Subject: Conduct of Relocation Subdivison and Stake out Survey for Proposed
1 HECTARE Subdivision of Lots at Puerto Galera.
I. Scope of Work
II. Methodology
Construction staking and site layout survey using electronic total station/GPS RTK.
Survey scope includes the following: layout of site development (if any), staking of
building footprints and other structures present in the construction plans to be
provided. Wooden or metal stakes may be used for site development and layout of
building footprints. Upon completion the Chief of Party shall request a joint survey with
the client showing completion of all layout works prior to demobilization.
Page 1 of 4
III. Equipments to be used
1. Geodetic Engineer :1
2. Instrument Man :1
3. Survey Aide/Local Aide :2
4. Driver :1 (OPTIONAL)
V. Deliverables/Output
VI. Duration
Completion of all survey works shall be within a total of fourteen (5) days inclusive of
data processing. Survey Team shall mobilize within seven (3) days upon signing of
conformity and posting of down payment.
1 2 3 4 5
Mobilizatio & Demobilization
Research & Reconnaissance
Relocation, Subdivision ad Stakeout Survey
Data Processing
Prep and Submission of Deliverables
*Note: Approved Deliverables shall conform to the calendar days based on agencies
concerned but this shall no shorter than 3 months or longer than 12 months.
VII. Cost
For the completion of the scope of work for this project, the total cost is ONE
HUNDRED TWENTY THOUSAND FIVE HUNDRED PESOS ONLY (PhP
120,500.00) with discount upon notice of award or conformity.
Here is the breakdown of our cost for your evaluation and perusal.
Page 2 of 4
UNIT PRICE
Mobilization and
1 1.0 Lot - - - 10,000.00
Demobilization
Verification of
2 1.0 Lot - - - 0.00
GCPs and BMs
Relocation
3 1 Ha. - - - 30,000.00
Survey
Subdivision and
4 10 Lot - - - 80,500.00
Stakeout Survey
SUB TOTAL 120,500.00
1. Fifty (50%) of Professional Services Fee as down payment for mobilization upon
acceptance of proposal and signing of conformity;
2. Fifty (50%) remaining balance as full and final payment pon submission of all
deliverables.
1. The Client shall facilitate the acquisition of clearances and permits and to appoint
a representative to liaise with concerned authorities for the necessary access and
the unimpeded conduct of the works, ground survey, and their timely completion;
2. The Client shall provide all relevant lot data and previous GCP and BM survey
documents; and
3. Any other assistance regarding safety, coordination, documentations, and
communications with the other parties if deemed necessary.
Should the above proposal meet your requirements, kindly signify your conformity by
signing on the space provided below and return to us one (1) signed copy to serve as our
interim working agreement pending receipt of Purchase Order. This may also serve as
our contract. This proposal is valid for thirty (30) calendar days.
I highly appreciate whatever action you may extend regarding this proposal. Should you
have further inquiries or concerns with respect to the foregoing, we would be delighted to
provide information or clarifications. You may reach me at 0997-603-6579 or at e-mail
address: pabzzamorajr@gmail.com
Page 3 of 4
Very truly yours,
PABLING F. ZAMORA JR
Geodetic Engineer II
CONFORME:
_________________________
Date: _________________________
Page 4 of 4