Você está na página 1de 23

9.

87

9.87
Ø20.00
30.00

R10.00

20.00

100.00
20.00

120.00
20.00
80.00

R4
.00

10.00
10.44

40.00
10.32

2.00

10.00
160.00
120.00

EXHAUST FAN

EARTH CONTROL MCB


SHT CIRCUIT BREAKER SHUNT TRIP COIL

INDICATION
H.R.C FUSE
CAPACITOR BANK

C.C CIRCUIT BREAKER CLOSING COIL

49.74
NO. DATE REVISION BY
DWG TITLE

TP MCCB/ACB PUSH BUTTON


ASSIGNMENT #1
FOR "ON" R5.00

UVT CIRCUIT BREAKER UVT COIL


50.11 ENGINEER
SIR SAJJAD
CHECKED BY
SIR SAJJAD
JOB NO DRAWN BY

CAD DWG FILE


M.ARSLAN
PUSH BUTTON SCALE
No Scale
DATE
2/3/2018

FOR "OF" DWG NO

1
SHEET NO

OF 3
BRIDGE RECTIFIER

32° 32°

94.3
7
94.3

80.10

80.10

7
90°

90°

58°
58°
49.90 49.90

LIGHTING ARRESTOR 50.00

HALF WAVE RECTIFIER

GENERATOR -AC A M
A M
P2 S2

MULTIPLE POSITION
110V 220VAC SELECTOR SWITCH

P1 S1
HOOTER

40
0
R1
10

10
C BUZZER

B NPN
NO. DATE REVISION BY
40
60

60
DWG TITLE

E ASSIGNMENT #1

ENGINEER CHECKED BY

B NPN JOB NO
SIR SAJJAD SIR SAJJAD
DRAWN BY

CAD DWG FILE


CIRCUIT BREAKER 60 SCALE
M.ARSLAN
DATE
No Scale 2/3/2018
DRAW OUT TYPE 60 DWG NO

1
E SHEET NO

2 OF 3
TP ACB (TERASAKI)
FP ACB (ABB)
230
Control Vc.c
CT for
Neutral Power M
220 220 415 line Supply LRC SHT
Vc.c 9 Vc.c 7 Vc.c ML
k L +/L +/L -/N 230
M YC K51 YO K51 YU 230
Vc.c

230V
415V
Vc.c

110V
YC YO

0V
220
Vc.c 10 8

S33M/1

19 29 01 11 21 0515 2506 16 26 09 08 18 28 02 22 03 20 10 112111114212211214312311314412411414

UI U2 C1 C2 C3 C11C12 C13 13 14 11 1223 24 2122 D2 D1

DC SUPERVISION RELAY
24 20
O/C & E/F RELAY
23 19
X6 X2
T/F STATUS INDICATING RELAY 22 18
1 POWER 11 16 E-LAB 21 17
1L1 -Ve 1 NEUTRAL 9
5A

SUPPLY
2 12 15 Temp. 2 4 CONNECTION DIAGRAM FOR ANNUNCIATOR
+Ve 2 Phase Trip 10 P
3 T1 14 3
1L2 Phase 1
5A

3 11

BELL
RESET
4 13

ACK.
4 Phase 12 INPUT SIGNAL

LT.
5 T2 12 +
1L3 Buchholz
5A

6 11 5 Buchh. Alarm Trip 13 -


7 T3 10 6 Buchh. Trip Alarm 14 1 2 3 4 5 6 7 8 9 10 11121314 1516171819 20
5A

8 IO1 9 7 15
1A

Temp. Alarm
6
9 T4 8 16
8 Temp. Trip 17 18 19 5
10 7
1A

8 12
11 IO2 6
0.2A

7 11
12 5
A1

13 4 N
CONNECTION DIAGRAM FOR AUX RELAY
U0/
UL2
UL1/

14 3 NO. DATE
DWG TITLE
REVISION BY

2 13 5 1 6 2
IF

ASSIGNMENT #1
1
230 Va.c 14 9 10
O/C & E/F
RELAY PE ENGINEER CHECKED BY
SIR SAJJAD SIR SAJJAD
JOB NO DRAWN BY

CAD DWG FILE


M.ARSLAN
SCALE DATE

P N DWG NO
No Scale 2/3/2018

1
SHEET NO

3 OF 3
Q52
125A
FP MCCB

R
Y
B
N
Incoming From Transformer
SC Cable 50mm
2

E
N
20A For AC#8 20A For AC#5 20A For AC#1

20A For AC#9 20A For AC#6 20A For AC#2

20A For AC#10 20A For AC#7 20A For AC#3

16A For PC(16) 16A For PC(17) 20A For AC#4

Brass Bar 10x15mm


16A For Pump 16A For Pump 16A For PC(17)

16A For E.Fan(2) 16A For E.Fan(2) 16A For E.Fan(2)

12A For Lights(34) 12A For Lights(33) 16A For Pump

12A Extra 10A Extra 12A For Lights(33)

6A For B.Fan (7) 6A For Printer#2 6A For Printer#1

6A For B.Fan (8)


Q1- Q9

Q20-Q28
Copper Comb

Copper Comb
Q10-Q19

Copper Comb

CAD DWG FILE


NO.

SCALE
JOB NO

DWG NO
1
ENGINEER

SHEET NO
DWG TITLE
DATE

SIR SAJJAD

2
DATE
REVISION

1 OF 1
DRAWN BY
CHECKED BY
DB FOR OFFICE

7/3/2018
M.ARSLAN
SIR SAJJAD
BY
3-PHASE, 4-WIRE, 415VAC
R

B
-F100
6A.6KA
R R

97
95
-F49
96
98

-S1 2 R R
OFF
-K1
-Q1
R R

REMOTE CONTROL BOX


1

-S1
OFF 2

L1 L2 L3

-K1
T1 T2 T3
0~000A
-P1 1 2
A
11 12
L O R
L L R R
P1
K -SA1
S1

-T1
S2
C.T
LR 3 13

REMOTE CONTROL BOX


P2

-S2 -K1 3
ON 4 14
-S2
ON 4

Y R G NO. DATE REVISION BY


DWG TITLE

-H3 -H1 -H2


A1 DOL STARTER
TRIP OFF ON
-K1

M N
A2

ENGINEER

JOB NO
SIR SAJJAD
CHECKED BY
SIR SAJJAD
DRAWN BY

CAD DWG FILE


60KW SCALE DATE
M.ARSLAN

1 9/3/2018
DWG NO

3
SHEET NO

1 OF 3
-F100
3-PHASE, 4-WIRE, 415VAC R R
R
Y
B
0-.......A
-P1 95
AM-METER
-F49
96
1 2 12 11

TP MCCB 31 53 97
1 -K1 -F49
-S69 -S1 32 54 98
9 11
ASS OFF 2
10 6 2

INSTALLED AT FIELD LOCAL CONTROL


P1 P1 P1

K K K

REMOTE CONTROL BOX


1
S1 S1 S1 -S1
OFF 2
-T1-T3
S2 S2 S2 LB

BOX
LY
LR

L O R L L R R

L1 L2 L3 L1 L2 L3 L1 L2 L3 -SA1
-K1 -K2 -K3
T1 T2 T3 T1 T2 T3 T1 T2 T3

3 13 3
-S2 -K1 -S2
-F49 ON 4 14 ON 4

G R Y
13 43 13
-K3 -K1 -K2 -H1 -H2 -H3
14 44 14 NO. DATE REVISION BY

M OFF ON TRIP DWG TITLE

21 9
-K3 -T1 A.S.D STARTER

22 5

A1 A1 A1 A1 ENGINEER CHECKED BY

-K1 -K2 -K3 -T1 JOB NO


SIR SAJJAD SIR SAJJAD
DRAWN BY

CAD DWG FILE


A2 A2 A2 A2 SCALE DATE
M.ARSLAN

1 9/3/2018
N DWG NO

3
SHEET NO

2 OF 3
-F100
3-PHASE, 4-WIRE, 415VAC R R
R
Y
B

95

-F49
96

1 -K1 -K1 -K2 -F49


TP MCCB -S1
OFF 2

REMOTE CONTROL BOX


1
-S1
OFF 2

L O R L R R L
L1 L2 L3 L1 L2 L3
-K2
-K1 -K2 -SA1
T1 T2 T3 T1 T2 T3

3 3
-S1 -S2 -K2 -K1
-F49 FWD 4 REV 4 FWD REV
ON ON ON ON

-K1 -K2 R G G Y

-H1 -H2 -H3 -H4

OFF FWD REV TRIP NO. DATE REVISION BY

-K2 -K1 DWG TITLE

M
ON ON

REV/FWD STARTER

FWD A1 A1
REV ENGINEER CHECKED BY

-K1 A2 -K2 A2 JOB NO


SIR SAJJAD SIR SAJJAD
DRAWN BY

CAD DWG FILE


M.ARSLAN

N SCALE
1
DATE
9/3/2018
DWG NO

3
SHEET NO

2 OF 3
R

COPPER COMB

Q1-Q9
Q52
FP MCCB
125A
20A 20A 20A 20A 16A 16A 16A 12A 6A
SP MCB SP MCB SP MCB SP MCB SP MCB SP MCB SP MCB SP MCB SP MCB

AC#1 AC#2 AC#3 AC#4 PC#17 E.F#2 W.P#1 LIGHTS#13 PRINTER#1


UNIT UNIT UNIT

20A
SP MCB
Y B

COPPER COMB COPPER COMB

Q10-Q19

Q20-Q28
20A 20A 20A 16A 16A 16A 12A 10A 6A 6A 20A 20A 20A 16A 16A 16A 12A 12A 6A
SP MCB SP MCB SP MCB SP MCB SP MCB SP MCB SP MCB SP MCB SP MCB SP MCB SP MCB SP MCB SP MCB SP MCB SP MCB SP MCB SP MCB SP MCB SP MCB

NO. DATE REVISION BY

AC#5 AC#6 AC#7 PC#17 W.P#2 E.F#2 LIGHTS#33 SPEAR PRINTER#2 B.F#8 AC#8 AC#9 AC#10 PC#16 W.P#3 E.F#2 LIGHTS#34 SPEAR B.F#7 DWG TITLE

UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT


DB SLD

BRASS BAR 10X15 mm


ENGINEER CHECKED BY
SIR SAJJAD SIR SAJJAD
JOB NO DRAWN BY

CAD DWG FILE


M.ARSLAN
SCALE DATE
1 12/3/2018
DWG NO

4
SHEET NO

1 OF 2
P1 S1

220VAC 110VAC

P2 S2

NO. DATE REVISION BY


DWG TITLE

DYNAMIC TF. PB.

ENGINEER CHECKED BY
SIR SAJJAD SIR SAJJAD

OFF JOB NO DRAWN BY

CAD DWG FILE


M.ARSLAN
SCALE DATE
1 12/3/2018
DWG NO

4
SHEET NO

2 OF 2
3-PHASE, 4-WIRE, 415VAC
R

B
-F100
6A.6KA
R R

97
95
-F49
96
98

-S1 2 R R
OFF
-K1
-Q1
R R

REMOTE CONTROL BOX


1

-S1
OFF 2

L1 L2 L3

-K1
T1 T2 T3
0~000A
-P1 1 2
A
11 12
L O R
L L R R
P1 K -SA1
S1

-T1
S2
C.T
LR 3 13

REMOTE CONTROL BOX


P2

-S2 -K1 3
ON 4 14
-S2
ON 4
NO. DATE REVISION BY
DWG TITLE

Y R G

-H3 -H1 -H2 DYNAMIC DOL

A1
TRIP OFF ON
-K1

M A2 ENGINEER

JOB NO
SIR SAJJAD
CHECKED BY
SIR SAJJAD
DRAWN BY

CAD DWG FILE


M.ARSLAN
N SCALE
1
DATE
13/3/2018

60KW DWG NO

5
SHEET NO

1 OF 3
-F100
3-PHASE, 4-WIRE, 415VAC R R
R
Y
B
0-.......A
-P1 95
AM-METER
-F49
96
1 2 12 11

TP MCCB 31 53 97
1 -K1 -F49
-S69 -S1 32 54 98
9 11
ASS OFF 2
10 6 2

P1 P1 P1

REMOTE CONTROL BOX


LOCAL CONTROL BOX
INSTALLED AT FIELD
K K K
1
S1 S1 S1 -S1
OFF 2
-T1-T3
S2 S2 S2 LB
LY
LR

L O R L L R R

L1 L2 L3 L1 L2 L3 L1 L2 L3 -SA1

LOCAL CONTROL BOX


INSTALLED AT FIELD
-K1 -K2 -K3
T1 T2 T3 T1 T2 T3 T1 T2 T3

3 13 3
-S2 -K1 -S2
-F49 ON 4 14 ON 4

G R Y
13 43 13
-K3 -K1 -K2 -H1 -H2 -H3
NO. DATE REVISION BY

14 44 14 DWG TITLE

M -K3
21

22
-T1
9
OFF ON TRIP
DYNAMIC A.S.D

ENGINEER CHECKED BY

A1 A1 A1 A1 SIR SAJJAD SIR SAJJAD

-K2 -K3 -T1


JOB NO DRAWN BY

-K1

CAD DWG FILE


M.ARSLAN
SCALE DATE
A2 A2 A2 A2 1 13/3/2018
DWG NO

N 5
SHEET NO

2 OF 3
-F100
3-PHASE, 4-WIRE, 415VAC R R
R
Y
B

95

-F49
96

1 -K1 -K1 -K2 -F49


TP MCCB -S1
OFF 2

REMOTE CONTROL BOX


1
-S1
OFF 2

L O R L R R L
L1 L2 L3 L1 L2 L3
-K2
-K1 -K2 -SA1
T1 T2 T3 T1 T2 T3

3 3
-S1 -S2 -K2 -K1
-F49 FWD 4 REV 4 FWD REV
ON ON ON ON

-K1 -K2 R G G Y

-H1 -H2 -H3 -H4

NO. DATE REVISION BY

OFF FWD REV TRIP DWG TITLE

-K2 -K1

M
ON ON
DYNAMIC REV/FWD

FWD A1 A1
REV ENGINEER CHECKED BY
SIR SAJJAD SIR SAJJAD
-K1 A2 -K2 A2 JOB NO DRAWN BY

CAD DWG FILE


M.ARSLAN
SCALE DATE

N DWG NO
1 13/3/2018

5
SHEET NO

1 OF 3
BUS BAR 100X10mm
R Y B

A A A A
OFF ON TRIP OFF ON TRIP OFF ON TRIP OFF ON TRIP OFF ON TRIP
R Y B
S/S L/O/R S/S L/O/R S/S L/O/R S/S L/O/R
A A A E/A CT's OFF ON OFF ON OFF ON OFF ON
3200/5A
Q1 TP MCCB 16A Q2 TP MCCB 16A Q3 TP MCCB 32A Q4 TP MCCB 32A

CT1 A CT2 A CT3 A CT4 A


16/5A 16/5A 32/5A 32/5A
Q52 3200A
FP ACB
K1 12A K2 12A K3.1(R) 22A K4.1(R) 22A
MCB TP ACB TP ACB K3.2(F) 22A K4.2(F) 22A
0~500V
TP ACB TP ACB
V Vss
F49.1 F49.2 F49.3 F49.4
F27/59 9~13A 9~13A 16~22A 16~22A

M M M M
5.5KW 5.5KW 11KW 11KW
STARTER-1 STARTER-2 STARTER-3 STARTER-4

BUS BAR 100X10mm

A A A A A
OFF ON TRIP OFF ON TRIP OFF ON TRIP OFF ON TRIP OFF ON TRIP

S/S L/O/R S/S L/O/R S/S L/O/R S/S L/O/R S/S L/O/R
OFF ON OFF ON OFF ON OFF ON OFF ON

Q5 TP MCCB 50A Q6 TP MCCB 50A Q7 TP MCCB 80A Q8 TP MCCB 80A Q9 TP MCCB 125A

CT5 A CT6 A CT7 A CT8 A CT9 A


50/5A 50/5A 80/5A 80/5A 125/5A
K9.1(M) 50A
K5 40A K6 40A K7 65A K8 65A K9.2(D) 50A
TP ACB TP ACB TP ACB TP ACB K9.3(S) 32A
TP ACB

F49.5 F49.6 F49.7 F49.8 F49.9


24~36A 24~36A 45~65A 45~65A 34~50A

NO. DATE REVISION BY


DWG TITLE

M M M M M
SLD MCC

18.5KW 18.5KW 30KW 30KW 45KW


STARTER-5 STARTER-6 STARTER-7 STARTER-8 STARTER-9
ENGINEER CHECKED BY
SIR SAJJAD SIR SAJJAD
JOB NO DRAWN BY

CAD DWG FILE


M.ARSLAN
SCALE DATE
1 16/3/2018
DWG NO

6
SHEET NO

1 OF 2
BUS BAR 100X10mm

A A A A A
OFF ON TRIP OFF ON TRIP OFF ON TRIP OFF ON TRIP OFF ON TRIP

S/S L/O/R S/S L/O/R S/S L/O/R S/S L/O/R S/S L/O/R
OFF ON OFF ON OFF ON OFF ON OFF ON

Q10TP MCCB 125A Q11 TP MCCB 250A Q12 TP MCCB 250A Q13 TP MCCB 400A Q14 TP MCCB 800A

CT10 A CT11 A CT12 A CT13 A CT14 A


125/5A 250/5A 250/5A 400/5A 800/5A
K10.1(M) 50A K11.1(M) 105A K12.1(M) 105A K13.1(M) 180A K14.1(M) 300A
K10.2(D) 50A K11.2(D) 105A K12.2(D) 105A K13.2(D) 180A K14.2(D) 300A
K10.3(S) 32A K11.3(S) 65A K12.3(S) 65A K13.3(S) 105A K14.3(S) 150A
TP ACB TP ACB TP ACB TP ACB TP ACB

F49.10 F49.11 F49.12 F49.13 F49.14


34~50A 85~105A 85~105A 110~160A 240~360A

M M M M M
45KW 90KW 90KW 150KW 250KW
STARTER-10 STARTER-11 STARTER-12 STARTER-13 STARTER-14

BUS BAR 100X10mm

A
OFF ON TRIP

S/S L/O/R
OFF ON

Q15 TP MCCB 1250A

CT15 A
1250/5A
K15.1(M) 600A
K15.2(D) 600A
K15.3(S) 300A
TP ACB

F49.15
300~450A

NO. DATE REVISION BY


DWG TITLE

M SLD MCC

400KW
STARTER-15 ENGINEER CHECKED BY
SIR SAJJAD SIR SAJJAD
JOB NO DRAWN BY

CAD DWG FILE


M.ARSLAN
SCALE DATE
1 16/3/2018
DWG NO

6
SHEET NO

2 OF 2
FL.CU 3(100X10)mm
R

B
FL.CU 50X5mm FL.CU 3(50X5)mm FL.CU 2(50X5)mm

Q52
FP ACB ST.1 ST.2 ST.3 ST.4 ST.5
3200A 5.5KW 5.5KW 18.5KW 18.5KW 11KW ST.11
16A 16A 50A 50A 32A
250KW
800A

To Motor To Motor To Motor To Motor To Motor


FL.CU 40X5mm FL.CU 2(40X5)mm To Motor

ST.15
400KW
1250A

ST.6 ST.7 ST.8 ST.12 ST.13


R Y B N 90KW 90KW
30KW 30KW 11KW
80A 80A 32A 250A 250A

FL.CU 20X5mm
To Motor To Motor To Motor FL.CU 30X5mm To Motor To Motor To Motor

ST.9 ST.10 ST.14


45KW 45KW 150KW
125A 125A 400A

15OO KVA
To Motor To Motor To Motor
TRANSFORMER
FL.CU 1(100X10)mm
N
FL.CU 1(50X10)mm NO. DATE REVISION BY
DWG TITLE

E
PANEL ARRANGMENT

ENGINEER CHECKED BY
SIR SAJJAD SIR SAJJAD
JOB NO DRAWN BY

CAD DWG FILE


M.ARSLAN
SCALE DATE
1 24/3/2018
DWG NO

7
SHEET NO

1 OF 1
E/A 0-3200A (R) 0-3200A (Y) 0-3200A (B)
R A A A
AUX. AUX. AUX. AUX.
Y SUPPLY SUPPLY
B R Y B L1L2L3 N SUPPLY SUPPLY

R Y B
CT's
3200/5A 0-500A
N AUX.
V SUPPLY
FP ACB (ABB)

220 220 415


Q52 Va.c Va.c Va.c
FP ACB M YC K51 9 YO K51 7 YU
YC YO V/S
3200A 10 8 7-POSITION
D/U
S33M/1

Y R B N
U1 U2 C1 C2 C3 C11C12 C13 13 141112 23242122 D2 D1

ON OFF
PULSE PULSE

Y B N FP MCB
R
6A
R Y B
L1 L2 L3 N
AUX. TRIP
CONTACT
PHASE INDICATION

N NO. DATE
DWG TITLE
REVISION BY

1500KVA MCCB INTERRIOR


T/F

ENGINEER CHECKED BY
SIR SAJJAD SIR SAJJAD
JOB NO DRAWN BY

CAD DWG FILE


M.ARSLAN
SCALE DATE
1 24/3/2018
DWG NO

8
SHEET NO

1 OF 2
E/A 0-3200A (R) 0-3200A (Y) 0-3200A (B) F50/51N

R A A A
AUX. AUX. AUX. AUX. TRIP
Y CONT.
B R Y B L1 L2 L3 N SUPPLY SUPPLY SUPPLY SUPPLY R Y B EARTH

R Y B
CT's
3200/5A

N 0-500A
AUX.
V SUPPLY
FP ACB (ABB)

220 220 415


Q52 Va.c Va.c Va.c
FP ACB M YC K51 9 YO K51 7 YU
3200A YC YO V/S
10 8 7-POSITION
D/U
S33M/1
R Y B N
U1 U2 C1 C2 C3 C11 C12 C13 13 14 11 12 23 24 21 22 D2 D1

ON OFF
PULSE PULSE

N FP MCB
R Y B
6A
R Y B

PHASE NO. DATE REVISION BY


DWG TITLE

INDICATION
G N
MCCB INTERRIOR

1500KVA
GENERATOR ENGINEER CHECKED BY
SIR SAJJAD SIR SAJJAD
JOB NO DRAWN BY

CAD DWG FILE


M.ARSLAN
SCALE DATE
1 24/3/2018
DWG NO

8
SHEET NO

2 OF 2
TRANSFORMER
R

T.S ON OFF F27/59


L/S
T/F

GEN
D/U
T/F

220VAC OFF ON TRIP 220VAC 220VAC 415VAC


M C.C T.C UVT

N B

GENERATOR
R

T.S ON OFF F27/59


L/S
GEN

T/F
D/U
GEN
NO. DATE REVISION BY
DWG TITLE

220VAC OFF ON TRIP 220VAC 220VAC 415VAC MCCB INTERRIOR SCH

M C.C T.C UVT

ENGINEER CHECKED BY
SIR SAJJAD SIR SAJJAD
JOB NO DRAWN BY

CAD DWG FILE


M.ARSLAN
SCALE DATE

N B DWG NO
1 24/3/2018

9
SHEET NO

1 OF 1
R
Y
B

-F55 -P55
1 1 1 PFI RELAY PF METER
-F100 -F101 -F102
SP MCB SP MCB SP MCB
6A 2 6A 2 6A 2
0V 400VF1 F2 C 1 2 3 4 5 6 7 8 9 10 11 12 S1 S2 2 1 3 5 4 6

S1 S2
C.T SIGNAL FROM
INCOMING PANAL-1
A 0 M A M A 0 M A M

-SA2 -SA2

EXHAUST FAN-1 EXHAUST FAN-2


-Y101 -Y102

NO. DATE REVISION BY


DWG TITLE

PFI OPRATION

ENGINEER CHECKED BY
SIR SAJJAD SIR SAJJAD
JOB NO DRAWN BY

CAD DWG FILE


M.ARSLAN
SCALE DATE
1 24/3/2018
DWG NO

N 10
SHEET NO

1 OF 1
R

AOM 5

-SA1 2 -F55

C C C C C C

1 2 3 4 5 6

AOM 1 M 3 M 5 M 7 M 9 M 11

-SA1 2 4 6 8 10 12

1 1 1 1 1 1
-S1 -S2 -S3 -S4 -S5 -S6
2 2 2 2 2 2

3 13 3 13 3 13 3 13 3 13 3 13
-S21 -K1 -S22 -K2 -S23 -K3 -S24 -K4 -S25 -K5 -S26 -K6
4 14 4 14 4 14 4 14 4 14 4 14

A1 A1 A1 A1 A1 A1
-K1 -K2 -K3 -K4 -K5 -K6
A2 A2 A2 A2 A2 A2

N
-K1 -K2 -K3 -K4 -K5 -K6
L1 T1 L1 T1 L1 T1 L1 T1 L1 T1 L1 T1

L2 T2 L2 T2 L2 T2 L2 T2 L2 T2 L2 T2

L3 T3 L3 T3 L3 T3 L3 T3 L3 T3 L3 T3
NO. DATE REVISION BY
DWG TITLE

13 14 13 14 13 14 13 14 13 14 13 14
PFI CONTROLING

21 22 21 22 21 22 21 22 21 22 21 22

31 32 31 32 31 32 31 32 31 32 31 32
ENGINEER CHECKED BY
SIR SAJJAD SIR SAJJAD
JOB NO DRAWN BY

CAD DWG FILE


43 44 43 44 43 44 43 44 43 44 43 44 SCALE DATE
M.ARSLAN

1 24/3/2018
DWG NO

11
SHEET NO

1 OF 2
-F55

C C C C C C

7 8 9 10 11 12

M 13 M 15 M 17 M 19 M 21 M 23

14 16 18 20 22 24

1 1 1 1 1 1
-S7 -S8 -S9 -S10 -S11 -S12
2 2 2 2 2 2

3 13 3 13 3 13 3 13 3 13 3 13
-S27 -K7 -S28 -K8 -S29 -K9 -S30 -K10 -S31 -K11 -S32 -K12
4 14 4 14 4 14 4 14 4 14 4 14

A1 A1 A1 A1 A1 A1
-K7 -K8 -K9 -K10 -K11 -K12
A2 A2 A2 A2 A2 A2

N
-K7 -K8 -K9 -K10 -K11 -K12
L1 T1 L1 T1 L1 T1 L1 T1 L1 T1 L1 T1

L2 T2 L2 T2 L2 T2 L2 T2 L2 T2 L2 T2

L3 T3 L3 T3 L3 T3 L3 T3 L3 T3 L3 T3

13 14 13 14 13 14 13 14 13 14 13 14

21 22 21 22 21 22 21 22 21 22 21 22
NO. DATE REVISION BY
DWG TITLE

31 32 31 32 31 32 31 32 31 32 31 32
PFI CONTROLING

43 44 43 44 43 44 43 44 43 44 43 44

ENGINEER CHECKED BY
SIR SAJJAD SIR SAJJAD
JOB NO DRAWN BY

CAD DWG FILE


M.ARSLAN
SCALE DATE
1 24/3/2018
DWG NO

11
SHEET NO

2 OF 2
NO. DATE REVISION BY
DWG TITLE

PFI PANEL

ENGINEER CHECKED BY
SIR SAJJAD SIR SAJJAD
JOB NO DRAWN BY

CAD DWG FILE


M.ARSLAN
SCALE DATE
1 24/3/2018
DWG NO

12
SHEET NO

1 OF 1
R

43 43 43 43 43 43
-K1 -K2 -K3 -K4 -K5 -K6
44 44 44 44 44 44

1 1 1 1 1 1
-H1 -H2 -H3 -H4 -H5 -H6
2 2 2 2 2 2

N
STAGE-1 STAGE-2 STAGE-3 STAGE-4 STAGE-5 STAGE-6
ON ON ON ON ON ON

43 43 43 43 43 43
-K7 -K8 -K9 -K10 -K11 -K12
44 44 44 44 44 44

1 1 1 1 1 1
-H7 -H8 -H9 -H10 -H11 -H12
NO. DATE REVISION BY

2 2 2 2 2 2 DWG TITLE

PFI.P INDICATION

ENGINEER CHECKED BY
SIR SAJJAD SIR SAJJAD
N JOB NO DRAWN BY

CAD DWG FILE


M.ARSLAN
STAGE-7 STAGE-8 ON STAGE-9 STAGE-10 STAGE-11 STAGE-12 SCALE
No Scale
DATE
24/3/2018

ON ON ON ON ON DWG NO

13
SHEET NO

1 OF 1

Você também pode gostar