BILL OF ENGINEERING MEASUREMENT & EVALUATION (BEME)

MATERIALS FOR SUB-STATION


1 100kVA, 11/0.415kV Transformer(Copper to Copper) 0 No
2 200kVA, 11/0.415kV Transformer(Copper to Copper) 0 No
3 300kVA, 110.415kV Transformer(Copper to Copper) 0 No
4 500kVA, 11/0.415kV Transformer(Copper to Copper) 0 No
5 100kVA, 33/0.415kV Transformer(Copper to Copper) 0 No
6 200kVA, 33/0.415kV Transformer(Copper to Copper) 0 No
7 300kVA, 33/0.415kV Transformer(Copper to Copper) 0 No
8 500kVA, 33/0.415kV Transformer(Copper to Copper) 0 No
9 2.5MVA, 33/11kV Transformer(Copper to Copper) 0 No
10 11kV Ganged Isolator 0 Set
11 33kV Ganged Isolator 0 Set
12 11kv Ganged Isolator Silicon 0 Set
13 33kv Ganged Isolator Silicon 0 Set
14 11kV 'D ' Type Fuse 0 Set
15 33kV 'D ' Type Fuse 0 Set
16 11kV Lightning Arrester 0 Set
17 33kV Lightning Arrester 0 Set
18 M.V. Feeder Pillar ( 4-ways ) 800Amps 0 No
19 Channel Iron 3 x 2 x 21 (11kV) 0 No
20 Channel Iron 4 x 2 x 21 (33kV) 0 No
21 1 x 500mm2 MV Cable (Nigeria cable) 0 m
22 1 x 300mm2 MV Cable (Nigeria cable) 0 m
23 4 core x 70mm2 MV Cable (Nigeria cable) 0 m
24 4 core x 120mm2 MV Cable (Nigeria cable) 0 m
25 4 core x 150mm2 Cable (Nigeria cable) 0 m
26 4 core x 185mm2 Cable (Nigeria cable ) 0 m
27 1 core x 35mm2 XLPE Cable(11KV) (Nigeria cable) 0 m
28 1 core x 70mm2 XLPE Cable(33KV) (Nigeria cable) 0 m
29 Earthing Mat (1m x 1.5m) 0 Set
30 Raychem Terminating kit (11KV) 0 Set
31 Raychem Terminating kit (33KV) 0 Set
32 Earthing Rod (Copper) 0 No
33 Earthing Rod (Galvanized) 0 No
34 Earthing Wire ( Copper ) 70mm 0 m
35 Anti Climb devices 0 No
36 500mm2 Cable lug 0 No
37 300mm2 Cable lug 0 No
38 185mm2 Cable lug 0 No
39 70mm2 Cable lug 0 No
40 3M Tape 0 No
41 Ebonite Tube 0 No
42 Phase Colour Disc 0 No
SUB-TOTAL (A)
MATERIALS FOR GRID EXTENTION AND STRINGING
HT ONLY 0 km
150mm2, ACSR "WOLF" (Route
43 HT ONLY 0 km
Length) Nigeria Cable
LT 0 km
HT ONLY 0 km
100mm2, ACSR "DOG" (Route
44 HT/LT 0 km
Length) Nigeria cable
LT 0 km
HT ONLY 0 km
150mm2, AAC (Route Length)
45 HT/LT 0 km
Nigeria cable
LT 0 km
HT ONLY 0 km
100mm2, AAC (Route Length)
46
Nigeria cable
100mm2, AAC (Route Length)
46 HT/LT 0 km
Nigeria cable
LT 0 km
70mm2, AAC "EARWIG" (Route
47 LT ONLY 0 km
Length) Nigeria cable
48 35mm2, AAC "MOSQUITO" Nigeria cable 0 km
48 8.5m (28') Concrete Poles 0 No
49 10.36m (33') Concrete Poles 0 No
50 12.00m (40') Concrete Poles 0 No
51 11kV Pin Insulator complete 0 Set
52 33kV Pin Insulator complete 0 Set
53 Disc (Strain Insulator) 0 Set
54 Tension set complete 0 Set
55 MV Stay Insulator 0 No
56 11kV Stay Insulator 0 No
57 33kv Stay Insulator 0 No
58 5/8" Stay Wire (mv/11KV) 0 m
59 7/8"Stay Wire (33kv) 0 m
60 6' Stay Rod (MV/11KV) 0 No
61 8' Stay Rod (33kV) 0 No
62 Stay Thimble 0 No
63 Stay Block 0 No
64 Bracket Pot Insulator Mount 0 Set
65 11kv Silicon Pot Insulator (SC) 0 Set
66 33kv Silicon Pot Insulator 0 Set
67 11kv Disc Silicon Insulator 0 Set
68 33kv Disc Silicon Insulator 0 Set
69 33kv Lightning Arrester Silicon 0 Set
70 11kv Lightning Arrester Silicon 0 Set
71 33kv D Type Fuse Silicon 0 Set
72 11kv D Type Fuse Silicon 0 Set

73 Double Groove Shackle Insulator complete with D-iron & pins 0 No


74 Extension Strap 0 No
75 Line Tap 0 No
76 Steel Cross-Arm 11kV 0 No
77 Steel Cross-Arm 33kV 0 No
78 Fibre Cross-Arm 11kV 0 No
79 Fibre Cross-Arm 33kV 0 No
80 Tie Strap 11kV 0 No
81 Tie Strap 33kV 0 No
82 16 x 51 Bolts, Nuts, & Washers 0 No
83 16 x 152 Bolts, Nuts, & Washers 0 No
84 16 x 200 Bolts, Nuts, & Washers 0 No
85 16 x 254 Bolts, Nuts, & Washers 0 No
86 16x280/305 Bolts, Nuts, & Washers 0 No
87 Flat Washer For 22mm Dia. 0 No
88 Flat Washer For 18mm Dia. 0 No
89 M20 x 2282 Bolts, Nuts, & Washers 0 No
90 Street Lighting Fittings (Complete) 0 Set
91 Street Lighting Fittings Kiosk 0 No
SUB-TOTAL (B)
SUMMARY
A MATERIALS FOR SUB-STATION

B MATERIALS FOR GRID EXTENTION AND STRINGING


SUB- TOTAL

SUB- TOTAL (Materials)

C SERVICES
Civil Work and Substation Fencing with insulated wire mesh,
92 0 No
filled with granite and lockable iron gate

Civil Work and Substation Fencing with insulated wire mesh,


93 0 No
filled with granite and lockable iron gate -2.5MVA S/S

94 Service Connection 0 No
95 Transformer and Feeder Pillar Plinth 0 Lot
96 Sign Post (Per Sub - Station) 0 No
97 Removal of poles 0 No
98 Pole Identification & REA Inscription 0 No
99 Danger Plate 0 No
100 Excavation and backfilling of concrete pole hole 0 No
101 Pole Foundation in Swampy Soil 0 No
102 Pole Foundation in Rocky Soil 0 No
103 Route Survey and pegging (ITC) 0 km
104 Route Survey and pegging (TDN) 0 km
105 Bush Clearing - Intertownship 0 km
106 Bush Clearing - Township 0 km
107 Welding of Stay Assembly 0 No
108 Tree cutting 0 km
109 Creating of Access Road (1000mx15m) 0 km
110 Special Equipment for Riverine project 0 No
SUB-TOTAL (C)

TOTAL (Materials and Services)

Testing, Hooking & commissioning of the entire network and


112
Transformers

113 Logistics and Tranaportation 10%


114 VAT (5%)
115 Contingency (2.5% )
GRAND TOTAL :
ERECTION (12% OF
MATERIALS PROJECT COST
MATERIAL COST)

- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
-

- -
- -
- -
- -
- -
- -

- -

- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
-
-
-

0
0

- -

- -

- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
-

-
-