Você está na página 1de 3

٣٥١

٢٦٥٢ / ‫ﺭﻗﻡ ﺍﻟﻣﻧﺎﻓﺳﺔ‬

A23

Kilometer
Slope (%)
Soil Cover
Ground Level

Chainage (m)
Pipe Diameter
Stake Number

Invert Level (m)

A22

0 Partial Distance (m)


A21 90
+1095.00
+1097.00
+1099.00
+1101.00
+1103.00
+1105.00
+1107.00
+1109.00
+1111.00
+1113.00
+1115.00
+1117.00
+1119.00

0
0.00 3.01 1101.83 1105.84 A1

A20
50.00

50.00 2.82 1101.91 1105.73 A2


A19
A18 800
50.00

100.00 2.93 1101.99 1105.92 A3

A17
50.00

150.00 3.05 1102.08 1106.13 A4


0.1633

A16 700
50.00

200.00 2.06 1102.16 1105.22 A5

A15
50.00

250.00 2.08 1102.24 1105.32 A6


29.37
A14 600
279.37 2.07 1102.29 1105.36 A7
20.63 ARV Ø200
300.00 2.00 1102.32 1105.32 A8

A13
50.00

350.00 2.14 1102.20 1105.34 A9

A12 500
50.00

400.00 2.19 1102.08 1105.27 A10

A11
50.00

450.00 2.15 1101.97 1105.12 A11

400
50.00

A10

500.00 3.10 1101.85 1105.95 A12

A9
50.00

550.00 2.14 1101.73 1104.87 A13


1000 mm
-0.2362

300 A8
50.00

A7
600.00 2.12 1101.61 1104.73 A14

A6
50.00

650.00 2.14 1101.49 1104.63 A15

A5 200
50.00

700.00 2.22 1101.38 1104.60 A16

A4
50.00

749.99 2.47 1101.26 1104.73 A17

A3 100
50.00

799.99 2.02 1101.14 1104.16 A18


12.26 WO
812.25 2.05 1101.11 1104.16 A19
A2
37.74

849.99 2.76 1101.29 1105.05 A20

A1
50.00

899.99 2.87 1101.54 1105.41 A21


0.4894

50.00

949.99 2.73 1101.78 1105.51 A22


49.82

999.81 2.49 1102.03 1105.51 A23


(
)

:
:
:
:
:
:

:
101 -

1437

1126
:

:
‫ﻣﺷﺭﻭﻉ ﺧﺯﺍﻥ ﺍﻟﺗﺟﻣﻳﻊ ﻭﻣﺣﻁﺔ ﺍﻟﺗﻭﺯﻳﻊ ﻓﻲ ﻣﺭﻛﺯ ﺗﺛﻠﻳﺙ‬
٢٦٥٢ / ‫ﺭﻗﻡ ﺍﻟﻣﻧﺎﻓﺳﺔ‬ ‫ﻣﺷﺭﻭﻉ ﺧﺯﺍﻥ ﺍﻟﺗﺟﻣﻳﻊ ﻭﻣﺣﻁﺔ ﺍﻟﺗﻭﺯﻳﻊ ﻓﻲ ﻣﺭﻛﺯ ﺗﺛﻠﻳﺙ‬

+1111.00
CONNECTION TO DISCHARGE PIPE
FROM PUMP STATION
+1109.00
PIPELINE OF DIAMETER 1000mm CONNECTION TO PIPE OF DIAMETER 500mm
CROWN LEVEL = 1102.93 DONE UNDER ANOTHER CONTRACT
INVERT LEVEL = 1102.60
+1107.00

+1105.00

+1103.00

+1101.00

+1099.00

+1097.00

VALVE

WO
+1095.00

B10

B11

B12

B13

B14
B15
B1

B2
B3

B4

B5

B6

B7

B8

B9
Stake Number

1104.41 1106.86

1104.31 1106.86
1104.24 1106.86

1104.09 1106.76

1103.81 1106.59

1103.26 1105.76

1103.22 1105.82

1103.17 1105.89

1103.07 1105.99

1102.98 1106.09

1102.89 1106.17

1102.80 1106.31

1102.70 1106.24

1102.61 1106.21
1102.60 1106.20
Ground Level

Invert Level (m)

2.05

2.15
2.12

2.17

2.28

2.00

2.10

2.22

2.42

2.61

2.78

3.01

3.04

3.10
3.10
Soil Cover

Slope (%) -0.1000 -0.1857

400
Pipe Diameter(mm) 500

8.69
1.86

5.39
Partial Distance (m) 14.86 24.59 50.00 21.79 28.21 50.00 50.00 50.00 50.00 50.00 50.00

100.00

121.79

150.00

200.00

250.00

300.00

350.00

400.00

450.00
455.39
10.55

25.41

50.00
Chainage (m)
0.00

8.69

Kilometer 0

CONNECTION TO PIPE OF DIAMETER 500mm


DONE UNDER ANOTHER CONTRACT
INVER LEVEL = 1102.60
EXISTING PIPELINE Ø1000
400 B13

300 B11

200 B9
WO

B7
B12
B15
B14

B10

B8

B6 100

PROPOSED PIPELINE Ø1000 B5


:
REFER TO DRAWING PP-101
FOR CONTINUATION

B4 VALVE
B3
B1
B2

( )
:

: :

102 -
: :

1437
: :

: :

1126

٣٥٢
‫ﺭﻗﻡ ﺍﻟﻣﻧﺎﻓﺳﺔ ‪٢٦٥٢ /‬‬ ‫ﻣﺷﺭﻭﻉ ﺧﺯﺍﻥ ﺍﻟﺗﺟﻣﻳﻊ ﻭﻣﺣﻁﺔ ﺍﻟﺗﻭﺯﻳﻊ ﻓﻲ ﻣﺭﻛﺯ ﺗﺛﻠﻳﺙ‬

‫‪+1113.00‬‬

‫‪+1111.00‬‬

‫‪+1109.00‬‬

‫‪+1107.00‬‬

‫‪FROM RESERVOIR‬‬ ‫‪+1105.00‬‬

‫‪OUTLET CHAMBER‬‬
‫‪+1103.00‬‬

‫‪+1101.00‬‬

‫‪+1099.00‬‬

‫‪+1097.00‬‬

‫‪+1095.00‬‬

‫‪C10‬‬
‫‪C11‬‬
‫‪Stake Number‬‬

‫‪C1‬‬
‫‪C2‬‬

‫‪C3‬‬

‫‪C4‬‬

‫‪C5‬‬
‫‪C6‬‬

‫‪C7‬‬
‫‪C8‬‬

‫‪C9‬‬
‫‪1104.11 1106.71‬‬
‫‪1104.10 1106.71‬‬

‫‪1103.95 1106.52‬‬

‫‪1103.81 1106.25‬‬

‫‪1103.78 1106.22‬‬
‫‪1103.87 1106.20‬‬

‫‪1103.85 1106.16‬‬
‫‪1103.74 1106.14‬‬

‫‪1103.62 1105.92‬‬

‫‪1103.57 1105.97‬‬
‫‪1103.57 1105.97‬‬
‫‪Ground Level‬‬

‫)‪Invert Level (m‬‬

‫‪2.30‬‬
‫‪2.31‬‬

‫‪2.27‬‬

‫‪2.14‬‬

‫‪2.14‬‬
‫‪2.23‬‬

‫‪2.21‬‬
‫‪2.10‬‬

‫‪2.00‬‬

‫‪2.10‬‬
‫‪2.10‬‬
‫‪Soil Cover‬‬

‫)‪Slope (%‬‬ ‫‪-0.3267‬‬ ‫‪-0.1000‬‬

‫‪Pipe Diameter‬‬ ‫‪300 mm‬‬ ‫‪100 mm‬‬ ‫‪300 mm‬‬

‫)‪Partial Distance (m‬‬


‫‪2.89‬‬

‫‪3.77‬‬

‫‪5.69‬‬

‫‪3.61‬‬

‫‪1.25‬‬
‫‪47.11‬‬ ‫‪41.54‬‬ ‫‪8.46‬‬ ‫‪36.93‬‬ ‫‪50.00‬‬

‫)‪Chainage (m‬‬

‫‪100.00‬‬
‫‪103.77‬‬

‫‪109.46‬‬
‫‪113.07‬‬

‫‪150.00‬‬

‫‪200.00‬‬
‫‪201.25‬‬
‫‪50.00‬‬

‫‪91.54‬‬
‫‪0.00‬‬
‫‪2.89‬‬

‫‪Kilometer‬‬ ‫‪0‬‬

‫ﺍﻟﺸــﻤﺎﻝ‬

‫ﺍﳌﻤﻠﻜـــــﺔ ﺍﻟﻌﺮﺑﻴـــــﺔ ﺍﻟﺴـــــﻌﻮﺩﻳﺔ‬


‫ﻭﺯﺍﺭﺓ ﺍﳌﻴــــﺎﻩ‬
‫ﻭﺍﻟﻜﻬﺮﺑـــــﺎﺀ‬

‫ﺍﳌﺪﻳﺮﻳــــﺔ ﺍﻟﻌﺎﻣــــﺔ ﻟﻠﻤﻴــــﺎﻩ‬


‫ﲟﻨﻄﻘـــــــــﺔ ﻋﺴـــــﲑ‬
‫ﺍﻹﺩﺍﺭﺓ ﺍﻟﻌﺎﻣــــﺔ ﻟﻠﻤﺸــــﺎﺭﻳﻊ‬
‫ﺍﻻﺳﺘﺸــــــﺎﺭﻱ‪:‬‬

‫ﺷﺮﻛــــــــــﺔ ﺍﻻﲢــــــــﺎﺩ ﺍﳍﻨﺪﺳـــــــــﻲ ﺍﻟﺴﻌﻮﺩﻳــــــــــــــﺔ‬


‫ﺧﻄﻴــــــــــــﺐ ﻭ ﻋﻠﻤــــــــــــﻲ‬
‫‪C2 C1‬‬

‫ﺍﺳــﻢ ﺍﳌﺸــﺮﻭﻉ‪:‬‬
‫ﺍﻋــــﺪﺍﺩ ﺍﻟﺪﺭﺍﺳــــﺎﺕ ﺍﻻﺳﺘﺸــــﺎﺭﻳﺔ ﻭﺍﻟﺘﺼــــﺎﻣﻴﻢ ﳌﻨﻈﻮﻣــــﺎﺕ ﻣﻴــــﺎﻩ ﺍﻟﺸــــﺮﺏ‬
‫‪C3‬‬ ‫ﻭﺗﻮﺳــــﻌﺔ ﻭﺗﻄﻮﻳــــﺮ ﳏﻄــــﺎﺕ ﻭﺷــــﺒﻜﺎﺕ ﺍﻟﺼــــﺮﻑ ﺍﻟﺼــــﺤﻲ ﺍﻟﻘﺎﺋﻤــــﺔ‬
‫ﺑﻌـــﺪﺩ ﻣـــﻦ ﳏﺎﻓﻈـــﺎﺕ ﻭﻣـــﺪﻥ ﻣﻨﻄﻘـــﺔ ﻋﺴـــﲑ )ﺍﳌﺮﺣﻠـــﺔ ﺍﻻﻭﱃ(‬
‫‪C11‬‬
‫‪C8 C7‬‬

‫‪200 C10‬‬
‫‪C6‬‬
‫‪C5‬‬

‫‪C9‬‬

‫‪C4‬‬ ‫ﺍﺳــﻢ ﺍﻟﻌﻘــﺪ‪:‬‬

‫ﻣﺸــﺮﻭﻉ ﺇ�ﺸــﺎﺀ ﺧــﺰﺍﻥ ﺍﻟﺘﺠﻤﻴــﻊ‬


‫‪100‬‬

‫‪PLUG FOR‬‬ ‫ﻭﳏﻄـــــــﺔ ﺍﻟﺘﻮﺯﻳـــــــﻊ ﰲ ﻣـــــــﺮﻛﺰ ﺗﺜﻠﻴـــــــﺚ‬


‫‪FUTURE CONNECTION‬‬
‫ﻋﻨــﻮﺍﻥ ﺍﳌﺨﻄــﻂ‪:‬‬

‫ﺭﺳﻢ‪:‬‬ ‫ﳐﻄــﻂ ﺭﻗــﻢ‪:‬‬

‫ﺍﺭ‬ ‫ﻡ ‪103 -‬‬


‫ﺗﺼـــــﻤﻴﻢ‪:‬‬ ‫ﺗــــــﺎﺭﻳﺦ‪:‬‬

‫ﻉﻝﻉ‬ ‫ﻫﺠﺮﻱ ‪1437‬‬


‫ﻣﺮﺍﺟﻌﺔ‪:‬‬ ‫ﻣﻘﻴـــﺎﺱ‪:‬‬

‫ﻕﺍﺡ‬ ‫ﻛﻤـــﺎ ﻣﺒـــﲔ‬


‫ﻣﻮﺍﻓﻘــــﺔ‪:‬‬ ‫ﺭﻗــﻢ ﺍﳌﺸـــﺮﻭﻉ‪:‬‬

‫ﻡﺍﺡ‬ ‫ﺟﻲ ‪1126‬‬

‫‪٣٥٣‬‬