Você está na página 1de 1

PRIVATISATION OF SUNGAI BESI – ULU KELANG

ELEVATED EXPRESSWAY (SUKE)


PACKAGE:CA1
ACRE WORKS SDN BHD
(584875-K)
Tel: +603-62033819 Fax: +603-62033809

DAILY REPORT
SUKE/QC/WPC/F-7 Rev: 0 Page: 1/1

Date : 20/3/2019 Day : Wednesday


1 2 3 4 5 6 7 8 9 10 11 12 Working 1 2 3 4 5 6 7 8 9 10 11 12
Weather
13 14 15 16 17 18 19 20 21 22 23 24 Hours 13 14 15 16 17 18 19 20 21 22 23 24

Sunny Cloudy Drizzle Heavy Rain


Activities:
SECTION 2 : MCAO VALLEY/MS60
1. Compact work at access area and work platform.
1.Prepration formwork cross head sp6-p6
2. Hacking bored pile sp6-p4.
3. Pre bored mcao-s1-p20-02(RHS).
4. Intall walling beam doka at sp6-p3.
5. Install sheet pile at mcao-s1-p19(RHS).
6. Excavation for pile cap at mcao-s1-p19(RHS)
7. Second cast cross head ms60-sp6-p6
-cleaning discharge drain
-housekeeping
-Install barricade at mcao-s1-p19 (RHS).
- Shifting doka material from ms60b to ms60a.
-shifting water pump to mc10.
-tranfer excavator to mc10.
-trnfer excavator from mc10-u1-p41 to ms60a.
-tranfer vibro to mc10.

Visitors :

Remarks/Instruction :

Manpower Qty Manpower Qty Machinery Qty Material Received Qty


Project Director Clerk Tower Crane
Project Manager Chainman Crawler Crane 2
Managers 1 Foreman Mobile Crane 2
Coordinator Carpenter Excavator 2
Engineers 2 Barbender Backhoe 1
Qty Surveyors Concretor Payloader
Land Surveyors Bricklayer Bulldozer
Officers Tiler Tractor
Supervisors Steel workers Paver
Technician Plasterer Dump Truck
Assistant General workers 8 1 ton lorry
Sungeo 7 Generator Set 1
IZW 2 Bar cutting machine 2
Kalin 2 Bar bending machine 2
Air compressor 1
AWSB 11 Vibrators
BG 2

Note: Manpower and machinery listing can be tailored to contractor actual staff and machine

Prepared by: Checked by: Approved by:

________________________ ________________________ ____________________________


Name: Farhan Name: Name:
Date : 20/3/2019 Date : Date :