TIE POINT LIST

Design, Engg, Supply, Installation, commissioning of LP Gas


Compressors at CTF-Ankleshwar

Engineering Rev : 0 Page: 1 OF 2


Doc No: PC115-5300-TP LIST-CTF PDIL,
Services,
Vol : Section : VADODARA
Ankleshwar

TIE POINT LIST

(LP Gas Compressor Package)


(Unit – 310)

0 18.10.17 18.10.17 SKC VP VP


REV REV DATE EFF DATE PURPOSE PREPD REVWD APPD
TIE POINT LIST

Design, Engg, Supply, Installation, commissioning of LP Gas


Compressors at CTF-Ankleshwar

Engineering Rev : 0 Page: 2 OF 2


Doc No: PC115-5300-TP LIST-CTF PDIL,
Services,
Vol : Section : VADODARA
Ankleshwar

Location Type of Tie point Description Remark P & ID No


Compressor No.
TP-01 LP Scruber (V-11) Gas outlet pipe.
LP GAS TP-02 LP Gas compressors Common suction
PC115-5300-310-
Reciprocating TP-03 LP Gas Compressors Common
CTF- 0021, Rev-0/
Compressors discharge
Ankleshwar PC115-5300-310-
(310-K-101 TP-04 Compressed gas pipe to LPG Plant 0022, Rev-0
A/B/C)
TP-05 Fuel gas pipe line tapping in LPG Plant
Outlet Lean gas pipe line.
TYPICAL PRIMARY SKETCHES
(GAS COMPRESSOR)
DESIGN, ENGG, SUPPLY, INSTALLATION, COMMISSIONING OF GAS
COMPRESSOR AT CTF-ANKLESHWAR
Engineering REV : 0 SHEET : 1 OF 2
DRAWING NO.- PC00115-5300-TSS- PDIL,
Services,
0722 VOL : II SECTION : INST. VADODARA
Ankleshwar

TYPICAL PRIMARY SKETCHES (GAS COMPRESSOR)

0 25.10.17 FIRST ISSUE SSP SK JV


REV. DATE PURPOSE PRPD REWD APPD
TYPICAL PRIMARY SKETCHES (GAS COMPRESSOR)-INDEX
DESIGN, ENGG, SUPPLY, INSTALLATION, COMMISSIONING OF GAS
COMPRESSOR AT CTF-ANKLESHWAR

Engineering REV : 0 SHEET : 2 OF 2


DRAWING NO.- PC00115-5300- PDIL,
Services,
TSS-0722 VADODARA
Ankleshwar VOL : II SECTION : INST.
Sheet REVISION Sheet REVISION Sheet REVISION
Description NO 0 1 2 3 4 5 Description NO 0 1 2 3 4 5 Description NO 0 1 2 3 4 5

COVER 1 X
PRESSURE
INDEX 2 X
PRESSURE GAUGE
( LIQUID & GAS P1 X
This Document is the property of Projects & Development India Limited (PDIL) and not to be copied or reproduced or exhibited to third parties without the written permission of PDIL.

SERVICE)

PRESSURE GAUGE
FLOW (VOL.SEAL)
P2 X

DIFF.PRESSURE PRESSURE TRANS.


TRANSMITTER- F1 X ( LIQUID & GAS P3 X
FLOW SERVICE )

PRESSURE TRANS.
P4 X
( VOLSEAL )

TEMPERATURE

TEMPERATURE
T1 X
ELEMENT
TEMPERATURE
LEVEL T2 X
GAUGE

LEVEL GAUGE L1 X

LEVEL
TRANSMITTER L2 X
( DP TYPE )

RADAR GAUGE L3 X

STILL WELL DEAILS


L4 X
FOR RADAR GAUGE

0 25.10.17 FIRST ISSUE SSP SK JV


REV DATE PURPOSE PREPARED REVIEWED APPROVED
DESIGN, ENGG, SUPPLY, INSTALLATION, COMMISSIONING OF GAS COMPRESSOR AT
CTF-ANKLESHWAR

REV.: 0 SHEET F1 OF F1
DRAWING NO. - PDIL
VOL : II SECTION : INST. VADODARA

TAPPING ORIENTATION

NOTE:-
1.
2. SLOPE FROM TRANSMITTER MIN 1:12.
3. 3-WAY MANIFOLD (SS 316) COMPLETE ASSEMBLY - OVAL
FLANGES / ADAPTER 1/2"NPTF, "O" RINGS, STUDS,NUTS, WITH
DRAIN / VENT VALVE PLUGGED etc. SUPPLIED WITH INST.
.
5. IMPULSE PIPING SHALL BE SUITABLY PAINTED.

* VENDOR TO FILL UP APPLICABLE MATERIALS, RATING AS PER PIPE


CLASS.
1/2" SW WITH STUDS, NUTS &
10 FLANGE 02Nos.
GASKET * *
09 NIPPLE L=100 mm 1/2" PLAIN 04Nos.
* *
08 FEMALE CONNECTOR 1/2"NPTF X 1/2" OD TUBE SS 316 02Nos.
07 MALE CONNECTOR 1/2"NPTM X 1/2" OD TUBE SS 316 06Nos.
06 TUBE 1/2" OD A269 TP316 7M
05 CAP 1/2"NPTF 04Nos.
* *
04 GATE VALVE 1/2"SW X 1/2"SW * * 06Nos.
03 EQUAL TEE 1/2"SW 04Nos.
* *
02 NIPPLE L=100 mm 1/2"NPTM X 1/2"PL. 06Nos.
* *
01 SEAMLESS PIPE 1/2"PL. * * 20M
SL
ITEM DESCRIPTION SIZE MATERIAL RATING QTY. REMARKS
NO.
0 25.10.17 SSP SK JV
REV. DATE PURPOSE PREP'D. BY REVIW'D. BY APP'D. BY
DESIGN, ENGG, SUPPLY, INSTALLATION, COMMISSIONING OF GAS COMPRESSOR AT
CTF-ANKLESHWAR

REV.: 0 SHEET L1 OF L4
DRAWING NO. - PDIL
VOL : II SECTION : INST. VADODARA
SL.NO. TAG NO. PIPE / VESSEL NO.
MECHANIC SCOPE :- COCKS, FLANGES, VENT PLUG
PIPE INSTALLATION
PROCESS FLUID :- LIQUID
LOW & MEDIUM PRESSURE :-
FLUID IN IMPULSE LINE :- LIQUID
IMPULSE LINE CLASS :-

03

03
04

02

01
VESSEL

05
1" 300 # RF

NOTE:-
1. IMPULSE PIPING SHALL BE SUITABLY PAINTED.

* VENDOR TO FILL UP APPLICABLE MATERIALS & RATINGS


AS PER PIPE CLASS
01No. SUPPLY WITH
05 PLUG 1/2" NPTM * * INST.
1/2" SW WITH STUDS,
04 FLANGE NUTS & GASKET * * 01No.

03 NIPPLE L=100 mm 1/2"PL * SCH. 02Nos.


02 GATE VALVE 1/2"SW * * 02Nos.
01 NIPPLE L=100 mm 1/2"NPTM X 1/2"PL. SCH. 01No.
*
SL
ITEM DESCRIPTION SIZE MATERIAL RATING QTY. REMARKS
NO.
0 25.10.17 SSP SK JV
REV. DATE PURPOSE PREP'D BY REVIW'D. BY APPV'D BY
DESIGN, ENGG, SUPPLY, INSTALLATION, COMMISSIONING OF GAS COMPRESSOR AT
CTF-ANKLESHWAR

REV.: 0 SHEET L3 OF L4
DRAWING NO. -
VOL : II SECTION : INST.

Pipe Installation
Process Fluid :- Propylene / propane / butylene
Low / Medium pressure :-
Impulse line class :-
L*

@
H

Minimum
300 mm

0 25.10.17 SSP SK JV
REV. DATE PURPOSE PREP'D BY REVIW'D. BY APPV'D BY
DESIGN, ENGG, SUPPLY, INSTALLATION, COMMISSIONING OF GAS COMPRESSOR AT
CTF-ANKLESHWAR

REV.: 0 SHEET L4 OF L4 PDIL


DRAWING NO. -
VOL : II SECTION : INST. VADODARA

0 25.10.17 SSP SK JV
REV. DATE PURPOSE PREP'D BY REVIW'D. BY APPV'D BY
DESIGN, ENGG, SUPPLY, INSTALLATION, COMMISSIONING OF GAS COMPRESSOR AT
CTF-ANKLESHWAR

REV.: 0 SHEET P1 OF P4 PDIL


DRAWING NO. -
VOL : II SECTION : INST. VADODARA
MECHANICAL SCOPE :- NIPPLES & VALVES
PIPE INSTALLATION
PROCESS FLUID :- LIQUID
LOW / MEDIUM PRESSURE :-
FLUID IN IMPULSE LINE :- LIQUID
IMPULSE LINE CLASS :- B24, D24
MECH.
INST.

SEAL WELDED IN
ME ST.
CH
.

* VENDOR TO FILL UP APPLICABLE MATERIALS, RATING AS PER PIPE CLASS.

1/2" SW WITH STUDS, *


07 FLANGE NUTS & GASKET 2Nos.
*
06 GLOBE VALVE 1/2"SW * 1No.
*
05 EQUAL TEE 1/2"SW * 1No.
*
04 CAP 1/2"NPTF * 2Nos.
*
03 REDUCER 3/4"NPTF X 1/2"SW * * 1No.
02 NIPPLE L=100 mm 1/2"NPTM X 1/2"PL. SCH.* * 2Nos.
01 SEAMLESS PIPE 1/2"PL. SCH.* * 5M

0 25.10.17 SSP SK JV
REV. DATE PURPOSE PREP'D BY REVIW'D. BY APPV'D BY
DESIGN, ENGG, SUPPLY, INSTALLATION, COMMISSIONING OF GAS COMPRESSOR AT
CTF-ANKLESHWAR

REV.: 0 SHEET P2 OF P4 PDIL


DRAWING NO. -
VOL : II SECTION : INST. VADODARA

PIPING SCOPE

1. FLANGES ASSEMBLY AS PER ANSI / ASME B16.5


2. STUDS , NUTS, GASKET , COUNTER FLANGE AND OTHER AS SHOWN
BY DEMARCATION LINE.

Inst.
Mech.

VESSEL

* VENDOR TO FILL UP APPLICABLE MATERIALS, RATING AS PER PIPE CLASS.

0 25.10.17 SSP SK JV
REV. DATE PURPOSE PREP'D BY REVIW'D. BY APPV'D BY
DESIGN, ENGG, SUPPLY, INSTALLATION, COMMISSIONING OF GAS COMPRESSOR AT
CTF-ANKLESHWAR

REV.: 0 SHEET P3 OF P4 PDIL


DRAWING NO. -
VOL : II SECTION : INST. VADODARA

MECHANICAL SCOPE :- NIPPLES & VALVES


PIPE INSTALLATION
PROCESS FLUID :- LIQUID & GAS
LOW / MEDIUM PRESSURE :-
FLUID IN IMPULSE LINE :- LIQUID & GAS
IMPULSE LINE CLASS :-
MECH.
INST.

SEAL WELDED

SEAL
WELDED

NOTE:-
1. TYPICAL DRAWING, IMPULSE ROUTING TO BE DECIDED AT SITE.
2. SLOPE FROM TRANSMITTER MIN 1:12.
3. 1/2"NPTF X 1/2"NPTF TWO-WAY MANIFOLD (SS 316) COMPLETE
ASSEMBLY - OVAL FLANGE / ADAPTER 1/2"NPTF, "O" RINGS,
STUDS,NUTS, WITH DRAIN / VENT VALVE PLUGGED etc.
SUPPLIED WITH INST.
4. BOTH SIDES THREADED NIPPLE SHALL BE HEXAGONAL.
5. IMPULSE LINE SHALL BE SUITABLY PAINTED.

* VENDOR TO FILL UP APPLICABLE MATERIALS, RATING AS PER PIPE CLASS.


1/2" SW WITH STUDS,
10 FLANGE NUTS & GASKET * * 2Nos.
09 FEMALE CONNECTOR 1/2"NPTF X 1/2" OD TUBE 1No.
* *
08 MALE CONNECTOR 1/2"NPTM X 1/2" OD TUBE 1No.
* *
07 TUBE 1/2" OD * * 3M
06 GLOBE VALVE 1/2"SW * * 3Nos.
05 EQUAL TEE 1/2"SW 2Nos.
* *
04 CAP 1/2"NPTF 2Nos.
* *
03 REDUCER 3/4"NPTF X 1/2"SW * * 1No.
02 NIPPLE L=100 mm 1/2"NPTM X 1/2"PL. * * 2Nos.
01 SEAMLESS PIPE 1/2"PL. * * 5M

0 25.10.17 SSP SK JV
REV. DATE PURPOSE PREP'D BY REVIW'D. BY APPV'D BY
DESIGN, ENGG, SUPPLY, INSTALLATION, COMMISSIONING OF GAS COMPRESSOR AT
CTF-ANKLESHWAR

REV.: 0 SHEET P4 OF P4 PDIL


DRAWING NO. -
VOL : II SECTION : INST. VADODARA

* VENDOR TO FILL UP APPLICABLE MATERIALS, RATING AS PER PIPE CLASS.

0 25.10.17 SSP SK JV
REV. DATE PURPOSE PREP'D BY REVIW'D. BY APPV'D BY
DESIGN, ENGG, SUPPLY, INSTALLATION, COMMISSIONING OF GAS COMPRESSOR AT
CTF-ANKLESHWAR

REV.: 0 SHEET T1 OF T2 PDIL


DRAWING NO. -
VOL : II SECTION : INST. VADODARA

Typical symbol on P & I

OR

EQUIPMENT

<

* VENDOR TO FILL UP APPLICABLE MATERIALS, RATING AS PER PIPE CLASS.

0 25.10.17 SSP SK JV
REV. DATE PURPOSE PREP'D BY REVIW'D. BY APPV'D BY
TYPICAL SECONDARY SKETCHES
(GAS COMPRESSOR)
DESIGN, ENGG, SUPPLY, INSTALLATION, COMMISSIONING OF GAS
COMPRESSOR AT CTF-ANKLESHWAR
Engineering REV : 0 SHEET : 1 OF 2
DRAWING NO.- PC00115-5300-TSS- PDIL,
Services,
0726 VOL : II SECTION : INST. VADODARA
Ankleshwar

TYPICAL SECONDARY SKETCHES ( GAS COMPRESSOR )

0 25.10.17 FIRST ISSUE SSP SK JV


REV. DATE PURPOSE PRPD REWD APPD
TYPICAL SECONDARY SKETCHES (GAS COMPRESSOR)-INDEX
DESIGN, ENGG, SUPPLY, INSTALLATION, COMMISSIONING OF GAS
COMPRESSOR AT CTF-ANKLESHWAR
Engineering REV : 0 SHEET : 2 OF 2
DRAWING NO.- PC00115-5300- PDIL,
Services,
TSS-0726 VOL : II SECTION : INST. VADODARA
Ankleshwar
Sheet REVISION Sheet REVISION Sheet REVISION
Description NO 0 1 2 3 4 5 Description NO 0 1 2 3 4 5 Description NO 0 1 2 3 4 5

COVER 1 X

INDEX 2 X

ON/OFF VALVE WITH


S1 X
SOV
CONTROL VALVE
WITH E/P S2 X
POSITIONER

0 25.10.17 FIRST ISSUE SSP SK JV


REV DATE PURPOSE PREPARED REVIEWED APPROVED