Project Quality Plan
guru
CIVIL CONSTRUCTION
Comments
1 Introduction
THIS DOCUMENT, THE COMPANY NAME QUALITY PLAN FORMS PART OF THE
PROJECT BUSINESS PLAN.
THE PROJECT BUSINESS PLAN IS THE COMPANY MANUAL, WHICH DESCRIBES THE
COMPANY STRATEGY FOR CONTROLLING THE PROJECT THROUGHOUT THE
CONSTRUCTION PROCESS, FROM DESIGN TO HANDOVER.
THE PROJECT QUALITY PLAN OUTLINES THE SPECIFIC QUALITY CONTROL MEASURES,
WHICH SHALL BE DEVELOPED AND IMPLEMENTED. THESE SHALL PRINCIPALLY COMPRISE
OF METHOD STATEMENTS, INSPECTION AND TEST PLANS AND GUIDANCE NOTES FOR
COMPLIANCE AND CONTINUAL IMPROVEMENT.
THE COMPANY QUALITY SYSTEM IS SUBJECTED TO INTERNAL AUDITS IN ACCORDANCE
WITH AN AUDIT SCHEDULE PREPARED FOR THE COMPANY.
2 Scope of work.
THE PROJECT CONSISTS OF CONSTRUCTION OF ANY NUMBERS OF BUILDINGS FOR ANY
PURPOSE, ANCILLARY BUILDINGS, EARTHWORK, COMPOUND WALL, PLAY COURTS,
WALKWAYS, LANDSCAPING, ASPHALTING, SEWAGE TREATMENT PLANT AND ALL
ASSOCIATED ELECTRO-MECHANICAL SERVICES.
3 Project Organisation and Responsibilities
THE BELOW TABLE DETAILS IS RELATIONSHIP BETWEEN THE PROJECT QUALITY
TEAM AND THE REST OF THE COMPANY PROJECT TEAM AND THEIR ROLES AND
RESPONSIBILITIES.
Status Use
2
For documents which
Issued for
01 will not be used for
Information
construction.
For documents to be
Issued for
03 approved by client or
Approval
lead consultant
Issued for
FOR
05
Review
REVIEW
AND
COMMENT
4.1.2 Working drawings
A SCHEDULE OF WORKING DRAWINGS WILL BE PRODUCED TOGETHER WITH ISSUE DATES
AS AGREED BY THE APPOINTED DESIGN MANAGER. ON-SITE DISCUSSIONS WILL TAKE
PLACE BETWEEN THE DESIGN TEAM AND CONTRACTOR TO ESTABLISH LEAD TIMES FOR
DRAWING APPROVALS.
3
4.1.3 Electronic Drawings
ELECTRONIC TRANSFER OF DRAWINGS WILL BE DONE FOLLOWING THE PROCESS LAID
OUT IN THE SECTION OF THE PROJECT BUSINESS PLAN (PBP).
4
4.1.8 Filing System
THE QS DEPARTMENT WILL BE RESPONSIBLE FOR ESTABLISHING THE MASTER FILING
SYSTEM FOR THE PROJECT COMPLETE WITH A COPY OF THE FILING CODES. ALL
DEPARTMENTS SHOULD INTEGRATE THEIR FILING SYSTEM WITH THE MASTER FILING
SYSTEM THEY’RE BY AVOIDING DUPLICATION AND INFORMATION GAPES.
4.1.9 E-mails
ALL CORRESPONDENCE BETWEEN CORE GROUP MEMBERS WILL BE THROUGH
ELECTRONIC DOCUMENT MANAGEMENT SYSTEM.
INCOMING E-MAILS RECEIVED BY INDIVIDUALS WILL BE COPIED AND TREATED AS FOR
ORIGINAL CORRESPONDENCE (E.G. COPIED TO THE PROJECT LEADER OR NOMINEE FOR
STAMPING, DISTRIBUTION AND COPYING). A CENTRAL EMAIL ADDRESS WILL BE PROVIDED
TO ENSURE THE CENTRAL FILE RECEIVES A COPY. THE ADDRESSEE WILL DEAL WITH
CONFIDENTIAL E-MAILS.
OUTGOING E-MAILS WILL BE DEALT WITH AS FOR OUTGOING CORRESPONDENCE
ENSURING AUTHORITY FOR SIGNING AND COPIED TO CENTRAL FILE.
IT IS THE DISCRETION OF THE EMPLOYEE TO ASCERTAIN WHETHER E-MAILS ARE TO BE
FILED AS PER THE ABOVE PROCESS.
5
METHOD STATEMENT PREPARATION AND SUBMITTAL WITH THE ELECTRONIC DOCUMENT
MANAGEMENT SYSTEM.
THE PREPARATION OF THESE METHOD STATEMENTS IS THE RESPONSIBILITY OF THE
PROJECT ENGINEER AND OR HIS DELEGATE AND APPROVED BY THE CONSTRUCTION
MANAGER. THE QUALITY REPRESENTATIVE WILL CONDUCT SAMPLE REVIEWS AS A
MINIMUM.
METHOD STATEMENTS ARE REQUIRED TO BE PRODUCED FOR ALL SIGNIFICANT
ACTIVITIES. THE CONTRACTOR FORMAT AS DEFINED IN THE TECHNICAL MANAGEMENT
SECTION OF INFOSYSTEM IS PROPOSED UNLESS OTHER SPECIFIC PROJECT
REQUIREMENTS ARE PREFERRED.
ALL METHOD STATEMENTS WILL BE CHECKED BY THE PROJECT MANAGER OR MANAGER
RESPONSIBLE, AND FORMALLY APPROVED. ALL METHOD STATEMENTS INFLUENCING
EITHER THE WORKS OR SAFETY ARE TO BE SUBMITTED TO THE ENGINEER.
EACH METHOD STATEMENT WILL IDENTIFY WORK PROCEDURES. THE METHOD OF
PRODUCTION, TEMPORARY WORKS, MATERIALS, STANDARDS, EQUIPMENT, SAFETY
PRECAUTIONS, PROTECTION AND LOGISTICS INVOLVED. PROVISIONS FOR INSPECTION
WILL BE SPECIFIED.
THE WHOLE SITE TEAM ARE RESPONSIBLE FOR THE SUCCESSFUL IMPLEMENTATION AND
COMPLIANCE WITH THESE DOCUMENTED REQUIREMENTS WITHIN THE METHOD
STATEMENTS.
THE QUALITY REPRESENTATIVE WILL CONDUCT SAMPLE SURVEILLANCES TO VERIFY
COMPLIANCE AND OR AS REQUIRED. QUALITY AUDITS WILL CONFIRM COMPLIANCE TO
INSPECTION TEST PLANS.
INSPECTIONS AND CHECKLISTS WILL FORM PART OF THE DOCUMENTED EVIDENCE OF
COMPLIANCE.
1. Providing engineering support to all facets of the contractor organization. This includes the review
of design for buildability, proposing alternative design solutions and co-ordination of all design
queries. Formal communication within the Technical Department is managed through minutes by
weekly meetings. Formal communication with the Engineer is managed via submittals. In addition,
a bi-weekly meeting is convened between Engineer and contractor technical personnel.
2. Management of Shop Drawing Preparation – The responsibility of Shop Drawing Preparation will
be as per the roles and responsibilities defined within the (Appendix A)
3. Management of As-Built records, in accordance with the Contract Close-out process
4. Management of Design by Others. Where this option is exercised, Site Procedures will be
produced in order to define this activity.
6
DISCREPANCIES AND ANALYZE ANY TRENDS FOR IMPLEMENTATION OF PREVENTIVE
MEASURES.
FOR SPECIFIC CONSTRUCTION INSPECTION CHECKLISTS, I.E. EARTHWORKS, CONCRETE
FOUNDATIONS, CONCRETE GROUND FLOOR SLAB ETC. (APPENDIX B)
5 Management of Materials:
A WIDE VARIETY OF MATERIALS ARE REQUIRED ON THE PROJECT. PRIOR TO EXECUTION
OF CONSTRUCTION, THESE ARE TO BE SOURCED PRIMARILY BASED ON AVAILABILITY,
CAPABILITY FOR SUPPLY IN SUFFICIENT QUANTITY, AND COMPLIANCE WITH SPECIFIED
TECHNICAL REQUIREMENTS. THE PROCEDURE FOR PROCUREMENT CONTROLS THE
MANAGEMENT OF THE PROCUREMENT PROCESS. DETAILS OF MATERIALS PROPOSED FOR
USE IN THE PERMANENT WORKS, ARE SUBMITTED TO THE ENGINEER FOR APPROVAL.
WHERE PRE-CONSTRUCTION TRIALS OR MOCK-UPS ARE REQUIRED, METHOD
STATEMENTS ARE PRODUCED AND SUBMITTED TO THE ENGINEER FOR APPROVAL.
7
6 Change Management
CHANGE ENCOMPASSES ANY OR ALL OF THE PARAMETERS OF SCOPE, COST, TIME, RISK,
QUALITY OR OTHER CONSTRAINTS.
A PRESCRIPTIVE PROCESS WILL BE TAILORED IN ACCORDANCE WITH THE AGREED TERMS
OF THE CONTRACT. AS PART OF THE EVALUATION PROCESS THERE WILL BE INPUT AND
CONSULTATION WITH OTHER MEMBERS OF THE PROJECT TEAM IN RESPECT OF THE
FOLLOWING;
8
8 Management System Review, Maintenance &
Improvement
THE EVO MANAGEMENT SYSTEM IS UNDER CONTINUAL REVIEW. WHERE AREAS
REQUIRING MAINTENANCE AND/OR IMPROVEMENT ARE IDENTIFIED, THIS WILL BE
ADDRESSED. THE PRINCIPAL METHODS OF PERFORMING THIS PROCESS ARE:
AUDIT PLANNING
AUDIT EXECUTION
REPORTING
CORRECTION, PREVENTION, AND CLOSE-OUT
INSPECTIONS
MANAGEMENT REVIEWS
8.1 Audits:
AUDITS ARE CONDUCTED UNDER THE CONTROL OF THE QUALITY MANAGER. THESE
INCLUDE INTERNAL AUDITS OF CONTRACTOR ORGANIZATIONAL DEPARTMENTS,
PROCESSES, AND OPERATIONS, AS WELL AS EXTERNAL AUDITS OF SUPPLIERS AND
SUBCONTRACTORS. A SCHEDULE OF PROGRAM AUDITS IS PRODUCED. THIS IS SUBMITTED
FOR INFORMATION TO ALL CONTRACTOR DEPARTMENT MANAGERS, RELEVANT
SUBCONTRACTORS, SUPPLIERS, AND THE ENGINEER. WRITTEN CONFIRMATION IS
PROVIDED TO THE AUDITEE IN ADVANCE OF THE AUDIT. UNSCHEDULED AUDITS MAY BE
CONDUCTED AT THE DISCRETION OF THE QUALITY MANAGER. AUDITS ARE PLANNED,
EXECUTED AND CONDUCTED IN ACCORDANCE WITH THE Audit procedure included within
‘InfoSystem’. CORRECTIVE AND PREVENTATIVE MEASURES, AS WELL AS AUDIT CLOSEOUT,
ARE ALSO MANAGED IN ACCORDANCE WITH THIS MANAGEMENT PROCEDURE. THE
PROJECT QUALITY MANAGER OR HIS DELEGATE WILL INSPECT THE CONCRETE
SUPPLYING PLANT, WITH IN 3 WEEKS OF RECEIVING THE MONTHLY QUALITY REPORT OF
THE SUPPLIER, WHICH INCLUDES CALIBRATION CERTIFICATES, AGGREGATE TEST
REPORTS ETC. THE PROCESS RELATED TO CONCRETE SUPPLY WILL BE VERIFIED
THEREBY ON MONTHLY BASIS.
9
WHEN AN NCR HAS BEEN RAISED AGAINST SUBCONTRACTOR’S WORK, THE
SUBCONTRACTOR WILL PROPOSE A CORRECTIVE ACTION, NOT LATER THAN WEEK’S TIME,
WHICH WILL BE AGREED BY THE CONTRACTOR. WHERE APPROPRIATE THE DESIGN TEAM
MAY BE INVOLVED IN APPROVING THE CORRECTIVE ACTION ON THE NCR FORM OR MAY
USE AN EQUIVALENT SYSTEM, WHICH IS DEALT WITH IN THE SAME MANNER.
REMEDIAL WORK REQUIRED WILL NOT BE UNDERTAKEN UNTIL THE NECESSARY
APPROVALS HAVE BEEN GRANTED. A COPY OF THE NCR AND CORRECTIVE ACTION WILL
BE COPIED TO THE Q.S. DEPARTMENT FOR ASSISTING IN EVALUATING MONTHLY REVIEW
OF REWORK COSTS.
SUBCONTRACTORS WILL BE REQUIRED TO OPERATE A FORMAL NON-CONFORMANCE
SYSTEM USING THEIR OWN APPROVED DOCUMENTED SYSTEM. WHERE THIS DOES NOT
EXIST, THEY WILL USE THE CONTRACTOR SYSTEM. THE SUBCONTRACTOR WILL DEAL
WITH THESE INTERNALLY IN THE SAME WAY AS DESCRIBED PREVIOUSLY.
← Previous Post
Next Post →
Leave a Reply
Top of Form
Your email address will not be published. Required fields are marked *
Comment
Name *
Email *
Website
Notify me of follow-up comments by email.
Notify me of new posts by email.
Bottom of Form
Bottom of Form
10
Recent Posts
1. CONSTRUCTION MACHINERIES, EQUIPMENTS AND INSTRUMENTS / HANDLING AND
MAINTANANCE
2. Check list for Ready Mix Concrete (Parapet wall)
3. Check list for Grade Slab
4. Check list for Sandstone Cladding