19 Shower Door Glass Cleaning 123 24.6 5 √ √ √ √ √
20 Shower Wall Cleaning 123 24.6 5 √ √ √ √ √
21 Shower Floor Brushing 123 24.6 5 √ √ √ √ √
Special 2 Persons
22 Floor / Incld. Balcony Brushing 123 4 30.75 √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
23 Ceiling & Ac Grill Vacuuming 123 4 30.75 √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √ √
Note:
- The Training must be set up (How to) before staff implemented the program.
- Report to Engineering if any damage / not standart found during the program for repairing.
- Record system should be well organize.

Prepared by,

HK Team
General Cleaning Program Action Plan
The Schedule
Periode: Ramadhan / August 1 - 30, 2011
Date & Day
No Description Program Detail Methode / Focus Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Remark
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Batu Tulis Restaurant
1 Ceiling Vacuuming Clean spider web & spider egg N N
2 Ceiling Lamp Dusting With special chemicals N N
3 AC Grill Dusting With chemicals Anti fungus N N
4 Ceiling Springkler Dusting Clean spider web & spider egg N N
5 Ceiling Smoke Detector Dusting With special chemicals N N
6 Wall Washing / Spotting 1 meter above floor A
7 Chairs Shampooing A A A A A
8 Sofa Shampooing A A
9 Table Polishing With special chemicals A
10 Marble Floor Polishing Cristalization M M M M M M M M M M M M M M
Katulampa Lounge
11 Ceiling Vacuuming Clean spider web & spider egg N
12 Ceiling Lamp Dusting With special chemicals N
13 Ceiling Springkler Dusting Clean spider web & spider egg N
14 Ceiling Smoke Detector Dusting With special chemicals N
15 Wall Washing / Spotting 1 meter above floor N
16 Chairs Shampooing A
17 Sofa Shampooing A A A A A
18 Table Polishing With special chemicals A A
19 Tile Floor Brushing A
Lobby
22 Ceiling Vacuuming Vacuuming spider web & spider egg N N
23 Ceiling Lamp Dusting With special chemicals N N
24 Ceiling Springkler Dusting Vacuuming spider web & spider egg N N
25 Ceiling Smoke Detector Dusting With special chemicals N N
26 Wall Washing / Spotting 1 meter above floor A
27 Chairs Shampooing A A A A A
28 Sofa Shampooing A A
29 Table Polishing With special chemicals A
30 Marble Floor Polishing Cristalization M M M M M M M M M M M M M M M
Note:
- The Training must be set up (How to) before staff implemented the program.
- Report to Engineering if any damage / not standart found during the program for repairing.
- Record system should be well organize.

Prepared by,

HK Team
General Cleaning Program Action Plan
The Schedule
Periode: Ramadhan / August 1 - 30, 2011
Date & Day
No Description Program Detail Methode / Focus Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Remark
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Floor H2 H3 H4 H5 H6 C2 C3 C4 C5 C6 C7 C8 All Floor
1 Ceiling Vacuuming Clean spider web & spider egg N N N N N N N N N N N N
2 Ceiling Lamp Dusting With special chemicals N N N N N N N N N N N N
3 AC Grill Dusting With chemicals Anti fungus N N N N N N N N N N N N
4 Ceiling Springkler Dusting Clean spider web & spider egg N N N N N N N N N N N N
5 Ceiling Smoke Detector Dusting With special chemicals N N N N N N N N N N N N
6 Wall Washing / Spotting 1 meter above floor N N N
7 Painting Dusting N
8 Hydrant Box Dusting N N N
9 Guest Lif Polishing Detail polish N N N
10 Floor Brushing M M M M M M M M

Note:
- The Training must be set up (How to) before staff implemented the program.
- Report to Engineering if any damage / not standart found during the program for repairing.
- Record system should be well organize.

Prepared by,

HK Team
General Cleaning Program Action Plan
The Schedule
Periode: Ramadhan / August 1 - 30, 2011
Date & Day
No Description Program Detail Methode / Focus Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Remark
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Nirwana
1 Ceiling Vacuuming Clean spider web & spider egg M M M
2 Ceiling Lamp Dusting With special chemicals M M M
3 AC Grill Dusting With chemicals Anti fungus M M M
4 Ceiling Springkler Dusting Clean spider web & spider egg M M M
5 Ceiling Smoke Detector Dusting With special chemicals M M M
6 Wall Washing / Spotting 1 meter above floor M
7 Door Dusting M
8 Carpet Shampooing M M M M
Panorama
9 Ceiling Vacuuming Clean spider web & spider egg M M
10 Ceiling Lamp Dusting With special chemicals M M
11 AC Grill Dusting With chemicals Anti fungus M M
12 Ceiling Springkler Dusting Clean spider web & spider egg M M
13 Ceiling Smoke Detector Dusting With special chemicals M M
14 Wall Washing / Spotting 1 meter above floor M
15 Door Dusting M
16 Carpet Shampooing M M
Padma
17 Ceiling Vacuuming Clean spider web & spider egg M M
18 Ceiling Lamp Dusting With special chemicals M M
19 AC Grill Dusting With chemicals Anti fungus M M
20 Ceiling Springkler Dusting Clean spider web & spider egg M M
21 Ceiling Smoke Detector Dusting With special chemicals M M
22 Wall Washing / Spotting 1 meter above floor M
23 Door Dusting M
24 Carpet Shampooing M M

Note:
- The Training must be set up (How to) before staff implemented the program.
- Report to Engineering if any damage / not standart found during the program for repairing.
- Record system should be well organize.

Prepared by,

HK Team

Você também pode gostar