Escolar Documentos
Profissional Documentos
Cultura Documentos
As on 31st March
M/S SDP STONES Rs in Lacs 0.00
0 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24
1 SOURCES Proj. Proj. Proj. Proj. Proj. Proj.
a. Net Profit (After Tax) 30.37 40.28 45.83 56.00 70.17 88.42
d. Increase In TL. Incl.public deposits 0.00 0.00 0.00 0.00 0.00 0.00
e. Decrease in
i.) Fixed Assets 0.00 0.00 0.00 0.00 0.00 0.00
ii.) Other Non Current Assets 0.00 0.00 0.00 0.00 0.00 0.00
2 USES
a. Net Loss 0.00 0.00 0.00 0.00 0.00 0.00
b. Dec.in Term Liab. incl. Pub.Dep. 0.00 50.00 50.00 50.00 50.00 50.00
c. Increase in
i) Fixed Assets 0.00 0.00 0.00 0.00 0.00 0.00
ii) Other Non current assets 0.00 0.00 0.00 15.00 35.00 45.00
5 iii Inc./Dec. in CL other than BB 0.00 0.25 5.94 7.43 16.71 21.98
6 iv Inc./Dec. in WC Gap 0.00 48.01 45.04 29.99 51.02 45.09
7 v Net Surplus (+) Deficit (-) 98.31 0.00 -0.01 0.00 23.01 49.14
Movement of TNW
No Particulars
1 List of Machinery
3 Schedule of Implementation
4 Schedule of Depreciation
9 DSCR Calculation
13 Break-Even Analysis
14 Sensitivity Analysis
19 Settling Tank
M/S SDP STONES Rs. Lacs
LIST OF MACHINERIES
GRANTRY CRANE,
OVERHEAD CRANE, AND
MARBLE DRESSING
2 MACHINE SDP MACHINES - AJMER 177.00
WATER TREATMENT
3 PLANT GORANA ENGINEERING WORKS 28.44
TOTAL 394.24
M/S SDP STONES Annexure - 2
COST OF THE PROJECT Rs. In lacs
MEANS OF FINANCING
9 Promoter's Contribution 164.24
10 Term loan 300.00
TOTAL 464.24
11 PROMOTER'S CONTRIBUTION (%) 35.38%
12 DEBT EQUITY RATIO 0.55
M/S SDP STONES Annexure -3
SCHEDULE OF IMPLEMENTATION
MANPOWER REQUIREMENT
Rs. 000's
Salary / Monthly
Particulars Nos Month Salary
Manager 1 15 15
Accountant 1 12 12
Security 1 7 7
Crane Operators 1 10 10
Machine Operators 4 12 48
Polishing Section 2 7.5 15
Helpers 6 5 30
Total 16 137 1.37 Rs. Lakhs
Figures in Italics represents estimates taken at the time of the last renewal.
Other Ratios
Bank Finance/ Ct. Assets (%) 52.72 46.77 41.79 38.76 36.61
Figures in Italics represents estimates taken at the time of the last renewal.
PARTICULARS Depn WDV ADD DEPN WDV DEPN WDV DEPN WDV DEPN WDV DEPN WDV DEPN WDV
Rate 2019 2020 2021 2022 2023 2024
Land 0.00% 49.00 0.00 49.00 0.00 49.00 0.00 49.00 0.00 49.00 0.00 49.00 0.00 49.00
Building 10.00% 50.00 5.00 45.00 4.50 40.50 4.05 36.45 3.65 32.81 3.28 29.52 2.95 26.57
Plant & Machinery 15.00% 414.24 62.14 352.10 52.82 299.29 44.89 254.40 38.16 216.24 32.44 183.80 27.57 156.23
Furniture & Fixtures 10.00% 2.00 0.20 1.80 0.18 1.62 0.16 1.46 0.15 1.31 0.13 1.18 0.12 1.06
Computers 60.00% 1.00 0.60 0.40 0.24 0.16 0.10 0.06 0.04 0.03 0.02 0.01 0.01 0.00
TOTAL 516.24 67.94 448.30 57.74 390.57 49.20 341.37 41.99 299.38 35.86 263.52 30.65 232.87
Gross Block 516.24 516.24 516.24 516.24 516.24 516.24 516.24 516.24
Deprciation (Cumulative) 67.94 125.67 174.87 216.86 252.72 283.37 309.63 332.07
Net Block 448.30 390.57 341.37 299.38 263.52 232.87 206.61 184.17
Rs. Lakhs
SUMMARY
YEARS 2019 2020 2021 2022 2023 2024 2025
Interest 28.63 24.37 19.19 14.02 8.84 3.67 0.22
Balance 262.50 212.50 162.50 112.50 62.50 12.50 0.00
Repayments 37.50 50.00 50.00 50.00 50.00 50.00 12.50
Working Capital 200.00 200.00 200.00 200.00 200.00 200.00 200.00
Interest 20.70 20.70 20.70 20.70 20.70 20.70 20.70
ASSESSMENT OF WORKING CAPITAL REQUIREMENT
OPERATING STATEMENT
Name of the Account M/s M/S SDP STONES
Amt.in Lacs
As per profit and loss account actuals/ estimates for the year ending 31st March
4 % age rise (+) or fall (-) in net 1.45 5.78 5.71 5.64
sales compared to previous
year (annualised)
5 Cost of Sales
(a) Imported
6 Dividend payable
12 Subsidy
NET WORTH
21 Revaluation reserve
Other CL(Except Bank Borr.) 67.28 67.53 73.47 80.90 90.18 102.88
Net Working Capital (Act./Proj) 112.07 160.08 205.11 235.10 256.13 280.19
Manufacturing Expenses
Raw Materials 1272.00 1174.03 1257.80 1329.63 1404.63 1519.11 1583.31
Segments 25.94 27.42 28.16 31.15 32.76 34.40 34.81
Consumables(1%of sales) 13.65 14.86 15.72 16.62 17.56 18.99 19.79
Salary and Wages 16.44 18.08 18.99 19.94 20.93 21.98 23.08
Power Charges 22.12 25.67 26.95 28.30 29.72 31.20 32.76
Land Rent 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Repair and Maintenance 1.20 1.32 1.45 1.60 1.76 1.93 2.13
Transportation & Freight 29.30 29.73 31.45 33.24 35.12 37.98 39.58
Other Manufacturing Expenses 21.98 22.29 23.58 24.93 26.34 28.48 29.69
Add : Opening Stock of FG 0.00 120.25 130.00 140.00 145.00 150.00 155.00
Less: Closing Stock of FG 120.25 130.00 140.00 145.00 150.00 155.00 160.00
Total manufacturing expenses ### ### ### ### ### 1689.08 ###
Admin and selling Expenses 21.98 22.29 23.58 24.93 26.34 28.48 29.69
Profit Before Intt., Dep. & Tax 160.66 160.34 154.56 156.70 165.64 181.33 189.30
Interest on Working Capital 20.70 20.70 20.70 20.70 20.70 20.70 20.70
Interest on Term Loan 28.63 24.37 19.19 14.02 8.84 3.67 0.22
Operating Profit Before Dep. & Tax 111.32 115.27 114.67 121.98 136.10 156.97 168.39
Depreciation 67.94 57.74 49.20 41.99 35.86 30.65 26.26
Preliminary Expenses W/O 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Operating Profit after dep. 43.39 57.54 65.47 80.00 100.24 126.32 142.13
Add. Net non operative income 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Profit Before Tax 43.39 57.54 65.47 80.00 100.24 126.32 142.13
Less: Provision for Income Tax 13.02 17.26 19.64 24.00 30.07 37.90 42.64
Profit After Tax 30.37 40.28 45.83 56.00 70.17 88.42 99.49
Computation of DSCR 30.37
Particulars Projection
Profit After Tax 30.37 40.28 45.83 56.00 70.17 88.42 99.49
Preliminary Exp. W/o 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Interest on Term Loan 28.63 24.37 19.19 14.02 8.84 3.67 0.22
Funds From Operation 126.94 122.38 114.22 112.00 114.87 122.74 125.96
Debt Obligation
Interest on Term Loan 28.63 24.37 19.19 14.02 8.84 3.67 0.22
Installment on term loan 37.50 50.00 50.00 50.00 50.00 50.00 12.50
Total Debt obligations 66.13 74.37 69.19 64.02 58.84 53.67 12.72
Yearwise DSCR (in times) 1.92 1.65 1.65 1.75 1.95 2.29 9.91
Average DSCR (in times) 2.10
M/S SDP STONES
Projected Balance Sheet
0.00 0.00 0.00 0.00 0.00 0.00 0.00
LIABILITIES 2019 2020 2021 2022 2023 2024 2025
Projn
Capital ( Partners)
Opening Balance (Capital) 0.00 300.00 300.00 300.00 300.00 300.00 300.00
Addn. During the year 300.00 0.00 0.00 0.00 0.00 0.00 0.00
Add. Net Profit + reserve 30.37 70.65 116.48 172.48 242.64 331.07 430.56
Less. Drawings 0.00 0.00 0.00 3.00 3.00 3.00 3.00
Closing Balance 330.37 370.65 416.48 469.48 539.64 628.07 727.56
Unsecured Loans from Family 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Long Term Liabilities
Term Loan 262.50 212.50 162.50 112.50 62.50 12.50 0.00
Total term liabilities 262.50 212.50 162.50 112.50 62.50 12.50 0.00
Current Liabilities & Provisions
Working Capital CC 200.00 200.00 200.00 200.00 200.00 200.00 200.00
Sundry Creditors 53.00 48.92 52.41 55.40 58.53 63.30 65.97
Other Current Liabilities & Provisions 14.28 18.61 21.06 25.50 31.65 39.58 44.41
Total Current Liabilities 267.28 267.53 273.47 280.90 290.18 302.88 310.38
Total Liabilities 860.15 850.68 852.45 862.88 892.32 943.45 ###
ASSETS
Fixed Assets
Gross Block 516.24 516.24 516.24 516.24 516.24 516.24 516.24
Less:Depreciation 67.94 125.67 174.87 216.86 252.72 283.37 309.63
Net Block 448.30 390.57 341.37 299.38 263.52 232.87 206.61
Current Assets
Inventories
Stock of Raw materials/consumables 100.00 110.00 135.00 150.00 160.00 170.00 180.00
Stock of Raw materials/consumables/Finished 120.25 130.00 140.00 145.00 150.00 155.00 160.00
Sundry Debtors 133.18 165.14 174.69 184.67 195.09 210.99 219.90
Cash & Bank Balance 12.90 5.20 9.25 12.33 11.15 9.19 16.28
Other Current Assets - 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Advance Tax 13.02 17.26 19.64 24.00 30.07 37.90 42.64
Total Current Assets 379.35 427.60 478.59 516.00 546.31 583.07 618.82
Non Current Assets:
Investments/Deposits 0.00 0.00 0.00 15.00 50.00 95.00 180.00
Misc Expe not Written off 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Deposits & Advances 32.50 32.50 32.50 32.50 32.50 32.50 32.50
Total Assets 860.15 850.67 852.45 862.88 892.33 943.44 ###
M/S SDP STONES Annexure - 11
Key Performance Indicators 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.8131506395
Parameter 2019 2020 2021 2022 2023 2024 2025
Projn
Reserves and Surplus 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Unsec Loan/Quasi Equity 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Opg Profit (PBIDT) 160.66 160.34 154.56 156.70 165.64 181.33 189.30
PBDIT/ Sales (%) 10.97% 10.79% 9.83% 9.43% 9.43% 9.55% 9.56%
NPAT / Sales (%) 2.07% 2.71% 2.91% 3.37% 4.00% 4.66% 5.03%
BREAKEVEN ANALYSIS
No PARTICULARS 1 YR 2 YR 3 YR 4 YR 5 YR
As on 31st March 2019 2020 2021 2022 2023
A. SALES 1465.00 1486.29 1572.25 1662.04 1755.79
B VARIABLE EXPENSES
Raw Materials 1272.00 1174.03 1257.80 1329.63 1404.63
Segments 25.94 27.42 28.16 31.15 32.76
Consumables 13.65 14.86 15.72 16.62 17.56
Salary and Wages 16.44 18.08 18.99 19.94 20.93
Power Charges 22.12 25.67 26.95 28.30 29.72
Repair and Maintenance 1.20 1.32 1.45 1.60 1.76
Transportation (2% of sales) 29.30 29.73 31.45 33.24 35.12
Other Manufacturing Expenses(1.5%) 21.98 22.29 23.58 24.93 26.34
Interest on Working Capital 20.70 20.70 20.70 20.70 20.70
Increase / Decrease in Inventory -120.25 -9.75 -10.00 -5.00 -5.00
SUB TOTAL B 1303.07 1324.36 1414.81 1501.11 1584.51
D. FIXED EXPENSES
1 Depreciation 67.94 57.74 49.20 41.99 35.86
2 Preliminary Exp. W/o 0.00 0.00 0.00 0.00 0.00
3 Land Rent 0.00 0.00 0.00 0.00 0.00
3 Selling & Genl expenses 21.98 22.29 23.58 24.93 26.34
4 Interest on Term loans 28.63 24.37 19.19 14.02 8.84
SUB TOTAL D 118.54 104.40 91.98 80.93 71.04
E OPERATING PROFIT(C-D) 43.39 57.54 65.47 80.00 100.24
F. BREAK EVEN SALES
(D X A)\C 1072.46 958.18 918.46 835.87 728.23
G. Break - Even % of Sales 73% 64% 58% 50% 41%
Rs. In lacs Rs. In lacs
6 YR 7 YR
2024 2025
1898.89 1979.14
1519.11 1583.31
34.40 34.81
18.99 19.79
21.98 23.08
31.20 32.76
1.93 2.13
37.98 39.58
28.48 29.69
20.70 20.70
-5.00 -5.00
1709.78 1780.85
189.11 198.29
30.65 26.26
0.00 0.00
0.00 0.00
28.48 29.69
3.67 0.22
62.80 56.16
126.32 142.13
630.53 560.51
33% 28%
M/S SDP STONES
SECURITY MARGIN & ASSET COVERAGE:
PROJECTION PROJECTION
PARTICULARS 31-03-2012 31-03-2013
PROJECTION PROJECTION
PARTICULARS 31-03-2012 31-03-2013
PROJECTION PROJECTION
PARTICULARS 31-03-2012 31-03-2013
LIABILITIES
CURRENT LIABILITIES
1 Short term borrowings from banks
(incl BP/BD and the excess
borrowings placed on repayment
but exclude bills drawn under LCs)
i From bank 200.00 200.00
ii (of which BP/BD ) 0.00 0.00
PROJECTION PROJECTION
PARTICULARS 31-03-2012 31-03-2013
TERM LIABILITIES
11 Unsecured Loans 0.00 0.00
12 Preference shares (redeemable
after one year) 0.00 0.00
13 Term Loans ( Exclusive of instalments
payable within one year) 262.50 212.50
15 Term deposits (repayable after 1 year) 0.00 0.00
16 Other term liabilities 0.00 0.00
NETWORTH
18 Paid up capital 300.00 300.00
19 Profit & Loss account 30.37 70.65
21 Misc Exp.outstanding(not w/o) 0.00 0.00
22 Drawings 0.00 0.00
PROJECTION PROJECTION
PARTICULARS 31-03-2012 31-03-2013
ASSETS
CURRENT ASSETS
25 Cash & bank balances 12.90 5.20
26 Investments other than
long term investments 0.00 0.00
I Government & other
trustee securities/CP,CD,MF 0.00 0.00
ii Fixed deposits with bks 0.00 0.00
27 I Recievables other than deferred
export recievables ( incl BP/BD
excluding BP/BD by Banks
drawn under LCs) 133.18 165.14
ii Export recievables (Excluding
bills purchased and discounted
by banks drawn under LCs 0.00 0.00
28 Instalments of deferred
recievables (due within one year) 0.00 0.00
29 INVENTORY
I Raw material (including stores &
other items used in the process of
manufacture
a Imported
b Indigenous Err:509 Err:509
ii Semi Finished Goods Err:509 Err:509
iii Finished Goods 120.25 130.00
iv Consumable Stores and Spares
a Imported
b Indigenous 0.00 0.00
30 Advances to suppliers of
raw materials 0.00 0.00
31 Advance payment of taxes 13.02 17.26
32 Other current assets
(Specify major ones)
i TDS 0.00 0.00
iii Advance to Staff 0.00 0.00
iii Others 0.00 0.00
PROJECTION PROJECTION
PARTICULARS 31-03-2012 31-03-2013
FIXED ASSETS
34 GROSS BLOCK 516.24 516.24
35 Less Depreciation 67.94 125.67
36 NET BLOCK 448.30 390.57
ADDITIONAL INFORMATION
I ICDs placed 0.00 0.00
ii ICDs taken 0.00 0.00
iii Bk fin for bills under LC 0.00 0.00
iv Inv. in CP /CD / MF 0.00 0.00
v Disputed indirect tax 0.00 0.00
vi Others 0.00 0.00
Diff.in balance sheet * Err:509 Err:509
FORM IV
PROJECTION PROJECTION
PARTICULARS 31-03-2012 31-03-2013
A. CURRENT ASSETS
PROJECTION PROJECTION
PARTICULARS 31-03-2012 31-03-2013
A. CURRENT LIABILITIES
(other than bank borrowings
for working capital)
PURCHASES 1311.59 1216.31
10 Creditors for purchase of
raw materials,stores &
consumable spares: 53.00 48.92
Mth's purchases (0.50) (0.50)
Projections Projections
31-03-2013 31-03-2014
(AMOUNT - Rs in lacs)
As per balance sheet as at
Projections Projections
31-03-2013 31-03-2014
1 SOURCES OF FUNDS
a Net Profit (after tax) less drawings 40.28 45.83
b Depreciation 57.74 49.20
c Misc Exp W/0 0.00 0.00
d Increase in Term liabilities
(incl. public deposits) 0.00 0.00
e Decrease in
I Fixed Assets 0.00 0.00
ii Other non-current assets 0.00 0.00
f Others - Preliminery expenses w/o 0.00 0.00
2 USES OF FUNDS
a Net loss 0.00 0.00
b Decrease in Term liabilities
( including public deposits) 50.00 50.00
c Increase in
I Fixed Assets 0.00 0.00
ii Other non-current assets 0.00 0.00
d I Dividend payable /paid 0.00 0.00
Others - Preliminery expenses 0.00 0.00
(AMOUNT - Rs in lacs)
As per balance sheet as at
Projections Projections
31-03-2013 31-03-2014
(AMOUNT - Rs in lacs)
As per balance sheet as at
Projections Projections
31-03-2013 31-03-2014
I Increase/(-)decrease in
Raw Materials Err:509 Err:509
ii Increase/(-)decrease in
Stocks in process Err:509 Err:509
iii Increase/(-)decrease in
Finished Goods 9.75 10.00
iv Increase/(-)decrease in
Receivable 31.96 9.55
v Increase/(-)decrease in
Stores & Spares - 0.00
vi Increase/(-)decrease in
other current assets (3.46) 6.43
Projections Projections
Projections Projections
NES
REQUIREMENTS
MENT
(Rs. in lacs)
PROJECTION PROJECTION
31-03-2014 31-03-2015
1572.25 1662.04
0.00 0.00
0.00 0.00
1572.25 1662.04
0.00 0.00
1572.25 1662.04
0.00 0.00
1257.80 1329.63
1257.80 1329.63
0.00 0.00
43.88 47.77
43.88 47.77
26.95 28.30
0.00 0.00
1.45 1.60
18.99 19.94
23.58 24.93
31.45 33.24
102.42 108.01
49.20 41.99
1453.31 1527.40
0.00 0.00
0.00 0.00
1453.31 1527.40
130.00 140.00
140.00 145.00
1443.31 1522.40
91.80% 91.60%
NES
REQUIREMENTS
MENT
(Rs. in lacs)
PROJECTION PROJECTION
31-03-2014 31-03-2015
23.58 24.93
1466.89 1547.33
105.36 114.71
39.89 34.72
65.47 80.00
4.16% 4.81%
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
- -
65.47 80.00
19.64 24.00
45.83 56.00
0.00 0.00
0.00 0.00
45.83 56.00
100% 100%
4.16% 4.81%
2.91% 3.37%
NES
ANCE SHEET
(Rs. in lacs)
PROJECTION PROJECTION
31-03-2014 31-03-2015
200.00 200.00
0.00 0.00
200.00 200.00
0.00 0.00
52.41 55.40
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
21.06 25.50
73.47 80.90
273.47 280.90
NES
ANCE SHEET
(Rs. in lacs)
PROJECTION PROJECTION
31-03-2014 31-03-2015
0.00 0.00
0.00 0.00
162.50 112.50
0.00 0.00
0.00 0.00
162.50 112.50
435.97 393.40
300.00 300.00
116.48 172.48
0.00 0.00
0.00 3.00
416.48 469.48
852.45 862.88
NES
ANCE SHEET
(Rs. in lacs)
PROJECTION PROJECTION
31-03-2014 31-03-2015
9.25 12.33
0.00 0.00
0.00 0.00
0.00 0.00
174.69 184.67
0.00 0.00
0.00 0.00
Err:509 Err:509
Err:509 Err:509
140.00 145.00
0.00 0.00
0.00 0.00
19.64 24.00
0.00 0.00
0.00 0.00
0.00 0.00
Err:509 Err:509
NES
ANCE SHEET
(Rs. in lacs)
PROJECTION PROJECTION
31-03-2014 31-03-2015
516.24 516.24
174.87 216.86
341.37 299.38
0.00 15.00
0.00 0.00
32.50 32.50
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
32.50 47.50
0.00 0.00
Err:509 Err:509
416.48 469.48
205.11 235.10
0.00 0.00
1.05 0.84
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
Err:509 Err:509
NES
URRENT LIABILIITIES
As Per Balance Sheet as at
PROJECTION PROJECTION
31-03-2014 31-03-2015
0.00 0.00
0.00 0.00
Err:509 Err:509
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
(0.00) (0.00)
Err:509 Err:509
0.00 0.00
140.00 145.00
(1.16) (1.14)
174.69 184.67
(1.33) (1.33)
0.00 0.00
(0.00) (0.00)
0.00 0.00
28.89 36.33
Err:509 Err:509
Err:509 Err:509
NES
PROJECTION PROJECTION
31-03-2014 31-03-2015
1301.68 1377.40
52.41 55.40
(0.50) (0.50)
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
21.06 25.50
0.00 0.00
21.06 25.50
73.47 80.90
73.47 80.90
ON UNDER ABS METHOD
HRIM STONES
Projections
31-03-2015
Err:509
80.90
Err:509
235.10
Err:509
0.00%
0.00%
0.00%
Err:509
41
15
3.37%
(AMOUNT - Rs in lacs)
Projections
31-03-2015
53.00
41.99
0.00
0.00
0.00
0.00
0.00
94.99
0.00
50.00
0.00
15.00
0.00
0.00
65.00
29.99
Err:509
7.43
Err:509
Err:509
0.00
89.78
NES
et as at
Projections
31-03-2015
94.99
65.00
29.99
7.43
Err:509
Err:509
FLOW STATEMENT
(AMOUNT - Rs in lacs)
Projections
31-03-2015
Err:509
Err:509
5.00
9.98
0.00
7.44
Err:509
Err:509
Projections Projections
31-03-2014 31-03-2015
154.56 156.70
2.91% 3.37%
5.38% 6.49%
95.03 97.99
95.03 94.99
100% 97%
9.83% 9.43%
3.87 4.51
Err:509 Err:509
Err:509 Err:509
OVER MEHTOD
Projections Projections
31-03-2014 31-03-2015
1572.25 1662.04
393.06 415.51
78.61 83.10
314.45 332.41
200.00 200.00
ITIONAL METHOD
Projections Projections
31-03-2014 31-03-2015
Err:509 Err:509
73.47 80.90
Err:509 Err:509
Err:509 Err:509
205.11 235.10
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Projected Projected
Err:509 Err:509
Err:509 Err:509
91.80% 91.60%
Err:509 Err:509
Err:509 Err:509
2011 2012
Estm. Projn.
1572.25 1662.04
105.36 114.71
65.47 80.00
4.16% 4.81%
45.83 56.00
95.03 97.99
154.56 156.70
300.00 300.00
416.48 469.48
416.48 469.48
1.05 0.84
1.05 0.84
205.11 235.10
0.00 0.00
ES & S.CRS
Projected Projected
2014 2015
0.00 0.00
(0.00) (0.00)
0.00 0.00
(1.16) (1.14)
(1.33) (1.33)
(0.50) (0.50)
Projected
2015
Err:509
80.90
Err:509
235.10
Err:509
0.00%
0.00%
Err:509
0.00%