DELIVERING EXCELENCE…GLOBALLY
Chemie-Tech Corporate Group
Established in 1997
At a glance…
Delivering Solutions
200+ Design
Offices- HQ in Under Construction in 7 of Art Engineering
Countries Engineers
UAE Office*
Consistently
Storage 375,000 Sq. Ft. of
DELIVERED Engineers & Fabrication Workshops
45+ Million Tons/Annum Technicians -12 in India, UAQ & RAK
36 Countries-4 Continents
-Oil Cargo Handling Nationalities
Single Window Solution…
Concept to Commissioning
Engineering
• Optimized Solutions
OFFSHORE
ONSHORE
•UPSTREAM PORT &
•MIDSTREAM AIRPORTS
•DOWNSTRAM
Industries Served
Marine Jetties &
Global Topside Facilities
Expertise…......
Local Refinery/Process
Knowledge Plants
• Offsites & Utilities
Concept Feasibility Studies FEED Studies Basic Engineering Detailed Engineering Project Planning Procurement
Debottlenecking &
Fabrication Site Installation Pre-Commissioning Commissioning Handover Maintenance & Operations
Maintenance
Design & Engineering
DETAILED
ENGINEERING
DESIGN •PROCESS
•MECHANICAL
•CONCEPTUAL STUDIES •STATIC - TANKS
•PRE FEASIBILITY STUDIES •ROTARY
•FEASIBILITY STUDIES •PIPING
•FRONT END ENGINEERING DESIGN (FEED) •PIPELINE
•BASIC ENGINEERING •CIVIL
•PROCESS EVALUATION •STRUCTURAL
•FIELD DEVELOPMENT PLAN •ARCHITECTURAL
•COMMISSIONING •ELECTRICAL
•REVAMPS •AUTOMATION & CONTROL
•DE-BOTTLENECKING •HVAC
•TROUBLESHOOTING •FIRE PROTECTION
•QUALITY
•HSE
US$
25,000,000
20,000,000
Smart Software's for seamless coordination 15,000,000
between Engineering Dept. & Site Offices 10,000,000
5,000,000
-
Alliances with reputed Global Vendors
2016 2017 2018
Steel Pipes Package
Instrumentaion Electrical
Project Management
We Simplify Complexity
Chemie-Tech Global Footprint
London
Rotterdam
Bucharest
Dubai/Sharjah, UAE
Accra
Headquarter/Engineering Centre Lagos
Singapore
Regional Headquarter/Procurement Office
Representative Offices
Sydney
Cape Town
Inherent
Strength- Our
Resources
Global Skills : Local Knowledge
Construction Machinery
Engineering Tools
Quality, 15
HR, 10
HSE, 25
Project
Management,
30
Procurement &
Logistics, 27 Admin, 25
Project Control &
Craftsmen & Technicians, Planning, 12
3900 Other, 61
CMD
M K Saiyed
Director Director
COO
Sameer Bawa Anurag Trivedi Hiren Adhiya
Director Engineering
Ajit Shrivastava
Business Development Projects Planning & Procurement & HR & Admin FINANCE
Controls Contracts
BASIC & Detail Engineering
• Project Management • Scheduling, Reporting • Procurement • HR Training • Finance & Team
& Monitoring • Administration Accounts
• Project Execution • Sub-contacting Procurement & Logistics
• Planning & Control • IT
• Project Coordination • Logistics HR & Manpower Functions
• Document Control
• Safety Administration
•Quality Control & Quality Assurance,
INTEGRATED MANAGEMENT SYSTEM
QUALITY POLICY
Total
Participation
Process Process
Management Improvement
IMS
(Key
Drivers)
Planning Customer
Process Focus
Delivering Projects in Challenging
Environment...Globally
Procurement : 85 million $
Five hundred (500) capacity Truck Parking Start Work : 1st May, 2019
ENGINEERING, PROCUREMENT AND CONSTRUCTION OF A NEW IFP380 TANK
FARM AND ITS ASSOCIATED PIPELINES IN MER ROUGE, MAURITIUS.
STORAGE TANKS
ENGINEER & PMC
TYPE NOS SIZE CAPACITY Industry: Downstream, Oil & Gas
(M X M) (CUM)
Internal Floating
7 25.5 X 15 7339 Scope: Engineering, Part
Roof
Procurement, Construction &
Cumulative
Capacity
49,150 commissioning
OTHER FACILITIES
ASSOCIATED PIPELINE
Location: Mer Rouge, Mauritius
FABRICATION, ERECTION, PIPING ERECTION
MARINE LOADING ARMS, JETTY WORKS
Brief: Fuel depot of working capacity
TESTING & PWHT
of 49,150 metric tons,(25.5D X 15H)
ALL CIVIL WORK INCLUDING TANK FOUNDATION, BUILDINGS &
for storage of IFO 380 CST.
CONTROL ROOM
BLASTING PAINTING, CATHODIC PROTECTION, % Completed : 7
FIREFIGHTING SYSTEM
ELECTRICAL , INSTRUMENTATION & AUTOMATION WORKS
ENGINEERING, PROCUREMENT AND CONSTRUCTION OF WAJIR FIELD
DEVELOPMENT PROJECT, KENYA
MAJOR FACILITIES
Industry: Up-stream
FEED / Basic Engineering with Project Estimate
Well Engineering Scope: Oil Filed Development
Design and Detailed Engineering Services
Drilling and allied services.
Project Material Procurement Location: Wajir, Kenya (700 Km from
Drilling and allied services supervision Nairobi)
EPC of Surface Central Processing Facilities
All Construction of (Civil, Pipeline, Mechanical, Electrical & Brief: Oil Field Development
Instrumentation & other specialized works / services)
including CPF
MAJOR FACILITIES
Industry: Refinery, Oil & Gas
Refinery including process unit;
• Crude Distillation Unit (CDU),
• Vacuum Distillation Unit (VDU), Scope: Design, Detail Engineering,
• Hydrotreater Unit Procurement, Construction and
• Hydrogen Generation Unit
• Sulphur Recovery Unit Commissioning
Other packages like Sour Water Stripping (SWS) System,
Furnaces, Incinerator, Flare systems.
Location: Sohar Port, Oman
Major Scope;
• Civil & Structural works including Buildings, Foundations,
Piling, Ground improvement, Boundary Wall, Roads etc Brief: 30,000 BPSD Bitumen & Process
• Offsite & Utilities system includes mainly Steam &
Condensate System, Tempered Water System, Sea Cooling Refinery
Water System, Secondary Cooling Water System, Potable/
Service/ Soft Water System, Hot Oil System, Fuel Oil System,
Instrument Air/ Plant Air System, Nitrogen System, Waste % Completed : June 2019 Start Work
Water Treatment Plant and Drainage Systems.
• Tank Farm for Crude Oil, Bitumen, AGO, VGO, Kerosen, Fire
Water & Unit storage
• 06 Pipelines from Refinery Plant to Marine Jetty
• Other related works
ENGINEERING, PROCUREMENT AND CONSTRUCTION OF PETROLEUM
STORAGE TANK PACKAGE II FOR DANGOTE OIL REFINING CO LTD, LEKKI
FREEZONE, LAGOS, NIGERIA
STORAGE TANKS
ENGINEER & PMC
TYPE NOS CAPACITY Industry: Refinery, Oil & Gas
(CUM)
STORAGE TANKS
ENGINEER & PMC
TYPE NOS SIZE CAPACITY Industry: Refinery, Oil & Gas
(M X M) (CUM)
% Completed : 9
ENGINEERING, PROCUREMENT AND CONSTRUCTION OF INTERMEDIATE
PROCESS STORAGE TANK PACKAGE III FOR DANGOTE OIL REFINING CO LTD,
LEKKI FREEZONE, LAGOS, NIGERIA
STORAGE TANKS
ENGINEER & PMC
TYPE NOS SIZE CAPACITY Industry: Refinery, Oil & Gas
(M X M) (CUM)
% Completed : 3
FRONT DESIGN AND ENGINEERING FOR BULK STORAGE TERMINAL, TRESCOP
SOHAR TERMINALS, OMAN
STORAGE TANKS
TYPE NOS SIZE CAPACITY
Industry: Downstream, Oil & Gas
(M x M) (CUM)
CRUDE/GASOIL /JETA1 TBD TBD 600,000 Scope: Front Design and Engineering
/GASOLINE STORAGE
TANK (FEED)
(AL. DOME ROOF WITH IFR)
FIRE WATER TANK 1 18.5 D X 17.5 H 3,358
(FIXED CONE ROOF) Location: Sohar Port, OMAN
OTHER FACILITIES
CIVIL & STRUCTURAL
Brief: Trescop is developing Crude Oil
PIPING, E&I, FIREFIGHTING SYSTEM
& Petroleum Product Storage
BUILDINGS Terminals
PIPELINE
TRUCK LOADING GANTRIES % Completed : 70
COMPLETE TERMINAL AUTOMATION DESIGN
ENGINEERING, PROCUREMENT AND CONSTRUCTION OF SUSTAINABLE
RELIABLE SOLUTIONS TERMINAL, HAMRIYAH, UNITED ARAB EMIRATES
STORAGE TANKS
TYPE NOS SIZE CAPACITY
(M x M) (CUM)
GASOLINE & GAS OIL 4 20 X 21 26,376 Industry: Downstream, Oil & Gas
(INTERNAL FLOATING ROOF)
GASOLINE, GAS OIL & FUEL OIL 6 28 X 20 43,407
(VERTICAL FIXED DOME ROOF) Scope: Engineering, Part
ACETIC ACID, 0 – XYLENE
(VERTICAL FIXED CONE ROOF)
3 16.5 X 21 13,464 Procurement, Construction ,
METHANOL 2 16.5 X 21 8,976
Installation, Pre – Commissioning &
(INTERNAL FLOATING ROOF) commissioning
BITUMEN 3 16.5 X 21 13,464
(VERTICAL FIXED CONE ROOF)
ETHYL ACETATE 2 16.5 X 21 8,976 Location: Hamriyah, Sharjah, United
(INTERNAL FLOATING ROOF )
Arab Emirates
ETHANOL 1 16.5 X 21 4,488
INTERNAL FLOATING ROOF
STORAGE TANKS
TYPE NOS SIZE CAPACITY Industry: Downstream, Oil & Gas
(M x M) (CUM)
GASOLINE
(FIXED CONE ROOF) 4 36 X 25 104,000 Scope: Engineering, Part
GASOLINE
2 28 X 25 30,000
Procurement, Construction &
(FIXED CONE ROOF)
commissioning
OTHER FACILITIES
PUMP HOUSE, TANK FOUNDATION, TERMINAL OFFICE, LOADING BAYS Location: Amsterdam, Netherlands
PRODUCT IMPORT EXPORT PIPELINE , ADMINISTRATIVE BUILDING
VAPOUR RECOVERY SYSTEM, FIRE FIGHTING SYSTEM Brief: Greenfield 134,000 Cubic
CCTV, ELECTRICAL AND INSTRUMENTATION
meter of Gasoline Storage Terminal
% Completed : 57
TANKAGES WORKS FOR GURU GOBIND SINGH POLYMER ADDITION PROJECT
OF M/s HPCL MITTAL ENERGY LIMITED
STORAGE TANKS
TYPE NOS SIZE(M x M) CAPACITY
(CUM)
% Completed : 60
ENGINEERING, PROCUREMENT AND CONSTRUCTION OF FUEL STORAGE
FACILITIES AND TRUCK LOADING STATION IN HAS SAPTAN, MALTA
STORAGE TANKS
TYPE NOS SIZE CAPACITY
(Underground Tanks) (M x M x M) (CUM) Industry: Downstream , Oil & Gas
Gasoline 3 16.5 x 3.5 x 5 774m3
Scope: Engineering, Procurement,
Gas Oil 3 16.5 x 3.5 x 5 774m3
Construction, Pre- Commissioning
Bio Diesel + Kerosene 1 16.5 x 3.5 x 5 774m3 commissioning of undergrounds
Tanks
HVO 1 16.5 x 3.5 x 5 774m3
STORAGE TANKS
TYPE NOS SIZE CAPACITY
(M x M) (CUM)
PMC
ULP-93 TANKS 2 36.8M × 21M 45,000m3 Industry: Downstream, Oil & Gas
INTERNAL FLOATING ROOF
ULP-95 TANKS
INTERNAL FLOATING ROOF
1 26.2M × 20M 11,500m3
Scope: Engineering, Part
LSD TANKS 1 36.8M × 20M 225000m3
Procurement, Construction &
GEODESIC DOME ROOF commissioning
ULSD TANKS 2 36.8M × 20M 22,000m3
GEODESIC DOME ROOF
STORAGE TANKS
TYPE NOS CAPACITY
CRUDE OIL STORAGE TANK
(DD EXTERNAL FLOATING ROOF)
4 2,200,000 bbl
Industry: Midstream, Oil & Gas PMC
CRUDE OIL STORAGE TANK 1 1500 m3
(EXTERNAL FLOATING ROOF)
Scope: Engineering, Procurement,
DIESEL STORAGE TANK 1 942 m3
(EXTERNAL FLOATING ROOF) Construction & Commissioning
FIRE WATER TANK 1 2289 m3
(FIXED CONE ROOF)
Location: Ras Issa Penninsula,
OTHER CRITICAL KEY FACILITIES
PUMPS : 25000 BBL/HR (EACH)
Yemen
-BOOSTER PUMP – 3 NOS.
-SHIPPING PUMPS (CRUDE ENGINE DRIVEN) – 3 NOS.
PIPELINE :
Brief: Greenfield 2 Million bbl
-A NEW PIPELINE - 36” (DIA) / 8.13 KM Crude Oil Export Storage Terminal
-INTERCONNECTION WITH NEW SPM 1 LOCATION (8.13km, 15°7.6'N,41°36.5'E)
-FUTURE PROVISION OF PIPELINE EXTENSION TO SPM 2 with Ship loading facility &
OTHER ASSOCIATED FACILITIES captive power generation
POWER HOUSE RESIDENTIAL BUILDING
SUB STATION & ELECTRICALS LABORATORY % Completed : 48 (Under Force
WARE HOUSE FIRE STATION Majeure)
INSTRUMENTATION & CONTROL SEA WATER INTAKE SYSTEM
ADMIN & CONTROL BUILDING FIRE PROTECTION SYSTEM
ENGINEERING, PROCUREMENT AND CONSTRUCTION OF BASE OIL REFINERY,
FOR MARJAN Al SAUDI FACTORY, JEDDAH, SAUDI ARABIA
MAJOR FACILITIES
RAW MATERIAL STORAGE & RECEIPT
Industry: Refinery, Oil & Gas
FILTERATION & CHEMICAL INJECTION
FLASH DISTILATION SECTION
Scope: Engineering, Part
INTERMEDIATE STORAGE
Procurement, Construction &
HYDROGENATION FACILITY
FINISH PRODUCT STORAGE
commissioning
OFFSITE & UTILITIES
CONTROL, E&I BUILDINGS
Location: Jeddah 3rd Ind. City,
OFFICE BUILDING
Kingdom of Saudi Arabia
FIREPROOFING
COMMISSIONING Brief: 200 MT/day Base Oil Refinery
including distillation, hydro-
treatment, storage, piping, Civil &
Structure and utilities & offsite
% Completed : 74
ENGINEERING, PROCUREMENT AND CONSTRUCTION OF BASE OIL REFINERY
FOR G.O.A.L, OLENTIA, ROMANIA
MAJOR FACILITIES
RAW MATERIAL STORAGE & RECEIPT
FILTERATION & CHEMICAL INJECTION Industry: Refinery, Oil & Gas
FLASH DISTILATION SECTION
INTERMEDIATE STORAGE Scope: Engineering, Part
HYDROGENATION FACILITY Procurement, Construction &
FINISH PRODUCT STORAGE commissioning
OFFSITE & UTILITIES
CONTROL, E&I BUILDINGS Location: Olentia, Romania
OFFICE BUILDING
FIREPROOFING Brief: 200 MT/day Base Oil Refinery
COMMISSIONING including distillation, hydro-
treatment, storage, piping, Civil &
Structure and utilities & offsite
% Completed : 21
Global Footprint of Projects
Partnering with Clients Strategic Objectives
RESIDUAL ENGINEERING, PROCUREMENT AND CONSTRUCTION OF OIL
STORAGE TERMINAL FOR QUANTUM TERMINAL LTD, TEMA, GHANA
STORAGE TANKS
STORAGE TANKS
TYPE NOS SIZE CAPACITY
(M x M) (CUM)
6
Industry: Downstream, Oil & Gas
DIESEL / GASOLINE 23.15 D X 15 H 37,863
STORAGE TANK
(AL. DOME ROOF WITH IFR)
Scope: Engineering, Procurement,
FIRE WATER TANK 1 18.5 D X 12.5 H 3,358
(FIXED CONE ROOF) Construction & Commissioning
OTHER FACILITIES
EXTENSION OF ELECTRICAL BUILDING & CONTROL ROOM Location: KAFZA, Iraq
INTERCONNECTION & TERMINAL PIPING
FIRE PROTECTION SYSTEM Brief: Brownfield Diesel Storage
PIPELINE FROM TERMINAL TO JETTY Terminal. A BP Joint Venture
GASOLINE UNLOADING GANTRY Project
OTHER CIVIL WORKS
STORAGE TANKS
TYPE OF PRODUCT NOS SIZE NOMINAL
(M X M) CAPACITY Industry: Downstream, Oil & Gas
(CUM)
Crude Oil Tanks 6 62 D X 20 H 60,300
Scope: Engineering, Procurement,
Petroleum Product 4 17 D X 18 H 16,272
Construction & Commissioning
GASOLINE 4 17 D X 18 H 16,272
FUEL OIL 8 17 D X 18 H 32,272
Location: Hamriyah Freezone, UAE
BASE OIL 8 17 D X 18 H 32,272
TURPENTINE 4 17 D X 18 H 16,272
Brief: Brownfield Petroleum
DIESEL FUEL 8 17 D X 18 H 32,272
Storage Terminal Project
OTHER ASSOCIATED FACILITIES
comprising
CIVIL & STRUCTURAL WORKS STP
AIR COMPRESSOR PUMPS
OWS SYSTEM ELECTRICAL
Commissioned & Handed Over :
CHEMICAL INJECTION SYSTEM INSTRUMENTATION & CONTROL
2016
RO PACKAGE FIRE PROTECTION SYSTEM
FRONT END ENGINEERING & DESIGN (FEED) FOR PETROLEUM STORAGE
FACILITY FOR GUNVOR JVCO, TEMA, GHANA
STORAGE TANKS
TYPE NOS SIZE CAPACITY
(M x M) (CUM) Industry: Downstream, Oil & Gas PMC
GASOIL / GASOLINE 6 33.5 D X 20 H 100,000
STORAGE TANK
(AL. DOME ROOF WITH IFR) Scope: Front End Engineering &
FIRE WATER TANK 1 18.5 D X 17.5 H 3,358 Design (FEED)
(FIXED CONE ROOF)
OTHER FACILITIES
Location: TEMA, Ghana
CIVIL & STRUCTURAL
PIPING, E&I, FIREFIGHTING SYSTEM
BUILDINGS
Brief: 100,000 m3 capacity
PIPELINE
Petroleum Storage Terminal for JV
TRUCK LOADING GANTRIES Co. lead by Gunvor
COMPLETE TERMINAL AUTOMATION DESIGN
Handed Over : May, 2016
RESIDUAL ENGINEERING, PROCUREMENT AND CONSTRUCTION OF
DIESEL STORAGE FACILITY, QUENSLAND, AUSTRALIA
STORAGE TANKS
TYPE NOS SIZE CAPACITY
(M x M) (CUM)
Industry: Downstream, Oil & Gas PMC
DIESEL / GASOLINE 3 41.00 D X 20 H 75,000
STORAGE TANK
(AL. DOME ROOF WITH IFR) Scope: Residual Engineering,
FIRE WATER TANK
(FIXED CONE ROOF)
1 7.99 D X 5.86 H 289 Procurement, Construction &
Commissioning
OTHER ASSOCIATED FACILITIES
CIVIL & STRUCTURAL WORKS MARINE LOADING/UNLOADING ARMS
AIR COMPRESSOR PUMPS Location: Queensland, Australia
OWS SYSTEM ELECTRICAL
CHEMICAL INJECTION SYSTEM INSTRUMENTATION & CONTROL Brief: Greenfield Diesel Storage
BUILDINGS FIRE PROTECTION SYSTEM Terminal. A Morgan Stanley
RAILHEAD,
SYSTEMS
TRUCK LOADING JETTY CONNECTION PIPELINES
Commodities Division Project
COMMISSIONING
Commissioned & Handed Over :
Jan, 2015
ENGINEERING, PROCUREMENT AND CONSTRUCTION OF PETROLEUM
STORAGE TERMINAL FOR ALSSA GROUP, SHARJAH, UAE
STORAGE TANKS
TYPE OF PRODUCT NOS SIZE NOMINAL
(M X M) CAPACITY Industry: Downstream, Oil & Gas
(CUM)
PRODUCT STORAGE TANK 4 25 D X 19 H 38794
Scope: Engineering, Procurement,
PRODUCT STORAGE TANK 2 25 D X 19 H 19397
Construction & Commissioning
PRODUCT STORAGE TANK 4 12 D X 19 H 9322
PRODUCT STORAGE TANK 8 12.5 D X 19 H 18644
Location: Hamriyah Freezone, UAE
FIRE WATER TANK 1 10.5 D X 18 H 1413
STORAGE TANKS
TYPE NOS SIZE CAPACITY
(M x M) (CUM)
Industry: Downstream, Oil & Gas
GASOIL & FUEL OIL 10 27.00 D X 19 H 109,000
STORAGE TANK
(AL. DOME ROOF WITH IFR) Scope: Front End Engineering &
BITUMEN, GASOIL, METHNOL,
OTHER PRODUCT
10 15.00 D X 19 H 41,000 Design (FEED)
(AL DOME ROOF / IFR)
MAJOR FACILITIES
PRE-TREATMENT & LIGHT OIL REMOVAL SECTION
Industry: Refinery, Oil & Gas
GASOLINE SEPARATION SECTION
RAW MATERIAL STORAGE & RECEIPT
Scope: Engineering, Procurement,
FILTERATION & CHEMICAL INJECTION
Construction & Commissioning
FLASH DISTILATION SECTION
INTERMEDIATE STORAGE
HYDROGENATION FACILITY
Location: Umm Al Quwain, UAE
FINISH PRODUCT STORAGE
OFFSITE & UTILITIES Brief: Greenfield 1.4 Million
CONTROL, E&I BUILDINGS bbls/year Petrochemical Plant
OFFICE BUILDING including Storage & Utilities
FIREPROOFING
COMMISSIONING Commissioned & Handed Over :
May, 2011
FRONT END ENGINEERING & DESIGN (FEED) & DETAILED ENGINEERING
FOR PETROLEUM STORAGE FACILITY FOR GPS CHEMOIL, FUJAIRAH,
UAE
STORAGE TANKS
TYPE NOS CAPACITY
(CUM)
Industry: Downstream, Oil & Gas
FUEL OIL
07 379,163
GAS OIL
09 90,872 Scope: Front End Engineering &
JET OIL Design (FEED) & Detailed
05 110,417
engineering
OTHER FACILITIES
CIVIL & STRUCTURAL
Location: Fujairah, UAE
PIPING, E&I, FIREFIGHTING SYSTEM
BUILDINGS
Brief: 572,171 m3 capacity
PIPELINE
TRUCK LOADING GANTRIES
Petroleum Storage Terminal for
COMPLETE TERMINAL AUTOMATION DESIGN
Chemoil
STORAGE TANKS
TYPE NOS SIZE CAPACITY
(M x M) (CUM) MAIN EPC
SEAL OIL TANK (CONE ROOF) 48.78 D X 12.8 H Industry: Downstream, Oil & Gas CONTRACTOR
2 47,818
STORAGE TANKS
TYPE NOS SIZE CAPACITY MAIN EPC CONTRACTOR
(M x M) (CUM)
Industry: Downstream, Oil & Gas
FUEL OIL (CONE ROOF) 1 36 D X 17 H 17295
Location: Yemen
STORAGE TANKS
TYPE NOS SIZE CAPACITY MAIN EPC CONTRACTOR
(M x M) (CUM)
Fuel Oil (Cone Roof) Industry: Downstream, Oil & Gas
4 30 D X 17 H 48,042
Gas Oil (Cone Roof)
2 20 D X 17 H 10,676 Scope: Construction, Testing and
Lube Oil (Cone Roof)
3 6 D X 9.55 H 810 Commissioning of Storage Tanks
Fuel Oil (Cone Roof)
2 29.7 D X 22 H 30,467
Location: Jabel Ali, UAE