Tutorial # 1
Mass Haul Diagram
Question # 1:
Answer:
End-area cut End-area fill Volume of Volume of fill
Station
(sf) (sf) cut (bcy) (ccy)
125 0.00 785.00 0.00 0.00
126 652.00 0.00 1207.41 1453.70
127 2150.00 0.00 5188.89 0.00
128 3210.00 0.00 9925.93 0.00
129 1255.00 147.00 8268.52 272.22
130 95.00 780.00 2500.00 1716.67
131 0.00 3666.00 175.93 8233.33
Question # 2:
Answer:
Volume Volume
End-area End-area Stripping Stripping Total cut Total fill Adj. fill Algebraic Mass
Station of cut of fill
cut (sf) fill (sf) cut (bcy) fill (ccy) (bcy) (ccy) (bcy) sum (bcy) ordinate
(bcy) (ccy)
0.90
0 0.00 0.00 0
1 0.00 90.00 0.00 166.67 0.00 24.00 0.00 190.67 211.85 -211.85 -211.85
2 0.00 154.00 0.00 451.85 0.00 40.00 0.00 491.85 546.50 -546.50 -758.35
3 147.00 0.00 272.22 285.19 15.00 19.00 257.22 304.19 337.98 -80.76 -839.12
4 192.00 0.00 627.78 0.00 50.00 0.00 577.78 0.00 0.00 577.78 -261.34
4.5 205.00 0.00 367.59 0.00 57.00 0.00 310.59 0.00 0.00 310.59 49.26
5 179.00 0.00 355.56 0.00 21.00 0.00 334.56 0.00 0.00 334.56 383.81
6 121.00 0.00 555.56 0.00 43.00 0.00 512.56 0.00 0.00 512.56 896.37
6.5 100.00 0.00 204.63 0.00 19.00 0.00 185.63 0.00 0.00 185.63 1082.00
7 52.00 10.00 140.74 9.26 8.00 0.00 132.74 9.26 10.29 122.45 1204.45
8 0.00 180.00 96.30 351.85 10.00 20.00 86.30 371.85 413.17 -326.87 877.58
9 0.00 231.00 0.00 761.11 0.00 69.00 0.00 830.11 922.35 -922.35 -44.77
10 0.00 285.00 0.00 955.56 0.00 18.00 0.00 973.56 1081.73 -1081.73 -1126.50
Mass Diagram
1500
1000
500
Volume (bcy)
0
0 1 2 3 4 5 6 7 8 9 10 11
-500
-1000
-1500
Stations (X+00)
18CEM02I Construction Equipments S2 –2018/2019
Question # 3:
Answer:
Area
Volume Volume Algebraic Under
Stripping Stripping Total cut Total fill Adj. fill Mass
Station of cut of fill sum the
cut (bcy) fill (ccy) (bcy) (ccy) (bcy) ordinate
(bcy) (ccy) (bcy) Curve
(bcy*ft)
0.88
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0
1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0
2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0
3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0
4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0
5 30.00 0.00 0.00 0.00 30.00 0.00 0.00 30.00 30.00 1500
6 86.00 210.00 0.00 0.00 86.00 210.00 238.64 -152.64 -122.64 -4631.818
7 150.00 437.00 0.00 0.00 150.00 437.00 496.59 -346.59 -469.23 -29593.18
8 250.00 800.00 0.00 0.00 250.00 800.00 909.09 -659.09 -1128.32 -79877.27
9 380.00 1167.00 0.00 0.00 380.00 1167.00 1326.14 -946.14 -2074.45 -160138.6
10 340.00 1333.00 0.00 0.00 340.00 1333.00 1514.77 -1174.77 -3249.23 -266184.1
11 33.00 691.00 0.00 0.00 33.00 691.00 785.23 -752.23 -4001.45 -362534.1
12 0.00 10.00 0.00 0.00 0.00 10.00 11.36 -11.36 -4012.82 -400713.6
Total Area Under Curve (bcy*ft) -1302173
Total Haul Quantity (bcy) -4012.82
Average Haul Distance (ft) 324.50
18CEM02I Construction Equipments S2 –2018/2019
Mass Diagram
500.00
0.00
0 1 2 3 4 5 6 7 8 9 10 11 12 13
-500.00
-1000.00
Volume (bcy)
-1500.00
-2000.00
-2500.00
-3000.00
-3500.00
-4000.00
-4500.00
Stations (X+00)