I. PEKERJAAN PENDAHULUAN
1 Pek. Pembersihan Lokasi
P (m') =
L (m') =
VOL. (m²) =
=
P (m') =
L (m') =
VOL. (m') =
=
II. PEKERJAAN TANAH & PASIR
1 Pek. Galian Tanah Pondasi
- Pondasi setempat
a.Volume tapak pondasi =
b.Volume kolom pondasi =
c.Volume pasir urug + lantai kerja =
c.Volume sisi tanah =
d.Volume isian pondasi =
P (m') =
L (m') =
T (m') =
VOL. (m³) =
=
III PEKERJAAN PONDASI
1 Pekerjaan Beton Lantai Kerja Tebal 5 cm
P (m') =
L (m') =
T (m') =
JML (bh) =
VOL. (m³) =
=
P (m') =
L (m') =
T (m') =
JML (bh) =
VOL. (m³) =
=
P (m') =
T (m') =
VOL. (m³) =
=
P (m') =
T (m') =
JML (bh) =
VOL. (m³) =
=
6 Pekerjaan Beton Balok Sloof 15x20 Adk.1:1,5:3
P (m') =
L (m') =
T (m') =
JML (bh) =
VOL. (m³) =
=
IV PEKERJAAN STRUKTUR
1 Pekerjaan Beton Kolom Struktur 15x20 Adk.1:1,5:3 (K2)
P (m') =
L (m') =
T (m') =
JML (bh) =
VOL. (m³) =
=
P (m') =
L (m') =
T (m') =
VOL. (m³) =
=
V PEKERJAAN DINDING
1 Pekerjaan Pasangan Dinding Batako
P (m') =
T (m') =
VOL. (m³) =
=
P (m') =
T (m') =
JML (bh) =
VOL. (m³) =
=
- Kuda-Kuda K2 P (m') =
L (m') =
T (m') =
JML (bh) =
VOL. (m³) =
=
P (m') =
L (m') =
T (m') =
VOL. (m³) =
=
P (m') =
L (m') =
JML (bh) =
VOL. (m³) =
=
VIII PEKERJAAN PLAFOND
1 Pekerjaan Plafond Plywood 3,80 mm
P (m') =
L (m') =
VOL. (m³) =
=
P (m') =
L (m') =
VOL. (m³) =
=
P (m') =
IX PEKERJAAN LANTAI
1 Pekerjaan Beton Lantai Tebal 5 Cm Adk.1:1,5:3
P (m') =
L (m') =
T (m') =
VOL. (m³) =
=
P (m') =
L (m') =
VOL. (m³) =
=
5 Pek.Pasangan Feeting
T (m') =
L (m') =
JML (bh) =
VOL. (m³) =
=
T (m') =
L (m') =
VOL. (m³) =
=
L (m²) =
JML (bh) =
VOL. (m²) =
=
L (m²) =
JML (bh) =
VOL. (m²) =
=
L (m²) =
JML (bh) =
VOL. (m²) =
=
3 Pek.Cat Minyak Daun Pintu Panil Papan
L (m²) =
JML (bh) =
VOL. (m²) =
=
L (m²) =
JML (bh) =
VOL. (m²) =
=
P (m') =
T (m') =
VOL. (m²) =
=
P (m') =
T (m') =
VOL. (m²) =
=
P (m') =
L (m') =
VOL. (m²) =
=
P (m') =
L (m') =
VOL. (m²) =
=
P (m') =
T (m') =
- Dikurangi volume kusen pintu VOL. (m²) =
- Dikurangi volume kusen jendela VOL. (m²) =
- Dikurangi volume pentilasi VOL. (m²) =
VOL. (m³) =
=
P (m') =
T (m') =
- Dikurangi volume kusen pintu VOL. (m²) =
- Dikurangi volume kusen jendela VOL. (m²) =
- Dikurangi volume pentilasi VOL. (m²) =
VOL. (m³) =
=
288 m²
24 m'
12 m'
24 x 12
288 m²
31 m'
24 m'
7 m'
24 + 7
31 m'
7.984 m³
0.8 m'
0.8 m'
1 m'
7 bh
(0,8 x 0,8 x 1) x 7
4.48 m³
21.90 m'
0.4 m'
0.4 m'
21,9 x 0,4 x 0,4
3.504 m³
0.656 m³
0.8 m'
0.8 m'
0.05 m'
7 bh
(0,8 x 0,8 x 0,05)
0.2240 m³
21.6 m'
0.4 m'
0.05 m'
25 x 0,4 x 0,05
0.432 m³
6.42 m³
0.686 m³
0.399 m³
0.343 m³
0.21 m³
9.31 m³
0.86 m³
1.296 m³
1.296 m³
14.404 m³
7.984 m³
42.85 m³
20.55 m'
6.95 m'
0.3 m'
20,55 x 6,95 x 0,3
42.85 m³
20.55 m'
1.85 m'
1.5 m'
20,55 x 1,85 x 1,5
57.03 m³
9.04 m³
20.55 m'
8.8 m'
0.05 m'
20,55 x 8,8 x 0,05
9.04 m³
0.66 m³
0.8 m'
0.8 m'
0.05 m'
7 bh
(0,8 x 0,8 x 0,05) x 7
0.224 m³
21.6 m'
0.4 m'
0.05 m'
25 x 0,4 x 0,05
0.432 m³
0.69 m³
0.7 m'
0.7 m'
0.2 m'
7 bh
(0,7 x 0,7 x 0,2 ) x 7
0.686 m³
0.58 m³
0.15 m'
0.2 m'
2.75 m'
7 bh
(0,15 x 0,2 x 2,75 ) x 7
0.5775 m³
7.11 m²
23.7 m'
0.3 m'
23,7 x 0,3
7.11 m²
14.22 m²
23.7 m'
0.3 m'
2 bh
23,7 x 0,3 x 2
14.22 m²
1.64 m²
27.3 m'
0.15 m'
0.2 m'
2 bh
( 27,3 x 0,15 x 0,2) x 2
1.638 m³
0.75 m³
0.15 m'
0.2 m'
3.55 m'
7 bh
(0,15 x 0,2 x 3,55) x 7
0.7455 m³
0.82 m³
27.3 m'
0.15 m'
0.2 m'
27,3 x 0,15 x 0,2
0.819 m³
24.14 m²
6.8 m'
3.55 m'
6,8 x 3,55
24.14 m²
48.28 m²
6.8 m'
3.55 m'
2 bh
6,8 x 3,55 x 2
48.28 m²
3.48 m³
56.99 m'
0.1 m'
0.05 m'
7 bh
(56,99 x 0,1 x 0,05) x 7
1.99465 m³
28.50 m'
0.1 m'
0.05 m'
2 bh
(28,50 x 0,1 x 0,05) x 2
0.28495 m³
240.00 m'
0.1 m'
0.05 m'
240 x 0,1 x 0,05
1.2 m³
1.51 m³
430.82 m'
0.05 m'
0.07 m'
430,82 x 0,05 x0,07
1.50787 m³
280.11 m²
44.82 m'
68.20 m'
23 m'
11.1 m'
2 bh
23 x 11,1 x 2
68.2 m'
180.84 m²
20.55 m'
8.8 m'
20,55 x 8,8
180.84 m²
59.39 m²
64.20 m'
0.93 m'
64,20 x 0,925
59.385 m²
189.00 m²
189.00 m'
4.52 m³
20.55 m'
8.8 m'
0.025 m'
20,55 x 8,8 x 0,05
4.521 m³
180.84 m²
20.55 m'
8.8 m'
20,55 x 8,8
180.84 m²
1 Ls
1 Unit
15 Ttk
3 Ttk
15 Bh
15 Bh
3 Bh
3 Bh
3 Bh
5.67 m²
2.1 m'
0.9 m'
3 bh
2,1 x 0,9 x 3
5.67 m²
8.25 m²
2.5 m'
3.3 m'
2,5 x 3,3
8.25 m²
3 Set
12 Bh
6 Bh
7.632 m²
0.636 m²
12 bh
0,636 x 12
7.632 m²
15.264 m²
1.272 m²
12 bh
1,272 x 12
15.264 m²
48 Bh
48 Bh
24 Bh
24 Bh
9.792 m²
0.52 m²
3 bh
0,52 x 3
1.56 m²
0.686 m²
12 bh
0,686 x 12
8.232 m²
2.85 m²
0.05 m²
57 bh
0,05 x 57
2.85 m²
11.34 m²
3.78 m²
3 bh
3,78 x 3
11.34 m²
15.264 m²
1.272 m²
12 bh
1,272 x 12
15.264 m²
17.05 m²
68.2 m'
0.25 m'
68,2 x 0,25
17.05 m²
9.45 m²
189.00 m'
0.05 m'
189 x 0,05
9.45 m²
180.84 m²
20.55 m'
8.80 m'
20,55 x 8,8
180.84 m²
59.39 m²
64.20 m'
0.93 m'
64,20 x 0,925
59.39 m²
245.65 m²
82.80 m'
3.40 m'
6.45 m²
25.43 m²
3.99 m²
35.87 m²
(82,80 x 3,4) - 35,87
245.65 m²
173.91 m²
56.80 m'
3.40 m'
6.45 m²
25.43 m²
3.99 m²
35.87 m²
16.66 m²
1 Ls
ANALISA HARGA SATUAN PEKERJAAN - SNI
C. PEKERJAAN BETON
C.1 1 M³ Membuat Beton Tumbuk Adukan 1:3:5 (Analisa Konstruksi)
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp.) Harga (Rp.)
A Tenaga
Pekerja Oh 1.65 - -
Tukang Kayu Oh 0.25 - -
Kepala Tukang Oh 0.025 - -
Mandor Oh 0.08 - -
Jumlah Tenaga Kerja -
B Bahan
Semen Portland Kg 218 - -
Pasir Pasang m³ 0.52 - -
Kerikil Sungai m³ 0.87 - -
Jumlah Harga Bahan -
C Peralatan -
Jumlah Harga Alat -
D Jumlah (A + B + C) -
E Overhead & Profit (Contoh 10%) 10% x D -
F Harga Satuan Pekerjaan (D + E) -
E. PEKERJAAN KAYU
E.1 1 M³ Pasang Konstruksi Kuda-Kuda Kayu, Kayu Kelas II (SNI - 2007)
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp.) Harga (Rp.)
A Tenaga
Pekerja Oh 4 - -
Tukang Kayu Oh 12 - -
Kepala Tukang Oh 1.2 - -
Mandor Oh 0.2 - -
Jumlah Tenaga Kerja -
B Bahan
Kayu Kelas II m³ 1.1 - -
Besi Strip Kg 15 - -
Paku Biasa 2''- 5'' Kg 0.8 - -
Jumlah Harga Bahan -
C Peralatan -
Jumlah Harga Alat -
D Jumlah (A + B + C) -
E Overhead & Profit (Contoh 10%) 10% x D -
F Harga Satuan Pekerjaan (D + E) -
E.5 1 M' Papan Lisplank Ukuran 2,5 x 25 cm, Kayu Kelas II (SNI - 2007)
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp.) Harga (Rp.)
A Tenaga
Pekerja Oh 0.1 - -
Tukang Oh 0.2 - -
Kepala Tukang Oh 0.02 - -
Mandor Oh 0.005 - -
Jumlah Tenaga Kerja -
B Bahan
Kayu Kelas II m³ 0.009 - -
Paku Biasa 2'' - 5'' Kg 0.05 - -
- -
Jumlah Harga Bahan -
C Peralatan -
Jumlah Harga Alat -
D Jumlah (A + B + C) -
E Overhead & Profit (Contoh 10%) 10% x D -
F Harga Satuan Pekerjaan (D + E) -
G. PEKERJAAN PLAFOND
G.1 1 M² Langit-Langit Triplek Tebal 3,80 mm (Analisa Konstruksi)
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp.) Harga (Rp.)
A Tenaga
Pekerja Oh 0.07 - -
Tukang Kayu Oh 0.1 - -
Kepala Tukang Oh 0.001 - -
Mandor Oh 0.0035 - -
Jumlah Tenaga Kerja -
B Bahan
Triplek Tebal 3,80 mm Lbr 0.375 - -
Paku Biasa 1/2''- 1'' Kg 0.03 - -
- -
Jumlah Harga Bahan -
C Peralatan -
Jumlah Harga Alat -
D Jumlah (A + B + C) -
E Overhead & Profit (Contoh 10%) 10% x D -
F Harga Satuan Pekerjaan (D + E) -
H. PEKERJAAN KERAMIK
G.1 1 M² Pasang Keramik Lantai Ukuran 40x40 (Analisa Konstruksi)
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp.) Harga (Rp.)
A Tenaga
Pekerja Oh 0.62 - -
Tukang Batu Oh 0.35 - -
Kepala Tukang Oh 0.035 - -
Mandor Oh 0.003 - -
Jumlah Tenaga Kerja -
B Bahan
Keramik 40 x 40 m² 1 - -
Sement Portland Kg 11.38 - -
Pasir Pasang m³ 0.042 - -
Semen Warna Kg 1.5 - -
Jumlah Harga Bahan -
C Peralatan -
Jumlah Harga Alat -
D Jumlah (A + B + C) -
E Overhead & Profit (Contoh 10%) 10% x D -
F Harga Satuan Pekerjaan (D + E) -
J. PEKERJAAN PENGECATAN
J.1 1 M² Pengecatan Bidang Kayu Baru, 1 Lapis Plamir, 1 Cat Dasar, 2 Lapis Cat Penutup (Analisa Konstruksi)
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp.) Harga (Rp.)
A Tenaga
Pekerja Oh 0.07 - -
Tukang Cat Oh 0.009 - -
Kepala Tukang Oh 0.006 - -
Mandor Oh 0.0025 - -
Jumlah Tenaga Kerja -
B Bahan
Cat Meni Kg 0.2 - -
Plamir Kg 0.15 - -
Cat Dasar Kg 0.17 - -
Cat Penutup 2 x Kg 0.26 - -
Jumlah Harga Bahan -
C Peralatan -
Jumlah Harga Alat -
D Jumlah (A + B + C) -
E Overhead & Profit (Contoh 10%) 10% x D -
F Harga Satuan Pekerjaan (D + E) -
J.2 1 M² Pengecatan Tembok Baru, 1 Lapis Plamir, 1 Cat Dasar, 2 Lapis Cat Penutup (Analisa Konstruksi)
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp.) Harga (Rp.)
A Tenaga
Pekerja Oh 0.02 - -
Tukang Cat Oh 0.063 - -
Kepala Tukang Oh 0.0063 - -
Mandor Oh 0.0025 - -
Jumlah Tenaga Kerja -
B Bahan
Plamir Kg 0.1 - -
Cat Dasar Kg 0.1 - -
Cat Penutup 2 x Kg 0.26 - -
Jumlah Harga Bahan -
C Peralatan -
Jumlah Harga Alat -
D Jumlah (A + B + C) -
E Overhead & Profit (Contoh 10%) 10% x D -
F Harga Satuan Pekerjaan (D + E) -
K. PEKERJAAN PEMBESIAN
K.1 1 KG Pembesian Dengan Besi Polos (Analisa Konstruksi)
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp.) Harga (Rp.)
A Tenaga
Pekerja Oh 0.007 - -
Tukang Cat Oh 0.007 - -
Kepala Tukang Oh 0.007 - -
Mandor Oh 0.003 - -
Jumlah Tenaga Kerja -
B Bahan
Besi Beton Polos Kg 1.05 - -
Kawat Beton Kg 0.015 - -
Jumlah Harga Bahan -
C Peralatan -
Jumlah Harga Alat -
D Jumlah (A + B + C) -
E Overhead & Profit (Contoh 10%) 10% x D -
F Harga Satuan Pekerjaan (D + E) -
L. PEKERJAAN BEKISTING
L.1 1 M² Pasang Bekisting Untuk Pondasi (Analisa Konstruksi)
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp.) Harga (Rp.)
A Tenaga
Pekerja Oh 0.3 - -
Tukang Cat Oh 0.26 - -
Kepala Tukang Oh 0.026 - -
Mandor Oh 0.005 - -
Jumlah Tenaga Kerja -
B Bahan
Kayu Kelas III m³ 0.02 - -
Paku Biasa 2''-5'' Kg 0.3 - -
Minyak Bekisting Ltr 0.1 - -
Jumlah Harga Bahan -
C Peralatan -
Jumlah Harga Alat -
D Jumlah (A + B + C) -
E Overhead & Profit (Contoh 10%) 10% x D -
F Harga Satuan Pekerjaan (D + E) -
760.5397