ctivity Productivity norms :No. of Productivity norms Machinery (in


/per Man hours
day (8 Labor Units per 8 hours Hours)
hrs)

Plate compactor

concrete Pump
Mobile Crane
Carpentor

Steel fxer

Scafolder
Carpentor

Steel fxer

Scafolder

Excavator
Quantity.

Painter
Mason

Helper
Painter
Mason

Helper

Shovel
JCB
Origina 8
l
Duratio
Activity ID Activity Name n Start Finish Units .
Construction 87 28-Mar-19 29-Jul-19
Area 87 28-Mar-19 29-Jul-19
Foundation_Lo 84 28-Mar-19 24-Jul-19
Tank - 67 28-Mar-19 30-Jun-19
1 Intial Survey & Marking for Excavation 2 28-Mar-19 30-Mar-19
2 Excavation & Disposal 3 1-Apr-19 4-Apr-19 m3 21 200 176
3 Compaction & Bed Preparation 2 11-Apr-19 13-Apr-19 m2 32 144
4 Shutter fixing & Laying of Polythene Sheet for Blinding 2 18-Apr-19 20-Apr-19 m2 4 4.8 8 12 5 8 0
5 Inspection & Pour Blinding Concrete 2 21-Apr-19 22-Apr-19 m3 3 7 8 12 3657 5486
6 Rebar Fixing, Insertion of HDPE Strip & Anchor Bolts in the Ring Wa 5 23-Apr-19 28-Apr-19 kg 3200 300 8 8 3 3
7 Shutter fixing for Wall & Fixing for the Ring Wall 7 24-Apr-19 1-May-19 m2 130 3.5 8 12 4 69 103 34
8 Inspection & Pour Concrete Ring Wall 5 4-May-19 8-May-19 m3 30 5 8 12 194 290
9 Shutter strike and Curing for Ring Wall 3 9-May-19 13-May-19 m2 121 8 8 12 75 113
10 Protection for Ring Wall Concrete 3 14-May-19 16-May-19 m2 75 15 8 46
11 Back Filling at Ring Wall Upto above GL (1000 mm approx.) 8 16-May-19 29-May-19 m3 86 120

1
Tipper

360
360
Tele handler achinery (in
Excavator

JCB

0.16 0.18
Mobile Crane

Plate compactor

0.02778

#REF!
Shovel
Machinery Hours

concrete Pump

Tipper

#REF!
0.089
Tele handler