18+000 - 19+00 1 IZQUIERDO 148.01 0.50 74.01 209.05
2 IZQUIERDO 138.33 0.50 69.17
3 DERECHO 46.25 0.90 41.63
4 DERECHO 26.95 0.90 24.26
19+000 - 20+00 5 DERECHO 22.12 0.60 13.27 29.37
6 IZQUIERDO 40.25 0.40 16.10
7 DERECHO 0.00 0.40 0.00
8 IZQUIERDO 0.00 0.40 0.00
20+000 - 21+00 9 IZQUIERDO 41.87 0.40 16.75 126.28
10 DERECHO 31.27 2.00 62.54
11 IZQUIERDO 52.21 0.90 46.99
21+000 - 22+00 12 IZQUIERDO 33.30 0.70 23.31 43.93
13 DERECHO 34.36 0.60 20.62
22+000 - 23+00 14 29.29 0.40 11.72 128.48
15 IZQUIERDO 26.74 1.30 34.76
16 DERECHO 102.50 0.80 82.00
23+000 - 24+00 17 DERECHO 34.16 1.30 44.41 74.57
18 DERECHO 23.20 1.30 30.16
24+000 - 25+00 19 IZQUIERDO 21.17 0.90 19.05 134.36
20 DERECHO 21.83 1.20 26.20
21 DERECHO 23.45 3.80 89.11
22 33.95 0.80 27.16
23 44.33 0.70 31.03
24 29.90 0.80 23.92
25 42.36 0.80 33.89
26 41.83 1.10 46.01
27 23.81 3.80 90.48
28 28.00 3.80 106.40
29 53.63 1.50 80.45
30 30.45 1.50 45.68
31 37.08 1.50 55.62
32 48.54 1.10 53.39
33 54.89 0.40 21.96
34 26.88 2.90 77.95
35 23.17 2.90 67.19
36 18.60 2.00 37.20
37 58.00 2.00 116.00
38 34.70 2.30 79.81
39 39.89 2.30 91.75
40 61.82 1.50 92.73
41 33.26 0.90 29.93
42 35.86 1.30 46.62
43 53.97 1.30 70.16
44 88.49 0.70 61.94
45 44.20 2.00 88.40
46 43.01 2.00 86.02
47 62.58 0.40 25.03
48 24.98 2.90 72.44
49 33.60 2.30 77.28
50 60.14 0.70 42.10
51 64.26 0.70 44.98
52 90.22 0.80 72.18
53 69.53 1.30 90.39
54 56.06 0.70 39.24
55 88.95 0.90 80.06
PLANILLA DE METRADOS

PROYECTO:

56 78.05 0.60 46.83


57 73.08 1.10 80.39
58 59.06 1.50 88.59
59 40.55 1.50 60.83
60 42.15 2.00 84.30
61 39.53 0.80 31.62
62 19.52 1.30 25.38
63 13.83 2.00 27.66
64 41.96 2.30 96.51
65 34.17 2.00 68.34
66 24.66 2.00 49.32
67 72.48 0.70 50.74
68 131.08 0.80 104.86
69 69.82 1.30 90.77
70 48.15 0.50 24.08
71 28.31 0.50 14.16
72 75.34 0.60 45.20
73 45.37 0.70 31.76
74 55.77 0.70 39.04
75 94.77 0.70 66.34
76 50.56 1.30 65.73
77 50.06 0.40 20.02
78 61.99 0.50 31.00
79 52.26 0.70 36.58
80 62.75 0.70 43.93
81 37.05 2.00 74.10
82 37.23 0.70 26.06
83 46.42 0.50 23.21
84 37.65 0.50 18.83
85 23.46 0.40 9.38
86 61.37 0.60 36.82
25+000 - 26+00 87 DERECHO 61.37 1.30 79.78 139.87
88 IZQUIERDO 54.63 1.10 60.09
26+000 - 27+00 89 DERECHO 43.36 0.80 34.69 34.69
27+000 - 28+00 90 DERECHO 63.79 1.30 82.93 126.20
91 IZQUIERDO 61.82 0.70 43.27
28+000 - 29+00 92 IZQUIERDO 69.47 0.40 27.79 122.24
93 DERECHO 39.24 0.80 31.39
94 IZQUIERDO 78.83 0.80 63.06
30+000 - 31+14 95 IZQUIERDO 49.65 0.60 29.79 54.49
96 DERECHO 41.17 0.60 24.70
TOTAL 4,841.27 4841.27
MUNICIPALIDAD PROVINCIAL DE MOHO
OFICINA DE INFRAESTRUCTURA Y DESARROLLO URBANO RURAL

PLANILLA DE METRADOS

PROYECTO:

FORMULA 01: MEJORAMIENTO DE SUPERFICIE DE RODADURA


ANCHO ALTURA LONGITUD
CODIGO PARTIDA UNIDAD DE CANTIDAD VOLUMEN PARCIAL METRADO
m m m
VECES
01.00.00 OBRAS PRELIMINARES
01.01.00 GEOREFERENCIACION, TRAZO Y REPLANTEO GLB 1.99
0+000 - 1+990 1.00 --- --- 1.99 --- --- 1.99

01.02.00 MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y HERRAMIENTAS GBL 1.00 --- --- --- --- --- 1.00 1.00

01.03.00 MANTENIMIENTO DE TRANSITO Y SEGURIDAD VIAL GBL 1.00 --- --- --- --- --- 1.00 1.00

01.04.00 DERECHO DE CANTERA M3 6,311.85


cantera para terraplen de relleno 1.20 --- --- --- --- 2,007.53 2409.04
Cantera para sub base granular 1.20 --- --- --- --- 1,959.06 2350.87
Cantera base Granular 1.20 --- --- --- --- 1,290.29 1548.35
Cantera de over para Asfalto 1.20 --- --- --- --- 1.20
Cantera para mejoramiento con material de cantera 1.20 --- --- --- --- 1.20
Cantera para relleno estructural en alcantarillas TMC 1.20 --- --- --- --- 1.20

02.00.00 OBRAS PRELIMINARES


02.01.00 CARTEL DE IDENTIFICACION DE OBRA 2.40x4.20 UND 1.00
1.00 --- --- --- --- --- 1.00
02.02.00 DESVIOS PROVISIONALES KM 0.70
Cantera 1.00 --- --- 0.50 --- --- 0.50
Fuente de agua 1.00 --- --- 0.20 --- --- 0.20

03.00.00 MOVIMIENTO DE TIERRA


03.01.00 DESBROCE Y LIMPIEZA EN ZONAS NO BOSCOSAS HA 1.00
Ver planilla de metrado en zonas de relleno 1.00 --- --- --- --- 1.00

03.02.00 EXCAVACION DE MATERIAL SUELTO M3 10,865.21


ver planilla de explanaciones 1.30 --- --- --- 8,357.85 --- 10865.21

03.03.00 EXCAVACION EN ROCA SUELTO M3 1.00


ver planilla de explanaciones 1.00 --- --- --- --- 1.00

COMFORMACION DE TERRAPLENES CON MATERIAL PROPIO


03.04.00 EXCEDENTE M3 1,788.39
ver planilla de explanaciones 1.00 --- --- --- 1,788.39 --- 1788.39

03.05.00 COMFORMACION DE TERRAPLENES CON MATERIAL DE CANTERA M3 2,007.53


ver planilla de explanaciones 1.00 --- --- --- 2,007.53 --- 2007.53

03.06.00 MEJORAMIENTO DE SUELOS A NIVEL DE SUB RASANTA


MEJORAMIENTO DE SUELO A NIVEL SUB RASANTE CON MATERIAL DE
03.06.01 CANTERA M3 1.00
ver planilla de metrado de mejoramiento 1.00 --- --- --- --- 1.00

03.07.00 DESQUINCHE M2 1.00


1.00 --- --- --- --- 1.00

04.00.00 BASE Y SUB BASE


04.01.00 SUB BASE GRANULAR DE (e=0.20 M.) m3 1,959.06
ver planilla de sub base 1.00 --- --- --- 1,959.06 --- 1959.06

04.02.00 BASE GRANULAR (e= 0.15 M.) M3 1,290.29


ver planilla de base granula 1.00 --- --- --- 1,290.29 --- 1290.29

05.00.00 PAVIMENTOS ASFALTICOS


05.01.00 IMPRIMACION ASFALTICA m2 1.00
ver planilla de imprimacion 1.00 --- --- --- --- 1.00

05.02.00 PAVIMENTO DE CONCRETO ASFALTICO EN CALIENTE DE (e=2") m2 1.00


ver planilla de carpeta asfaltica 1.00 --- --- --- --- 1.00

05.03.00 CEMENTO ASFALTICO PEN 120/150 GLN 1.00


ver planilla de imprimacion 1.00 --- --- --- --- 1.00

05.04.00 ASFALTO DILUIDO MC 30 GLN 0.30


ver planilla de carpeta asfaltica red/m2 0.30 --- --- --- AREA= --- 0.30
PLANILLA DE METRADOS

PROYECTO:

FORMULA 01: MEJORAMIENTO DE SUPERFICIE DE RODADURA


ANCHO ALTURA LONGITUD
CODIGO PARTIDA UNIDAD DE CANTIDAD VOLUMEN PARCIAL METRADO
m m m
VECES
05.05.00 CAL HIDRATADA KG 0.25
ver planilla de carpeta asfaltica red/m2 0.25 --- --- --- AREA= --- 0.25

05.06.00 ADITIVO MEJORADOR DE ADHERENCIA KG 0.04


ver planilla de carpeta asfaltica red/m2 0.04 --- --- --- AREA= --- 0.04

08.00.00 PAVIMENTOS ASFALTICOS


08.01.00 MARCAS EN EL PAVIMENTO UND 857.90
Lado derecha e izquierda Km 0+000 @ 1+990 2.00 0.10 --- 1,990.00 --- --- 398.00
Line Central Eje Km 0+000 @ 1+990 222.00 0.10 --- 4.50 --- --- 99.90
Linea Continua en curvas (ver curadro de elementos de curva) 2.00 0.10 --- 1,800.00 --- --- 360.00

08.02.00 SEÑALES PREVENTIVAS UND 10.00


ver planilla de metrado 1.00 --- --- --- 10.00 --- 10.00

08.03.00 SEÑALES REGLAMENTARIAS UND 10.00


ver planilla de metrado 1.00 --- --- --- 10.00 --- 10.00

08.04.00 SEÑALES IMFORMATIVAS M2 4.00


ver planilla de metrado 1.00 --- --- --- 4.00 --- 4.00

GUARDAVIAS METALICAS (INCLUYE SECCION FINAL, AMORTIGUACION Y CAPTAFAROS)


08.05.00 M 1.00
ver planilla de metrado 1.00 --- --- --- --- --- 1.00

08.06.00 TACHAS DELINEADORES BIDIRECCIONALES UND 6.00


En curvas horizontales (ver planilla de metrado) 3.00 --- --- --- --- --- 3.00
En curvas verticales (ver planilla de metrado) 3.00 --- --- --- --- --- 3.00

08.07.00 POSTES DELINEADORES UND 3.00


Km 15+840 @ 15+980 lado derecho 1.00 --- --- --- --- --- 1.00
Zonas de alcantarillas (Ver planilla de metrado) 2.00 --- --- --- --- --- 2.00

08.08.00 HITOS HILOMETRICOSKILOMETRAJE UND 3.00


0+000 lado izquierdo 1.00 --- --- --- --- --- 1.00
1+000 lado izquierdo 1.00 --- --- --- --- --- 1.00
2+000 lado izquierdo 1.00 --- --- --- --- --- 1.00
PLANILLA DE METRADOS

PROYECTO:

FORMULA 03: SEÑALIZACION VIAL

N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
01.00.00 OBRAS PROVICIONALES
01.01.00 TRAZO DE EJES EN PAVIMENTO
01.01.01 TRAZO Y REPLANTEO EN PAVIMENTO M ###
3 19,230.00 ###

02.00.00 SEÑALIZACION
02.01.00 SEÑALES REGLEMENTARIAS o DE REGULACIO UND 11.00
Prohibido adelantar Prog.0+100 Encuentro
en la via asillo - Tirapata, Prog 13+960 ,
0+760

2 2.00
Velocidad Maxima Prog. 0+980, 3+000,
5+500, 13+000, 13+600, 14+800, 14+480

7 7.00
No Deje Piedras en la Pista Prog. 0+760
0+100

2 2.00

02.02.00 SEÑALES PREVENTIVAS UND 32.00


Curva a la derecha e Izquierda prog. 0+060,
1+000, 1+160, 1+500, 1+600, 5+080,
5+280, 10+460, 10+620, 15+220, 15+360,
15+900, 16+040, 17+300, 17+400,
17+900, 17+980, 18+020, 18+120,
18+480, 18+560 21 21.00
Curva y contracurva Derecha - izquierda
Prog. 0+660, 1+360, 1+840

3 3.00
Empalme en angulo con vias Prog. 10+560,
13+900

2 2.00
Zona Escolar Prog. 18+840, 19+ 000

2 2.00
Zona Urbana Prog. 13+140, 13+560,
14+420, 14+780

4 4.00

02.03.00 PANELES DE SEÑALES INFORMATIVAS UND 12.00


Señal Destino con indicacion de distancias 4 4.00
PLANILLA DE METRADOS

PROYECTO:

FORMULA 03: SEÑALIZACION VIAL

N° Medidas
Partida Descripción Und Parcial Total
veces Largo Ancho Alto
Señal de localizacion 8.00

Comunidad Posoconi 7+080 2


Comunidada Japupunco 9+060 2
Sector Caluyo 13+400 2
Sector Huayraypata 14+540 2

02.04.00 CIMENTACION DE SEÑALES INFORMATIVAS UND 12.00


Señal con destino indicacion de distancias 4 4.00
Señal de localizacion 8 8.00

02.05.00 TUBO DE SOPORTE SEÑALES INFORMATIVAS UND 12.00


Señal con indicacion de distancias 4 4.00
Señal de localizacion 8 8.00

02.06.00 TERMINAL DE AMORTIGUACION EN GUARDAVI PAR 6.00


PI - 2 1 1.00
PI - 5 1 1.00
PI - 24 1 1.00
PI - 50 1 1.00
PI - 55 y 60 2 2.00

02.07.00 GUARDAVIAS M 333.00


PI - 2 1 50.00 50.00
PI - 5 1 70.00 70.00
PI - 24 1 46.00 46.00
PI - 50 1 67.00 67.00
PI - 55 y 60 2 50.00 100.00

02.08.00 HITOS KILOMETRICOS UND 19.00

19 19.00

02.09.00 MARCAS EN EL PAVIMENTO CON MICROESFER M2 4,749.07


Lineas laterales 2 19,227.00 0.10 3,845.40
Lineas separador central 1 19,227.00 0.37 0.10 711.40
1 19,227.00 0.10 0.10 192.27

02.10.00 POSTES DELINEADORES UND 200.00


35 PI en cada PI 20 10.00 200.00

02.11.00 TACHAS DELINEADORAS BIRECCIONALES UND 7,869.00


longitud total del tramo/3 3 1,623.00 4,869.00
3 1,000.00 3,000.00
MUNICIPALIDAD PROVINCIAL DE MOHO
OFICINA DE INFRAESTRUCTURA Y DESARROLLO URBANO RURAL

PLANILLA DE METRADOS DE MOVIMIENTO DE TIERRAS


PROYECTO :"MEJORAMIENTO DEL ACCESO
LOCALIDAD :
TRAMO
FECHA

CLASIFICACION DE MATERIAL CLASIFICACION MATERIAL


AREA VOLUMEN
DE CORTE RELLENO (m3)
PROGRESIVAS DISTANC.
MAT. ROCA ROCA
CORTE RELLENO CORTE RELLENO PROPIO PRESTAMO
SUELTO SUELTA FIJA
KM m m2 m2 m3 m3 m3 m3 m3 1 2
0+000 0.00 0.1 0.01 0.00 0.00 - - - - -
0+020 20.00 1.59 0.48 16.93 4.89 16.93 - - 4.89 -
0+040 20.00 0.46 1.44 20.51 19.18 20.51 - - 19.18 -
0+050 10.00 0.24 2.88 3.53 21.09 3.53 - - 21.09 -
0+060 10.00 5.37 0.00 27.66 13.93 27.66 - - 13.93 -
0+080 20.00 2.65 1.81 79.87 18.11 79.87 - - 18.11 -
0+100 20.00 1.28 1.49 39.27 33.01 39.27 - - 33.01 -
0+120 20.00 2.6 1.86 38.74 33.53 38.74 - - 33.53 -
0+140 20.00 7.17 0.50 97.68 23.60 97.68 - - 23.60 -
0+150 10.00 7.68 0.62 77.35 5.04 77.35 - - 5.04 -
0+160 10.00 5.04 0.90 66.22 6.73 66.22 - - 6.73 -
0+180 20.00 5.02 1.86 101.02 27.46 101.02 - - 27.46 -
0+200 20.00 3 0.34 80.16 22.02 80.16 - - 22.02 -
0+220 20.00 4.43 0.16 74.27 5.01 74.27 - - 5.01 -
0+240 20.00 0.35 3.91 47.77 40.72 47.77 - - 40.72 -
0+260 20.00 0.32 2.45 6.62 63.57 6.62 - - 63.57 -
0+280 20.00 0.12 2.50 4.39 49.46 4.39 - - 49.46 -
0+300 20.00 2.26 0.71 23.87 32.04 23.87 - - 32.04 -
0+320 20.00 3.63 0.40 58.92 11.03 58.92 - - 11.03 -
0+340 20.00 6.62 0.84 103.02 11.96 103.02 - - 11.96 -
0+350 10.00 5 0.61 58.53 6.52 58.53 - - 6.52 -
0+360 10.00 4.97 0.00 50.63 2.75 50.63 - - 2.75 -
0+370 10.00 4.82 0.02 50.40 0.08 50.40 - - 0.08 -
0+380 10.00 3.14 0.82 40.56 4.18 40.56 - - 4.18 -
0+400 20.00 2.29 1.11 54.29 19.28 54.29 - - 19.28 -
0+420 20.00 2.69 0.75 49.80 18.63 49.80 - - 18.63 -
0+440 20.00 2.84 0.03 55.31 7.83 55.31 - - 7.83 -
0+460 20.00 1.88 0.03 47.24 0.57 47.24 - - 0.57 -
0+480 20.00 0.4 3.55 22.69 35.85 22.69 - - 35.85 -
0+500 20.00 1.49 0.06 18.94 36.11 18.94 - - 36.11 -
0+520 20.00 2.98 0.00 44.78 0.61 44.78 - - 0.61 -
0+540 20.00 3.28 0.64 62.66 6.35 62.66 - - 6.35 -
0+560 20.00 2.16 1.02 54.38 16.58 54.38 - - 16.58 -
0+580 20.00 1.35 0.33 35.07 13.51 35.07 - - 13.51 -
0+600 20.00 2.01 0.11 33.59 4.42 33.59 - - 4.42 -
0+620 20.00 2.58 0.10 45.84 2.11 45.84 - - 2.11 -
0+640 20.00 2.78 0.09 53.55 1.83 53.55 - - 1.83 -
0+660 20.00 1.65 0.09 44.26 1.73 44.26 - - 1.73 -
0+680 20.00 0.91 0.41 25.63 4.93 25.63 - - 4.93 -
0+700 20.00 0.71 1.00 16.28 14.03 16.28 - - - -
0+720 20.00 0 3.81 7.13 48.10 7.13 - - - -
0+740 20.00 0 3.66 0.00 74.75 0.00 - - - -
0+760 20.00 0 3.46 0.00 71.24 0.00 - - - -
0+770 10.00 0 3.52 0.00 34.81 0.00 - - - -
0+780 10.00 0 3.66 0.00 35.72 0.00 - - - -
0+790 10.00 0.11 3.23 0.56 34.26 0.56 - - - -
0+800 10.00 0.8 1.78 4.57 25.03 4.57 - - 25.03 -
0+820 20.00 2.11 0.14 29.07 19.20 29.07 - - 19.20 -
0+840 20.00 1.57 0.75 36.78 8.89 36.78 - - 8.89 -
0+860 20.00 2.56 0.03 41.27 7.84 41.27 - - 7.84 -
0+880 20.00 8.58 0.00 111.36 0.31 111.36 - - 0.31 -
0+900 20.00 3.29 0.48 118.70 4.77 118.70 - - 4.77 -
0+920 20.00 1.95 0.76 52.41 12.39 52.41 - - 12.39 -
0+940 20.00 2.52 0.42 44.70 11.84 44.70 - - 11.84 -
0+950 10.00 5.11 0.00 37.16 2.12 37.16 - - 2.12 -
0+960 10.00 5.32 0.00 50.13 0.01 50.13 - - 0.01 -
0+970 10.00 4.34 0.00 46.71 0.00 46.71 - - - -
0+980 10.00 1.51 1.17 28.39 5.62 28.39 - - 5.62 -
0+990 10.00 1.61 0.37 15.47 7.37 15.47 - - 7.37 -
1+000 10.00 2.51 0.00 20.65 1.78 20.65 - - 1.78 -
1+020 20.00 1.68 0.39 41.89 3.87 41.89 - - 3.87 -
1+040 20.00 2.5 0.62 41.77 10.08 41.77 - - 10.08 -
1+050 10.00 2.67 1.12 25.58 8.61 25.58 - - 8.61 -
1+060 10.00 1.97 2.14 23.19 16.33 23.19 - - 16.33 -
1+080 20.00 3.24 1.32 52.11 34.62 52.11 - - 34.62 -
1+100 20.00 0.27 4.29 35.09 56.06 35.09 - - 56.06 -
1+120 20.00 0.15 13.16 4.16 174.46 4.16 - - 174.46 -
1+130 10.00 0.49 16.48 3.05 147.03 3.05 - - 147.03 -
1+140 10.00 0.05 15.28 2.36 153.85 2.36 - - 153.85 -
1+150 10.00 0.18 12.38 0.99 133.32 0.99 - - 133.32 -
1+160 10.00 0.11 8.38 1.31 100.40 1.31 - - 100.40 -
1+180 20.00 0.18 5.96 2.95 143.42 2.95 - - 143.42 -
1+200 20.00 7.93 1.33 81.11 72.92 81.11 - - 72.92 -
1+220 20.00 50.24 0.30 581.64 16.35 581.64 - - - 16.35
1+230 10.00 39.8 0.68 424.43 4.76 424.43 - - - 4.76
1+240 10.00 37.19 0.42 267.50 4.63 267.50 - - - 4.63
1+250 10.00 28.38 1.78 223.80 9.12 223.80 - - - 9.12
1+260 10.00 17.23 1.97 185.72 17.65 185.72 - - - 17.65
1+280 20.00 2.82 1.30 200.48 32.72 200.48 - - - 32.72
1+300 20.00 0.39 1.96 32.13 32.57 32.13 - - - 32.57
1+320 20.00 0 9.77 3.94 117.27 3.94 - - - 117.27
1+340 20.00 0.94 6.25 9.38 160.25 9.38 - - - 160.25
1+360 20.00 5.93 11.75 68.68 177.39 68.68 - - - 177.39
1+370 10.00 9.91 5.12 77.87 74.40 77.87 - - - 74.40
1+380 10.00 24.41 0.00 161.08 22.07 161.08 - - - 22.07
1+390 10.00 1.56 3.04 120.22 14.99 120.22 - - - 14.99
1+400 10.00 0 21.30 7.82 121.71 7.82 - - - 121.71
1+420 20.00 3.78 7.24 37.81 285.46 37.81 - - - 285.46
1+430 10.00 11.71 1.79 67.33 42.78 67.33 - - - 42.78
1+440 10.00 14.73 0.00 128.28 8.82 128.28 - - - 8.82
1+460 20.00 10.65 0.45 253.79 4.48 253.79 - - - 4.48
1+480 20.00 11.58 0.19 219.97 5.92 219.97 - - - 5.92
1+490 10.00 13.14 0.00 120.48 0.76 120.48 - - - 0.76
1+500 10.00 10.5 0.00 115.66 0.00 115.66 - - - -
1+520 20.00 9.31 0.00 198.16 0.00 198.16 - - - -
1+540 20.00 4.9 1.03 142.35 10.12 142.35 - - - 10.12
1+550 10.00 3.27 0.65 41.44 7.82 41.44 - - - 7.82
1+560 10.00 4.23 0.51 38.62 5.53 38.62 - - - 5.53
1+580 20.00 0.3 2.75 46.10 32.42 46.10 - - - 32.42
1+600 20.00 0 7.50 3.01 102.48 3.01 - - - 102.48
1+610 10.00 0 7.10 0.00 72.42 0.00 - - - 72.42
1+620 10.00 0.01 5.73 0.02 61.79 0.02 - - - 61.79
1+630 10.00 0.89 4.66 4.59 48.97 4.59 - - - 48.97
1+640 10.00 1.83 2.39 13.76 34.07 13.76 - - - 34.07
1+660 20.00 9.64 0.00 114.69 23.88 114.69 - - - 23.88
1+670 10.00 12.28 0 106.78 0.00 106.78 - - - -
1+680 10.00 14.03 0.01 125.34 0.04 125.34 - - - 0.04
1+690 10.00 16.33 0.05 142.49 0.27 142.49 - - - 0.27
1+700 10.00 15.47 0.01 154.94 0.27 154.94 - - - 0.27
1+720 20.00 9.62 1.78 247.6 17.85 247.60 - - - 17.85
1+730 10.00 9.01 1.18 83.07 14.91 83.07 - - - 14.91
1+740 10.00 7.02 0.01 75.85 6.02 75.85 - - - 6.02
1+760 20.00 3.39 1.92 104.11 19.27 104.11 - - - 19.27
1+780 20.00 2.91 0 63.04 19.15 63.04 - - - 19.15
1+800 20.00 3.17 0.34 60.84 3.41 60.84 - - - 3.41
1+820 20.00 3.51 0.02 66.82 3.59 66.82 - - - 3.59
1+840 20.00 4.09 0.04 76.14 0.58 76.14 - - - 0.58
1+850 10.00 3.65 0.04 38.93 0.42 38.93 - - - 0.42
1+860 10.00 6.17 0.03 49.45 0.37 49.45 - - - 0.37
1+870 10.00 3.13 0.04 46.84 0.34 46.84 - - - 0.34
1+880 10.00 1.92 0.44 25.48 2.38 25.48 - - - 2.38
1+890 10.00 0.9 4.04 14.27 22.39 14.27 - - - 22.39
1+900 10.00 2.41 5.82 16.68 49.20 16.68 - - - 49.20
1+920 20.00 1.72 3.8 41.28 96.27 41.28 - - - 96.27
1+930 10.00 0.62 3.67 11.41 37.43 11.41 - - - 37.43
1+940 10.00 0.97 3.9 7.79 37.63 7.79 - - - 37.63
1+960 20.00 0.22 4.13 11.98 80.37 11.98 - - - 80.37
1+980 20.00 4.88 0 51.01 41.34 51.01 - - - 41.34
1+989 8.89 2.35 0.1 32.11 0.43 32.11 - - - 0.43
KM 0+000 - KM 1+988.89 TOTAL 8357.85 4108.83 8357.85 0.00 0.00 1788.39 2007.53
MUNICIPALIDAD PROVINCIAL DE MOHO
OFICINA DE INFRAESTRUCTURA Y DESARROLLO URBANO RURAL

PLANILLA DE METRADOS SUB BASE GRANULA


4.00

04.00.00 BASE Y SUB BASA 4.65 BASE

04.01.00 SUB BASE GRANULAR DE (e=0.20 M.) 5.20 SUB BASE

SUB BASE GRANULAR DE (e=0.20 M.)


PROGRESIVAS
LARGO ANCHO ALTO AREA PARCIAL
KM m m2 m2 m2 M3
0+000 0+020 20.00 4.925 0.20 98.50 19.70
0+020 0+040 20.00 4.925 0.20 98.50 19.70
0+040 0+050 10.00 4.925 0.20 49.25 9.85
0+050 0+060 10.00 4.925 0.20 49.25 9.85
0+060 0+080 20.00 4.925 0.20 98.50 19.70
0+080 0+100 20.00 4.925 0.20 98.50 19.70
0+100 0+120 20.00 4.925 0.20 98.50 19.70
0+120 0+140 20.00 4.925 0.20 98.50 19.70
0+140 0+150 10.00 4.925 0.20 49.25 9.85
0+150 0+160 10.00 4.925 0.20 49.25 9.85
0+160 0+180 20.00 4.925 0.20 98.50 19.70
0+180 0+200 20.00 4.925 0.20 98.50 19.70
0+200 0+220 20.00 4.925 0.20 98.50 19.70
0+220 0+240 20.00 4.925 0.20 98.50 19.70
0+240 0+260 20.00 4.925 0.20 98.50 19.70
0+260 0+280 20.00 4.925 0.20 98.50 19.70
0+280 0+300 20.00 4.925 0.20 98.50 19.70
0+300 0+320 20.00 4.925 0.20 98.50 19.70
0+320 0+340 20.00 4.925 0.20 98.50 19.70
0+340 0+350 10.00 4.925 0.20 49.25 9.85
0+350 0+360 10.00 4.925 0.20 49.25 9.85
0+360 0+370 10.00 4.925 0.20 49.25 9.85
0+370 0+380 10.00 4.925 0.20 49.25 9.85
0+380 0+400 20.00 4.925 0.20 98.50 19.70
0+400 0+420 20.00 4.925 0.20 98.50 19.70
0+420 0+440 20.00 4.925 0.20 98.50 19.70
0+440 0+460 20.00 4.925 0.20 98.50 19.70
0+460 0+480 20.00 4.925 0.20 98.50 19.70
0+480 0+500 20.00 4.925 0.20 98.50 19.70
0+500 0+520 20.00 4.925 0.20 98.50 19.70
0+520 0+540 20.00 4.925 0.20 98.50 19.70
0+540 0+560 20.00 4.925 0.20 98.50 19.70
0+560 0+580 20.00 4.925 0.20 98.50 19.70
0+580 0+600 20.00 4.925 0.20 98.50 19.70
0+600 0+620 20.00 4.925 0.20 98.50 19.70
SUB BASE GRANULAR DE (e=0.20 M.)
PROGRESIVAS
LARGO ANCHO ALTO AREA PARCIAL
KM m m2 m2 m2 M3
0+620 0+640 20.00 4.925 0.20 98.50 19.70
0+640 0+660 20.00 4.925 0.20 98.50 19.70
0+660 0+680 20.00 4.925 0.20 98.50 19.70
0+680 0+700 20.00 4.925 0.20 98.50 19.70
0+700 0+720 20.00 4.925 0.20 98.50 19.70
0+720 0+740 20.00 4.925 0.20 98.50 19.70
0+740 0+760 20.00 4.925 0.20 98.50 19.70
0+760 0+770 10.00 4.925 0.20 49.25 9.85
0+770 0+780 10.00 4.925 0.20 49.25 9.85
0+780 0+790 10.00 4.925 0.20 49.25 9.85
0+790 0+800 10.00 4.925 0.20 49.25 9.85
0+800 0+820 20.00 4.925 0.20 98.50 19.70
0+820 0+840 20.00 4.925 0.20 98.50 19.70
0+840 0+860 20.00 4.925 0.20 98.50 19.70
0+860 0+880 20.00 4.925 0.20 98.50 19.70
0+880 0+900 20.00 4.925 0.20 98.50 19.70
0+900 0+920 20.00 4.925 0.20 98.50 19.70
0+920 0+940 20.00 4.925 0.20 98.50 19.70
0+940 0+950 10.00 4.925 0.20 49.25 9.85
0+950 0+960 10.00 4.925 0.20 49.25 9.85
0+960 0+970 10.00 4.925 0.20 49.25 9.85
0+970 0+980 10.00 4.925 0.20 49.25 9.85
0+980 0+990 10.00 4.925 0.20 49.25 9.85
0+990 1+000 10.00 4.925 0.20 49.25 9.85
1+000 1+020 20.00 4.925 0.20 98.50 19.70
1+020 1+040 20.00 4.925 0.20 98.50 19.70
1+040 1+050 10.00 4.925 0.20 49.25 9.85
1+050 1+060 10.00 4.925 0.20 49.25 9.85
1+060 1+080 20.00 4.925 0.20 98.50 19.70
1+080 1+100 20.00 4.925 0.20 98.50 19.70
1+100 1+120 20.00 4.925 0.20 98.50 19.70
1+120 1+130 10.00 4.925 0.20 49.25 9.85
1+130 1+140 10.00 4.925 0.20 49.25 9.85
1+140 1+150 10.00 4.925 0.20 49.25 9.85
1+150 1+160 10.00 4.925 0.20 49.25 9.85
1+160 1+180 20.00 4.925 0.20 98.50 19.70
1+180 1+200 20.00 4.925 0.20 98.50 19.70
1+200 1+220 20.00 4.925 0.20 98.50 19.70
1+220 1+230 10.00 4.925 0.20 49.25 9.85
1+230 1+240 10.00 4.925 0.20 49.25 9.85
1+240 1+250 10.00 4.925 0.20 49.25 9.85
1+250 1+260 10.00 4.925 0.20 49.25 9.85
1+260 1+280 20.00 4.925 0.20 98.50 19.70
1+280 1+300 20.00 4.925 0.20 98.50 19.70
1+300 1+320 20.00 4.925 0.20 98.50 19.70
1+320 1+340 20.00 4.925 0.20 98.50 19.70
1+340 1+360 20.00 4.925 0.20 98.50 19.70
1+360 1+370 10.00 4.925 0.20 49.25 9.85
SUB BASE GRANULAR DE (e=0.20 M.)
PROGRESIVAS
LARGO ANCHO ALTO AREA PARCIAL
KM m m2 m2 m2 M3
1+370 1+380 10.00 4.925 0.20 49.25 9.85
1+380 1+390 10.00 4.925 0.20 49.25 9.85
1+390 1+400 10.00 4.925 0.20 49.25 9.85
1+400 1+420 20.00 4.925 0.20 98.50 19.70
1+420 1+430 10.00 4.925 0.20 49.25 9.85
1+430 1+440 10.00 4.925 0.20 49.25 9.85
1+440 1+460 20.00 4.925 0.20 98.50 19.70
1+460 1+480 20.00 4.925 0.20 98.50 19.70
1+480 1+490 10.00 4.925 0.20 49.25 9.85
1+490 1+500 10.00 4.925 0.20 49.25 9.85
1+500 1+520 20.00 4.925 0.20 98.50 19.70
1+520 1+540 20.00 4.925 0.20 98.50 19.70
1+540 1+550 10.00 4.925 0.20 49.25 9.85
1+550 1+560 10.00 4.925 0.20 49.25 9.85
1+560 1+580 20.00 4.925 0.20 98.50 19.70
1+580 1+600 20.00 4.925 0.20 98.50 19.70
1+600 1+610 10.00 4.925 0.20 49.25 9.85
1+610 1+620 10.00 4.925 0.20 49.25 9.85
1+620 1+630 10.00 4.925 0.20 49.25 9.85
1+630 1+640 10.00 4.925 0.20 49.25 9.85
1+640 1+660 20.00 4.925 0.20 98.50 19.70
1+660 1+670 10.00 4.925 0.20 49.25 9.85
1+670 1+680 10.00 4.925 0.20 49.25 9.85
1+680 1+690 10.00 4.925 0.20 49.25 9.85
1+690 1+700 10.00 4.925 0.20 49.25 9.85
1+700 1+720 20.00 4.925 0.20 98.50 19.70
1+720 1+730 10.00 4.925 0.20 49.25 9.85
1+730 1+740 10.00 4.925 0.20 49.25 9.85
1+740 1+760 20.00 4.925 0.20 98.50 19.70
1+760 1+780 20.00 4.925 0.20 98.50 19.70
1+780 1+800 20.00 4.925 0.20 98.50 19.70
1+800 1+820 20.00 4.925 0.20 98.50 19.70
1+820 1+840 20.00 4.925 0.20 98.50 19.70
1+840 1+850 10.00 4.925 0.20 49.25 9.85
1+850 1+860 10.00 4.925 0.20 49.25 9.85
1+860 1+870 10.00 4.925 0.20 49.25 9.85
1+870 1+880 10.00 4.925 0.20 49.25 9.85
1+880 1+890 10.00 4.925 0.20 49.25 9.85
1+890 1+900 10.00 4.925 0.20 49.25 9.85
1+900 1+920 20.00 4.925 0.20 98.50 19.70
1+920 1+930 10.00 4.925 0.20 49.25 9.85
1+930 1+940 10.00 4.925 0.20 49.25 9.85
1+940 1+960 20.00 4.925 0.20 98.50 19.70
1+960 1+980 20.00 4.925 0.20 98.50 19.70
1+980 1+989 8.89 4.925 0.20 43.78 8.76
KM 0+000 - KM 1+990 TOTAL 9795.28 1959.06
MUNICIPALIDAD PROVINCIAL DE MO
OFICINA DE INFRAESTRUCTURA Y DESARROLLO URBANO RUR

PLANILLA DE METRADOS BASE GRANULA


4.00

04.00.00 BASE Y SUB BASA 4.65 BASE

04.02.00 BASE GRANULAR DE (e=0.15 M.) 5.20 SUB BASE

BASE GRANULAR DE (e=0.15 M.)


PROGRESIVAS
LARGO ANCHO ALTO AREA PARCIAL
KM m m2 m2 m2 M3
0+000 0+020 20.00 4.325 0.15 86.50 12.98
0+020 0+040 20.00 4.325 0.15 86.50 12.98
0+040 0+050 10.00 4.325 0.15 43.25 6.49
0+050 0+060 10.00 4.325 0.15 43.25 6.49
0+060 0+080 20.00 4.325 0.15 86.50 12.98
0+080 0+100 20.00 4.325 0.15 86.50 12.98
0+100 0+120 20.00 4.325 0.15 86.50 12.98
0+120 0+140 20.00 4.325 0.15 86.50 12.98
0+140 0+150 10.00 4.325 0.15 43.25 6.49
0+150 0+160 10.00 4.325 0.15 43.25 6.49
0+160 0+180 20.00 4.325 0.15 86.50 12.98
0+180 0+200 20.00 4.325 0.15 86.50 12.98
0+200 0+220 20.00 4.325 0.15 86.50 12.98
0+220 0+240 20.00 4.325 0.15 86.50 12.98
0+240 0+260 20.00 4.325 0.15 86.50 12.98
0+260 0+280 20.00 4.325 0.15 86.50 12.98
0+280 0+300 20.00 4.325 0.15 86.50 12.98
0+300 0+320 20.00 4.325 0.15 86.50 12.98
0+320 0+340 20.00 4.325 0.15 86.50 12.98
0+340 0+350 10.00 4.325 0.15 43.25 6.49
0+350 0+360 10.00 4.325 0.15 43.25 6.49
0+360 0+370 10.00 4.325 0.15 43.25 6.49
0+370 0+380 10.00 4.325 0.15 43.25 6.49
0+380 0+400 20.00 4.325 0.15 86.50 12.98
0+400 0+420 20.00 4.325 0.15 86.50 12.98
0+420 0+440 20.00 4.325 0.15 86.50 12.98
0+440 0+460 20.00 4.325 0.15 86.50 12.98
0+460 0+480 20.00 4.325 0.15 86.50 12.98
0+480 0+500 20.00 4.325 0.15 86.50 12.98
0+500 0+520 20.00 4.325 0.15 86.50 12.98
0+520 0+540 20.00 4.325 0.15 86.50 12.98
0+540 0+560 20.00 4.325 0.15 86.50 12.98
0+560 0+580 20.00 4.325 0.15 86.50 12.98
0+580 0+600 20.00 4.325 0.15 86.50 12.98
0+600 0+620 20.00 4.325 0.15 86.50 12.98
0+620 0+640 20.00 4.325 0.15 86.50 12.98
0+640 0+660 20.00 4.325 0.15 86.50 12.98
0+660 0+680 20.00 4.325 0.15 86.50 12.98
0+680 0+700 20.00 4.325 0.15 86.50 12.98
0+700 0+720 20.00 4.325 0.15 86.50 12.98
0+720 0+740 20.00 4.325 0.15 86.50 12.98
0+740 0+760 20.00 4.325 0.15 86.50 12.98
0+760 0+770 10.00 4.325 0.15 43.25 6.49
0+770 0+780 10.00 4.325 0.15 43.25 6.49
0+780 0+790 10.00 4.325 0.15 43.25 6.49
0+790 0+800 10.00 4.325 0.15 43.25 6.49
0+800 0+820 20.00 4.325 0.15 86.50 12.98
0+820 0+840 20.00 4.325 0.15 86.50 12.98
0+840 0+860 20.00 4.325 0.15 86.50 12.98
0+860 0+880 20.00 4.325 0.15 86.50 12.98
0+880 0+900 20.00 4.325 0.15 86.50 12.98
0+900 0+920 20.00 4.325 0.15 86.50 12.98
0+920 0+940 20.00 4.325 0.15 86.50 12.98
0+940 0+950 10.00 4.325 0.15 43.25 6.49
0+950 0+960 10.00 4.325 0.15 43.25 6.49
0+960 0+970 10.00 4.325 0.15 43.25 6.49
0+970 0+980 10.00 4.325 0.15 43.25 6.49
0+980 0+990 10.00 4.325 0.15 43.25 6.49
0+990 1+000 10.00 4.325 0.15 43.25 6.49
1+000 1+020 20.00 4.325 0.15 86.50 12.98
1+020 1+040 20.00 4.325 0.15 86.50 12.98
1+040 1+050 10.00 4.325 0.15 43.25 6.49
1+050 1+060 10.00 4.325 0.15 43.25 6.49
1+060 1+080 20.00 4.325 0.15 86.50 12.98
1+080 1+100 20.00 4.325 0.15 86.50 12.98
1+100 1+120 20.00 4.325 0.15 86.50 12.98
1+120 1+130 10.00 4.325 0.15 43.25 6.49
1+130 1+140 10.00 4.325 0.15 43.25 6.49
1+140 1+150 10.00 4.325 0.15 43.25 6.49
1+150 1+160 10.00 4.325 0.15 43.25 6.49
1+160 1+180 20.00 4.325 0.15 86.50 12.98
1+180 1+200 20.00 4.325 0.15 86.50 12.98
1+200 1+220 20.00 4.325 0.15 86.50 12.98
1+220 1+230 10.00 4.325 0.15 43.25 6.49
1+230 1+240 10.00 4.325 0.15 43.25 6.49
1+240 1+250 10.00 4.325 0.15 43.25 6.49
1+250 1+260 10.00 4.325 0.15 43.25 6.49
1+260 1+280 20.00 4.325 0.15 86.50 12.98
1+280 1+300 20.00 4.325 0.15 86.50 12.98
1+300 1+320 20.00 4.325 0.15 86.50 12.98
1+320 1+340 20.00 4.325 0.15 86.50 12.98
1+340 1+360 20.00 4.325 0.15 86.50 12.98
1+360 1+370 10.00 4.325 0.15 43.25 6.49
1+370 1+380 10.00 4.325 0.15 43.25 6.49
1+380 1+390 10.00 4.325 0.15 43.25 6.49
1+390 1+400 10.00 4.325 0.15 43.25 6.49
1+400 1+420 20.00 4.325 0.15 86.50 12.98
1+420 1+430 10.00 4.325 0.15 43.25 6.49
1+430 1+440 10.00 4.325 0.15 43.25 6.49
1+440 1+460 20.00 4.325 0.15 86.50 12.98
1+460 1+480 20.00 4.325 0.15 86.50 12.98
1+480 1+490 10.00 4.325 0.15 43.25 6.49
1+490 1+500 10.00 4.325 0.15 43.25 6.49
1+500 1+520 20.00 4.325 0.15 86.50 12.98
1+520 1+540 20.00 4.325 0.15 86.50 12.98
1+540 1+550 10.00 4.325 0.15 43.25 6.49
1+550 1+560 10.00 4.325 0.15 43.25 6.49
1+560 1+580 20.00 4.325 0.15 86.50 12.98
1+580 1+600 20.00 4.325 0.15 86.50 12.98
1+600 1+610 10.00 4.325 0.15 43.25 6.49
1+610 1+620 10.00 4.325 0.15 43.25 6.49
1+620 1+630 10.00 4.325 0.15 43.25 6.49
1+630 1+640 10.00 4.325 0.15 43.25 6.49
1+640 1+660 20.00 4.325 0.15 86.50 12.98
1+660 1+670 10.00 4.325 0.15 43.25 6.49
1+670 1+680 10.00 4.325 0.15 43.25 6.49
1+680 1+690 10.00 4.325 0.15 43.25 6.49
1+690 1+700 10.00 4.325 0.15 43.25 6.49
1+700 1+720 20.00 4.325 0.15 86.50 12.98
1+720 1+730 10.00 4.325 0.15 43.25 6.49
1+730 1+740 10.00 4.325 0.15 43.25 6.49
1+740 1+760 20.00 4.325 0.15 86.50 12.98
1+760 1+780 20.00 4.325 0.15 86.50 12.98
1+780 1+800 20.00 4.325 0.15 86.50 12.98
1+800 1+820 20.00 4.325 0.15 86.50 12.98
1+820 1+840 20.00 4.325 0.15 86.50 12.98
1+840 1+850 10.00 4.325 0.15 43.25 6.49
1+850 1+860 10.00 4.325 0.15 43.25 6.49
1+860 1+870 10.00 4.325 0.15 43.25 6.49
1+870 1+880 10.00 4.325 0.15 43.25 6.49
1+880 1+890 10.00 4.325 0.15 43.25 6.49
1+890 1+900 10.00 4.325 0.15 43.25 6.49
1+900 1+920 20.00 4.325 0.15 86.50 12.98
1+920 1+930 10.00 4.325 0.15 43.25 6.49
1+930 1+940 10.00 4.325 0.15 43.25 6.49
1+940 1+960 20.00 4.325 0.15 86.50 12.98
1+960 1+980 20.00 4.325 0.15 86.50 12.98
1+980 1+989 8.89 4.325 0.15 38.45 5.77
KM 0+000 - KM 1+990 TOTAL 8601.95 1290.29
PROVINCIAL DE MOHO
TURA Y DESARROLLO URBANO RURAL
MUNICIPALIDAD PROVINCIAL DE MOHO
OFICINA DE INFRAESTRUCTURA Y DESARROLLO URBANO RURAL

PLANILLA DE METRADOS SEÑALES PREVENTIVAS


PROYECTO:"MEJORAMIENTO DEL ACCESO
LOCALIDAD:
TRAMO
FECHA

TIPO DE
UBICACIÓN S CANTIDAD OBSERVCIONES
SEÑAL
0+000 D P-2A 1.00 LADO DERECHO
0+020 I P-2B 1.00 LADO IZQUIERDO
0+040 D 1.00 -
0+050 I 1.00 -