ELECTRICAL SYMBOLS (NOT ALL SYMBOLS APPLICABLE) SINGLE LINE SYMBOL LIST ELECTRICAL ABBREVIATIONS ELECTRICAL NOTES

FACILITIES
MANAGEMENT
AND PLANNING

12 KV
RELAY PROTECTION SYSTEM
INFRASTRUCTURE
UPGRADE
PHASE A

RECOMMENDED SEQUENCE OF OPERATION

DUCTBANK SYMBOLS

ELECTRICAL
SYMBOLS,
GENERAL NOTES,
& ABBREVIATIONS

E0.1
LEGEND:

FACILITIES
GENERAL NOTE: MANAGEMENT
AND PLANNING

12 KV
SYSTEM
INFRASTRUCTURE
UPGRADE
PHASE A

ELECTRICAL
EXISTING SITE PLAN
FOR REFERENCE
ONLY

FOR REFERENCE
SITE PLAN - EXISTING 12 KV DUCTBANK ROUTING ONLY
E1.1R
GENERAL NOTE:

LEGEND: FACILITIES
MANAGEMENT
AND PLANNING

12 KV
SYSTEM
INFRASTRUCTURE
UPGRADE
PHASE A

ELECTRICAL
SITE PLAN
12KV LOOP SYSTEM
PHASE 'A'

SITE PLAN 12KV LOOP SYSTEM - PHASE 'A'


E1.1
SHEET NOTES: GENERAL NOTES:

LEGEND: FACILITIES
MANAGEMENT
AND PLANNING

12 KV
SYSTEM
INFRASTRUCTURE
UPGRADE
PHASE A

PHYSICAL ED & GYM


SWITCH LOCATION
& ELECT. ROOM
FLOOR PLAN

PHYSICAL EDUCATION & GYM TRANSFORMER ROOM SECTIONALIZED SWITCH LOCATION


E4.1
LEGEND: SHEET NOTE: GENERAL NOTES:

FACILITIES
MANAGEMENT
AND PLANNING

12 KV
SYSTEM
INFRASTRUCTURE
UPGRADE
PHASE A

ART EDUCATION
BLDG SWITCH
LOCATION & ELECT.
ROOM FLOOR PLAN

ART EDUCATION BUILDING SECTIONALIZED SWITCH LOCATION


E4.2
GENERAL NOTES: LEGEND:

SHEET NOTES:

FACILITIES
MANAGEMENT
AND PLANNING

12 KV
SYSTEM
INFRASTRUCTURE
UPGRADE
PHASE A

STUDENT HEALTH
CENTER SWITCH
LOCATION & ELECT.
ROOM FLOOR PLAN

STUDENT HEALTH CENTER SECTIONALIZED SWITCH LOCATION


E4.3
GENERAL NOTES:

SHEET NOTES: FACILITIES


MANAGEMENT
AND PLANNING

LEGEND:

12 KV
SYSTEM
INFRASTRUCTURE
UPGRADE
PHASE A

VBT BLDG
SWITCH LOCATION
& ELECT. ROOM
FLOOR PLAN

VALLEY BUSINESS & TECHNOLOGY CENTER SECTIONALIZED SWITCH LOCATION E4.4


SHEET NOTES: LEGEND: GENERAL NOTES:

FACILITIES
MANAGEMENT
AND PLANNING

12 KV
SYSTEM
INFRASTRUCTURE
UPGRADE
PHASE A

LIBRARY
SWITCH LOCATION
& ELECT. ROOM
FLOOR PLAN

UNIVERSITY LIBRARY SECTIONALIZED SWITCH LOCATION


E4.5
SHEET NOTES: LEGEND: GENERAL NOTES:

FACILITIES
MANAGEMENT
AND PLANNING

12 KV
SYSTEM
INFRASTRUCTURE
UPGRADE
PHASE A

SCIENCE BLDG
SWITCH LOCATION
& ELECT. ROOM
FLOOR PLAN

SCIENCE BUILDING SELECT SWITCH LOCATION


E4.6
GENERAL NOTES:

FACILITIES
LEGEND: MANAGEMENT
AND PLANNING

BOOKSTORE
12 KV
SYSTEM
INFRASTRUCTURE
UPGRADE
PHASE A

LOCATION & ELECT.


ROOM FLOOR PLAN

UNIVERSITY UNION "OLD" SECTIONALIZED LOCATION


E4.7
LEGEND: SHEET NOTES: GENERAL NOTES:

FACILITIES
MANAGEMENT
AND PLANNING

12 KV
SYSTEM
INFRASTRUCTURE
UPGRADE
PHASE A

MEIKLEJOHN HALL
SWITCH LOCATION
& ELECT. ROOM
FLOOR PLAN

MEIKLEJOHN HALL SECTIONALIZED SWITCH LOCATION


E4.8
GENERAL NOTE:

SHEET NOTES:
FACILITIES
MANAGEMENT
AND PLANNING

12 KV
SYSTEM
INFRASTRUCTURE
UPGRADE
PHASE A

ELECTRICAL
PARTIAL
SITE PLAN
THEATER BLDG

KEY PLAN
FIRST FLOOR

PARTIAL SITE PLAN - THEATER BLDG 1 E4.9


GENERAL NOTES:

SHEET NOTES:

FACILITIES
MANAGEMENT
AND PLANNING

LEGEND:

12 KV
SYSTEM
INFRASTRUCTURE
UPGRADE
PHASE A

EQUIPMENT YARD - SUBSTATION PLAN EQUIPMENT YARD - SUBSTATION DEMOLITION PLAN

ELECTRICAL
PLANS
SUBSTATION
THEATER BLDG

SECTION KEY PLAN


FIRST FLOOR
E4.10
FACILITIES
MANAGEMENT
AND PLANNING

12 KV
SYSTEM
INFRASTRUCTURE
UPGRADE
PHASE A

LEGEND:

DEMOLITION
SINGLE LINE
DIAGRAM
12KV SYSTEM

DEMOLITION SINGLE LINE DIAGRAM


ED5.1
LEGEND: GENERAL NOTES: SHEET NOTES:

FACILITIES
MANAGEMENT
AND PLANNING

12 KV
SYSTEM
INFRASTRUCTURE
UPGRADE
PHASE A

ELECTRICAL
SINGLE LINE
DIAGRAM
LOOP SYSTEM

E5.1
12kV DISTRIBUTION LOAD SUMMARY - Phase A
CONNECTED DEMAND/METE CONNECTED DEMAND/METER
LOAD (KVA) R LOAD (KVA) LOAD (A) LOAD (A) FACILITIES
MANAGEMENT
AND PLANNING
Feeder 1 1500 645 72 31
Feeder 2 6500 2998.4 313 144
Feeder 3 7950 3999 383 193

Any Feeder with Entire Campus Load 15950 6350 768 306

12KV FEEDER AMPACITY #4/0 = 315A MIN ALLOWABLE CONDUIT SIZE 4"
12KV FEEDER AMPACITY #250MCM = 345A MIN ALLOWABLE CONDUIT SIZE 4"
12KV FEEDER AMPACITY #350MCM = 415A MIN ALLOWABLE CONDUIT SIZE 4"
12KV FEEDER AMPACITY #500MCM = 500A MIN ALLOWABLE CONDUIT SIZE 5"

Feeder Sizes
Loop Feeder 2 size is #350MCM
Radial Feeder 3 size is #250MCM
Radial Feeder 1 and 2 size is #4/0

12kV DISTRIBUTION LOAD - FEEDER #1 12kV DISTRIBUTION LOAD - FEEDER #2


CONNECTED METER LOAD CONNECTED DEMAND/METER
LOAD TYPE DESCRIPTION LOAD (KVA) (KVA) LOAD TYPE DESCRIPTION LOAD (KVA) LOAD (KVA)
FIELD HOUSE 750 283 PHYSICAL EDUCATION AND GYM 500 369 *
MUSIC BUILDING 750 362.4
ART & EDUCATION 750 233 *
STUDENT HEALTH CENTER 500 143 *
BUSINESS AND TECHNOLOGY 2000 1000 ****
UNIVERSITY THEATER 750 169.4 *
BOOKSTORE 500 250 ****
OLD UNIVERSITY UNION 500 480 *** 12 KV
MEIKLEJOHN HALL 1000 354 * SYSTEM
INFRASTRUCTURE
TOTAL 1500 645.4 UPGRADE
PHASE A
TOTAL CONNECTED LOAD IN AMPS AT 12000 V 3 Ph = 72 A
TOTAL DEMAND LOAD IN AMPS AT 12000 V 3 Ph = 31 A TOTAL 6500 2998.4

TOTAL CONNECTED LOAD IN AMPS AT 12000 V 3 Ph = 313 A


TOTAL DEMAND LOAD IN AMPS AT 12000 V 3 Ph = 144 A
12kV DISTRIBUTION LOAD - FEEDER #3
CONNECTED DEMAND/METER
LOAD TYPE DESCRIPTION LOAD (KVA) LOAD (KVA) **** = DEMAND LOAD (Demand Taken at 50% of Connected Load)

SSARB 2000 1000 **** *** = CALCULATED LOAD FROM 2010 AEPC OLD STUDENT UNION STUDY
* = METERED LOAD
LIBRARY/WARREN HALL 2500 1129 *
SCIENCE BUILDING (NORTH, SOUTH) 750 620 *
EARLY CHILDHOOD CENTER 750 375 ****
BOILER HOUSE 300 150 ****
RECREATION AND WELLNESS CENTER 1500 650 ** 12kV DISTRIBUTION LOAD - ENTIRE CAMPUS LOAD (ANY FEEDER)
PIONEER HEIGHTS STREET LIGHTING 150 75 CONNECTED DEMAND/METER
LOAD TYPE DESCRIPTION LOAD (KVA) LOAD (KVA)

ENTIRE CAMPUS LOAD EXCEPT FOR RECREATION


AND WELLNESS CENTER 14450 5700 *
RECREATION AND WELLNESS CENTER 1500 650 **

TOTAL 7950 3999

TOTAL CONNECTED LOAD IN AMPS AT12000 V 3 Ph = 383 A


TOTAL DEMAND LOAD IN AMPS AT 12000 V 3 Ph = 193 A

Demand Taken at 50% of Connected Load


**** = DEMAND LOAD (Demand Taken at 50% of Connected Load) TOTAL 15950 6350

** = CALCULATED DEMAND LOAD FROM BUILDING DESIGN DRAWINGS


* = METERED LOAD LOAD STUDY
TOTAL CONNECTED LOAD IN AMPS AT 12000 V 3 Ph = 768 A
SCHEDULES
TOTAL DEMAND LOAD IN AMPS AT 12000 V 3 Ph = 306 A LOOP SYSTEM
Demand Taken at 50% of Connected Load

** = CALCULATED DEMAND LOAD FROM BUILDING DESIGN DRAWINGS


* = METERED LOAD

E5.2
(E) MH-7a [MH-9F2] (E) MH-6 [MH-8F2] (E) MH-5 [MH-7F2] GENERAL NOTES:

N N N

FACILITIES
MANAGEMENT
AND PLANNING

W E W E W E
SHEET NOTES:

S S S

MANHOLE LEGEND:

12 KV
SYSTEM
INFRASTRUCTURE
UPGRADE
PHASE A

(E) MH-7E [MH-12F2] (E) MH-7D [MH-11F2] (E) MH-7A [MH-10F2]


N N N

W E W E W E

S S S MANHOLE
DETAILS

E7.1
(E) MH-8 [MH-16F2] (E) MH-7c [MH-15F2] (E) MH-7b [MH-14F2] GENERAL NOTES:
N N N

FACILITIES
MANAGEMENT
AND PLANNING

W E W E W E SHEET NOTES:

S S S

CABLE LEGEND:

12 KV
SYSTEM
INFRASTRUCTURE
UPGRADE
(E) MH-8f [MH-20F2] (E) MH-8e [MH-19F2] (E) MH-8a [MH-17F2] PHASE A
(E) MH-3b [MH-31F3]
N N N N

W E W E W E W E

S S SE S S

MANHOLE
DETAILS

E7.2
FACILITIES
MANAGEMENT
AND PLANNING

NOTES

LEGEND

TRANSFORMER SYSTEM GROUNDING LOW VOLTAGE CONDUIT IN TRENCH DETAIL

12 KV
SYSTEM
INFRASTRUCTURE
UPGRADE
PHASE A

ELECTRICAL
DETAILS

GROUND TEST WELL


E7.3