CONTROL OF URBAN POLLUTION

SERIES: CUPS/ / 2015

INVENTORIZATION OF SEWAGE
TREATMENT PLANTS

MARCH, 2015

CENTRAL POLLUTION CONTROL BOARD


(Ministry of Environment and Forests, Govt. of India)

Parivesh Bhawan, East Arjun Nagar,

Delhi – 110032
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

CONTENTS
1.0 INTRODUCTION ............................................................................................................1
2.0 OBJECTIVE OF THE STUDY ........................................................................................2
2.1 METHODOLOGY OF STUDY ....................................................................................2
3.0 INVENTORY OF SEWAGE TREATMENT PLANTS ....................................................3
4.0 STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS...................................7
4.1 STPs AT ANDHRA PRADESH ...................................................................................7
4.2 STPs AT ANDAMAN & NICOBAR ISLAND .............................................................7
4.3 STPs AT ARUNACHAL PRADESH............................................................................7
4.4 STPs AT ASSAM .............................................................................................................8
4.5 STPs AT BIHAR ..........................................................................................................8
4.6 STPs AT CHANDIGARH ............................................................................................8
4.7 STPs AT CHHATTISGARH ........................................................................................9
4.8 STPs AT Daman Diu & Dadra Nagar Haveli.................................................................9
4.9 STPs AT DELHI...........................................................................................................9
4.10 STPs AT GOA ........................................................................................................ 11
4.11 STPs AT GUJARAT ............................................................................................... 12
4.12 STPs AT HARYANA ............................................................................................. 19
4.13 STPs AT HIMACHAL PRADESH ......................................................................... 21
4.14 STPs AT JAMMU & KASHMIR ............................................................................ 26
4.15 STPs AT JHARKHAND ......................................................................................... 28
4.16 STPs AT KARNATAKA ........................................................................................ 29
4.17 STPs AT KERALA ................................................................................................. 32
4.18 STPs AT LAKSHADWEEP .................................................................................... 33
4.19 STPs AT MADHYA PRADESH ............................................................................. 33
4.20 STPs AT MAHARASHTRA ................................................................................... 35
4.21 STPs AT MANIPUR ............................................................................................... 40
4.22 STPs AT MEGHALAYA ........................................................................................ 40
4.23 STPs AT MIZORAM .............................................................................................. 41
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

4.24 STPs AT NAGALAND ........................................................................................... 41


4.25 STPs AT ODISHA .................................................................................................. 41
4.26 STPs AT PUDUCHERRY....................................................................................... 43
4.27 STPs AT PUNJAB .................................................................................................. 44
4.28 STPs AT RAJASTHAN .......................................................................................... 51
4.29 STPs AT SIKKIM ................................................................................................... 56
4.30 STPs AT TAMILNADU ......................................................................................... 57
4.31 STPs AT TELANGANA ......................................................................................... 69
4.32 STPs AT TRIPURA ................................................................................................ 70
4.33 STPs AT UTTAR PRADESH ................................................................................. 70
4.34 STPs AT UTTRAKHAND ...................................................................................... 75
4.35 STPs AT WEST BENGAL ...................................................................................... 78
5. CONCLUSION.................................................................................................................. 81
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

1.0 INTRODUCTION
Urban water supply and sanitation are important basic needs for the improvement of the
quality of life and enhancement of productive efficiency of the people. In urban areas, water
is tapped for domestic and industrial uses from rivers, streams, wells and lakes. Almost 80%
of the water supplied for domestic use, comes out as wastewater. In most of the cases
wastewater is let out untreated and it either sinks into the ground as a potential pollutant of
ground water or is discharged into the natural drainage system causing pollution in
downstream areas. Wastewater needs to be conveyed to sewage treatment plants and treated
wastewater must meet the aesthetic standards of ambient environment for receiving water
bodies.
Sewage Treatment plants are used to treat sewage generated from residential, institutional,
commercial and industrial establishments which includes household waste liquid
from toilets, baths, showers, kitchens, sinks and so forth that is disposed of via sewers. In
India, different treatment technologies like ASP, UASB, Oxidation pond and advanced
technologies like SBR, MBR are adopted for the treatment of sewage. Central Pollution
Control Board carried out study on status of Municipal wastewater generation and treatment
capacity in Metropolitan cities, Class I cities and Class II towns of India and published a
document (CUPS/61/2005-06). The sewage generation is about 38254 MLD whereas
treatment capacity developed is only about 12000 MLD and 269 numbers of STPs are
installed in India. Growth of Urbanization in India is at rapid rate. This is illustrated in Figure
1 and summarized in Table 1.

37.7

POPULATION IN CRORES

28.5

21.8

15.6

10.7
7.8
6.2
4.4
2.6 2.6 2.8 3.3

1901 1911 1921 1931 1941 1951 1961 1971 1981 1991 2001 2011

Figure 1: Bar diagram shows growth of urban population 1901-2011

| INTRODUCTION 1
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Table 1: Decadal Urban Population Growth Since 1901


Year Total Rural Urban Urban, as % Decadal %
of total increase in
urban
population
1901 238,396,327 212,544,454 25,851,873 10.84 -

1911 252,093,390 226,151,757 25,941,633 10.29 0.35

1921 251,321,213 223,235,043 28,086,170 11.18 8.3


1931 278,977,238 245,521,249 33,455,989 11.99 19.1

1941 318,660,580 274,507,283 44,153,297 13.86 32.0

1951 361,088,090 298,644,381 62,443,709 17.29 41.4

1961 439,234,771 360,298,168 78,936,603 17.97 26.4

1971 548,159,652 439,045,675 109,113, 977 19.91 38.2

1981 683,329,097 523,866,550 159,462,547 23.34 46.1

1991 846,302,688 628,691,676 217,611,012 25.71 36.5

2001 1,027,015,247 741,660,293 285,354,954 27.78 31.1

2011 1,210,193,422 83,30,87662 377,105,760 31.16 32.2

The facilities like housing and water supply, sanitation also increased with urbanization.
However, facility of sewage management has not received the required focus. As a result,
untreated sewage is discharged into open storm water drains causing pollution to water
bodies.
2.0 OBJECTIVE OF THE STUDY
As stated earlier, Central Pollution Control Board (CPCB) has carried out study on status
of Municipal wastewater generation and treatment capacity in Metropolitan cities, Class I
cities and Class II towns of India and published a document (CUPS/61/2005-06) and
(CUPS/70/2009-10) and assessed the 269 number of STPs with capacity of 12000 MLD.
There is need to update the information on Sewage treatment facility as urbanization of
country increases with rapid pace and therefore the treatment facility for sewage is also
increased.
2.1 METHODOLOGY OF STUDY
CPCB has designed format for collation and collection on STPs from all 35 State Pollution
Control Boards and Pollution Control Committees. The format is attached at Annexure-I.
CPCB has communicated with SPCBs/PCCs numerous times and provided the prescribed
format.

| OBJECTIVE OF THE STUDY 2


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

3.0 INVENTORY OF SEWAGE TREATMENT PLANTS


CPCB has carried out an inventorization of Sewage Treatment Plants (STPs) located in
India in the year 2014-15. There are 816 STPs having capacity of 23277MLD in 28
States/UTs of India. Out of 816 STPs, 522 STPS are operational, 79 STPs are Non-
operational, 145 STPs are under construction and 70 STPs are proposed for construction.
The detail is mentioned in table -2 and figure-2 and 3.
Table 2: Break-up of STPs
Sl.No. Status Nos. Of STPs Capacity (MLD)
1. Operational 522 18883.2
2. Non-operational 79 1237.16
3. Under Construction 145 2528.36
4. Proposed 70 628.64
5. Total 816 23277.36

Proposed Non-operational
8% 10%

Under Construction
Operational 18%
64%

Figure 2: Pi-chart show distribution of Number of STPs


Proposed Non-operational
3% 5% Under Construction
11%

Operational
81%

Figure 3: Pi-chart show distribution of capacity of STPs

| INVENTORY OF SEWAGE TREATMENT PLANTS 3


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Arunachal Pradesh, Andaman & Nicobar Islands, Chhattisgarh,Daman Diu & Dadra Nagar Haveli,
Lakshadweep, Manipur and Nagalanddo not have treatment facility. Maharashtra, Gujarat, Delhi,
Maharashtra has the maximum sewage treatment capacity. Detailed break-up of STPs state -wise
is placed in Table 3. Figure 4 depicts installed capacity distribution among different stated of
India and Figure 5 show the number of STPs among different states of India.

Installed Capacity (MLD)


Andhra Pradesh Assam
Bihar Chandigarh
Delhi Goa
Gujarat Haryana
Himachal Pradesh Jammu & Kashmir
Jharkhand Karnataka
Kerala Maharashtra
Madhya Pradesh Meghalaya
Mizoram Odisha
Puducherry Punjab
Rajasthan Sikkim
Tamil Nadu Telangana
Tripura Uttar Pradesh
Uttrakhand West Bengal
Figure 4: Pi-chart depicting installed capacity distribution in India

Total No. of STPs Andhra Pradesh Assam


Bihar Chandigarh
Delhi Goa
Gujarat Haryana
Himachal Pradesh Jammu & Kashmir
Jharkhand Karnataka
Kerala Maharashtra
Madhya Pradesh Meghalaya
Mizoram Odisha
Puducherry Punjab
Rajasthan Sikkim
Tamil Nadu Telangana
Tripura Uttar Pradesh
Uttrakhand West Bengal
Figure 5: Pi-chart depicting STPs distribution in India

| INVENTORY OF SEWAGE TREATMENT PLANTS 4


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Table 3: Break-Up of STPs Located In Different States/UTs of India


Sl. No. State/UT Capacity of No. of Operational No. of STPs Non- No. of Under No. of STPs Proposed No. of STPs
Municipal Municipal Capacity Operational operational STPs Non- Construction Under Capacity Proposed
STPs STPs (MLD) Capacity operational Capacity Constructions (MLD)
(MLD) (MLD)

1 Andhra 247.27 12 156.27 9 - - 91 3 - -


Pradesh
2 Arunachal - - - - - - - - - -
Pradesh
3 Andaman & - - - - - - - - - -
Nicobar
Islands
4 Assam 0.21 1 0.21 1 - - - - - -
5 Bihar 124.55 6 99.55 5 25 1 - - - -
6 Chandigarh 314.5 5 314.5 5 - - - - - -
7 Chhattisgarh - - - - - - - - - -
8 Delhi 2693.7 35 2671.2 34 22.5 1 - - - -
9 Daman Diu - - - - - - - - - -
& Dadra
Nagar Haveli
10 Goa 74.58 7 34.5 4 - - 40.08 3 - -
11 Gujarat 3062.92 51 2111.64 32 498 4 359.5 8 93.78 7
12 Haryana 852.7 41 805 38 2.7 2 45 1 - -
13 Himachal 114.72 66 79.51 36 35.21 30 - - - -
Pradesh
14 Jammu & 264.74 19 145.74 15 2 1 117 3 - -
Kashmir
15 Jharkhand 117.24 15 117.24 15 - - - - - -
16 Karnataka 1304.16 57 1112.05 44 - - 192.11 13 - -
17 Kerala 152.97 10 112.87 6 3 1 37.1 3 - -

| INVENTORY OF SEWAGE TREATMENT PLANTS 5


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Sl. No. State/UT Capacity of No. of Operational No. of STPs Non- No. of Under No. of STPs Proposed No. of STPs
Municipal Municipal Capacity Operational operational STPs Non- Construction Under Capacity Proposed
STPs STPs (MLD) Capacity operational Capacity Constructions (MLD)
(MLD) (MLD)

18 Lakshadweep - - - - - - - - - -
19 Maharashtra 5160.36 76 4683.9 60 344.5 10 131.96 6 - -
20 Madhya 482.23 17 475.48 14 6.75 3 - - - -
Pradesh
21 Manipur - - - - - - - - - -
22 Meghalaya 1 1 - - 1 1 - - - -
23 Mizoram 10 1 - - - - 10 1 - -
24 Nagaland - - - - - - - - - -
25 Odisha 385.54 13 158.04 7 - - 227.5 6 - -
26 Puducherry 68.5 6 17.5 3 - - 51 3 - -
27 Punjab 1245.45 86 921.45 38 15.2 4 276.7 31 32.1 13
28 Rajasthan 865.92 63 384.5 16 - - 149.3 11 332.12 36
29 Sikkim 31.88 11 8 1 5 1 18.88 9 - -
30 Tamil Nadu 1799.72 73 1140.83 33 5.17 1 521.08 28 132.64 11
31 Telangana 685.8 18 634.8 17 - - 51 1 - -
32 Tripura 0.05 1 0.045 1 - - - - - -
33 Uttar Pradesh 2646.84 73 2372.25 62 89.59 7 170 3 15 1
34 Uttrakhand 152.9 24 90.75 10 - - 39.15 12 23 2
35 West Bengal 416.9 28 235.36 16 181.54 12 - - - -
Total 23277.36 816 18883.2 522 1237.16 79 2528.36 145 628.64 70
Note : ‘ – ‘ indicates that information not received from concerned SPCB/PCC

| INVENTORY OF SEWAGE TREATMENT PLANTS 6


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

4.0 STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS


As stated earlier, CPCB has communicated to provide information on STPs as per prescribed
format to all 35 SPCBs/PCCs. All SPCBs/PCCs provide the information in prescribed format
andArunachal Pradesh,Andaman & Nicobar Islands, Chhattisgarh,Daman Diu & Dadra Nagar
Haveli, Lakshadweep, Manipur and Nagaland has informed that they do not have sewage
treatment plant in their territory. Details of STPs of remaining 28 States/UTs are mentioned in
subsequent section.

4.1 STPs AT ANDHRA PRADESH


Andhra Pradesh has total number of 12 STPs having capacity of 247 MLD. Out of 12 STPs, 03
STPs of capacity 91 MLD are under construction. Detail is mentioned in Table 4.
Table 4:-STPs –Andhra Pradesh
Sl. No. City/town STP Location STP Status STP Technolog Consent
Commissio (Operational Installe y (UASB / Status
ned in /Non- d ASP / OP /
(Year) Operational/ Capacit SBR /
Under y MLD MBR/
Construction FAB Etc.)
)
1. Rajamundry Rajamundry, Operational 30
EG district
2. Tirupathi Tukivakam Operational 25
3. Vijayawada Azithsinghnagar Operational 27.27
4. Azithsinghnagar Under 40
Construction
5. Auto Nagar Operational 10
6. Ramalingeswara Operational 10
Nagar Information Information Information
7. Poornanadampe not provided Operational 14 not provided not provided
t
8. Visakhapatnam Appughar Operational 25
9. Muvasalava Under 13
Contstruction
10. Old town Under 38
Contstruction
11. Port area Operational 10
12. Vizianagaram Pedda Chruvu Operational 5

4.2 STPsAT ANDAMAN & NICOBAR ISLAND


Andaman & Nicobar Islands has zero number of STPs.

4.3 STPs AT ARUNACHAL PRADESH


Arunachal Pradesh has zero number of sewage treatment plants.

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 7


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

4.4 STPs AT ASSAM


Assam has 1STP of capacity 0.21 MLD.Table 6 shows the details of STP in Assam.
Table 6: STPs- Assam
Sl. NO City/town STP Location STP Status STP Technology Consent
Commission (Operational/ Installed (UASB / Status
ed in (Year) Non- Capacity ASP / OP /
Operational/U MLD SBR /
nder MBR/ FAB
Construction) Etc.)
GMDA truck
Ds Hospitality yard near IBP Information Construction NOC
1. 0.21 SAFF
(Assam) Ltd petrol pump Not provided completed Accorded
NH-37

4.5 STPsAT BIHAR


There are 06 numbers of STPs having treatment capacity of 125 MLD. 01 STP installed at
Pahari, Patna is non-operational. Details of STPs of Bihar are shown in Table 7.
Table 7: STPs-Bihar
Sl. No City/town STP Location STP Status STP Technolog Consent
Commissio (Operational/ Installe y (UASB / Status
ned in Non- d ASP / OP /
(Year) Operational/ Capacit SBR /
Under y MLD MBR/
Construction FAB Etc.)
)
1 Patna Saidpur STP Operational 4.55 ASP Information
Old Unit, Patna not provided

2 Saidpur Operational 45 ASP


STP,Patna
3 Beur STP, Operational 35 ASP
Patna, Bihar Consent
4 Pahari, Patna-7 Information Not functional 25 Aerated from SPCB
not provided at the time Lagoon has been
monitoring provided but
not renewed
5 Karmalichak Karmalichak Operational 4 Aerated
Lagoon
6 Bhagalpur Bhagalpur STP Operational 11 Aerated
Lagoon

4.6 STPs AT CHANDIGARH


In Chandigarh, there are 05STPs with capacity of 314 MLD. Only 01 STP at Raipur Kalan has
valid consent to operate and remaining STPs do not have valid consent to operate. Detail
information of plants is placed in Table 8.

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 8


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Table 8: STPs-Chandigarh
SI.No. City/Town STP Location STP Status STP Technology Consent
Commissio (Operational/ Installed (UASB / Status
ned in Non- Capacity ASP / OP /
(Year) Operational/U MLD SBR /
nder MBR/ FAB
Construction) Etc.)
1 Diggian, Mohali 1966 (1st 30 MGD- 205 UASB-30 This is in
Phase) Operational MGD, the
1987 (2nd 15 MGD- ASP-15 jurisdiction
Phase) 1991 Under MGD of PPCB
(3rd Phase) Renovation
2 3 BRD, Near 2004 & it Operational 73 11 MGD- No, under
Sector-47, commissione SBR, 5 process
Chandigarh Chandigarh d in Nov., MGD-
2007 UASB
3 Raipur Kalan, 2003 Operational 23 UASB Yes
Chandigarh
4 Raipur Khurd, 2003 Operational 6 ASP No, under
Chandigarh process
5 Dhanas, 2013 Operational 7.5 SBR
Chandigarh

4.7 STPs AT CHHATTISGARH


Chhattisgarh has zero number of sewage treatment plants.

4.8 STPs AT Daman Diu & Dadra Nagar Haveli


Daman Diu 7 Dadra Nagar Haveli has zero number of sewage treatment plants.

4.9 STPs AT DELHI


Delhi has 35 numbers of sewage treatment plants having treatment capacity of 2693.7 MLD. 01
STP installed at Ghitorni is non-operational. Details of STPs of Delhi are shown in Table 10.
Table 10: STPs-Delhi
Status Technology
(Operational/ STP (UASB /
STP
Non- Installed ASP / OP / Consent
Sl. No City/town STP Location Commission
Operational/U Capacity SBR / Status
ed in (Year)
nder MLD MBR/ FAB
Construction) Etc.)
STP
1 Akshardham Akshardham 2014 Operational 4.5 MBR Informatio
STP Kondli n not
2 phase-I 1987 Operational 45 ASP provided
STP Kondli Old
3 Kondli Phase-II 1989 Operational 112.5 ASP

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 9


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Status Technology
(Operational/ STP (UASB /
STP
Non- Installed ASP / OP / Consent
Sl. No City/town STP Location Commission
Operational/U Capacity SBR / Status
ed in (Year)
nder MLD MBR/ FAB
Construction) Etc.)
STP Kondli
4 Phase-III 2001 Operational 45 ASP
STP Kondli New
5 Phase-IV 2014 Operational 202.5 ASP

6 Papankalla STP Papankalla 2000 Operational 90 ASP


7 Nazafgarh STP Nazafgarh 2002 Operational 22.5 EA
Yamunavihar
8 Yamuna Vihar Phase - I 1999 Operational 45 ASP
Yamunavihar
9 Phase - II 2002 Operational 45 ASP
10 Rithla
Rithla Old 1989 Operational 180 ASP
11 Rithla New 2014 Operational 180 ASP

12 Rohini Rohini Sec-25 2002 Operational 67.5 ASP


13 Okhla Phase - I 1937 Operational 135 ASP
14 Okhla Phase - II 1982 Operational 54 ASP
15 Okhla Phase-III 1993 Operational 202.5 ASP
Okhla
16 Okhla Pase-IV 1993 Operational 166.5 ASP
17 Okhla Phase-V 2001 Operational 72 ASP
18 Okhla Phase-VI 2011-2012 Operational 135 ASP
Keshopur Information
19 Nilothi-I 1958 Operational 54 ASP not provided
Keshopur
20 Keshopur Nilothi-II 1975 Operational 90 ASP
Keshopur
21 Nilothi-III 1990 Operational 180 ASP
22 Nilothi-IV 2002 Operational 180 ASP
Coronation Trickling
23 Pillar-I 1957 Operational 45 Filtration
Coronation
coronation
24 Pillar-II 1999 Operational 90 ASP
25 Narela-I 2001 Operational 45 ASP
Narela
26 Narela-II 2014 Operational 27 ASP
27 Vasant Kunj Vasant Kunj-I 1982 Operational 22.5 EA

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 10


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Status Technology
(Operational/ STP (UASB /
STP
Non- Installed ASP / OP / Consent
Sl. No City/town STP Location Commission
Operational/U Capacity SBR / Status
ed in (Year)
nder MLD MBR/ FAB
Construction) Etc.)
28 Vasant Kunj-II 1997 Operational 9.9 EA
Vasant Kunj-
29 III 1997 Operational 13.5 EA
Dr. Sen Dr. Sen
Nursing Home Nursing Home
30 Nalla Nalla 1998 Operational 9.9 Bio-Far
Delhi Gate Delhi Gate Information
31 Nalla Nalla 1998 Operational 9.9 Bio-Far not provided

32 Mehrauli Mehrauli 2003 Operational 22.5 ASP


Non
33 Ghitorni Ghitorni 2014 Operational 22.5 ASP
34 Timarpur Timarpur - Operational 27 OP

35 Chilla Chilla 2014 operational 40.5 SBR

4.10 STPs AT GOA


Goa has 07 numbers of sewage treatment plants having treatment capacity of 74.58 MLD.
031STPs of capacity 40.08 MLDare under construction. Details of STPs of Goa are shown in
Table 11.
Table 11: STPs-Goa
Sl. No City/town STP Location STP Status STP Technolog Consent
Commission (Operational/ Instal y (UASB / Status
ed in (Year) Non- led ASP / OP /
Operational/ Capa SBR /
Under city MBR/ FAB
Construction) MLD Etc.)
1 Calangute Calangute 2014 Under 0.08 MBR CTE
Contstruction
2 Navelim 2000 Operational 7.5 ASP Valid till
October 15,
Margao 2014
3 Navelim 2014 Under 20 ASP CTE
Shirvodem Construction
4 Mormugao Baina Operational 14 ASP Applied for
1985
renewal
5 Baina Under 20 SBR CTE
2014
Construction

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 11


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

6 Patto Operational 0.5 TF Valid till


2002
2016
Panaji
7 Tonca Operational 12.5 ASP Valid till
2005
2015
4.11 STPs AT GUJARAT
Gujarat has 51 numbers of sewage treatment plants having treatment capacity of 3062.92 MLD.
04 STPs of capacity 498 MLD are Non-Operational, 08 STPs of capacity 359.5 MLD are under
construction and 07 STPs of capacity 93.78 MLD are proposed. Details of STPs of Gujarat are
shown in Table 12.
Table 12: STPs-Gujarat
Sl. No City/town STP Location STP Status STP Technolog Consent
Commissio (Operational/ Installe y (UASB / Status
ned in Non- d ASP / OP /
(Year) Operational/U Capacit SBR /
nder y MLD MBR/
Construction) FAB Etc.)
1 STP of Capital 2008 Operational 76 ASP Valid CCA
Project, Jaspur, up to
Gandhinagar 24/03/2016
2 Basan STP, S 2014 Constructed 2 SBR NOC(CTE)
No. 218,219, (Proposed) but yet not Granted
Near IIT, Palaj- commissioned
Basan road,
Basan. Tal. &
Gandhinagar Dist.
Gandhinagar
3 Sargasan 2014 Operational 10 SBR NOC(CTE)
Sewage Granted
Treatment Plant and applied
S. No. 111, for CCA of
Sargasan, Tal. the GPCB
& Dist.
Gandhinagar
4 STP of VMSS, 2000 Operational 43 ASP Consent
Atladara-I Valid up to
18/09/2014
5 STP of VMSS, 1998 Operational 52 UASB Consent
Tarsali Valid up to
Vadodara 15/09/2014
6 STP of VMSS, 1998 Operational 66 ASP Consent
Gajrawadi Valid up to
23/09/2014
7 STP of VMSS, 2004 Operational 43 UASB Consent
Atladara-II Valid up to

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 12


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Sl. No City/town STP Location STP Status STP Technolog Consent


Commissio (Operational/ Installe y (UASB / Status
ned in Non- d ASP / OP /
(Year) Operational/U Capacit SBR /
nder y MLD MBR/
Construction) FAB Etc.)
28/10/2014

8 STP of VMSS, 2010 Operational 43 ASP Consent


Kapurai Valid up to
19/04/2015
9 STP of VMSS, 2010 Operational 8.5 ASP Consent
Sayaji Garden Valid up to
19/04/2015
10 STP of VMSS, Under 21 ASP CTE
Chhani Construction granted
11 Talaja Talaja 2005 Operational 3 ASP -
Nagarpalika,
Bhavnagar,
Gujarat
12 Proposed 35 UASB Presently
having
Oxidation
Pond 20
MLD
capacity
Ruvapari Road consists 5
,Bhavnagar, MLD
Gujarat industrail
effluent of
GIDC,
Chitra &
Bhavnagar 15 MLD
domestic
W/W
13 Proposed 45 UASB Presently
having
Oxidation
Pond 20
Nari Road
MLD
Bhavnagar,
capacity
Gujarat
consists 5
MLD
industrail
effluent of

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 13


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Sl. No City/town STP Location STP Status STP Technolog Consent


Commissio (Operational/ Installe y (UASB / Status
ned in Non- d ASP / OP /
(Year) Operational/U Capacit SBR /
nder y MLD MBR/
Construction) FAB Etc.)
GIDC,
Chitra &
15 MLD
domestic
W/W

14 Kunkavav Kunkavav, Dist. Proposed 1.35 OP Applied for


Amreli, Gujarat CTE of the
Board
15 Dhari Dhari, Dist. Proposed 3.2 OP Applied for
Amreli CTE of the
Board
16 Khambha Khambha, Dist. Proposed 1.5 OP Applied for
Amreli CTE of the
Board
17 Liliya Mota Liliya Mota, Proposed 1.73 OP Applied for
Dist. Amreli, CTE of the
Gujarat Board
18 Savarkundla Savarkundla Proposed 6 OP Informatio
Nagarpalika, n not
Dist. Amreli, provided
Gujarat
19 Palitana Palitana, Dist. 2005 Operational 4.5 OP
Bhavnagar,
Gujarat
20 Ahmedabad S. No. 2011 Operational 70 UASB 13/08/2018
93,10,113,115,1
17(P),118,119,9
2,104,105,109,1
11,112,116,120
near
Vinobabhavena
gar, Vill.
Vinzol,
Ahmedabad

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 14


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Sl. No City/town STP Location STP Status STP Technolog Consent


Commissio (Operational/ Installe y (UASB / Status
ned in Non- d ASP / OP /
(Year) Operational/U Capacit SBR /
nder y MLD MBR/
Construction) FAB Etc.)
21 Ankleshwar Sukhavali, 2001 Operational 150 OP Informatio
Nagarpalika, Ankleshwar n not
Ankleshwar, provided
Dist.
Bharuch
22 Ankleshwar Plot No. 624/B, 2008 Operational 22.5 ASP Obtained
Notified GIDC,
Area Ankleshwar
Authority,
GIDC,
Ankleshwar,
Dist.
Bharuch
23 Kevadia Kevadia 2007 Operational 2.64 OP Obtained
Colony, Dist. Colony, Ta.
Narmadada Nandod, Dist.
Narmada
24 Old Pirana 2001 Operational 106 UASB CCA,
Sewage Obtained
Treatment valid up to
Plant, Pirana 10/03/2016
Road,
Behrampura
25 Pirana Sewage 2010 Operational 60 ASP CCA,
Treatment Plant valid up to
60 MLTD in 11/04/2018
compund of 106
Ahmedabad
MLD STP,
Pirana Road,
Behrampura
26 New Pirana 2001 Not in 182 OP CCA,
Sewage Operation refected on
Treatment 21/06/2011
Plant, Pirana
Octroi Naka,
Pirana Road,
Ahmedabad

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 15


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Sl. No City/town STP Location STP Status STP Technolog Consent


Commissio (Operational/ Installe y (UASB / Status
ned in Non- d ASP / OP /
(Year) Operational/U Capacit SBR /
nder y MLD MBR/
Construction) FAB Etc.)
27 New Pirana 2008 Operational 180 ASP CCA,
Sewage valid up to
Treatment Plant 11/04/2018
(180MLD),
Near 182 MLD
STP. Pirana,
Ahmedabad
28 Old Vasna 2001 Operational 126 UASB CCA,
Sewage valid up to
Treatment Plant 10/03/2016
Near V.N.
Bridge, Narol
Sarkhej High
Way
29 Vasna STP-135, 2011 Operational 35 ASP CCA,
between V.N. valid up to
Bridge and Toll 11/04/2018
from Sabarmati,
Vasna
30 New Vasna 1995 Not in 76 OP CCA
STP, Narol- operational Renewal
Sarkhje High Appln
Way rejected on
26/05/2011
31 Vasna STP, 2011 Not in 240 ASP CCA,
97/A/1, at operational valid up to
Sabarmati 28/07/2018
River, Vasna
32 AMC, Jalvihar, Proposed Open Land, yet 60 - Applied for
Old Vadarj construction CTE
not started

33 AMC, Jalvihar, Proposed Open Land, yet 60 - Applied for


Near Bhavans construction CTE
College, not started
Khanpur

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 16


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Sl. No City/town STP Location STP Status STP Technolog Consent


Commissio (Operational/ Installe y (UASB / Status
ned in Non- d ASP / OP /
(Year) Operational/U Capacit SBR /
nder y MLD MBR/
Construction) FAB Etc.)
34 Sanand Sanand 2015 Under 20.5 Under STP
Construction Constructio Nagarpalik
n a
35 Vallabh Vill. Vallabh 1987 Old STP not in - - -
Vidhyanagar Vidhyanagar STP working
condition
36 Raiya STP, 1/10/2010 Operational 51 ASP AWH-
Vill. Raiya 53277
Rajkot Managar Validity up
Palika Rajkot to
17/03/2016
37 STP Rajkot 1/2/2004 Operational 12 ASP AWH-
Municipal 52754
Corporation S Validity up
No. to
61,64,111,120& 07/02/2015
121 Paiki,
Ishwarya
Temple Road,
Rajkot Vill.-
Madhapar, Dist.
Rajkot
38 STP of Rajkot - Under 56 - Applied for
Mahanagar Contstruction CTE
Palika at
Raiyadhar,
Raiya Road,
Rajkot
39 STP of Rajkot - Under 70 - Applied for
Mahanagar Contstruction CTE
Palika at
Gauridad, Ta &
Dist. Rajkot
40 Block No. 1/P, 2009 In operational 15 ASP Expired on
11/P 13to19 at 17/06/2014
Surat Asarma, Ta. and applied
Choryasi, Dist. for renewal
Surat

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 17


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Sl. No City/town STP Location STP Status STP Technolog Consent


Commissio (Operational/ Installe y (UASB / Status
ned in Non- d ASP / OP /
(Year) Operational/U Capacit SBR /
nder y MLD MBR/
Construction) FAB Etc.)
41 Near Anand 2003 In operational 155 ASP Valid up
Park Society, to
Opp. Akhand 05/02/2019
Anand College
42 City S. No. 10 1958 In operational 82.5 UASB Valid up
Paiky 11& 13 to
Paiky14, Final 28/03/2019
Plot 119
43 Survey No. 46, 2011 In operational 100 ASP Valid up
Vadod to
28/04/2016
44 Bhatar, SMC. 1999 In operational 162 ASP Valid up
Surat to
31/01/2019
45 S. No. 44,45,51, 1995 In operational 100 ASP Valid up
56-62 to
17/02/2019
46 Moje. Dindoli 2009 In operational 66 ASP Valid up
to
10/12/2018
47 Karanj, SMC, 1999 In operational 142 ASP Valid up
Surat to
09/03/2019
48 Vill. Khajod, 2009 In operational 25 ASP Expired on
Ta. Choryasi, 17/06/2014
Dist. Surat and applied
for renewal
49 Block No. 128, 2012 In operational 84 ASP Expired on
Kosad Amroli 18/04/2013
Road, Kosad extension
pending
50 Sandhpore 1998 Operational 16 ASP Not
Pardi, Valsad obtained
51 Jamnagar 2015 Under 70 ASP CTE
Municipal Construction obtained
Corporation,
Jamnagar

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 18


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

4.12 STPs AT HARYANA


Haryana has 41 numbers of sewage treatment plants having treatment capacity of 852.7 MLD. 02
STPs of capacity 2.7 MLD are Non-Operational and 01 STP of capacity 45 MLD is under
construction. Details of STPs of Haryana are shown in Table 13.
Table 13: STPs-Haryana
Status Technolog
STP
STP (Operational/ y (UASB /
Installe
Commissio Non- ASP / OP / Consent
Sl. No City/town STP Location d
ned in Operational/U SBR / Status
Capacit
(Year) nder MBR/
y MLD
Construction) FAB Etc.)
1 Sonipat Shiv road Operational 35 UASB
STP Panipat
Dodala road, Under
Panipat
2 Siwah Construction 45 UASB
3 Jattal Road Operational 25 UASB
4 Gurgaon-I Operational 157.5 UASB
Gurgaon
5 Gurgaon-II Operational 67.5 ASP
Information Information
6 Badshapur Operational 45 SBR
not provided not provided
7 Mirjapur Operational 45 SBR
8 Faribadab Pratapgarh Operational 50 SBR
9 Palwal Operational 9 SBR
10 Hodal Operational 9 MBR
11 Sector-4 Operational 40 UASB
Near Shv Oxidation
12 Colony WCJ Operational 8 Pond
Karnal New Anaj Non oxidation
13 Mandi Indri Operational 1.5 Pond
Gharonda oxidation
14 Railway Road Operational 3 Pond
Information Information
15 Bahadurgarh Operational USB
Bhadurgarh not provided not provided
16 Bahadurgarh Operational 36 SBR
17 Jhajjar Jhajjar Operational 5.5 MBBR
18 Kalanur Kalanur Operational 3.5 MBBR

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 19


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Status Technolog
STP
STP (Operational/ y (UASB /
Installe
Commissio Non- ASP / OP / Consent
Sl. No City/town STP Location d
ned in Operational/U SBR / Status
Capacit
(Year) nder MBR/
y MLD
Construction) FAB Etc.)
Bhiwani Town
19 Plant-I Operational 20 SBR
Bhiwani Town
Bhiwani
20 Plant-II Operational 10 SBR
Dardi Road
21 Bhiwani Operational 30 SBR
22 Chakri Dadri Chakri, Dadri Operational 5 SBR
23 Meham Meham Operational 5 MBBR

24 Rohtak Rohtak Operational 10 SBR


Nasiaji Road
25 Rewari Operational 16 MBBR
Rewari
Kaluwat
26 Village Operational 6.5 MBBR
STP Panchkula
27 Sector 20 Operational 18 ASP
STP Panchkula
Panchkula
28 Sector 20 Operational 39 ASP
STP Panchkula
29 Sector 28 Operational 15 ASP
Non
30 Kalka STP Kalka Operational 1.2 EA
Oxidation
31 Beri STP, Beri Town Operational 2 Pond

32 Jind STP, Jind Operational 15 MBBR


33 Uchana STP, Uchana Information Operational 4.5 EA Information
STP Narvana not provided not provided
34 Operational 3.5 MBBR
Narvana STP- II No.,
35 Narvana Operational 3.75 MBBR

36 Kaithal STP-SBR, Operational 10 SBR

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 20


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Status Technolog
STP
STP (Operational/ y (UASB /
Installe
Commissio Non- ASP / OP / Consent
Sl. No City/town STP Location d
ned in Operational/U SBR / Status
Capacit
(Year) nder MBR/
y MLD
Construction) FAB Etc.)
STP-MBBR,
37 Kaithal Operational 10 MBBR
38 Ambala Operational 4.5 MBBR
Ambala STP Ambala
39 City Naya Gaon Operational 3.25 MBBR
STP Yamuna
Nagar- Radaur
40 Yamuna Road Operational 25 UASB
Nagar STP Yamuna
Nagar- Baddi
41 Majra Operational 10 UASB

4.13 STPs AT HIMACHAL PRADESH


Himachal Pradesh has 66 numbers of sewage treatment plants having treatment capacity of
114.72 MLD. 30 STPs of capacity 35.21 MLD are under construction. Details of STPs of
Himachal Pradesh are shown in Table 14.
Table 14: STPs-Himachal Pradesh
Status Technolog
STP
STP (Operational/ y (UASB /
Installe
Commissio Non- ASP / OP / Consent
Sl. No City/town STP Location d
ned in Operational/U SBR / Status
Capacit
(Year) nder MBR/
y MLD
Construction) FAB Etc.)
RCOP
STP
1 2005-2006 operational 1.2 ASP valid upto
Ghumarawin
31.03.2016
RCOP
STP Naina Devi
2 Bilaspur 2005-2006 operational 1.35 ASP valid upto
ji
31.03.2016

Information Non Septic COP given


3 STP Bilaspur 1.5
not provided operational Tank upto 2016

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 21


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

RCOP
STP
4 20.03.2008 operational 1.5 ASP valid upto
ChambaBarga
31.03.2016
RCOP
STP
5 Chamba 25.02.2008 operational 0.898 ASP valid upto
ChambaBhagot
31.03.2011

STP Shitla COE upto


6 23.03.2010 operational 0.2 ASP
Bridge 2011

STP Hamirpur, RCOP


7 Distt. Hamirpur 06.08.2008 operational 1.35 ASP valid upto
Zone II 31.03.2015
STP Hamirpur, RCOP
8 Hamirpur Distt. Hamirpur 23.01.2010 operational 3.13 ASP valid upto
Zone I 31.03.2015
STP Hamirpur,
9 Distt. Hamirpur 23.01.2010 operational 0.68 ASP
Zone III Informatio
STP Sujanpur, Non n not
10 1.75 ASP
Zone-II Information operational provided
not provided Non
11 STP Nadaun 1.69
operational
RCOP
STP
12 Kullu 2006-2007 operational 2.5 ASP valid upto
BhootnathKullu
31.03.2018
RCOP
13 STP Manali 2006-2007 operational 1.82 ASP valid upto
31.03.2016
RCOP
14 STP Badah 2008-2007 operational 0.38 ASP valid upto
31.03.2018
RCOP
STP Lanka
15 2009-2010 operational 2.57 ASP valid upto
Baker
31.03.2015
STP Mela RCOP
16 Ground 2006-2007 operational 0.99 ASP valid upto
(Bhunter) 31.03.2016
RCOP
STP Sharabai
17 2006-2007 operational 0.46 ASP valid upto
(Bhunter)
31.03.2016

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 22


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Informat RCOP
Information
18 Una Zone-C operational ion not ST valid upto
not provided
provided 31.03.2014
COP is
Mehatpur, D
19 operational ST valid upto
Distt. Una
31.03.2011
RCOP
STP Sujanpur
20 operational 1.5 EAP valid upto
Zone-I
31.03.2015
STP,
Una COE given
Santokhgarh, Non
21 1.65 ASP on
Distt. Una zone- operational
01.10.2010
II
STP,
Septic COE given
Santokhgarh, Non
22 786 user Tank/Soak on
Distt. Una zone- operational
pit 01.10.2010
I
COE given
STP,Una zone- Non
23 2.53 ASP on
A operational
30.09.2014
COE given
Non
24 STP Garget 3.14 EAP on
operational
11.12.2014
COE gien
STP Una zone Non
25 0.63 ASP on
D operational
30.09.2014
COE given
STP Mehatpur Non
26 0.77 ASP on
ABC operational
02.06.2012
RCOP
STP-North
27 2003 operational 5.8 EAP valid upto
Disposal Shimla
31.03.2016
RCOP
STP Dhalli,
28 2003 operational 0.76 EAP valid upto
Shimla
31.03.2016
Shimla
RCOP
STP-Summer
29 2003 operational 3.93 EAP valid upto
hill, Shimla
31.03.2016
STP- RCOPvalid
30 Snowdown, 2003 operational 1.35 EAP upto
Shimla 31.03.2016

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 23


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

STP RCOP
Information
31 Rampur,(Khopr operational 1 ASP valid upto
not provided
i) Distt Shimla 31.03.2016
Rampur RCOP
32 operational 0.5 ASP
(Choohabag) valid upto
RCOP
33 STP Rohroo operational 1.015 EAP valid upto
31.03.2016
STP RCOP
34 SanjualiMalyan operational 4.44 EAP valid upto
a 31.03.2016
Anaerobic
RCOP
Systmecum
35 STP Lalpani operational 19.35 valid upto
Aerobic
31.03.2016
System
RCOP
36 STP Jubbal operational 0.65 EAP valid upto
31.03.2016
COE given
Non
37 STP Narkanda 0.45 EAP on
operational
28.07.2010
COE given
STP Kotkhai Non
38 0.305 EAP on
Zone-I operational
09.06.2011
COE given
STP Kotkhai Non
39 0.16 EAP on
Zone-II operational
09.06.2011
COE given
Non
40 STP Suni 0.65 EAP on
operational
28.11.2013
COE given
Non
41 STP Theog 1.15 EAP on
operational
24.12.2015
RCOP
STP Khaliar,
42 Mandi 2004-2005 operational 0.47 ASP valid upto
DisttMandi
31.03.2016
STP RCOP
43 RaghunathKaPa 2004-2005 operational 3.83 ASP valid upto
dhar, Mandi 31.03.2016
STP, Sunder
Without
44 Nagar, Distt. 2007-2008 operational 3.55 ASP
consent
Mandi

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 24


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Aerobic COE given


Information Non
45 STP Rewalsar 0.35 Sludge on
not provided operational
Digestion 15.01.2014
STP Sarkaghat, COE given
Non
46 Distt. Mandi 1.67 EAP on
operational
zone C 06.10.2008
STP at
RCOP
NeriKhadd,
47 2009-2010 operational 1.735 EAP valid upto
Joginder Nagar,
31.03.2015
Distt. Mandi
STP RCOP
48 Dharamsala, 10.10.2006 operational 5.15 AD valid upto
Distt. Kangra 31.03.2018
Kangra
STP RCOP
49 Jwalamukhi, 19.10.2004 operational 3.66 AD valid up to
Distt. Kangra 31.03.2013
Without
50 STP Palampur 2005 operational 0.351 AD
Consent
COE given
STP Kangra Non
51 1.68 EAP on
zone I operational
15.03.2008
COE given
STP Kangra Information Non
52 1.46 EAP on
zone II not provided operational
15.03.2008
COE given
STP Kangra Non
53 0.59 EAP on
zone III operational
15.03.2008
Aerobic COE given
Non
54 STP Dehra 1.38 Sludge on
operational
Digestion 27.08.2008
COE given
Non
55 STP Nagrota 29.03.2007 1.34 ASP on
operational
29.03.2007
Aerobic COE given
Information Non
56 STP Nurpur 3.13 Sludge on
not provided operational
Digestion 06.09.2010
COE given
STP Non
57 0.224 ASP on
Bhangsunag operational
08.11.2011
STP Rekong- COP valid
58 Kinnaur peo, Distt. operational 1 ASP up to
Kinnaur 31.03.2008

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 25


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

COE given
STP Solan Zone Non
59 Solan 2.9 EAP on
B operational
10.04.2008
COE given
Non
60 STP Arki 0.7 EAP on
operational
06.02.2007
COE given
STP, Paonta Non
61 Sirmour 1 ASP on
Sahib Zone II operational
08.07.2008
COE given
STP, Paonta Non
62 1.72 ASP on
Sahib Zone III operational
08.07.2008
COE given
STP, Paonta
63 operational 0.44 ASP on
Sahib Zone I
08.07.2008
COE given
STP Keylong Non Septic
64 Lahaul&Spiti 0.188 on
phase-I operational Tank
20.12.2008
COE given
STP Keylong Information Non Septic
65 0.289 on
phase-II not provided operational Tank
20.12.2008
COE given
STP Keylong Non Septic
66 0.215 on
phase-III operational Tank
20.12.2008

4.14 STPs AT JAMMU & KASHMIR


Jammu & Kashmirhas 19 numbers of sewage treatment plants having treatment capacity of
264.74 MLD. 03 STPs of capacity 117 MLD are under construction and 01 STPs of capacity 02
MLD is non-operational. Details of STPs of Jammu & Kashmir are shown in Table 15.
Table 15: STPs-Jammu & Kashmir
Status Technolog
STP
STP (Operational/ y (UASB /
Installe
Commissio Non- ASP / OP / Consent
Sl. No City/town STP Location d
ned in Operational/U SBR / Status
Capacit
(Year) nder MBR/
y MLD
Construction) FAB Etc.)
2009-10
1 Bhagwati Nagar (UEED- Operational 10 UASB Applied
Jammu Jammu)
MPD/CPWD
2 2009 operational 1 ASP Not applied
Satwari
Non
3 Reasikatra KatraBhawan 2005 2 ASPA -do-
Operational

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 26


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Status Technolog
STP
STP (Operational/ y (UASB /
Installe
Commissio Non- ASP / OP / Consent
Sl. No City/town STP Location d
ned in Operational/U SBR / Status
Capacit
(Year) nder MBR/
y MLD
Construction) FAB Etc.)
Katra
4 Basement, near 2006 Operational 0.5 ASP --do-
Gita Mandir
Likely to be
commission
Bhagwati under
5 ed in 2013- 27 UASB Not applied
Nagar construction
14 UEED
Jammu
Jammu Likely to be
commission
Bhagwati ed in the under
6 30 UASB Not applied
Nagar year 2013- construction
14 UEED
Jammu
Hazratbal –
7 2006 operational 7.5 MBBR Applied
Srinagar
8 Habak 2006 operational 3.2 MBBR
9 Nishat 2006 -do- 4.5 MBBR
Srinagar
Srinagar Informatio
10 1993-94 -do- 17.1 ASP
Barinambal n not
SKIMS provided
11 - -do- 2.4 ASP
Srinagar
Nallah Amir 2010-11
12 -do- 5.4 SBR
khan Srinagar LAWDA
Barinbal
13 -do- -do 16.1 SBR
Srinagar
Barinbal
14 -do- -do- 7 SBR
Srinagar Srinagar
UEED Proposed/Under Informatio
15 Noor Bagh 60 ASP
Srinagar construction n not
Not provided
16 Alochibagh 2010-11 do 50.24 specified
DPR
Srinagar-
17 Parimpora 2010-11 do 11.98 ASP
Parimpora
18 Srinagar Mujgund UEED do 3.82 SBR

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 27


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Status Technolog
STP
STP (Operational/ y (UASB /
Installe
Commissio Non- ASP / OP / Consent
Sl. No City/town STP Location d
ned in Operational/U SBR / Status
Capacit
(Year) nder MBR/
y MLD
Construction) FAB Etc.)
B.D.Cantt
19 Under Army do 5 ASP
Srinagar

4.15 STPs AT JHARKHAND


Jharkhand has 15 numbers of sewage treatment plants having treatment capacity of 117.24
MLD. Details of STPs of Jharkhand are shown in Table 16.
Table 16: STPs-Jharkhand
Sl.No. City/town STP Location STP Status STP Technolog Consent
Commissio (Operational/ Installe y (UASB / Status
ned in Non- d ASP / OP /
(Year) Operational/U Capacit SBR /
nder y MLD MBR/
Construction) FAB Etc.)
1. IEL Gomia 50 years ago Operational SAS No
Township 1.6
2. BSL Not Known Operational Lagoon
Township(a)
Sector 12 10.4
3. Bokaro (b) Sector 6 Not Known Operational 5.85 Lagoon Informatio
4. (c) Sector 11 Not Known Operational 2.57 Lagoon n not
5. (d) Dhandabara Not Known Operational Lagoon provided
11.4
6. (e) Camp II Not Known Operational 0.582 Lagoon
7. (f) BGH Not Known Operational 1.17 Lagoon
8. STP Kharkai 1952 Operational 16 ASP 31/12/2014
9. STP Bara 1994 Operational 45 ASP 31/12/2014
10. Jmshedpur Baridih STP 1952 Operational OP Up to 2013
Unit-I 4.5
11. Baridih STP 1964 Operational OP Up to
Unit-II 7.65 31/12/2013
12. Jadugoda STP 1995 Operational ASP Up to
UCIL 4.086 31/12/2012
13. Jadugora, ES NarwaPahar 1995 Operational ASP Up to
STP 2 31/12/2012
14. Moubhandar 1985 Operational Classified Up to
HCL 0.8 31/12/2007
15. Moubhandar Moubhandar Operational Up to
3.636 Filtration 31/12/2007
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 28
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

4.16 STPs AT KARNATAKA


Karnatakahas 57 numbers of sewage treatment plants having treatment capacity of 1304.16
MLD. 13 STPs of capacity 192.11 MLD are under construction. Details of STPs of Karnataka
are shown in Table 17.
Table 17: STPs-Karnataka
Status Technolog
STP
STP (Operational/ y (UASB /
Installe
Commissio Non- ASP / OP / Consent
Sl. No. City/town STP Location d
ned in Operational/U SBR / Status
Capacit
(Year) nder MBR/
y MLD
Construction) FAB Etc.)
1 Nayandanahalli Operational 180
-I
2 Nayandanahalli Operational 75
-I
3 Kempambudhi Operational 1
4 Nagasandra- Operational 163 Informatio Informatio
Information
Yemalur post, n not n not
not provided
Chalaghatta provided provided
Village-STP-I
5 Bangaluru Nagasandra- Operational 55
Yemalur post,
Chalaghatta
Village-STP-II
6 Nagasandra- Operational 30
Yemalur post,
Chalaghatta
Village-STP-III
7 Kadabeesanahal Operational 50
li
8 Bangaluru Madiwala Operational 4
Informatio Informatio
9 Nagasandra Information Operational 20
n not n not
10 Hebbal not provided Operational 60
provided provided
11 Yelahanka Operational 10
12 Jakkur Operational 10
13 Rajacanal Operational 40
14 K.R. Puram Operational 20
15 Cubbon Park Operational 1.5
16 Lalbagh Operational 1.5
17 Ramanagar Ramanagar Operational 7.56

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 29


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Status Technolog
STP
STP (Operational/ y (UASB /
Installe
Commissio Non- ASP / OP / Consent
Sl. No. City/town STP Location d
ned in Operational/U SBR / Status
Capacit
(Year) nder MBR/
y MLD
Construction) FAB Etc.)
18 Kolar Operational 10.16
Kolar
19 Srinivasapura Operational 3
20 Chikballapura Under 3.1
Chikballapur Contstruction
21 a Chintamanai Yet to 2
commission
22 Kollegal Operational 3.34
Chamarajnag
23 ar Chamarajnagar Under 9
Contstruction
24 Hassan Hassan Operational 10
25 Chikkegowdana Operational 9.2
doddi, Mandya
26 Guttahalu, Operational 1.58
Mandya
Mandya
27 Maddur Operational 3.5
28 Srirangapatana Operational 1.39
29 Rayankere, Operational 60
Mysore
30 Vidyaranyapura Operational 67.65
m, Maysorfe
31 Kesare, Operational 30
Mysore Maysore
32 Hunsur, Operational 3.9
Maysore Informatio Informatio
33 K. R. Nagar Operational 1.44 n not n not
34 K. R. Nagar Operational 1.45 provided provided
35 Bannur Operational 3.85
36 Chikamagalu Chikamagalur Under
25
r Contstruction
37 Karwar Karkalla Operational 1.5
38 Bhatkala Operational 3.5
39 Kavoor STP In operational. 43.5
Mangalore Information
and Tertiary Operating at 18
not provided

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 30


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Status Technolog
STP
STP (Operational/ y (UASB /
Installe
Commissio Non- ASP / OP / Consent
Sl. No. City/town STP Location d
ned in Operational/U SBR / Status
Capacit
(Year) nder MBR/
y MLD
Construction) FAB Etc.)
treatment Plant MLD capacity

40 Pachanady STP Trail run 8.75


41 Jeppinamogaru Under 20
STP Contstruction
42 Surathkal STP Under 16.5
Contstruction
43 Sullia, STP has 20
Mangalore installed, UGD
work under
construction
44 Udupi Operational 12
Udupi
45 Operational 5.5
46 Operational 3
47 Bagalkote yet to 5
Bagalkote commission
48 Badam Yet to 4.3
commission
49 Haveri Under 4.71
Contstruction
Haveri
50 Ranebennur Yet to 7.5
commission
51 Ananthpur Operating 30
Bellary
52 Cowl bazar Operating 15
53 Gulbarga Gulbarga Under 55
Informatio
Information Contstruction
54 Raichur Raichur n not
not provided Under 20
Contstruction provided
55 Davangere Davangere Operational 19.45

56 Bhadravati Bhadravati Operational 5.83 Informatio


n not
57 Tumkur Tumkur Operational 25
provided

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 31


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

4.17 STPs AT KERALA


Kerala has 10 numbers of sewage treatment plants having treatment capacity of 152.97 MLD.
Out of 10 STPs, 01 STP of capacity 03 MLD is Non-Operational and 03 STPs of capacity
37.1 MLD are under construction. Details of STPs of Kerala are shown in Table 18.
Table 18: STPs-Kerala
Sl. No. City/town STP Location STP Status STP Technolog Consent
Commissio (Operational/ Installe y (UASB / Status
ned in Non- d ASP / OP /
(Year) Operational/U Capacit SBR /
nder y MLD MBR/
Construction) FAB Etc.)
1 Thiruvananth Muttathara, 01.11.2013 Operational 107 ASP with Consent
apuram extended issued ob
aeration 03.03.2014
valid upto
31.03.2016
2 Marine Drive- 1984 Operational 0.6 ASP with Under
GCDA-STP extended Processing
aeration
3 Ernakulam KWA STP at 1970 Operational 4.5 ASP Consent to
Elamkulam Operate
valid upto
30.06.2015
4 Kottayam Kumarakam(Co 2007 Operational 0.09 Diffused Consent
mmon STP for aeration valid upto
House Boat) attached 30.06.2015
growth
process
5 Alappuzha Kunnumma 2014 Operational 0.18 Electrolytic Consent
village coagulation expires on
(Common STP 31.12.2014
for House Boat) Applied for
renewal
6 Kannur Thaliparamba 2013 Operational 0.5 ASP Not applied
for consent

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 32


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Sl. No. City/town STP Location STP Status STP Technolog Consent
Commissio (Operational/ Installe y (UASB / Status
ned in Non- d ASP / OP /
(Year) Operational/U Capacit SBR /
nder y MLD MBR/
Construction) FAB Etc.)
7 Guruvayoor Chakkamkanda STP Units Non- 3 ASP Consent
Municipality Constructed Operational issued
4 years back valid upto
21.03.2011
Not applied
for renewal
8 Kollam Kureepuzha Construction 11.6 MBBR Consent to
not started establish
issued
valid upto
04.04.2014
Information
applied for
not provided
renewal
9 Kochi Mundenvely Construction 12 MBBR/SB Consent to
not started R establish
issued
valid upto
25.05.2014
Consent to
establish
issued
11.05.2010
valid upto
10.05.2013
Karimpanampala Information Construction not applied for
10 Kozhikode m not provided started 13.5 MBBR renewal

4.18 STPs AT LAKSHADWEEP


Lakshadweep has zero number of sewage treatment plant.

4.19 STPs AT MADHYA PRADESH


Madhya Pradesh has 17 numbers of sewage treatment plants having treatment capacity of
482.23MLD.Out of 17 STPs, 03 STPs of capacity 6.75 MLD are Non-Operational. Details of
STPs of Madhya Pradesh are shown in Table 19.

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 33


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Table 19: STPs-Madhya Pradesh


Sl. No City/town STP Location STP Status STP Technology Consent
Commission (Operational/N Installed (UASB / Status
ed in (Year) on- Capacity ASP / OP /
Operational/Un MLD SBR /
der MBR/ FAB
Construction) Etc.)
1 Ujjain Information Operational 52 Waste Informatio
not provided stabilizatio n not
n pond provided
Ujjain OPS
Karnal
Technolog Not
2 Sadaval 2001 Operational 53 y obtained
consent
3 Gwalior Laltipara 1.11.2010 Operational 50 WSP obtained
Maintained &
running by
IMC through Not
4 Kabitkhedi, 2006 contractor 78 USAB obtained
Indore
Maintained &
running by
IMC through Not
5 Kabitkhedi, 2009 contractor 12 USAB obtained
Not in working Not
6 Burhanpur Burhandpur 2009 condition 6 OP obtained
Not
7 MC Jabalpur Gwarighat 2012 Operational 150 FAB obtained
Maholi valid upto
8 Dhamkheda 15/10/01 Operational 25 WSP 31/12/13
Oxidation valid upto
9 Badwai 15/10/01 Operational 17 pond 31/12/13
Oxidation valid upto
10 Gondermau 15/10/01 Operational 2.36 pond 31/12/13
valid upto
11 MC Bhopal Kotra Singhpur 15/10/01 Operational 10 WSP 31/12/13
(NRCP) Ekant Oxidation Not
12 Park 2008 Operational 8 pond obtained
Oxidation Not
13 Bawadia Kalan 1975 Operational 13.56 pond obtained
Bio-
Bio-Filteration Filtration Not
14 Mata Mandir 1959 Operational 4.56 Plant obtained

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 34


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Sl. No City/town STP Location STP Status STP Technology Consent


Commission (Operational/N Installed (UASB / Status
ed in (Year) on- Capacity ASP / OP /
Operational/Un MLD SBR /
der MBR/ FAB
Construction) Etc.)
Karnal
Non Technolog
15 Nagda Nagda operational y
Karnal Informatio
Information
Technolog n not
not provided
16 Vidisha Vidisha Operational y provided
Karnal
Non Technolog
17 Keolari Keolari operational 0.75 y

4.20 STPs AT MAHARASHTRA


Maharashtra has 76 numbers of sewage treatment plants having treatment capacity of
5160.36MLD. 10 STPs of capacity 344.5 MLD are Non-Operational and 06 STPs of capacity
131.96 MLD are under construction. Details of STPs of Maharashtra are shown in Table 20.
Table 20: STPs-Maharashtra
Status(Operati Technology
STP
STP onal/ Non- (UASB/AS
Installed Consent
SI.No. City/Town STP Location commissione Operational/ P/OP/SBR/
Capacity Status
d in Under MBR/FAB
(MLD)
Construction) ETC.)

1 Two at Apr.13 Operational 30.5 ASP Applied


Lalkhedi
2 Amravati Dec.12 Non 44 ASP Applied
Amravati
operational
3 CIDCO STP 1998 Operational 6.5 ASP Applied
Near Airport
Aurangabad
4 Near Salim Ali Feb.2013 Operational 5 SBR Applied
Sarovar Hudco
5 Operational Operational 17 Digester Applied
and
6 Bhiwandi
Katai Under Under 13 Chlorinatio Applied
Nizampur construction construction n with
sludge
lagoons
7 Under Under 25 ASP Not applied
Chandrapur Pathanpura commission commissioning
ing

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 35


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Status(Operati Technology
STP
STP onal/ Non- (UASB/AS
Installed Consent
SI.No. City/Town STP Location commissione Operational/ P/OP/SBR/
Capacity Status
d in Under MBR/FAB
(MLD)
Construction) ETC.)

8 Under Under 45 ASP Not applied


commission commissioning
Rahamat Nagar ing
9 1978 Non 16 Primary Applied
Adharwadi Operational Clarifier
10 1980 Non 14 SBR Applied
Motagaon Operational
11 Jan.13 Operational 15 SBR Applied
Barave
12 Jan.13 Operational 25 SBR Applied
Adharwadi
13 final stage Non 40 SBR Applied
Kalyan of Operational
Dombivali commission
Chinchpada ing
14 final stage Non 40 SBR Applied
of Operational
commission
Motagaon ing
15 Information Non 2 SBR Applied
not provided Operational
Titwala east
16 Titwala west Information Operational, 1 SBR Applied
not provided
17 Kasba Bawda 1974 Operational 43.5 Primary Applied
Clarifier,
Kolhapur
18 Kasba Bawda 2014 Operational 76 Trickling Applied
Filter, SBR
19 Jessel Park 2008 Operational 2 ASP Applied
Mira
20 Bhaindar Shrusti complex 2008 Non 1.5 ASP Applied
operational
21 Colaba 1988 Operational 41.1 Primary & Applied
Secondary
Greater treatment ,
Mumbai Aerated
Lagoons

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 36


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Status(Operati Technology
STP
STP onal/ Non- (UASB/AS
Installed Consent
SI.No. City/Town STP Location commissione Operational/ P/OP/SBR/
Capacity Status
d in Under MBR/FAB
(MLD)
Construction) ETC.)

22 Love Grove, 1990 Operational 756.9 Primary & Applied


worli Secondary
treatment ,
Aerated
Lagoons
23 Bandra 2003 Operational 796.9 Primary & Applied
Secondary
treatment ,
Aerated
Lagoons
24 Versova 1992 Operational 180 Primary & Applied
Secondary
treatment ,
Aerated
Lagoons
25 Malad 1998 Operational 240 Primary & Applied
Secondary
treatment ,
Aerated
Lagoons
26 Bhandup 2002 Operational 280 Primary & Applied
Secondary
treatment ,
Aerated
Lagoons
27 Ghatkopar 2003 Operational 300 Primary & Applied
Secondary
treatment ,
Aerated
Lagoons
28 Charkop 2009 Operational 6 Primary & Applied
Secondary
treatment ,
Aerated
Lagoons

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 37


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Status(Operati Technology
STP
STP onal/ Non- (UASB/AS
Installed Consent
SI.No. City/Town STP Location commissione Operational/ P/OP/SBR/
Capacity Status
d in Under MBR/FAB
(MLD)
Construction) ETC.)

29 Nagpur Bhandewadi, Mar-01 Operational 100 ASP,Prima Applied


ry Clarifier,
secondary,
tertiary
30 Nanded Bondar 26/03/97 Operational 87 ASP Applied
Waghela
31 Elichpur Information Operational 30 ASP Applied
not provided
32 Tapovan 1 2003 Operational 78 UASB Applied
reactor
33 Tapovan 2 2010 Operational 52 ASP Applied

34 Panchak 1 2003 Operational 7.5 ASP Applied


Nashik
35 Panchak 2 2012 Operational 21 ASP Applied
36 Chehadi 1 2006 Operational 22 ASP Applied
37 Chehadi 2 2012 Operational 20 ASP Applied
38 CBD Belapur 6/10/2011 Operational 19 SBR Till
31/05/2017
39 Nerul sec.50 15/04/08 Operational 100 ASP Till
31/05/2017
40 Sanpada 15/04/12 Operational 37.5 ASP Till
31/05/2017
41 Vashi 30/06/08 Operational 100 ASP Till
Navi 31/05/2017
42 Mumbai Kopar khairane 1/1/2012 Operational 87.5 ASP Till
31/05/2017
43 Airoli 30/04/08 Operational 80 ASP Till
31/05/2017
44 Nerul sec.2 taken from Operational 10 ASP Till
cidco 31/05/2017
45 Ghansoli 22/06/10 Operational 27 ASP Till
31/05/2017

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 38


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Status(Operati Technology
STP
STP onal/ Non- (UASB/AS
Installed Consent
SI.No. City/Town STP Location commissione Operational/ P/OP/SBR/
Capacity Status
d in Under MBR/FAB
(MLD)
Construction) ETC.)

46 Kamothe Feb.2012 Operational 85 ASP Till


31/05/2017
47 Kalamboli Dec.11 Operational 50 ASP Till
31/05/2017
48 Chikali Phase-I 1987 Operational 16 ASP Applied
49 Chikali Phase-II 2000 Operational 16 SBR Applied

50 Chinchwad 2000 Operational 30 FAB Applied


Phase I
51 Chinchwad 2008 Operational 30 FAB Applied
Phase II
52 Kasarwadi 1999 Operational 40 FAB Applied
Phase I
53 Pimpi Kasarwadi 2003 Operational 40 FAB Applied
Chinchwad Phase II
54 Kasarwadi 2010 Operational 40 FAB Applied
Phase III
55 Sangvi Phase I 2001 Operational 15 FAB Applied
56 Sangvi Phase II 2012 Operational 20 FAB Applied
57 Pimpale Nilakh 2007 Operational 20 FAB Applied
58 Ravet 2009 Operational 20 FAB Applied
59 Charoli 2012 Operational 21 FAB Applied
60 Akurdi 2011 Al Operational 30 FAB Applied
61 Erandawane 2004 Operational 50 Extended Applied
aeration
62 Bopodi 2004 Operational 18 Extended Applied
aeration
63 Bahiroba 2003 Operational 130 ASP Applied
64 Pune Tanajiwadi 2004 Operational 17 Biotower Applied
with
Extended
aeration
65 Vitthalwadi 2009 Operational 32 Extended Applied
aeration
66 Baner 2010 Operational 30 SBR Applied

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 39


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Status(Operati Technology
STP
STP onal/ Non- (UASB/AS
Installed Consent
SI.No. City/Town STP Location commissione Operational/ P/OP/SBR/
Capacity Status
d in Under MBR/FAB
(MLD)
Construction) ETC.)

67 Mundhava 2009 Operational 45 SBR Applied


68 Kharadi 2012 Operational 40 SBR Applied
69 Sangli 100 Ft 1976 Non 12.76 Primary,O Applied
road Operational & P
under
construction
70 Sangli Miraj Bedag road , 1976 Non 9.2 Primary, Applied
Kupwad Miraj Operational & OP
under
construction
71 Dhulgaon commission Under 27 Primary, Applied
ing commissioning OP
72 Solapur Solapur Information Non 55 Primary Applied
not provided Operational
73 Kopri 17/02/12 Operational 120 SBR, ( C- 31.12.16
Tech)
74 Kalwa not started Non 100 SBR, ( C- Informatio
Thane Operational Tech) n not
75 Mumbra not started Non 32 SBR, ( C- provided
Operational Tech)
76 Ulhasnagar Khande 2006 Operational 28 Digester Applied
Golivali and
Chlorinatio
n

4.21 STPs AT MANIPUR


Manipur has zero number of sewage treatment plants.

4.22 STPs AT MEGHALAYA


Meghalaya has 1 sewage treatment plant having treatment capacity of 1 MLD. 1STP of capacity
1 MLD is Non Operational at Shillong. Details of STPs of Meghalaya are shown in Table 21.

Table 21: STPs-Meghalaya

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 40


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Status Technolog
STP
STP (Operational/ y (UASB /
Installe
Commissio Non- ASP / OP / Consent
Sl. No City/town STP Location d
ned in Operational/U SBR / Status
Capacit
(Year) nder MBR/
y MLD
Construction) FAB Etc.)
NEIGRIHMS,
Mawdiandiang,
East Khasi Hills Non -
1 Shillong District 04.07.2006 Operational 1 ASP 30.06.2012

4.23 STPs AT MIZORAM


Mizoram has 01 sewage treatment plant having treatment capacity of 10 MLD. 01 STP of
capacity 10 MLD is Under Construction at Aizawal Mizoram. Details of STPs of Mizoram are
shown in Table 22.

Table 22: STPs-Mizoram


Status Technolog
STP
STP (Operational/ y (UASB /
Installe
Commissio Non- ASP / OP / Consent
Sl. No City/town STP Location d
ned in Operational/U SBR / Status
Capacit
(Year) nder MBR/
y MLD
Construction) FAB Etc.)
Bethlehem CoE in
Aizawal Vengthlang (on Under 2011,
10 PS+ASP
Mizoram the bank of Information Construction renewed on
1 Chite stream) not provided 2012

4.24 STPs AT NAGALAND


Nagaland has zero number of sewage treatment plants.

4.25 STPs AT ODISHA


Odisha has 13 numbers of sewage treatment plants having treatment capacity of 385.54MLD.
6STPs of capacity 227.5 MLD are Under Construction. Details of STPs of Odisha are shown
in Table 23.

Table 23: STPs-Odisha

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 41


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Status Technolog
STP
STP (Operational/ y (UASB /
Installe
Commissio Non- ASP / OP / Consent
Sl. No City/town STP Location d
ned in Operational/U SBR / Status
Capacit
(Year) nder MBR/
y MLD
Construction) FAB Etc.)
STP-I: Steel
1 Township July,2007 Operational 18 OP 31.03.2016
sector-14
Roulkela
STP-II: Steel
2 Township March,2005 Operational 3.24 OP
Sector-22
OCL, Township Area-
3 25.03.2011 Operational 43.2 SBR 31.03.2015
Rajgangpur STP1
4 Line-2 Step-2 May,2011 Operational 7.2 SBR
L&T
5 STP 20-09-1990 Operational 38.4 SBR 31.3.2015
Kansbahal
The CMC
has applied
Consent on
20.08.2014
& is under
6 Cuttack Mattagajpur Jun-05 Operational 33 OP
process.(Th
is STP will
be
Dismantled
)
Obtained
Consent to
Information Under
7 Mattagajpur 16 ASP establish
not provided Construction
from the
board
Obtained
Consent to
Information Under
8 Bidanasi 36 ASP establish
not provided Construction
from the
board

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 42


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

The
Muncipalit
y has not
obtained
Consent to
9 Puri Mangalaghat 2013 Operational 15 ASP
establish &
Consent to
operate
from the
Board
The BMc
has
obtained
Information Under
10 Bhubaneswar Rokta 48 ASP Consent to
not provided Construction
establiseh
from the
Board
Obtained
Consent to
Under
11 Meherpalli 56 ASP establiseh
Construction
from the
Board
obtained
Consent to
Under
12 Kochilaput 43.5 ASP establiseh
Construction
from the
Board
obtained
Consent to
Under
13 Basuaghai 28 ASP establiseh
Construction
from the
Board

4.26 STPs AT PUDUCHERRY


Puducherryhas 06 numbers of sewage treatment plants having treatment capacity of 68.5
MLD. 03 STPs of capacity 51 MLD are Under Construction. Details of STPs of Puducherry
are shown in Table 24.

Table 24: STPs-Puducherry

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 43


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Sl. No City/town STP Location STP Status STP Technology Consent


Commission (Operational/N Installed (UASB / Status
ed in (Year) on- Capacity ASP / OP /
Operational/Un MLD SBR /
der MBR/ FAB
Construction) Etc.)
1 Sewage Farm, Operational 12.5 Oxidation
Lawspet, Pond
Puducherry
2 Sewage Farm, Operational 2.5 UASB
Lawspet,
Lawspet,
Puducherry
Puducherry
3 Sewage Farm, Under 17 SBR
Informatio
Lawspet, Information Contstruction
n not
Puducherry not provided
provided
4 Dubrayapet, Operational 2.5 UASB
Dubrayapet, Puducherry
5 Puducherry Dubrayapet, Under 17 SBR
Puducherry Contstruction
6 Reddiarpalya Kanaganeri, Under 17 SBR
m, Reddiarpalyam, Contstruction
Puducherry Puducherry

4.27 STPs AT PUNJAB


Punjab has 86 numbers of sewage treatment plants having treatment capacity of
1245.45MLD. 04 STPs of capacity 15.2 are Non-Operational, 31 STPs of capacity 276.7
MLD are Under Construction and 13 STPs of capacity 32.1 MLD are proposed. Details of
STPs of Punjab are shown in Table 25.
Table 25: STPs-Punjab
SI. No. City/ Town STP location STP Status STP Techno- Consent
commissione (Operational/ installed logy(UASB status
d in (Year) Non- capacity /ASP/ OP/
operational/ SBR/ MBR/
under FAB etc.
construction
1 Ludhiana Bhattian 2007 Operational 111 UASB Not
Obtained
2 Ludhiana Bhattian 2012 Operational 50 SBR Not
Obtained
3 Ludhiana Jamalpur 2008 Operational 48 UASB Not
Obtained

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 44


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

SI. No. City/ Town STP location STP Status STP Techno- Consent
commissione (Operational/ installed logy(UASB status
d in (Year) Non- capacity /ASP/ OP/
operational/ SBR/ MBR/
under FAB etc.
construction
4 Ludhiana Baloke 2008 Operational 152 UASB Not
Obtained
5 Ludhiana Baloke 2011 Operational 105 SBR Consent to
operate
under
Water Act,
1974 had
been
expired on
15.03.2012
.
6 Nawanshahr Village Under 6 SBR Not
Gujarpur Construction Applied
7 Banga At Happowal Under 3 SBR Not
Road Banga Construction Applied
Information Under
8 Hoshiarpur Jalandhar 30 MBBR Not
Byepass not provided Construction Applied
9 Tanda At Tanda to Under 4 MBBR Not
Miani Road Construction Applied
10 Mukerian Village Under 4 MBBR Not
Attalgarh Construction Applied
11 Dasuya Near Model 2013 Operational 4 Waste Not
Town, Dasuya Stablizatio Applied
(Dasuya to n Ponds
Miani Road)
12 Sham Sham Churasi - Under 1 Waste Not
Churasi Information Construction Stablizatio Applied
not provided n Ponds
13 BBMB BBMB 2013 Operational 8 SBR Granted
Township, Township
Talwara
14 Municipal Fazilka 2007 Operational 8 WSP Not
Council, obtained
Fazilka
15 Municipal Abohar Yet to Under 25 SBR Not
Council, commission construction obtained
Abohar,
Distt. Fazilka

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 45


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

SI. No. City/ Town STP location STP Status STP Techno- Consent
commissione (Operational/ installed logy(UASB status
d in (Year) Non- capacity /ASP/ OP/
operational/ SBR/ MBR/
under FAB etc.
construction
16 Municipal Jalalabad (w) 2013 Operational 8 MBBR Not
Council, obtained
Jalalabad
(w), Distt.
Fazilka
17 Municipal Talwandi Bhai Yet to Under 4 MBBR Not
Council, commission construction obtained
Talwand
Bhai, Distt.
Ferozepur
18 Municipal Zira 2014 Operational 8 MBBR Not
Council, obtained
Zira, Distt.
Ferozepur
19 Nagar Makhu Yet to Under 4 MBBR Not
Panchayat, commission construction obtained
Makhu,
Distt.
Ferozepur
20 Municipal Moga 2013 Operational 27 SBR Not
Corporation, obtained
Moga
21 Municipal Dharmkot Yet to Under 4 MBBR Not
Council, commission construction obtained
Dharamkot,
Distt. Moga
22 Municipal Bathinda 2013 Operational 52 SBR Not applied
Corporation, /obtained
Bathinda
23 Municipal Rampura 2012 Operational 7.5 MBBR Not applied
Council, /obtained
Rampura
Phul
24 Municipal Bhucho 2013 Operational 3 OP Not applied
Council, /obtained
Bhucho
Mandi

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 46


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

SI. No. City/ Town STP location STP Status STP Techno- Consent
commissione (Operational/ installed logy(UASB status
d in (Year) Non- capacity /ASP/ OP/
operational/ SBR/ MBR/
under FAB etc.
construction
25 Nagar Kotfatta 2014 Operational 1.5 OP Not applied
Panchayat,K /obtained
otfatta
26 Municipal Maur Not Under N.A. NA Not applied
Council,Mou installed construction /obtained
r
27 Municipal Raman Mandi Not Under N.A. NA Not applied
Council,Ram installed construction /obtained
an Mandi
28 Municipal Sangat Not Not yet 1.5 OP Not applied
Council,Sang commission operated /obtained
at Mandi ed yet
29 Municipal Goniana 2013 Operational 3 OP Applied
Council,Goni and under
ana process
30 Nagar Talwandi Sabo 2013 Operational 3 SBR Not applied
Panchayat, /obtained
Talwandi
Sabo
31 Balamgarh 2012 Non 3.5 MBBR Not applied
Road Operational /obtained
32 Municipal Balamgarh 2012 Non 5.7 MBBR Not applied
Council,Muk Road Operational /obtained
33 atsar Jalaalabad Road 2012 Operational 8.7 MBBR Not applied
/obtained
34 Municipal Malout Not Under N.A. NA Not applied
Council,Mal commission construction /obtained
out ed yet
35 Municipal Gidderbaha Not Under N.A. NA Not applied
Council,Gidd commission construction /obtained
erbaha ed yet
36 Nagar Bariwala Not Construction N.A. NA Not applied
Panchayat,Ba installed not yet started /obtained
ri Wala
37 Municipal Mansa 2014 Operational 14 MBBR Not applied
Council,Man /obtained
sa
38 Municipal Budhlada 2014 Operational 6.5 MBBR Not applied
Council,Bud /obtained

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 47


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

SI. No. City/ Town STP location STP Status STP Techno- Consent
commissione (Operational/ installed logy(UASB status
d in (Year) Non- capacity /ASP/ OP/
operational/ SBR/ MBR/
under FAB etc.
construction
hlada

39 Municipal Bareta Not Not yet N.A. OP Not applied


Council,Bare commission operated /obtained
ta ed yet
40 Nagar Sardulgarh 2014 Operational 4 OP Not applied
Panchayat, /obtained
Sardulgarh
41 Nagar Bhikhi 2014 Operational 3 OP Not applied
Panchayat, /obtained
Bhikhi
42 Sri Near village 2014 Non- 1 Stabilizatio Not
Hargobindpu Rampur, operational n Ponds obtained
r Talwara
43 Dera Baba Dera Baba 2014 Operational 1.5 Stabilizatio Not
Nanak Nanak n Ponds obtained
44 Pathankot Near ladochak 2014 Under 27 SBR Not
village construction obtained
45 Samana Sehajpura 2010 Operational 10 SBR Not
Distt. Patiala Road, Samana obtained
46 Adampur Adampur - Proposed 4 -
47 Alawalpur Adampur Information Proposed 1 -
not provided
-
48 Nakodar Nakodar 31.10.2014 Under 6 SBR
construction Informatio
49 Nurmahal Nurmahal Proposed 4 - n not
50 Shahkot Shahkot Information Proposed 3 - provided
not provided
51 Goraya Goraya Proposed 4 -
52 Phillaur 2001 Operational 2.6 Duckweed
53 Phillaur 30.09.2014 Under 3 SBR
construction
54 Lohian Lohian - Proposed 1.5 -

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 48


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

SI. No. City/ Town STP location STP Status STP Techno- Consent
commissione (Operational/ installed logy(UASB status
d in (Year) Non- capacity /ASP/ OP/
operational/ SBR/ MBR/
under FAB etc.
construction
55 Phagwara Phagwara 2008 Operational 20 UASB
56 2014 Under 8 MBBR
stabilization
57 30.09.2014 Under 8 MBBR
construction
58 Jalandhar Jalandhar 2008 Operational 100 UASB
Pholriwal
59 Pholriwal 2011 Operational 25 SBR
60 Pholriwal 30.09.2014 Under 25 SBR
construction
61 STP on 30.06.2014 Under 50 SBR
Kapurthala stabilization
Road, Jalandhar

62 at Jaitewali, 30.09.2014 Under 25 SBR


Hoshiarpur construction
Road, Jalandha Informatio
n not
63 STP at 31.10.2014 Under 10 SBR
provided
Bhambiawali, construction
G.T Road,
Jalandhar
64 Kartarpur Kartarpur - Proposed 4 -
65 Kapurthala Kapurthala 2006 Operational 25 UASB
66 Bholath Bholath 05.02.2014 Under 4 WSP
stabilization
67 Bhogpur Bhogpur - Proposed 4

68 Begowal Begowal 30.07.2014 Under 2.5 SBR


construction
69 Sultanpur Sultanpur 2003 Operational 2.6 WSP
Lodhi Lodhi-I
70 Sultanpur Information Proposed 2.6 Informatio
Lodhi-II not provided n not
71 Dhilwan Dhilwan Proposed 2.5 provided

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 49


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

SI. No. City/ Town STP location STP Status STP Techno- Consent
commissione (Operational/ installed logy(UASB status
d in (Year) Non- capacity /ASP/ OP/
operational/ SBR/ MBR/
under FAB etc.
construction
72 Naya Nangal Naya Nangal 1994 Operational 8 Not
ASP Obtained
73 BBMB Naya Nangal 1991 Operational 6.75 Obtained,
Township expired on
ASP 31/03/2010
74 Naya Nangal Naya Nangal Under 5
Construction
Informatio
Information (Likely to be
n not
not provided commissioned
by 30/09/2014) provided
MBBR
75 Anandpur Anandpur Sahib Feb, 2010 Operational 8 Obtained,
Sahib expired on
31/12/2013
MBBR
76 Zirakpur Village Sept, 2013 Operational 17.3 Obtained
Singhpura,
Tehsil Dera
Bassi. SBR
77 Roopnagar Vill Badi 1/7/2013 Operational 10 Not
Haveli SBR obtained
78 Roopnagar Vill Sadabarat About 2-3 Operational 2 Not
weeks back SBR obtained
79 Roopnagar Vill Rasoolpur About 2 Operational 2.5 Not
months back SBR obtained
80
Under
construction
(90 % work
completed)
Bela Road, (Likely to be
Chamkaur Chamkaur commissioned
Sahib Sahib by 30/09/2014) 1.7 SBR
81 Kharar Kharar Under 11 SBR
construction Informatio
Information (60 % work n not
not provided completed) provided
82 Kurali Kurali Information Construction 5 SBR Informatio
not provided almost n not
complete provided

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 50


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

SI. No. City/ Town STP location STP Status STP Techno- Consent
commissione (Operational/ installed logy(UASB status
d in (Year) Non- capacity /ASP/ OP/
operational/ SBR/ MBR/
under FAB etc.
construction
83 Jaula Kalan Jaula Kalan Under Informat Oxidation
construction ion not pond based
provided on settled
sewage
system
84 Lalru Lalru Under 1.5 SBR
construction,
will be
commissioned
within 06
months
85 Mohali Mohali 9/9/2009 Operational 45 UASB Not
obtained
86 Machhiwara Machhiwara, Yet to be Under 4 SBR NA
Ludhiana commission construction
ed

4.28
STPs AT RAJASTHAN
In Rajasthan, there are 63 numbers of sewage treatment plants with capacity of 865.92 MLD.
Out of 63 STPs, 11 STPs of capacity 149.3 MLD are Under Construction and 36 STPs of
capacity 322.12 MLD are proposed. Details of STPs of Rajasthan are shown in Table 26.
Table 26: STPs-Rajasthan
Status Technolog
STP
STP (Operational/ y (UASB /
Installe
Commissio Non- ASP / OP / Consent
Sl. No City/town STP Location d
ned in Operational/U SBR / Status
Capacit
(Year) nder MBR/
y MLD
Construction) FAB Etc.)

Swaran Jayanti
Park, Vidyadhar CTO
1 Nagar 2014 Operational 1 MBBR 04.03.2014
CTO
2 Jaipur Gajodhar Pura 2013 Operational 30 ASP 09.09.2013
CTO
3 Amer Road 2008 Operational 27 ASP 1.8.2007
CTO
4 Delawas-I 2006 Operational 62.5 ASP 25.02.2010

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 51


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Status Technolog
STP
STP (Operational/ y (UASB /
Installe
Commissio Non- ASP / OP / Consent
Sl. No City/town STP Location d
ned in Operational/U SBR / Status
Capacit
(Year) nder MBR/
y MLD
Construction) FAB Etc.)
CTO
5 Delawas-II 2010 Operational 62.5 ASP 01.07.2011
Jaisinghpura CTO
6 Khor 2010 Operational 50 ASP 16.06.2011
Under CTE
7 Central Park Information Construction 1 MBBR 13.07.2010
not provided Under CTE
8 Ralawata Construction 30 ASP 17.08.2010
CTO
9 Jawahar Circle 2010 Operational 1 MBBR 03.06.2010
Application
for
Informatio CTE/CTO
10 Sahakar Marg Information Proposed 2 not applied
n not
not provided
provided Application
not
11 Talkatora Proposed 1 submitted
JDA Ramniwas CTO
12 Garden 2011 Operational 1 MBBR 26.04.2011
Agayara CTO
13 Ramgarh 2012 Operational 20 WSP 17.01.2013
Alwar
CTO
14 Bhiwadi 2012 Operational 4 SBR 26.03.2012
Anaeobic
&
Facultative CTE
Information
15 PHED Nandari Operational 20 Ponds 31.01.2007
not provided
Jodhpur CTE Under
Salawas (Phase Considerati
16 - II) Proposed 50 ASP on
Salawa (Phase - CTE
17 I) 2011 Operational 50 ASP 29.10.2012
Facultative
Sawaimadhp stabilizatio CTO
18 ur Sawaimadhopur 2012 Operational 10 n Ponds 26.10.2012

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 52


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Status Technolog
STP
STP (Operational/ y (UASB /
Installe
Commissio Non- ASP / OP / Consent
Sl. No City/town STP Location d
ned in Operational/U SBR / Status
Capacit
(Year) nder MBR/
y MLD
Construction) FAB Etc.)
CTO
application
dated
Anaerobic 29.03.2012
Lagoors under
Vallabha Fceulative constructio
19 Bikaner Garden 2007 Operational 20 lessons n
Bhilwara Information CTE
20 Sewage not provided Proposed 4.5 ASP 27.05.2013
CTO
Bhilwara issued
21 Bhilwara Sewage 2012 Operational 5.5 ASP 6.12.2012
CTO
22 Udaipur Eklingpura, 2014 Operational 20 MBBR 11.03.2014
PHED CTE
23 Pratappura Proposed 5 UASBR 30.07.2012
Rajsamand Application
Informatio for
n not CTE/CTO
24 Nathdwara Constructed 4.3 provided not applied
CTE
Kishopura, Under 31.010.201
25 Ladpura Construction 30 SBR 2
Under CTE
26 Kota Balita Ladpura Information Construction 6 SBR 26.10.2012
Dad Devi Road, not provided Application
Village Dhakad Informatio for
Kheri, Tehsil n not CTE/CTO
27 Ladpura Constructed 20 provided not applied
Anaerobic
&
Under Facultative CTE
28 Jaisalmer Kisan Ghat Construction 10 Ponds 22.02.2013
Anaerobic
&
Ajmer
Under Facultative CTE
29 Kishangar Construction 10 Ponds 13.05.2009

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 53


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Status Technolog
STP
STP (Operational/ y (UASB /
Installe
Commissio Non- ASP / OP / Consent
Sl. No City/town STP Location d
ned in Operational/U SBR / Status
Capacit
(Year) nder MBR/
y MLD
Construction) FAB Etc.)
Waste
Ganahera stabilizatio CTE
30 Pushkar Proposed 3.5 n ponds 17.08.2012
CTE
31 Anasagar Proposed 13 ASP 22.08.2012
CTE
32 Khanpura Proposed 40 ASP 26.10.2012
Under CTE
33 Khanpura Construction 20 ASP 12.04.2006
Tagawali
Village
Rajkhera,
Dholpur RUIDP Under CTE
34 Dholpur STP Construction 10 UASB 19.09.2012
Waste
Under stabilizatio CTE
35 Bundi Devpura Construction 8 n ponds 31.07.2012
Waste
Pali Information stabilizatio CTE
36 Sumerpur Pali not provided Proposed 10 n ponds 19.09.2012
Waste CTE Under
stabilizatio Considerati
37 Jalore Jalore Proposed 10 n ponds on
CTE
38 Didwana Proposed 5 SBR 23.09.2014
Nagor Waste
stabilizatio CTE
39 Balwa Road Proposed 8 n ponds 19.09.2012
Waste
stabilizatio CTE
40 Barmer Barmer Proposed 10 n ponds 19.09.2012
CTE
41 Karoli Karoli Proposed 5 UASB 07.08.2012
CTE
42 Bharatpur Gopal Nangla Proposed 8 SBR 13.08.2012

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 54


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Status Technolog
STP
STP (Operational/ y (UASB /
Installe
Commissio Non- ASP / OP / Consent
Sl. No City/town STP Location d
ned in Operational/U SBR / Status
Capacit
(Year) nder MBR/
y MLD
Construction) FAB Etc.)
CTE
43 Chittorgarh Bhoikhera Proposed 5 UASB 20.01.2012
CTE issued
44 Sirohi Mont Abu Proposed 6 ASP 17.08.2012
Fatehpur CTE
45 Shekhawati Proposed 7.5 SBR 19.09.2013
Application
Informatio for
Nani Beed n not CTE/CTO
46 Sikar Proposed 10 provided not applied
Sikar
Application
Informatio for
Devipura Beed n not CTE/CTO
47 Sikar Proposed 5 provided not applied
CTE
48 Sikar Proposed 10 UASB 26.10.2012
Bagar Road Information CTE Under
Muncipal not provided Considerati
49 Jhunjhunu Council Proposed 8.5 UASB on
CTE
50 Gaisar Churu Proposed 7 WSP 13.08.2012
Waste
Churu Nagar Palika stabilizatio CTE
51 Sardar Shar Proposed 4 n ponds 19.09.2012
Nagar Palika CTE
52 Sardar Shar Proposed 9.6 WSP 19.09.2012
Nathaniya CTE
53 Bikaner Village Proposed 12 MBBR 22.08.2012
Abhohar
Hanumangar Bypass Near Waste
h Railway Track, stabilizatio CTE
54 Hanuman Jun. Proposed 7.5 n ponds 21.09.2012

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 55


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Status Technolog
STP
STP (Operational/ y (UASB /
Installe
Commissio Non- ASP / OP / Consent
Sl. No City/town STP Location d
ned in Operational/U SBR / Status
Capacit
(Year) nder MBR/
y MLD
Construction) FAB Etc.)
upflow
anaerobic
sludge
Near blanket
Ganganagar followed
Road Chak by holding CTE
55 3KNT Proposed 5 ponds 19.09.2012
CTE issued
56 Jhalrapatan Proposed 3 WSP 24.01.2013
Jhalawar
CTE issued
57 Jhalrapatan Proposed 6 ASP 04.04.2013
Septic tank
with
anaerobic CTE
58 Tonk Tonk Proposed 1.016 Filter 03.05.2011
CTE
59 Nagur Makarana Proposed 6 SBR 03.09.2013
Information
CTE Under
not provided
Considerati
60 Suratgarh Road Proposed 10 ASP on
CTE Under
Sriganganaga
Considerati
r
61 Idagah Ponding Proposed 10 ASP on
CTE Under
Sugar Mil Considerati
62 Ponding Proposed 15 ASP on
CTE Under
Considerati
63 Balotra Balotra Proposed 9 SBR on

4.29 STPs AT SIKKIM


Sikkim has 11numbers of sewage treatment plants having treatment capacity of 31.88MLD.
01 STP of capacity 05 MLD is Non-Operational at Adampool in Gangtok, 09 STPs of
capacity 18.11 MLD are Under Construction. Details of STPs of Sikkim are shown in Table
27.
Table 27: STPs-Sikkim

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 56


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Sl. No City/town STP Location STP Status STP Technolog Consent


Commissio (Operational/ Installe y (UASB / Status
ned in Non- d ASP / OP /
(Year) Operational/U Capacit SBR /
nder y MLD MBR/
Construction) FAB Etc.)
Non Trickling
1 Adampool 1987 Operational 5 Filter
2 Adampool 2011 Operational 8 FAB
Under
3 Adampool Construction 4.69 FAB
Gangtok Under
4 Lower Sichey Construction 3.9 FAB
Under
5 Rainpool Construction 1.27 MBR
Under Informatio
6 Lower Syari Construction 1.6 SBR n not
Information Under provided
7 Singtam Singtam not provided Construction 0.66 MBR
Under
8 Rangpo Rangpo Construction 0.96 MBR
under
9 Namchi Namchi Construction 3.62 FAB
under
10 Jorethang Jorethang Construction 1.7 WSP
Under
11 Melli Melli Construction 0.48 MBR

4.30
STPs AT TAMILNADU
Tamil Nadu has 73numbers of sewage treatment plants having treatment capacity of
1799.72MLD. 01 STP of capacity 5.17 MLD is Non-Operational at Virapalayam in Erode
district, 28 STPs of capacity 521.08 MLD are Under Construction and 11 STPs of capacity
132.64 MLD are proposed. Details of STPs of Tamil Nadu are shown in Table 28.
Table 28: STPs-Tamil Nadu
Status Technolog
STP
STP (Operational/ y (UASB /
Installe
Commissio Non- ASP / OP / Consent
Sl. No City/town STP Location d
ned in Operational/U SBR / Status
Capacit
(Year) nder MBR/
y MLD
Construction) FAB Etc.)
Sewage Information Under Informatio
7 STP
1 Ambattur Treatment Plant not provided construction n not
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 57
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Status Technolog
STP
STP (Operational/ y (UASB /
Installe
Commissio Non- ASP / OP / Consent
Sl. No City/town STP Location d
ned in Operational/U SBR / Status
Capacit
(Year) nder MBR/
y MLD
Construction) FAB Etc.)
Pumping provided
Station, TNHB
Colony,
Ayapakkam
M/s.Sewage Convention
Treatment plant al activated
for perambalur sludge
Municipality, process
Perambalur Under with
2 District Operation 4.20 aeration
Ariyalur
M/s.Ariyalur Convention
Municipality al activated
Sewage sludge
Treatment process
Plant, Ariyalur Under with
3 Distrct construction 4.16 aeration
Kondungaiyur Cconventio Informatio
4 (a) Information In operation 110 nal n not
not provided Cconventio provided
5 (b) In operation 80 nal
Cconventio
6 © In operation 80 nal
Cconventio
7 Koyambedu (a) In operation 60 nal
Chennai Under Cconventio
8 (b) construction 120 nal
Cconventio
9 © In operation 34 nal
Cconventio
10 Nesapakkam (a) In operation 40 nal
Cconventio
11 (b) In operation 54 nal
Information Cconventio Informatio
12 © not provided In operation 23 nal n not

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 58


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Status Technolog
STP
STP (Operational/ y (UASB /
Installe
Commissio Non- ASP / OP / Consent
Sl. No City/town STP Location d
ned in Operational/U SBR / Status
Capacit
(Year) nder MBR/
y MLD
Construction) FAB Etc.)
M/s.Sewage provided
Treatment plant
P N Palayam
Coimbatore (N)
T.K.,
Coimbatore Coimbatore Not Yet Cconventio
13 North District Establishment 3.53 nal
M/s.CBE
CORPORATIO
N STP AT
UKKADAM,
Ukkadam , Sequential
Coimbatore Batch
south , In operational Reactor
14 Coimbatore Condition 70 (SBR)
M/s.CBE
CORPORATIO
N STP AT CTE of the
NANJUNDAP Board stayed Sequential
Coimbatore URAM, by Honourable Batch
South Uppilipalayam, High Court of Reactor
15 Coimbatore Madras 40 (SBR)
M/s.SEWAGE
TREATMENT Sequential
PLANT Batch
ONDIUDUR, Construction Reactor
16 Coimbatore under process 60 (SBR)
M/s.POLLACH
I MUNICIPAL
SEWAGE Construction Sequential
TREATMENT under process Batch
Informatio
PLANT, Information Reactor
n not
17 Coimbatore not provided 11.5 (SBR)
provided
M/s.DINDIGU
L Activated
CORPORATIO Under Sludge
18 Dindigul N Operation 13.5 Process

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 59


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Status Technolog
STP
STP (Operational/ y (UASB /
Installe
Commissio Non- ASP / OP / Consent
Sl. No City/town STP Location d
ned in Operational/U SBR / Status
Capacit
(Year) nder MBR/
y MLD
Construction) FAB Etc.)
UASB Sewage
Treatment Anaerobic
Plant, Presently not Treatment
Vairapalayam, under with UASB
19 Erode District operation 5.17 technology
Erode City
Erode Municipal Aerobic
Corporation. treated
Sewage with
Treatment Civil Moving
Plant, construction Bed Bio
Peelamedu works under Reactor
20 Village, Erode progress 50.55 technology
(Conventio
Dharmapuri nal)
Municipality Biological
21 UGSS System In operation 4.860 Treatment
Hosur
(Conventio
nal)
Krishnagiri Under Biological
22 Municipality Operation 9.19 Treatment

Madurai
Corporation
STP
Sakkimangalam
STP Aringar
Anna Maligai
Informatio
Tallakulam Information
Madurai n not
23 Madurai not provided In Operation 45.7 SBR
provided
Madurai
Corporation
STP
Avaniapuram
STP Aringar
Anna Maligai,
24 Madurai In Operation 125 SBR

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 60


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Status Technolog
STP
STP (Operational/ y (UASB /
Installe
Commissio Non- ASP / OP / Consent
Sl. No City/town STP Location d
ned in Operational/U SBR / Status
Capacit
(Year) nder MBR/
y MLD
Construction) FAB Etc.)
Cycli
Activated
Sludge.
Based on
Under
Sequential
construction
batch
M/s.Tambaram reactor
Municipality - (CAS/SBR
25 Common STP 30 )
Cycli
M/s.Chennai Activated
Metropolitan Sludge.
Water Supply Based on
Under
and Sewage Sequential
construction
Board - batch
Common STP reactor
at (CAS/SBR
26 M.M.Nagar Sholinganallur 18 )
M/s.Chennai
Metropolitan
Water Supply
and Sewage
Board - New Activated
Perungudi 54 Sludge
27 MLD STP In Operation 54 Process Informatio
M/s.Chennai Information
n not
Metropolitan not provided
provided
Water Supply
and Sewage
Board - New
Perungudi 54
MLD STP Activated
Phase II (60 Sludge
28 MLD) In Operation 60 Process

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 61


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Status Technolog
STP
STP (Operational/ y (UASB /
Installe
Commissio Non- ASP / OP / Consent
Sl. No City/town STP Location d
ned in Operational/U SBR / Status
Capacit
(Year) nder MBR/
y MLD
Construction) FAB Etc.)
M/s.SEWAGE
TREATMENT
PLANT of
Alandur Activated
Municipality @ Sludge
29 Perungudi In Operation 12 Process
M/s.SEWAGE
TREATMENT
PLANT
Maraimalai Activated
Nagar Sludge
30 Municipality In Operation 2.2 Process

M/s.CMWSSB Under Activated


Navalur Sewage construction Sludge
31 Treatment Plant 6 Process
M/s.Nagappatin
am Under
Municipality construction
Nagapattina STP at Convention
32 m Nagapattinam 9.63 al

Underground Information Information


Sewage System not provided not provided
to Nagercoil
Municipality, STP
Agastheeswara Proposed.
m Taluk, Extended
Kanyakumari To be Aeration
33 Nagercoil Dist Commissioned 20.86 Process
Convention
al
(Activated
Namakkal Yes, STP in sludge
34 Namakkal municipality Operation 1.5 process)

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 62


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Status Technolog
STP
STP (Operational/ y (UASB /
Installe
Commissio Non- ASP / OP / Consent
Sl. No City/town STP Location d
ned in Operational/U SBR / Status
Capacit
(Year) nder MBR/
y MLD
Construction) FAB Etc.)

WSP
Techonology
Sewage Construction
Treatment Plant stoped due to Convention
, Bhavani public al &
Perundurai
35 Municipality agitation 3.94 Treatment
Perundurai
Town
Panchayat Convention
Sewage Construction al &
36 Treatment Plant under progress 3.07 Treatment
Pudukkottai
Pudukkottai Municipality Activated
STP (Under Not yet Sludge
37 Construction) commissioned 10.62 Process
Activated
Sludge
Sivagangai Not et Process
38 Municipality established 4.92 System
Activated
Sludge
Sivagangai Informatio
Ramanathapura Information Process
39 m Municipality n not
not provided In Operation 8.19 system
provided
Activated
Muthukulathur Sludge
Town Not yet Process
40 Panchayat established 2.415 system
M/s.Thanjavur
Municipality
Sewage
Tanjavur Treatment Plant Convention
, Tanjavur al
(Aeration
41 In Operation 44.67 pond)

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 63


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Status Technolog
STP
STP (Operational/ y (UASB /
Installe
Commissio Non- ASP / OP / Consent
Sl. No City/town STP Location d
ned in Operational/U SBR / Status
Capacit
(Year) nder MBR/
y MLD
Construction) FAB Etc.)
M/s.Kumbakon
am
Municipality
Sewage Convention
Treatment Plant al
- Tajnavur Dist (Aeration
42 In Operation 17 pond)
M/S
Underground
Sewerage
Scheme To Convention
Vallam Town al
Panchayat, (Aeration
43 Thanjavur. Proposed 2.3 pond)
M/s.CHINNAM Extended
ANUR Aeration
MUNICIPALIT System
Y SEWAGE (Activated
TREATMENT Sludge
PLANT , Process)
UTHAMAPAL Information Informatio
AYAM n not
not provided
TALUK, Theni provided
44 CTO Issued 3.99
THENI M/s.THENI - CTE Issued Extended
ALLINAGARA Aeration
M System
MUNICIPALIT (Activated
Y SEWAGE Sludge
TREATMENT Process)
PLANT,
S.F.No.107,The
ni-Allinagaram,
Theni Taluk,
45 15.1

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 64


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Status Technolog
STP
STP (Operational/ y (UASB /
Installe
Commissio Non- ASP / OP / Consent
Sl. No City/town STP Location d
ned in Operational/U SBR / Status
Capacit
(Year) nder MBR/
y MLD
Construction) FAB Etc.)
In Operation 8.7 Activated
Sludge
Process
Tiruvannama
followed
lai
Tiruvannamalai by
Municipality Disinfectio
46 STP. n
Activated
M/s. New sludge
Tirupur Area process
Development (Extended
Tiruppur Corporation Aeration
47 North Ltd., Tiruppur In operation. 15 System)

UDUMALPET Construction Activated


Tiruppur MUNICIPALIT Informatio
Information works are Sludge
48 South Y - STP n not
not provided under progress 7.81 Process
Sequential provided
Batch
Reactor
Technolog
49 STP Avadi Under CTE 36 y
Sewage
Tiruvallur Treatment Plant
Thirumazhisai Extended
Town Aeration
50 Panchayat Under CTE 3 Process
Common STP –
UGSS, DPR – Under MBBR
51 Tiruvallur Process 6.2 System
Biological
52 Udhagamand Kandal STP Operation 5 method
alam Minigarden Information Biological Information
53 STP not provided Operation 2 method

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 65


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Status Technolog
STP
STP (Operational/ y (UASB /
Installe
Commissio Non- ASP / OP / Consent
Sl. No City/town STP Location d
ned in Operational/U SBR / Status
Capacit
(Year) nder MBR/
y MLD
Construction) FAB Etc.)
The STP is not provided
nearing
completion.
Conveyance
Vellore City works are
Corporation under progress.
STP The trial run of Convention
STP is al
proposed Activated
within a 10.72 Sludge
54 VELLORE month. MLD Process
M/s Villupuram Proposed
Municipality Unit
UGSS with STP
Zone - I,
Kakuppam
Village,
Villupuram
55 Proposed Unit 9
Villupuram M/s Villupuram
Municipality
UGSS Zone II
S.F.No.
86/1,Erumanant
hangal Village,
Villupuram
Taluk
Villupuram Proposed
56 District Proposed Unit 3.5 Unit
MANKUTTAI Proposed Collection
SEWAGE Aeration
TREATME Chlorinatio Informatio
PLANT, Salem Information n
Salem n not
Corporation , not provided
provided
Salem
57 35

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 66


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Status Technolog
STP
STP (Operational/ y (UASB /
Installe
Commissio Non- ASP / OP / Consent
Sl. No City/town STP Location d
ned in Operational/U SBR / Status
Capacit
(Year) nder MBR/
y MLD
Construction) FAB Etc.)
VANDIPETTA Proposed Collection
I SEWAGE Aeration
TREATMENT Chlorinatio
PLANT, Salem n
58 44
VELLAKUTT Proposed Collection
AI SEWAGE Aeration
TREATMENT Chlorinatio
PLANT , Salem n
Corporation ,
Salem
59 23
ANAIMEDU Proposed Collection
SEWAGE Aeration
TREATMENT Chlorinatio
PLANT, Salem n
60 6
METTUR Proposed Collection
MUNICIPALIT Aeration
Y STP, Salem Chlorinatio
61 5.5 n
METTUR Proposed Collection
MUNICIPALIT Aeration
Y STP SALEM Chlorinatio
CAMP, City n
S.No:2, Mettur
Information Information
62 not provided 1 not provided
METTUR Proposed Collection
MUNICIPALIT Aeration
Y STP NEAR Chlorinatio
MTPS, Salem n
63 1

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 67


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Status Technolog
STP
STP (Operational/ y (UASB /
Installe
Commissio Non- ASP / OP / Consent
Sl. No City/town STP Location d
ned in Operational/U SBR / Status
Capacit
(Year) nder MBR/
y MLD
Construction) FAB Etc.)
JALAKANDA Proposed Collection
PURAM Aeration
SEWAGE Chlorinatio
TREATMENT n
PLANT,
Jalakandapuram
, Salem
64 2.34
Pre-
treatment
systems,
Anaerobic
ponds,
Trichy Facultative
Corporation Under Ponds, and
Sewage Operational Polishing
65 TRICHY treatment Plant Condition 88.64 Ponds
Sewage
Treatment Convention
Plant, Karur Under al Aeration
66 Karur Municipality, operation 15 Pond
Biological
Tirunelveli City treatment
Municipal (Activated
Corporation Sludge
67 Tirunelveli STP In operation 24.2 process)
Waste
Sewage Stabilisatio
Treatment Plant n Pond
Information In operation Information
68 Kancheepuram 14.71 system
Sriperumbud not provided not provided
ur Sequential
Batch
STP Town Reactor
Panchayat STP yet to be (SBR)
69 Sriperumbudur, installed 8.5 technology
Thoothukudi
Thoothukudi Municipal Project under
70 Corporation execution 27 MBR

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 68


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Status Technolog
STP
STP (Operational/ y (UASB /
Installe
Commissio Non- ASP / OP / Consent
Sl. No City/town STP Location d
ned in Operational/U SBR / Status
Capacit
(Year) nder MBR/
y MLD
Construction) FAB Etc.)
Alwarthirunaga
ri Town Project under Convention
71 Panchayat execution 1.23 al
Cuddalore Under Aerobic
72 Cuddalore Municipality Construction 12.25 Treatment
ETP is
receiving
effluent from
partial area out Activated
TWAD Board of 7.65 MLD Sludge
Underground expected only process
Virudhunaga sewer system 0.5MLD is Technolog
73 r STP Received 8.37 y

4.31
STPs AT TELANGANA
Telangana has 18 numbers of sewage treatment plants having treatment capacity of 685.8
MLD. 01 STP of capacity 51 MLD is Under Construction at Attapur in Greater Hyderabad.
Details of STPs of Telangana are shown in Table 29.
Table 29: STPs-Telangana
Sl. No City/town STP Location STP Status STP Technolog Consent
Commissio (Operational/ Installe y (UASB / Status
ned in Non- d ASP / OP /
(Year) Operational/U Capacit SBR /
nder y MLD MBR/
Construction) FAB Etc.)
1 Amberpet Operational 339

2 Attapur Under 51
Contstruction
3 Durgamcheruvu Operational 5
Informatio Informatio
Greater Information
n not n not
4 Hyderabad Kattendan, RR not provided Operational 4 provided provided
District
5 Kukatpally Operational 12
6 Langar house Operational 1.2
7 Miralam tank Operational 10
8 Nagole Operational 172
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 69
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

9 Nallacheruvu Operational 30
(Uppal)
10 Necklace road Operational 20
(Khairtabad)
11 Peddachruvu Operational 10
(Nacharam)
12 Safilguda Operational 0.6
13 Saroornagar Operational 2.5
14 Bhadrachala Bhadrachalam Operational 4
m
15 Ramagunda Malkapur, Operational 14
m Godavarikani
16 Ramagundam Operational 4
17 Manchiryala Reddy colony Operational 4

18 Saikunta Operational 2.5

4.32 STPs AT TRIPURA


Tripura has 01 STPof treatment capacity 0.045 MLD. Details of STPs of Tripura are shown in
Table 30.
Table 30: STPs-Tripura
Status Technolog
STP
STP (Operational/ y (UASB /
Installe
Commissio Non- ASP / OP / Consent
Sl. No City/town STP Location d
ned in Operational/U SBR / Status
Capacit
(Year) nder MBR/
y MLD
Construction) FAB Etc.)
Consent
Indian Check certificate
Post, Akhaura was issued
Border, on
1 Agartala 17.01.2014 Operational 0.045 MBBR 18.02.2014
4.33 STPs AT UTTAR PRADESH
Uttar Pradesh has 73 numbers of sewage treatment plants having treatment capacity of
2646.84 MLD. 07 STPs of capacity 89.59 MLD are Non-Operational,03 STPs of capacity 170
MLD are Under Construction and 01 STP of capacity 15 MLD is proposed. Details of STPs of
Uttar Pradesh are shown in Table 31.

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 70


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Table 31: STPs-Uttar Pradesh


Sl. No City/town STP Location STP Status STP Technolog Consent
Commissio (Operational/ Installe y (UASB / Status
ned in Non- d ASP / OP /
(Year) Operational/U Capacit SBR /
nder y MLD MBR/
Construction) FAB Etc.)
1 Boodhi Ka Operational 2.25 WSP Not
Nagla obtained
2 Pilakhar Operational 10 WSP Not
obtained
3 Dhandhupura Information Operational 78 UASB Not
not provided obtained
4 Jaganpur, Operational 14 UASB Not
Sikandarpur obtained
5 Bhim Nagri, Operational 12 UASB Not
Agra Devri Road. obtained
6 Sadarwan 2013 Operational 40 UASB Not
(Bichupri) obtained
7 Sadarwan 2014 Operational 36 UASB Not
(Bichupri) New obtained
8 Dhandhupura 2014 Operational 24 UASB Not
New obtained
9 Kalindi Vihar 2014 Operational 4.5 UASB Not
obtained
10 STP at near 2000 Operational 10.445 OP Not
Tiksi Mandir, obtained
Etawah (In
Yamuna Action
Etawah Plan)
11 STP at Mauza 2014 Trail run 13.5 OP Not applied
Umrain, Etawah complete but
(In State Sector presently Non-
and UIDSSMT) Operational
12 Mainpuri STP at Moja 2013 Not 23 UASB Not applied
Ordya, Padaria, Operational on
Mainpuri (In full capacity
State Sector and
UIDSSMT)

13 Kalidah, 0.5 Abanded Informatio


Information
Mathura Vrindavan n not
not provided
provided

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 71


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Sl. No City/town STP Location STP Status STP Technolog Consent


Commissio (Operational/ Installe y (UASB / Status
ned in Non- d ASP / OP /
(Year) Operational/U Capacit SBR /
nder y MLD MBR/
Construction) FAB Etc.)
14 Vrindavan Near Non- 4 OP Not applied
Pagal Baba Operational
Mandir
15 Masani 2006 Non- 13.59 OP Not applied
Operational
16 Trans Yamuna, 2006 Operational 14.5 OP Not applied
Jamunapar
17 Dinapur Operational 80 Trickling Not applied
Filter
18 Varanasi Bhagwanpur Operational 9.8 ASP Not applied
19 DLW, Information Operational 12 ASP Not applied
maduadih not provided
20 Sector-50 Operational 34 UASB
21 Sector-54 Operational 27 UASB Informatio
22 Sector-54 Operational 9 OP n not
provided
23 Sector-50 Operational 25 SBR
24 Sector-123 Operational 35 SBR
Noida
25 Sector-91 Information Operational 5 OP
26 Sector-54 not provided Operational 33 SBR
27 Sector-168 Operational 50 SBR
28 Kansa, Greater 2013 Operational 137 SBR Applied
Noida
29 Saharanpur Malhipur 2008 Operational 38 UASB Not applied
30 Muzaffarnag Muzaffarnagar 2008 Operational 32.5 OP Not applied
ar
31 STP Naini, Operational 80 ASP Not applied
Allahabad
32 Salori Operational 29 FAB Not applied
33 Rajapur, 2013 Operational 60 UASB & Not applied
Allahabad Aerated
Lagoon
Allahabad
34 Pongahat, 2013 Operational 10 BTR (Bio Not applied
Allahabad Tower
Reactor)
35 Numayadahi, 2013 Operational 50 BTR (Bio Not applied
Allahabad Tower
Reactor)
| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 72
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Sl. No City/town STP Location STP Status STP Technolog Consent


Commissio (Operational/ Installe y (UASB / Status
ned in Non- d ASP / OP /
(Year) Operational/U Capacit SBR /
nder y MLD MBR/
Construction) FAB Etc.)
36 Kodra, 2013 Operational 25 BTR (Bio Not applied
Allahabad Tower
Reactor)
37 Pakka Pokhara, Operational 14 UASB Not applied
Ramai Patti
38 WSB STP, Information Operational 4 WSP(Wast Not applied
Mirzapur
Vindhyanchal not provided e
Stabilizatio
n Pond)
39 Farrukhabad Farrukhabad 1992 Operational 2.7 OP Not applied
40 STP Jajmau 1989 Operational 5 UASB Not applied
41 STP Jajmau 1999 Operational 130 ASP Not applied
42 Bingava Proposed Operational 210 UASB Not applied
Kanpur(JNNUR Sept, 2014
M)
43 Kanpur Jajmau Proposed Operational 43 ASP Not applied
(JNNURM) Sept, 2014
44 Sajari Kanpur Proposed Operational 42 ASP Not applied
Dec., 2014
45 Baniyapur Proposed Proposed 15 UASB Not applied
Kanpur
46 Indirapuram 2001 Operational 56 UASB
Informatio
Trans Hindon
n not
47 Dudahera, 2001 Operational 70 UASB
provided
Vijay Nagar,
Sis Hindon
48 Indirapuram 2012 Operational 56 SBR Grant
Trans Hindon
49 Dudahera, 2012 Operational 56 SBR Grant
Ghaziabad Vijay Nagar,
Sis Hindon
50 Indirapuram 2012 Operational 74 SBR Informatio
Trans Hindon n not
provided
51 Govindpuram 2013 Operational 56 SBR Grant
Sis Hindon
52 Sadullabad, 2012 Operational 30 SBR Informatio
Loni n not

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 73


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Sl. No City/town STP Location STP Status STP Technolog Consent


Commissio (Operational/ Installe y (UASB / Status
ned in Non- d ASP / OP /
(Year) Operational/U Capacit SBR /
nder y MLD MBR/
Construction) FAB Etc.)
provided

53 Madhuban Yet to Construction 56 SBR


Babudham commission completed (
Yojna GZB. Sis Development
Hindon of Housing Informatio
Project is n not
under provided
Construction)
54 Morti Information Under 56 SBR
Ghaziabad Sis not provided Construction
Hindon
55 Doulatganj 2002 Operational 56 FAB Not applied
56 Bharwara 2011 Operational 345 UASBR Not applied
57 STP Near 2008 Operational 5 OP Not applied
Hathiya Nala
Sultanpur
58 Ahara Road, 2009 Operational 0.805 OP
Zone-A,
Anupshar
Bulandsahar
59 Ahara Road, 2009 Operational 1.75 OP
Zone-B,
Anupshar
60 MDA STP 2012 Operational 10 ASP
Ganganagar
61 MDA STP, 2012 Operational 6 ASP
Shradhapuri, Informatio
Phase-II n not
62 MDA STP 2012 Operational 6 ASP provided
Rakshapuram,
Meerut Meerut
63 MDA STP 2013 Operational 7 ASP
Sports
Complex, Delhi
Road, Meerut
64 MDA STP 2013 Operational 15 ASP
Sports
Vedvyaspuri,

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 74


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Sl. No City/town STP Location STP Status STP Technolog Consent


Commissio (Operational/ Installe y (UASB / Status
ned in Non- d ASP / OP /
(Year) Operational/U Capacit SBR /
nder y MLD MBR/
Construction) FAB Etc.)
Meerut
65 MDA STP 2012 Operational 7 ASP
Pallavpurm-I
66 MDA STP, 2012 Operational 6 ASP
Shradhapuri-I,
Phase-II
67 MDA STP 2011 Operational 15 ASP
Shatabdinagar
68 MDA STP Lohia 2011 Operational 10 ASP
Nagar, Hapur Information
Road, Meerut not provided
69 MDA STP 2007 Operational 1 ASP
Pandavnagar,
Meerut
70 MDA STP 2009 Operational 5 ASP
Pallavpurm-II,
Meerut
71 Rampur Road Under 58 SBR
Near Hanuman Information Contstruction
Murti Tiraha, not provided
Gulabbari
Moradabad
72 Mordabad Delhi 2012 Non Operational 20 ASP
Road,Vikas (non availability
Pradhikaran, of sewage) Information
not provided
MDA
73 Kemri Road 2014 Non Operational 15 UASB
(connectivity
Rampur problem due to
non availability
of sewage)

4.34 STPs AT UTTRAKHAND


Uttarakhand has the treatmentcapacity of 152.9 MLD and 24 numbers of STPs. Out of 24
STPs, 12 STPs having treatment capacity of 39.15 MLD are under construction and 02 STPs
of capacity 23 MLD are tendering under process. Details of STPs of Uttarakhand are shown in
Table 32.

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 75


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Table 32: STPs-Uttarakhand


Status Technology
STP (Operational/ STP (UASB /
STP Commissi Non- Installed ASP / OP /
Sl. No City/town Consent Status
Location oned in Operational/U Capacity SBR /
(Year) nder MLD MBR/ FAB
Construction) Etc.)
Working and in
1 Almora Bakh 2003-2004 Operational 2 MBBR use
Bhimtal Working and in
2 (Nainital) Bhimtal 2009-2010 Operational 1.25 UASB use
Settling
Tank with
tricking Working and in
3 Nainital Rushi 2009-2010 Operational 10 Filter use
Insufficient for
present
population,
25MLD
capacity is
4 Rishikesh lakkarghat 1984 Operational 6 OP being proposed
Scheme handed
over to
Near Bus Uttarakhand Jal
5 Srinagar Station 2009 Operational 3.5 FAB Sansthan
Swargashra
6 m Ved Niketan 2010 Operational 3 SBR Commissioned
Work is under
progress,
Informatio expected to be
Tapovan n not Under completed in
7 (Tehri) Tapovan provided Construction 3.5 SBR Dec 2014
Working and in
8 Uttarkashi Gyansu 2012 Operational 2 MBBR use
Work is under
progress,
Soil Bio expected to be
Under Technology completed in
Informatio
9 Devprayag Bah Bazar Construction 1.4 (SBT) Dec 2014
n not
Work is under
provided
progress,
expected to be
Under completed in
10 Gangotri Gangotri Construction 1 SBR Nov 2014

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 76


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Status Technology
STP (Operational/ STP (UASB /
STP Commissi Non- Installed ASP / OP /
Sl. No City/town Consent Status
Location oned in Operational/U Capacity SBR /
(Year) nder MLD MBR/ FAB
Construction) Etc.)
performance
well within
11 Jagjeetpur 1990 Operational 18 ASP NRCD limits
12 Haridwar Jagjeetpur 2010 Operational 27 SBR DO
Performance
Satisfactory
Sarai, (under
13 Jawalapur Dec-13 Operational 18 SBR observation
Work is under
progress,
expected to be
Under completed in
14 Bhattafall Construction 3.12 SBR Dec 2014
Work is under
progress,
expected to be
Landhor Under completed in
15 South Construction 1.3 SBR Dec 2014
Mussoorie
work is under
progress,
expected to be
Landhor Under completed in
16 North Informatio Construction 0.8 SBR Dec 2014
n not Work is under
provided progress,
expected to be
Under completed in
17 Kulri Construction 0.9 SBR Dec 2014
Work is under
progress,
expected to be
Under completed in
18 Indira Nagar Construction 5 SBR March 2015
Dehradun
Work is under
progress,
expected to be
Under completed in
19 Mothorowala Construction 20 SBR June 2014

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 77


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Status Technology
STP (Operational/ STP (UASB /
STP Commissi Non- Installed ASP / OP /
Sl. No City/town Consent Status
Location oned in Operational/U Capacity SBR /
(Year) nder MLD MBR/ FAB
Construction) Etc.)
Work is under
progress,
expected to be
Under ompleted in Oct
20 Jakhan Construction 1 SBR 2014
Work is under
progress,
expected to be
Under completed in
21 Vijay Colony Construction 0.42 SBR Oct 2014
Work is under
progress,
expected to be
Under completed in
22 Salawala Construction 0.71 SBR Oct 2014
Application
Informatio under process.
n not Expected to be
provided Tendring completed in
23 Mothorowala Under Process 20 SBR June 2016
Application
under process.
Expected to be
Tendring completed in
24 Kaulagarh Under Process 3 SBR June 2016

4.35
STPs AT WEST BENGAL
West Bengal has total number of 28 STPs having treatment capacity of 416.9 MLD. Out of 24
STPs,12STPs of capacity 181.54 MLD are Non-Operational. Details of STPs of West Bengal
are shown in Table 33.
Table 33: STPs-West Bengal
Status Technolog
STP
STP (Operational/ y (UASB /
Installe
Commissio Non- ASP / OP / Consent
Sl. No City/town STP Location d
ned in Operational/U SBR / Status
Capacit
(Year) nder MBR/
y MLD
Construction) FAB Etc.)

1 Titagarh Titagarh Operational 4.5 ASP No


| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 78
[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Status Technolog
STP
STP (Operational/ y (UASB /
Installe
Commissio Non- ASP / OP / Consent
Sl. No City/town STP Location d
ned in Operational/U SBR / Status
Capacit
(Year) nder MBR/
y MLD
Construction) FAB Etc.)
Non
2 Titagarh Operational 4.5 OP No
Jagaddal Non
3 Bhatpara New Operational 10 ASP No
Jagaddal Jagaddal Non
4 Bhatpara Bhatpara Old Operational 8.5 ASP Not Known
Jagaddal Non
5 Bhatpara Operational 10 OP NO
KANKINARA
STP,
KANKINAR MADRAIL,Bha Non
6 A tpara Operational 10 OP NO
7 Baidyabati Baidyabati Operational 6 OP No
8 Bandipur Bandipur Operational 14 OP Not Known
9 Konnagar Konnagar Not Known 22 OP No
Panihati
Information Operational
10 Panihati (Natagarh) 12 OP No
not provided
Kona, Chakpara
( Anandanagar
gram Panchayet
11 Kona ) Operational 30 OP No
Chandannagar,
Khalisani,
Chinsurah- Trickling
12 Chandannag Highly Operational 18.16 Filter No
ore Chandannagar,
Khalisani,
Chinsurah- Non
13 Highly Operational 4.54 OP No
Waste
stabilisatio
14 Bansberia Bansberia Operational 0.3 n pond No

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 79


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

Status Technolog
STP
STP (Operational/ y (UASB /
Installe
Commissio Non- ASP / OP / Consent
Sl. No City/town STP Location d
ned in Operational/U SBR / Status
Capacit
(Year) nder MBR/
y MLD
Construction) FAB Etc.)
Kamarhati,
Mathkol, near
Belgachia Trickling
15 Kamarhati Metro Car Shed Operational 40 Filter No

16 Naihati Naihati Operational 11.56 ASP No


Waste
stabilisatio
17 Garulia Garulia Not Known 7.9 n pond No
Garden Under
18 Reach Garden Reach Maintanance 47.5 ASP No
Serampore, at
Jannagar Road, Information Trickling
19 Serampore Serampore not provided Operational 18.89 Filter No
Waste
Mahestala, Non stabilisatio
20 Maheshtala Nungi Operational 4 n pond No
Waste
stabilisatio
21 Budge Budge Budge Budge Operational 4.25 n pond Not Known
Non Aerated
22 Bhadreswar Bhadreswar Operational 7.6 Lagoon No
Non Trickling
23 Howrah Howrah Operational 45 Filter No
Trickling
24 Kalyani STP Kalyani - I Operational 11 Filter
STP Kalyani -
25 II Operational 6 OP
Informatio
STP n not
26 Berhampore Berhampore Operational 3.7 OP
provided
Cossipore STP Cossipore
27 Chitpore Chitpore Operational 45 ASP

28 Nabadwip STP Nabadwip Operational 10 OP

| STATE-WISE DETAILS OF SEWAGE TREATMENT PLANTS 80


[INVENTORIZATION OF SEWAGE TREATMENT PLANTS]

5. CONCLUSION
CPCB access the data provided by SPCBs/PCCs and concluded that 816 number of STPs are
available having treatment capacity of 23,277 MLD equipped with different technologies like
ASP, OP, USAB, SBR etc. Out of 816 STPs, 522 STPs Operational, 79 STPs Non-
Operational, 145 STPs Under Construction and 70 STPs are proposed. It was also find out that
maximum STPs having ASP based treatment technology and nowadays SBR based technology
widely used for treatment of sewage.To check the performance and status from STPs, CPCB
has initiated performance evolution of STPs in India.

| CONCLUSION 81