Escolar Documentos
Profissional Documentos
Cultura Documentos
UBICACIÓN
ELABORADO POR
FECHA
OTRAS OPCIONES
de los metrados 2
CONTRATA
ADMINISTRACION DIRECTA
1 6
2 5
3
4
SI
NO
MO y EQ
TODOS
SEMANAL
MENSUAL
DATOS NECESARIOS PARA EL CALCULO DE FLETES
FLETE CON VEHICULO
INSUMOS
ORIGEN - DESTINO Prec. U.
MATERIALES HUARAZ- HUARI 0.15
AGREGADOS 0.00
TUBERIAS 0.00
3912
1288
1007
RELACION DE INSUMOS BASE
1205 28
124
1001 47 MO CAPATAZ hh 10
1002 47 MO OPERARIO hh 11.57
1003 47 MO OFICIAL hh 9.31
1004 47 MO PEON hh 8.43
1005 47 MO TOPÓGRAFO hh 10
1006 47 MO OPERADOR DE EQUIPO LIVIANO hh 12
1007 47 MO TECNICO DE CAMPO hh 8.82
1180 39 MA INSUMO CUYO PRECIO ES %MO %mo 12
1201 3 MA ACERO DE REFUERZO FY=4200 kg 10.17
1202 2 MA ALAMBRE NEGRO # 8 kg 2.85
1203 2 MA ALAMBRE NEGRO # 16 kg 2.85
1204 13 MA ARENA FINA m3 50.85
1205 21 MA CEMENTO PORTLAND TIPO I (42.5KG) bls 21.19
1206 32 MA FLETE RURAL glb 8.47
1207 32 MA FLETE TERRESTRE glb 677.97
1208 38 MA HORMIGON m3 35.61
1209 30 BS CARTEL DE OBRA 2.4 X 3.6M glb 950
3900 37 HE HERRAMIENTAS MANUALES %mo 0.85
3901 37 EQ MIRA TOPOGRÁFICA hm 0.71
3902 49 EQ NIVEL TOPOGRÁFICO hm 2.85
1210 39 BS ALMACEN Y GUARDIANIA mes 900
1211 30 BS CERCO PROVISIONAL DE SEGURIDAD Y PROTECCION m 8
1212 30 MA YESO EN BOLSA DE 20kg bls 12
1213 43 MA ESTACAS DE MADERA und 1.3
1214 54 MA PINTURA ESMALTE gal 40.5
3904 49 EQ WINCHA und 25
1215 72 MA UNIÓN PVC-SEL 3/4" (20mm) und 3
1216 12 MA CAJA CUADRADA DE ACERO GALVANIZADO 150x150x50mm und 7.8
1217 7 MA CABLE N°10 AWG (10m) rll 20
1218 7 MA CABLE N°14 AWG (10m) rll 13.5
3905 48 EQ TRACTOR ORUGA CAT D7-G hm 250
3906 49 EQ TEODOLITO hm 25
1219 5 MA MATERIAL GRANULAR PARA BASE m3 35
3907 48 EQ COMPACTADORA VIBRATORIA TIPO PLANCHA 4HP hm 15
3908 48 EQ RODILLO LISO VIBRATORIO AUTOPROPULSADO 125HP hm 170
3909 48 EQ CARGADOR SOBRE LLANTAS DE 125-135HP 3 yd3 hm 155
3910 48 EQ CAMION VOLQUETE DE 15m3 hm 170
1220 43 MA MADERA TORNILLO p2 5.2
1221 2 MA CLAVO PARA MADERA C/C DE 3" kg 3.8
1222 2 MA CLAVO PARA MADERA C/C DE 2" kg 3.5
1223 2 MA CLAVO PARA MADERA C/C DE 4" kg 4.5
1224 5 MA PIEDRA CHANCADA DE 1/2" m3 70
1225 5 MA ARENA GRUESA m3 70
3911 48 EQ VIBRADOR DE CONCRETO 4HP 2.4" hm 12
3912 48 EQ MEZCLADORA DE CONCRETO 11-12p3 P3 (18HP) hm 25
1226 39 MA AGUA m3 1.2
1227 13 MA ASFALTO RC-250 gal 13
1228 30 BS ARCO Y TABLERO DE FULBITO Y BASQUET S/D jgo 2140
1229 30 BS NET DE VOLEY INC. PARANTES Y ANCLAJES S/DISEÑO und 450
1230 54 MA PINTURA ESMALTE SINTETICO gal 48
1231 7 MA CABLE NH-80 1x2.5 mm2 m 1.5
1232 12 MA CAJA GALV. OCTOGONAL PESADA 4" und 1.9
1233 12 MA CAJA GALV. RECT. PESADA 4" x 2" x 2 1/4" und 1.4
1234 12 MA INTERRUPTOR 2 GOLPES TIPO TICINO und 9
1235 30 MA CINTA AISLANTE (NEGRO) und 6.5
1236 30 MA PEGAMENTO PARA PVC AZUL (946ml) und 11.9
1237 30 MA PEGAMENTO PVC NEGRO (1gln) gln 160
1238 72 MA CURVA PVC-SEL (ELECT.) 20mm und 3.8
1239 72 MA TUBO PVC-SEL (ELECT.) 20mm (3m) m 3.1
1240 72 MA UNION SIMPLE PVC-SEL 20 mm und 1.8
1241 12 MA TOMACORRIENTE DOBLE C/LINEA DE TIERRA TICINO und 15
1242 12 MA CAJA DE PASE GALVANIZADA 100x100x80mm pza 2.45
1243 48 BS MOTOR 3 HP und 325
1244 48 BS MOTOR 5HP und 525
1245 30 MA THOR GEL (DOSIS QUIMICA) und 100
1246 30 MA VARILLA DE COBRE 5/8" x 2.5m C/PUNTA und 430
1247 6 MA CABLE 1x50 mm2 COBRE DESNUDO m 33
1248 7 MA CONECTOR und 7.5
1249 80 MA CAJA DE CONCRETO CON TAPA (P.T) und 78.1
1250 12 MA INTERRUPTOR DIFERENCIAL - 2 x 20 A und 136.1
1251 12 MA INTERRUPTOR TERMOMAGNETICO - 2 x 15 A und 65.5
1252 12 MA INTERRUPTOR TERMOMAGNETICO - 2 x 20 A und 77
1253 12 MA GABINETE METALICO C/BARRA DE CU 12 POLOS und 289.5
1254 12 MA INTERRUPTOR TERMOMAGNETICO - 2 x 30 A und 52.8
1255 12 MA INTERRUPTOR TERMOMAGNETICO - 3 x 40 A und 119.6
1256 12 MA GABINETE METALICO CON BARRA DE COBRE und 326.5
1257 12 MA INTERRUPTOR TERMOMAGNETICO - 3 x 140 A 200A REG und 326.5
1258 12 MA INTERRUPTOR TERMOMAGNETICO - 3 x 15 A und 70
1259 12 MA INTERRUPTOR TERMOMAGNETICO - 3 x 60 A und 185
1260 12 MA TABLERO GABINETE METAL BARRA BRONCE 36 POLOS pza 429
1261 7 MA CABLE NH-80 1x4 mm2 m 2.1
1262 48 MA ELECTROBOMBA 2 HP und 335
1263 30 MA BANDA SEÑALIZADORA m 0.8
1264 7 MA CABLE NH 1x25 mm2 (T) m 15.2
1265 7 MA CABLE NH 1x50 mm2 m 27
1266 72 MA CURVA PVC-P (ELECT.) 35mm und 8.1
1267 19 MA CABLE NYY 1x4 mm2 m 3.5
1268 7 MA CABLE NH-80 1x6 mm2 m 3.6
1269 72 MA TUBO PVC SAP (LUZ) (E/C) 1" X 3 M. pza 4.3
1270 30 MA BANDEJA CABLOFIL 54/200 DE 54x200x3000MM m 150
1271 47 BS PASO DE CABLES METALICO 100x50xANCHO DE VIGA m 50
1272 47 BS PASO DE CABLES PVC-P 25MM EMBEBIDO EN CONCRETO m 30
1273 12 MA ARTEF. FLUORESC. 2x36 W AF (REACTOR ALPHA) m 154
1274 12 MA ARTEF. FLUORESC. 1x36 W AF (REACTOR ALPHA) m 115
1275 12 MA ARTEFACTO HERMETICO G.E. 2x18W und 145
1276 12 MA ARTEFACTO DICROICO "OJO DE BUEY" CON LED und 115
1277 12 MA ARTEFACTO RES-A JOSFEL 4x18W EMPOTRAR und 422
1278 12 MA REFLECTOR 70W HALOGENURO METALICO (COMPLETO) und 320
1279 12 MA SPOT "METAL SPOT" DE JOSFEL DE 70W DE HALOGENURO M und 210
1280 12 MA FAROLA ORNAMENTAL ALURA-SCHERDER 70 W HALOGENURO und 135
1281 11 MA LUMINARIA ORNAMENTAL 70W und 115
1282 12 BS ARTEFACTO PARA ALUMBRADO DE EMERGENCIA und 360
1283 72 MA TUB. PVC SAP P/INST. ELECT. DE 20mm m 3.1
1284 30 BS PLACA PARA TELEFONO pza 7
1285 30 BS PIR DETECTOR DE PRESENCIA und 60
1286 18 BS CABLE FLEX. 1x1.5 mm2 m 1.5
1287 30 BS SUBESTACION ELECTRICA glb 226400
1288 48 BS GRUPO ELECTROGENO DE 230 KW. hm 84
ULO DE FLETES
FLETE CON ACEMILA Y PEON
ORIGEN - DESTINO Prec. U. p.u.Cemento
HUARI - OBRA(YUPAN) 0.06 2.5
HUARI - OBRA(YUPAN) 1.20 L A H
0.00 6 2.2 1.5
10 3.11 3.11
11.57 3.59 3.59
9.31 2.89 2.89
8.43 2.62 2.62
10 3.11 3.11
12 3.73 3.73
8.82 2.74 2.74
12 3.73 3.73
10.17 3.73 3.16
2.85 1.04 0.88
2.85 1.04 0.88
50.85 18.63 15.79
21.19 7.76 6.58
8.47 3.1 2.63
677.97 248.45 210.55
35.61 13.05 11.06
950 348.14 295.03
0.85 0.31 0.26
0.71 0.26 0.22
2.85 1.04 0.88
900 329.81 279.5
8 2.93 2.48
12 4.4 3.73
1.3 0.48 0.41
40.5 14.84 12.58
25 9.16 7.76
3 1.1 0.93
7.8 2.86 2.42
20 7.33 6.21
13.5 4.95 4.19
250 91.61 77.64
25 9.16 7.76
35 12.83 10.87
15 5.5 4.66
170 62.3 52.8
155 56.8 48.14
170 62.3 52.8
5.2 1.91 1.62
3.8 1.39 1.18
3.5 1.28 1.08
4.5 1.65 1.4
70 25.65 21.74
70 25.65 21.74
12 4.4 3.73
25 9.16 7.76
1.2 0.44 0.37
13 4.76 4.03
2140 784.22 664.59
450 164.91 139.75
48 17.59 14.91
1.5 0.55 0.47
1.9 0.7 0.59
1.4 0.51 0.43
9 3.3 2.8
6.5 2.38 2.02
11.9 4.36 3.69
160 58.63 49.69
3.8 1.39 1.18
3.1 1.14 0.97
1.8 0.66 0.56
15 5.5 4.66
2.45 0.9 0.76
325 119.1 100.93
525 192.39 163.04
100 36.65 31.06
430 157.58 133.54
33 12.09 10.25
7.5 2.75 2.33
78.1 28.62 24.25
136.1 49.88 42.27
65.5 24 20.34
77 28.22 23.92
289.5 106.09 89.91
52.8 19.35 16.4
119.6 43.83 37.14
326.5 119.65 101.4
326.5 119.65 101.4
70 25.65 21.74
185 67.8 57.46
429 157.21 133.23
2.1 0.77 0.65
335 122.76 104.03
0.8 0.29 0.25
15.2 5.57 4.72
27 9.89 8.38
8.1 2.97 2.52
3.5 1.28 1.08
3.6 1.32 1.12
4.3 1.57 1.33
150 54.97 46.58
50 18.32 15.53
30 10.99 9.31
154 56.43 47.82
115 42.14 35.71
145 53.14 45.03
115 42.14 35.71
422 154.65 131.06
320 117.27 99.38
210 76.96 65.22
135 49.47 41.92
115 42.14 35.71
360 131.93 111.81
3.1 1.14 0.97
7 2.57 2.18
60 21.99 18.64
1.5 0.55 0.47
226400 82966.46 70310.56
84 30.78 26.08
#N/A 2
5 4
0 Cifra de redondeo decimal del parcial 2
Cod Denominación Rto UND
### #N/A #N/A #N/A #N/A #N/A
###
###
### OBRA POR CONTRATA MO MA
### En Soles 0.00 0.00
Insumos Und Cuad./cant. Cantidad
#N/A #N/A
### NO BORRAR ESTA FILA, ES LA FORMULA MODELO
EQ TOTAL
0.00 0.00
P.U. Parcial
RELACION DE INSUMOS DEL PROYECTO
Proyecto
Lugar
Elab. Por
Fecha
C.U. PARCIAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Sistemas RW7pro
CALCULO DEL FLETE
Proyecto :
Lugar :
Elab.Por :
Fecha :
Lugar
Elab. Por
Fecha
METRADO
PUESTO
PRESU
PAR T I DAS UND
AVANCE DIARIO(%)
PROGRAMADO
AVANCE ACUMULADO(%)
UMULADO(%)
CUADRILLA
DIAS
FISICA DE LA OBRA
Unidad de programación:
Plazo (días calendarios):
Inicio:
Fin:
90
DIAS
1/1/2018
3/31/2018
PRECE DENCIA
SL
DNL
FECHA
DIAS N. L.
01/01/18
02/01/18
03/01/18
04/01/18
05/01/18
06/01/18
1
D
07/01/18
08/01/18
09/01/18
10/01/18
11/01/18
12/01/18
13/01/18
1
D
14/01/18
15/01/18
16/01/18
17/01/18
18/01/18
19/01/18
20/01/18
1
D
21/01/18
22/01/18
23/01/18
24/01/18
25/01/18
26/01/18
27/01/18
1
D
28/01/18
29/01/18
30/01/18
31/01/18
01/02/18
02/02/18
03/02/18
1
D
04/02/18
05/02/18
06/02/18
07/02/18
08/02/18
09/02/18
10/02/18
1
D
11/02/18
12/02/18
13/02/18
14/02/18
15/02/18
16/02/18
17/02/18
1
D
18/02/18
19/02/18
20/02/18
21/02/18
22/02/18
23/02/18
24/02/18
1
D
25/02/18
26/02/18
27/02/18
28/02/18
01/03/18
02/03/18
03/03/18
1
D
04/03/18
05/03/18
06/03/18
07/03/18
08/03/18
09/03/18
10/03/18
1
D
11/03/18
12/03/18
13/03/18
14/03/18
15/03/18
16/03/18
17/03/18
1
D
18/03/18
19/03/18
20/03/18
21/03/18
22/03/18
23/03/18
24/03/18
1
D
25/03/18
26/03/18
27/03/18
28/03/18
29/03/18
30/03/18
31/03/18
1
D
01/04/18
02/04/18
03/04/18
04/04/18
05/04/18
06/04/18
07/04/18
1
D
08/04/18
09/04/18
10/04/18
11/04/18
12/04/18
13/04/18
14/04/18
1
D
15/04/18
16/04/18
17/04/18
18/04/18
19/04/18
20/04/18
21/04/18
1
D
22/04/18
23/04/18
24/04/18
25/04/18
26/04/18
27/04/18
28/04/18
1
D
29/04/18
30/04/18
01/05/18
02/05/18
03/05/18
04/05/18
05/05/18
1
D
06/05/18
07/05/18
08/05/18
09/05/18
10/05/18
11/05/18
12/05/18
1
D
13/05/18
14/05/18
15/05/18
16/05/18
17/05/18
18/05/18
19/05/18
1
D
20/05/18
21/05/18
22/05/18
23/05/18
24/05/18
25/05/18
26/05/18
1
D
27/05/18
28/05/18
29/05/18
30/05/18
31/05/18
01/06/18
02/06/18
1
D
03/06/18
04/06/18
05/06/18
06/06/18
07/06/18
08/06/18
1 09/06/18
D
10/06/18
11/06/18
12/06/18
13/06/18
14/06/18
15/06/18
16/06/18
1
D
17/06/18
18/06/18
19/06/18
20/06/18
21/06/18
22/06/18
23/06/18
1
D
24/06/18
25/06/18
26/06/18
27/06/18
28/06/18
29/06/18
30/06/18
1
D
01/07/18
02/07/18
03/07/18
04/07/18
05/07/18
06/07/18
07/07/18
1
D
08/07/18
09/07/18
10/07/18
11/07/18
12/07/18
13/07/18
14/07/18
1
D
15/07/18
16/07/18
17/07/18
18/07/18
19/07/18
20/07/18
21/07/18
1
D
22/07/18
23/07/18
24/07/18
25/07/18
26/07/18
27/07/18
28/07/18
1
D
29/07/18
30/07/18
31/07/18
01/08/18
02/08/18
03/08/18
04/08/18
1
D
05/08/18
06/08/18
07/08/18
08/08/18
09/08/18
10/08/18
11/08/18
1
D
12/08/18
13/08/18
14/08/18
15/08/18
16/08/18
17/08/18
18/08/18
1
D
19/08/18
20/08/18
21/08/18
22/08/18
23/08/18
24/08/18
25/08/18
1
D
26/08/18
27/08/18
28/08/18
29/08/18
30/08/18
31/08/18
01/09/18
1
D
02/09/18
03/09/18
04/09/18
05/09/18
06/09/18
07/09/18
08/09/18
1
D
09/09/18
10/09/18
11/09/18
12/09/18
13/09/18
14/09/18
15/09/18
1
D
16/09/18
17/09/18
18/09/18
19/09/18
20/09/18
21/09/18
22/09/18
1
D
23/09/18
24/09/18
25/09/18
26/09/18
27/09/18
28/09/18
29/09/18
1
D
30/09/18
01/10/18
02/10/18
03/10/18
04/10/18
05/10/18
06/10/18
1
D
07/10/18
08/10/18
09/10/18
10/10/18
11/10/18
12/10/18
13/10/18
1
D
14/10/18
15/10/18
16/10/18
17/10/18
18/10/18
19/10/18
20/10/18
1
D
21/10/18
22/10/18
23/10/18
24/10/18
25/10/18
26/10/18
27/10/18
1
D
28/10/18
29/10/18
30/10/18
31/10/18
01/11/18
02/11/18
03/11/18
1
D
04/11/18
05/11/18
06/11/18
07/11/18
08/11/18
09/11/18
10/11/18
1
D
11/11/18
12/11/18
13/11/18
14/11/18
15/11/18
16/11/18
17/11/18
1
D
18/11/18
19/11/18
20/11/18
21/11/18
22/11/18
23/11/18
24/11/18
1
D
25/11/18
26/11/18
27/11/18
28/11/18
29/11/18
30/11/18
01/12/18
1
D
02/12/18
03/12/18
04/12/18
05/12/18
06/12/18
07/12/18
08/12/18
1
D
09/12/18
10/12/18
11/12/18
12/12/18
13/12/18
14/12/18
15/12/18
1
D
16/12/18
17/12/18
18/12/18
19/12/18
20/12/18
21/12/18
22/12/18
1
D
23/12/18
24/12/18
25/12/18
26/12/18
27/12/18
28/12/18
29/12/18
1
D
30/12/18
31/12/18
01/01/19
SL
DL
SNL
DNL
Sistemas RW7pro SL
PROGRAMACIÓN DE LA EJECUCION FISICA DE LA OBRA V
PROYECTO: J
LUGAR: Inicio: 1/1/2018 M
Fecha Plazo (días calendarios): 90 M
Costo Directo S/ 0.00 Fin: 3/31/2018 L
Unidad de programación: SEMANAS DNL 1 1 1 1
CUADRI
PUEST
Jan-18
METR
PRES
MES
ADO
DIAS
LLA
PAR T I DAS UND PRECE DENCIA
O
U
######
######
######
######
######
######
DIAS C.
DIAS L.
######
######
######
######
Feb-18
1 1 1 1
######
######
######
######
######
######
Mar-18
1 1 1 1
######
######
Sistemas RW7pro
PROGRAMACIÓN DE LA EJECUCION FISICA DE LA OBRA
PROYECTO:
LUGAR: Inicio: 1/1/2018
Fecha Plazo (días calendarios): 90 Feriados
Costo Directo S/ 0.00 Fin: 3/31/2018 SL
Unidad de programación: MESES DNL 4 4 4 5 4
CUADRILL
METRAD
2018
PUESTO
PRESU
DIAS
PAR T I DAS UND PRECE DENCIA MES
27 May
24 Feb
27 Mar
27 Jan
25 Apr
DIAS L.
26 Jun
2018
26 Jul
27 Aug
25 Sep
27 Oct
26 Nov
26 Dec
27 Jan
24 Feb
26 Mar
26 Apr
27 May
4 5 4 5 4 4 5 4 4 5 4 4 5
25 Jun
2019
Sistemas RW7pro
Lugar :
Elab. Por :
Fecha :
CONFORMACION DE MONOMIOS
COEF. SIMB. % COEF.
N°M N° IU IU ELEMENTO INICIAL AGRUP. INCID. ACUM.
AVANCE FISICO DE OBRA VAL
OBRA:
MES :
PRESUPUESTO BASE
P A R T I D A S UND.
METR. C.U.
SICO DE OBRA VALORIZADO Nº …….
FECHA DE INICIO DE PLAZO
PLAZO DE EJECUCION
FECHA DE TERMINO PROGR.
OBRA
LUGAR
(S/.) (S/.)
8. MONTO NETO FACTURABLE SIN I.G.V. (5+6+ 303 376.66 270 915.25
SALDOS
POR
PAGAR
(S/.)
###
###
###
0.00
###
0.00
0.00
###
###
0.00
###
###
###