¤ Item Descripción Und. Metrado Precio (S/.) Parcial (S/.

)
0 01 OBRAS PROVISIONALES 4,033.41
0 01.01 CAMPAMENTO PROVISIONAL DE OBRA m2 64.00 37.76 2,416.64
0 01.02 CARTEL DE IDENTIFICACION DE LA OBRA 5.40M X 3.60M und 1.00 1,616.77 1,616.77
0 02 OBRAS PRELIMINARES 36,263.38
0 02.01 TRAZO Y REPLANTEO DEL EJE DE VIA km 5.38 1,145.63 6,163.49
0 02.02 TRAZO NIVEL Y REPLANTEO EN OBRA m2 29,590.00 0.27 7,989.30
0 02.03 RAYADO DE TALUD km 5.38 405.51 2,181.64
0 02.04 DESBROCE Y LIMPIEZA DE TERRENO ha 3.26 3,045.69 9,928.95
0 02.05 MOVILIZACION Y DESMOVILIZACION DE EQUIPO MECANICO glb 1.00 10,000.00 10,000.00
0 03 MOVIMIENTO DE TIERRAS 240,062.56
0 03.01 CORTE DE MATERIAL SUELTO CON EQUIPO m3 52,316.76 2.30 120,328.55
0 03.02 CORTE ROCA SUELTA (PERF. DISP) m3 1,143.00 13.84 15,819.12
0 03.03 PEINADO Y DESQUINCHE DE TALUDES m3 1,143.00 2.73 3,120.39
0 03.04 RELLENO CON MATERIAL PROPIO DE CORTE m3 9,421.40 3.11 29,300.55
0 03.05 CARGUIO DE MATERIAL CON EQUIPO m3 9,421.40 2.40 22,611.36
0 03.06 ELIMINACION DE MATERIAL EXCEDENTE DM=1 km m3 13,211.51 3.70 48,882.59
0 04 OBRAS DE ARTE Y DRENAJE 283,978.87
0 04.01 CUNETAS 15,325.44
0 04.01.01 PERFILADO DE CUNETAS LATERALES m 4,992.00 3.07 15,325.44
0 04.02 BADENES 268,653.43
0 04.02.01 TRAZO Y REPLANTEO m 401.80 421.87 169,507.37
0 04.02.02 EXCAVACION DE ZANJA CON EQUIPO IIEE (TERRENO SEMI m3 214.33 11.89 2,548.38
0 04.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 128.60 9.31 1,197.27
0 04.02.04 ENCOFRADO Y DESENCOFRADO m2 228.60 73.58 16,820.39
0 04.02.05 CONCRETO LOSAS f'c= 210 kg/cm2 m3 51.87 551.36 28,599.04
0 04.02.06 CONCRETO f'c=175 kg/cm2 m3 68.62 443.86 30,457.67
0 04.02.07 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 1,730.71 7.99 13,828.37
0 04.02.08 MAMPOSTERIA DE CONCRETO F'C=175 KG/CM2+60% P.M. m3 21.16 188.10 3,980.20
0 04.02.09 EMPEDRADO E=20CM m2 34.59 34.33 1,187.47
0 04.02.10 JUNTAS DE CONSTRUCCION Y SELLADO CON RC=250 m 40.81 12.92 527.27
0 05 SEÑALIZACION 20,651.87
0 05.01 SEÑALES PREVENTIVAS 20,029.77
0 05.01.01 EXCAVACION MANUAL DE HUECOS DE 0.55x0.55x0.50 m. m3 16.50 28.42 468.93
0 05.01.02 ENCOFRADO Y DESENCOFRADO EN SEÑALIZACION m2 7.20 56.31 405.43
0 05.01.03 CONCRETO PARA LA BASE DE SEÑALES f'c=175 kg/cm2 m3 7.93 383.29 3,039.49
0 05.01.04 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 EN SEÑA kg 225.12 8.09 1,821.22
0 05.01.05 BASTIDOR DE FºGº DE 2" (PINTADO) und 81.00 82.00 6,642.00
0 05.01.06 SEÑAL PREVENTIVA MAS INSTALACION und 30.00 255.09 7,652.70
0 05.02 SEÑALES KILOMETRICOS 622.10
0 05.02.01 EXCAVACION MANUAL m3 0.75 23.69 17.77
0 05.02.02 ENCOFRADO Y DESENCOFRADO EN SEÑALES KILOMETRI m2 4.49 22.12 99.32
0 05.02.03 CONCRETO CILOPEO PARA CIMIENTACION 1:10 + 30% P.M. m3 0.75 288.77 216.58
0 05.02.04 CONCRETO PARA EL HITO ILOMETRICO K. f'c=175 kg/cm2 m3 0.13 330.77 43.00
0 05.02.05 ACERO CORRUGADO DE 3/8" FY= 4200 kg/cm2 GRADO 60, kg 21.61 7.58 163.80
0 05.02.06 PINTURA EN SEÑALES KILOMETRICOS DE VIA m2 4.49 18.18 81.63
0 06 MITIGACIÓN DEL IMPACTO AMBIENTAL 9,287.98
0 06.01 CAPACITACION glb 1.00 7,000.00 7,000.00
0 06.02 SEGURIDAD mes 3.00 207.50 622.50
0 06.03 REFORESTACION DE AREAS AFECTADAS ha 1.08 1,265.94 1,367.22
0 06.04 RESTAURACION DE AREA DE CAMPAMENTO Y PATIO DE MAQ m2 40.00 1.93 77.20
0 06.05 INSTALACION PROVISIONAL SANITARIA EN OBRA glb 1.00 221.06 221.06
0 07 PRUEBAS DE CALIDAD 8,194.20
0 07.01 DISEÑO DE MEZCLAS DE CONCRETO und 2.00 300.00 600.00
0 07.02 ROTURA DE BRIQUETAS DE CONCRETO und 10.00 25.42 254.20
0 07.03 ESTUDIO DE SUELOS und 3.00 2,400.00 7,200.00
0 07.04 PRUEBAS DE DENSIDAD DE CAMPO und 4.00 35.00 140.00
0 08 PLACA RECORDATORIA 338.00
0 08.01 PLACA RECORDATORIA und 1.00 338.00 338.00
0 09 FLETES 7,000.00
0 09.01 FLETE TERRESTRE glb 1.00 7,000.00 7,000.00
COSTO DIRECTO 609810.27
Avance acumlado programado (%)
CRONOG
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

403 403 403 403 403 403


539 539 539

1027 1027 1027 1027 1027 1027


133 133 133 133 133 133 133 133 133 133 133 133
364 364 364 364 364 364
1655 1655 1655 1655 1655 1655
5000

2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005
264 264 264 264 264 264 264 264 264

###
637
299
2103 2103
7150
3807 3807
3457

1167 1167 1167 1167


208
342

###

300
2400
35

2333
0.15 0.15 0.15 1.16 0.40 0.43 0.00 1.46 1.04 0.85 0.62 0.56 0.56 0.00 8.03 0.98 0.74 2.24 1.02 1.02 0.00
0.15 0.31 0.46 1.62 2.02 2.45 2.45 3.91 4.95 5.8 6.42 6.99 7.55 7.55 15.6 16.6 17.3 19.5 20.6 21.6 21.6
CRONOGRAMA VALORIZADO DE OBRA - CONSTRUCCION DE TROCHA CARROZABLE TAHUAY - LAMANTI (CAPAQMARCA-CHUMBIVILC
22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42

133 133 133 133 133 133 133 133 133 133 133 133 133 133 133 133 133 133

2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005
264 264 264 264 264 264 264 264 264 264 264 264 264 264 264 264 264 264

1395 1395 1395


1077 1077 1077
2222 2222 2222 2222 2222 2222 2222 2222

307 307 307 307 307 307 307 307 307 307 307 307 307 307 307 307 307 307

###
637
299
2103 2103
7150
3807 3807
3457
995
297
132

3321 3321

1167 1167
208
342

300
63.6
2400
35

2333
0.85 0.64 0.44 0.47 0.81 1.35 0.00 1.41 0.44 0.45 0.86 0.81 0.81 0.00 8.30 0.84 1.19 2.60 1.84 1.43 0.00
22.4 23.1 23.5 24 24.8 26.1 26.1 27.5 28 28.4 29.3 30.1 30.9 30.9 39.2 40.1 41.3 43.9 45.7 47.1 47.1
ANTI (CAPAQMARCA-CHUMBIVILCAS-CUSCO)
43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63

133 133 133 133 133 133 133 133 133 133 133 133 133 133 133 133 133 133

2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005
264 264 264 264 264 264 264 264 264 264 264 264 264 264 264 264 264 264

1395 1395 1395 1395 1395 1395 1395 1395 1395


1077 1077 1077 1077 1077 1077 1077 1077 1077
2222 2222 2222 2222 2222 2222 2222

307 307 307 307 307 307 307 307 307 307 307 307 307 307 307 307 307 307

### ###
637 637
299 299
2103 2103 2103 2103
7150 7150
3807 3807 3807 3807
3457 3457
995 995
297 297
132 132

###
###

208
342

63.6 63.6
2400
35 35

2333
1.06 0.44 0.86 0.83 1.21 0.81 0.00 8.68 0.84 1.25 2.19 1.84 1.43 0.00 8.15 0.88 1.19 2.21 1.84 1.43 0.00
48.2 48.6 49.5 50.3 51.5 52.3 52.3 61 61.9 63.1 65.3 67.1 68.6 68.6 76.7 77.6 78.8 81 82.8 84.3 84.3
64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84

133 133 133 133 133 133 133 133 133 133 133 133

2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005
264 264 264 264 264 264 264 264 264 264 264 264 264 264 264
1560 1560
1395 1395 1395 1395 1395 1395 1395 1395 1395
1077 1077 1077 1077 1077 1077 1077 1077 1077
2222 2222 2222 2222 2222 2222 2222

307 307 307 307 307 307 307 307 307 307 307 307 307 307

995
297
132

117 117 117 117


50.7 50.7 50.7 50.7 50.7 50.7
380 380 380 380 380
228 228 228 228 228

957 957 957 957 957

8.89 8.89
49.7 49.7
108 108

40.8 40.8

342

63.6
1.09 0.47 0.86 0.48 1.21 0.83 0.00 0.87 0.45 0.97 0.67 1.33 0.97 0.00 0.66 0.19 0.61 0.72 1.19 0.46 0.00
85.4 85.8 86.7 87.2 88.4 89.2 89.2 90.1 90.5 91.5 92.2 93.5 94.5 94.5 95.1 95.3 96 96.7 97.9 98.3 98.3
85 86 87 88 89 90 SubTotal

2416.64
1616.77

6163.49
7989.3
2181.64
9928.95
5000 10000

120328.55
15819.12
3120.39
29300.55
22611.36
48882.587

15325.44

169507.37
2548.38
1197.27
16820.39
28599.04
30457.67
13828.37
3980.2
1187.47
527.27

468.93
50.7 50.7 405.43
380 380 380 3039.49
228 228 228 1821.22
6642
957 957 957 7652.7

17.77
99.32
216.5775
43.0001
163.8
81.63

7000
622.5
1367.22
38.6 38.6 77.2
221.06

600
254.2
7200
140

### 338

7000
0.17 0.10 0.17 0.10 0.16 0.98 609810.26
98.5 98.6 98.8 98.9 99 100