GRAPHIC SCALE IN METERS:

749
0 2 4 8 12
1:200

B.o.C -1 0
.75
.0
Km 700
NOTES:

.0 0 1. PUMP-OUT 12" CONNECTION NOZZLE

17 39 0 0 CENTER LINE ELEVATION OF POMP-OUT 12" IS AT LEVEL 1727.775

1H
:3 V
33. 2. PUMP-IN 8" CONNECTION NOZZLE

17 CENTER LINE ELEVATION OF POMP-IN 8" IS AT LEVEL 1747.020

Km .C -1
B.o
V 3. OUTLET NOZZLE

H:3 MAKK

75 .75
AH
1 OUTLET 1: THE ANGLE FROM THE AXIS TO THE AXIS NOZZLE IS 148°
OUTLET 2: THE ANGLE FROM THE AXIS TO THE AXIS NOZZLE IS 152°

0. 0

PLANT
0
4. FOR ALL EXCAVATION WORKS AND LAYING OF PIPES, CABLES ETC.:

GROUND MUST BE EXPLORED CAREFULLY BEFORE EXCAVATION AND EXCAVATION MUST BE PROCEEDED WITH ABSOLUTE CAUTION.

: 1 V ALL INDICATED SIZES OF PIPE DIAMETER ARE NOMINAL SIZES (INCH NOMINAL SIZES).

1 H INTERNAL LINING OF STATION PIPING: FBE (FUSION BONDED EPOXY).

5. TANK NOZZLE

ROUTING OF STATION PIPING OF TANK OUTLETS ARE PARALLEL TO THE CONSIDERED COMBINED OUTLET NOZZLE CENTERLINE.
SPECIFIC DIFFERENCE OF ANGEL OF THE NOZZLE HAS TO BE ADJUSTED ACCORDINGLY AT TANK NOZZLE SIDE
IT IS CONSIDERED A RECTANGULAR ANGLE DIFFERENCE BETWEEN INLET AND OUTLET ORIENTATION

LEGEND:
BUILDINGS & STRUCTURES LEVEL INDICATION

. 00 EXISTING BUILDING / SHAFTS GRADE ELEVATION

0 5
65 -1.0
NEW BUILDINGS / SHAFTS
PIPE CENTERLINE ELEVATION

Km o.C
ROADS & TRAFFIC AREAS
SECTION PLAN
TANKFARM:
B. 17 NEW ROAD
TYPE 2:
ROAD WIDTH = 5.00m
SHOULDER = 2x1.00m

33

R=
.0

0.0°
MAIN STATION PIPING

STEEL TANK N0. 1 0

6
INCH40/PN16

DRAIN 6"
STATION PIPING WITH YARD SHAFT, YARD SHAFT WITH

0.5
DIAMETER, PRESSURE CLASS DRAIN CHAMBER
DR
INLET C.S. OUTLET C.S.
.00

V= 170'000 m³
ABOVE GROUND

0
B.o.P = BOTTOM OF PIPE
BURIED B.o.S = BOTTOM OF SHAFT
B.o.C = BOTTOM OF CHANNEL
33

DRAINAGE AND OVERFLOW GRP

ø 106 m DRAINAGE SMALL SIZE GRP


17
.00

Km
B.o 800.00
9

.C -
1.7
173

5
6"
117
° I N
A
7 ° DR
12
DR
AIN °
6" 14
5

3° °


7 3
1 18

16
E = 642'323.529
N = 2'358'054.441 270.0°
90.0°
LEVEL TANKFARM
1727.00 = +/- 00.00
REFERENCE DRAWING:
DRAWING No. TITLE
°
250

DR
NOTE 1:
AIN
90° 6"

->
6"

56"
50.00 I N ENGINEER'S STAMP: CONTRACTOR'S STAMP:

RA
0

K m 8
1 .75
0

. C - D
B.o
.


0
9

>
B.o.P
173

"-
.

NOTE 2:
3

1723.39

60
173

DRAIN 6"
180.0°

REV. ISSUED FOR BY CHECKED APPROVED DATE

..\X-REF_PICTURES\KINGDOM OF SAUDIARABIA.PNG

NOTE 1: KINGDOM OF SAUDI ARABIA


..\X-REF_PICTURES\SALINE WATER COMPANY.PNG

OUTLET SALINE WATER CONVERSION CORPORATION(SWCC)

-1.00 NOTE 2: PROJECT


..\X-REF_PICTURES\STRATEGIC MAKKAH TAIF.PNG

Project No.
TITLE:
STRATEGIC RESERVOIR AT MAKKAH PHASE II &
INLET 20906 TAIF PHASE I

+0.50 ENGINEER:
44"

..\X-REF_PICTURES\SAUDI CONSOLIDATE.PNG
44"

SAUDI CONSOLIDATED ENGINEERING COMPANY


B.o.P (KHATIB & ALAMI)

1724.46

6 "
CONTRACTOR:
60"

N
B.o.C CHANNEL -> AL-AYUNI INVESTMENT & CONTRACTING CO.

I
AL-AYUNI

A
-1.80
00

900 x 700

R
LOCATION: STRATEGIC TANKS

D
R=10.

L=25.00, 32‰ TAIF

0.00 PIPING LAYOUT TANK 1


90 1.80
Km .C - SCALE:
B.o STEEL TANK N0. 2 1/200 7 6 - Q P 1 0 - P - 0 1 1 1/1 A
FINAL
ENGINEERING IBG Ltd.
GRAPHIC SCALE IN METERS:
0 1 2 5
1:100
0 1 5 10
1:200
ALL DIMENSIONS IN M IF NOTHING ELSE IS MENTIONED.
LEGEND:
TANK INLET & OUTLET PIPING
TANK PIPING
REFERENCE DRAWING:
DRAWING No. TITLE
ENGINEER'S STAMP: CONTRACTOR'S STAMP:
REV. ISSUED FOR BY CHECKED APPROVED DATE
Project No.
20906
LOCATION: STRATEGIC TANKS
TAIF
TANKS INLET & OUTLET PIPING
GENERAL ARRANGEMENT
SCALE: DRAWING NO. SHEET REV.
1:150 7 6 - Y B 7 0 - S - 0 0 1 1/9 A
FINAL
ENGINEERING IBG Ltd.