BRIEF OF THE PROJECT- HEARTBEAT-1

All the status information given hereby is tentative and


indicative only. The bidder/contractor is advised to visit the site
and carryout comprehensive study of incomplete works to
understand the extent of balance work
INTRODUCTION
The Heartbeat City – I
Company Name : Three Platinum Softech Pvt. Ltd.

Location : Sector – 107, Noida

UPRERA Reg. No. : UPRERAPRJ13921


Delivery Date : October 2021

Plot Size : 30,000 Sq.Mtr.

RESIDENTIAL

Saleable Area : 14,01,600 Sq.Ft.


No. of Units : 759
No. of Towers : 9 (G+22)

COMMERCIAL

No. of Shops : 26 units

2
Location Map of Heartbeat City,
Sector-107, Noida

3
Current Construction Status at The Heartbeat City - 1

TOWER A 4
5
Current Construction Status at The Heartbeat City - 1

TOWER B 6
7
Current Construction Status at The Heartbeat City - 1

TOWER C 8
9
Current Construction Status at The Heartbeat City - 1

TOWER D 10
11
Current Construction Status at The Heartbeat City - 1

TOWER E 12
13
Current Construction Status at The Heartbeat City - 1

Tower F
14
15
Current Construction Status at The Heartbeat City - 1

Tower G 16
17
Current Construction Status at The Heartbeat City - 1

Tower H 18
19
Current Construction Status at The Heartbeat City - 1

Tower J 20
21
Detailed Current Construction Status at The Heartbeat City - I

Tower Structure Brick work Door Frame Balcony Railing

1st to 20th floor


Raft to 21st floor Roof casted and for last
A slab all column steel work completed
completed in up to 18th floor
progress at 21st
20th floor

Raft to 21st floor Roof casted and for last


B slab all column steel work completed
1st to 20th floor 5th floor 20th floor

Raft to 20st floor Roof casted and for 21st


C floor roof- all column casted , slab
shuttering in progress.
1st to 18th floor 8th Floor 19th floor

Raft to 21st floor Roof casted and for last


D slab all column steel work completed &
50% column casted
1st to 21st floor 19th Floor 20th floor

Raft to 21st floor Roof casted and for last


E slab all column steel work completed
1st to 18th floor 15th Floor 20th floor

1st to 16th
F Raft to 22nd floor Roof casted . floor&
50% on 17th
14th Floor 20th floor

Raft to 21st floor Roof casted and for last


G slab all column steel work completed
1st to 21st floor 19th Floor 21st floor

H Raft to 22nd floor Roof casted . 2nd to 22 floor 19th floor 21st floor

J Raft to 21st floor Roof casted and for last Ground Floor to
19th floor 19th floor
slab 50% area of slab ready to cast. 21st floor

22
Detailed Current Construction Status at The Heartbeat City - I
Stair &
Tower Gypsum/ Cement Plaster External plaster Fire Fighting
Corridor Plaster
30% done work in Progress
A 17th Floor in Progress 20th floor

Corridor 1st to 3rd comp


B in progress on 4th floor External plaster in progress
progress on 4th
20th floor

C 14th floor in progress External plaster in progress Not started yet 19th floor
Completed up to 20th
D in Progress on 18th floor completed up to 20th floor
floor
20th floor
Stair - Main stair Not
started,
E 2nd to 13th floor Not Started yet Fire stair from 11th to 17th
Corridor 1st to 3rd
20th floor

Stair - 1st to 14th


F 10th floor Not Started yet
Corridor 1st to 14th
20th floor

Cement Plaster Stair - 1st to 11th


up to 20th floor (except 8th&9th)
G Not Started yet Corridor 1st to 18th 21st floor

Cement Plaster
Stair - not started
H up to 20th floor Not Started yet
Corridor 4th to 12th
21st floor

J 100% of 1st to 11th floor Stair - 1st to 11th


20th floor 18th floor
Corridor 1st to 18th

23
Detailed Current Construction Status at The Heartbeat City - I
Tower Electrical Conduit CPVC PIPEING UPVC PIPEING PIPEING in Shaft

Conduit -20th floor


A D.B. fixing -14th
1st to 18th 1st to 14th

up to 13th floor in 3
B Coduit -18th floor 1st to 15th 1st to 18th
flats
Conduit -18th floor up to 14th floor in
C 1st to 17th 1st to 17th
1flats
Conduit -21st floor
D DB fixing -11th
1st to 21st 1st to 21st up to 20th floor
Conduit -18th floor
DB fixing -7th
E 1st to 16th 1st to 16th

Conduit -16th floor


F DB fixing -10th 1st to 14th 1st to 14th

Conduit -20th floor


DB fixing -16th
G 1st to 19th 1st to 20th

Conduit -19th floor


H DB fixing -12th 1st to 19th 1st to 19th

J Conduit -20th floor


DB fixing -19th 1st to 19th 1st to 10th

24
Summary of Sold / Unsold Inventory at The Heartbeat City - I

STATUS TOWER TOWER TOWER TOWER TOWER TOWER TOWER TOWER TOWER COMMERCIAL
A B C D E F G H J

SOLD
59 74 85 81 80 68 79 60 63 26

UNSOLD 10 18 7 11 12 24 13 9 6 0

TOTAL 69 92 92 92 92 92 92 69 69 26

Total No. of flats : 759


Total No. of flats sold : 649
Total No. of flats unsold : 110
Total No. of shops : 26
Total No. of shops sold : 26
Additional covered garage unsold : 700

25