Você está na página 1de 46

Project : TWO - STOREY RESIDENTIAL HOUSE

Location : BRGY. MATOBATO, CALB. CITY

Subjects : PROGRAM OF WORK

PROGRAM OF WORK

PROJECT TITLE: SOURCE OF FUNDS:


TWO (2) STOREY RESIDENTIAL HOUSE Project Owner
LOCATION: PROJECT DURATION:
BRGY. MATOBATO, CALBAYOG CITY
PROJECT CATEGORY: SITE AREA:
Residential 205. 847 m2

PROJECT DESCRIPTION:
Construction of Two (2) Storey Residential Building Located at Brgy. Matobato, Calbayog City
( and to include all items as stated below )
ESTIMATED COST OF PROPOSED WORK

ITEM NO. DESCRIPTION % of TOTAL UNIT QUANTITY UNIT COST AMOUNT

I EARTHWORKS m3
II REINFORCING STEEL BARS kg
III CARPENTRY WORKS m2
IV STRUCTURAL CONCRETE m3
V MASONRY WORKS m2
VI TRUSS AND ROOFING units
VII PLUMBING WORKS m2
VIII CEILING WORKS set
IX DOORS AND WINDOWS set
X ELECTRICAL WORKS ls
X1 PAINTING WORKS m2
XII TILE WORKS m2
XIII FINISHES AND ACCESSORIES set

TOTAL ESTIMATED DIRECT COST ₱ 0.00

PREPARED BY: MA. DANESSA M. SEPEDA


BSCE 5
Project : TWO - STOREY RESIDENTIAL HOUSE
Location : BRGY. SAN POLICARPO CALB. CITY

Subjects : DURATIONS AND ACTIVITIES

DURATION ACTIVITY
ITEMS OF WORK
(DAYS) PRECEDES FOLLOWS
I. EARTHWORKS
A. Clearing, Grabbing & Layout
B. Excavation
C. Earthfill

II. REINFORCING STEEL BARS


D. Footing Reinforcement
E. Wall Footing Reinforcement
F. Column Reinforcement
G. Beam Reinforcement
H. Slab Reinforcement
I. Lateral Ties and Stirrups

III. CARPENTRY WORKS


J. Install Scafoldings
K. Install Formworks

IV. STRUCTURAL CONCRETE


L. Concreting of Footings
M. Concreting of Wall Footings
N. Concreting of Columns
O. Concreting of Beams
P. Concreting of Slab
Q. Concreting of Stairs

V. MASONRY WORKS
R. Chb Walling
S. Mortaring and Plastering
T. Plain Cement Finish

VI. TRUSS & ROOFING


U. Truss and Purlin Installation
V. Roofing

VII. PLUMBING WORKS


W. Pipes Installation
X. Septic Tank

VIII. CEILING WORKS


Y. Ceiling Installation

IX. DOORS AND WINDOWS


Z. Installation of Windows
AA. Installation of Doors

X. ELECTRICAL WORKS
BB. Installation of Wirings
CC. Installation of Outlets

XI. PAINTING WORKS


DD. Walls
EE. Ceiling

XII. TILE WORKS


FF. Tiles Installation

XIII. FINISHES & ACCESSORIES


GG. Accesories Installation
HH. Cleaning
Project : TWO - STOREY RESIDENTIAL HOUSE Page: 1/16
Location : BRGY. MATOBATO, CALB. CITY

Subjects : QUANTITY TAKE - OFF

ESTIMATED QUANTITIES
I. EARTHWORKS COMPUTATION

A. Clearing
And Grabbing Area = 205. 847 m²

B. Excavation Column Footing: ( 20 pcs. )


Vol. = 1 m x 1 m x 2 m
= 2 m³

Total Vol. = 20 x 2 m³ = 40 m³

Wall Footing:
Total Length = 84.67 m
Total Vol. = 84.67 x 0.5 x 0.4 = 16.93 m³

Septic Vault: ( 1 pc.)


Vol. = 1 x 3 x 3 = 9.0 m³

Total Vol. of Excavation :


= 40 + 16.93+ 9.0
= 65.93 m³

C. Earthfill Total Area = 120 m²


Vol. to be Filled = 120 m² x 0.5 m = 60 m³

Back Fill:
Footing = 1 x 1 x 0.2 x 20 = 4.0 m³
Column = 0.3 x 0.3 x (2-0.2) x 20 = 3.24 m³
Wall Footing = 84.67 x 0.4 x 0.15 = 5.08 m³
Masonry Wall = 84.67 x 0.2 x 0.35 = 5.93 m³
Total Back Fill = 18.25 m³

Total Vol. of Back Fill: = 65.93 - 18.25 = 47.68 m³

Total Vol. of Earth Fill Needed:


= 60 - 47.68
= 12.32 m³ , say...... 13 m³
Project : TWO - STOREY RESIDENTIAL HOUSE Page: 2/16
Location : BRGY. MATOBATO, CALB. CITY

Subjects : QUANTITY TAKE - OFF

ESTIMATED QUANTITIES
II. REINFORCING 10mm 12mm 16mm Tie
COMPUTATION
STEEL BARS RSB RSB RSB Wire ***
(pcs) (pcs) (pcs) (kg)

D. Footing

D.1 Rebars •Column Footing:


Footing Bar: ( using 16 mm Ø x 6 m commercial length )
Cut Length = 1.07 m
Req'd = 440 pcs.

No. of pcs./Bar = 6 m ÷ 1.07 m = 6 pcs.


No. of Bars = 440 pcs ÷ 6 pcs/bar = 74 pcs. ......... ......... 74

E. Wall Footing
Reinforcement
•Wall Footing:
Longitudinal Bar( using 12 mm Ø x 6 m commercial length )
Total Length = 94 m (with 10% splicing and wastage allowance)
Req'd = 3 pcs.

No. of Bars = (94 x 3) ÷ 6 = 47 pcs. ......... 47

Transverse Bar: ( using 10 mm Ø x 6 m commercial length )


Cut Length = 0.53 m
Req'd = 225 pcs

No. of pcs./Bar = 6 m ÷ 0.53 m = 12 pcs.


No. of Bars = 225 pcs ÷ 12 pcs/bar = 18.75 pcs. , say.. 19

Equivalent Weight:
10 mm Ø Bar = 19 pcs x 3.70 kg/pc. = 70.3 kg
12 mm Ø Bar = 47 pcs x 5.33 kg/pc. = 250.51 kg
16 mm Ø Bar = 74 pcs x 11.84 kg/pc. = 876.16 kg
Total Weight = 1116.97 kg

( Using No. 16 Tie Wire )


note: 1 kg of No. 16 Tie Wire is approximately
53 meters long.

Column Footing = 20 x 11 x 11 = 2420 ties


Wall Footing = 225 x 3 = 675 ties

Using 0.3 m long ties:


Total Length = (2420 + 675) x 0.3
= 928.5 m

No. of kg = 928.5 m ÷ 53 m/kg = 17.52 kg , say.. ......... ......... ......... 17.52


Project : TWO - STOREY RESIDENTIAL HOUSE Page: 3/16
Location : BRGY. MATOBATO, CALB. CITY

Subjects : QUANTITY TAKE - OFF

ESTIMATED QUANTITIES
II. REINFORCING COMPUTATION 10mm 12mm 16mm Tie
STEEL BARS RSB RSB RSB Wire *** ***
(pcs) (pcs) (pcs) (kg)

F. Column
Reinforcemen•Vertical bars: Column 1
(Foundation toReinforcing Bar: ( using 16 mm Ø x 10 m commercial length )
Ground Floor) Cut Length = 3.96 m
Req'd = 2 pcs. per column
Length of Excess = 10 - 2(3.96m) = 2.08 m
(excess per 10m C.L.)
# of bars/column = 2 ÷ 2 = 1 pcs.
Total # of bars = 20 x 1 = 20 pcs. ……… ……… ……… 20
Total # of bars = 20 pcs. of 2.08 m
(excess)
Cut Length = 8.0 m
Req'd = 4 pcs. per column
Length of Excess = 10 - 8m = 2.0m
No. of Bars = 20 x 4 = 80 pcs. ……… ……… ……… 80
Total # of bars = 80 pcs. of 2.0 m
(excess)

F. Column
Reinforcemen•Vertical bars: Column 1
(Ground Floor Reinforcing Bar: (using 16mmØ of excess bars from found.-1st flr.)
Second Floor) Cut Length = 1.96 m
Req'd = 2 pcs. per column

Length of excess = 2.08 - 1.96 = 0.12 m


2.0 - 1.96 = 0.04 m
Total # of bars = 20 x 2 = 40 pcs.
= 20 pcs. Of 2.08 m
= 20 pcs. Of 2.0 m
Remaining # of bars = 40 pcs. Of 2.0 m
20 pcs. Of 0.12 m
80 pcs. Of 0.04 m

(Foundation to
Second Floor) ( Using No. 16 Tie Wire )
C-1 = 20 x 18 = 360 ties

Using 0.3 m long ties:


Total Length = ( 360 ) x 0.3 = 108 m

No. of kg = 108 m ÷ 53 m/kg = 2.04 kg , say.. ......... ......... ......... 2


Project : TWO - STOREY RESIDENTIAL HOUSE Page: 4/16 Project :
Location : BRGY. MATOBATO, CALB. CITY Location :

Subjects : QUANTITY TAKE - OFF Subjects :

ESTIMATED QUANTITIES
II. REINFORCING COMPUTATION 10mm 12mm 16mm Tie II. REINFORCING
STEEL BARS RSB RSB RSB Wire *** STEEL BARS
(pcs) (pcs) (pcs) (kg)

G. Beams G. Lateral Ties


Reinforcement & Stirrups
Beams (Foundation to
• Reinforcing Bar: ( using 12 mm Ø x 6.0 m commercial length ) Second Floor)
Total Length = 220.908 m
Req'd = 6 pcs

No. of Bars = (220.908 x 6 x 1.10) ÷ 6 = 243 pcs. , say.. 243


( with 10% allowance for splicing and wastage)

Using 0.3 m long ties:


No. of kg = ( 36 x 78 x 0.3 ) ÷ 53 = 15.894 kg , say.. ......... .................. 16

H. Slab on
Ground
Floor Area = 103.47 m²
Temperature Bars: ( using 12 mm Ø x 6 m commercial length )

No. of Rebars = 103.47 m² x 1.980 pcs/m² = 204.87 pcs. , say.. 205

Equivalent Weight:
12 mm Ø Bar = 205 pcs x 5.33 kg/pc. = 1092.65 kg (Second Floor to
Roof)
( Using No. 16 Tie Wire at 0.30 cm long )

No. of kg = 103.47 m² x 0.132 kg/m² = 13.66 kg , say.. ......... .................. 14 No

H. Slab
(2nd Floor)
Floor Area = 91.724 m²
Temperature Bars: ( using 12 mm Ø x 6 m commercial length )

No. of Rebars = 91.724 m² x 2.360 pcs/m² = 216.47 pcs. , say.. 217 (Foundation t
Second Floor)
Equivalent Weigth:
12 mm Ø Bar = 217 pcs x 5.33 kg/pc. = 1153.78 kg
No
( Using No. 16 Tie Wire at 0.30 cm long )
No. of kg = 91.724 m² x 0.174 kg/m² = 15.96 kg , say.. ......... .................. 20
TWO - STOREY RESIDENTIAL HOUSE Page: 5/16 Project : TWO - STOREY
BRGY. MATOBATO, CALB. CITY Location : BRGY. MATO

QUANTITY TAKE - OFF Subjects : QUANTITY TAK

ESTIMATED QUANTITIES

COMPUTATION 10mm 12mm 16mm Tie III. CARPENTRY


RSB RSB RSB Wire *** *** WORKS
(pcs) (pcs) (pcs) (kg)

teral Ties COLUMNS


& Stirrups
•Stirrups, B-1: ( using 10 mm Ø x 10.5 m commercial length ) E2. Scaffoldings Total Length
ond Floor) Cut Length = 0.879 m
Req'd = 289 pcs.
2" x 3" lumber
No. of pcs./Bar = 10.5 m ÷ 0.879 m = 11 pcs. 2" x 2" lumber
No. of Bars = 289 pcs ÷ 11 pcs/bar = 26.27pcs. say ......... 27 ( 10.5 m commercial length ) 2" x 2" lumber

•Stirrups, B-2: ( using 10 mm Ø x 10.5 m commercial length )


Cut Length = 0.6781 m Common Wire Nai
Req'd = 160 pcs.
E4. Forms and C-1
No. of pcs./Bar = 10.5 m ÷ 0.6781 m = 15 pcs. Frames
No. of Bars = 160 pcs ÷ 15 pcs/bar = 10.67 pcs. say ......... 11 ( 10.5 m commercial length )

Equivalent Weight:
10 mm Ø Bar = 38 pcs x 3.70 kg/pc. = 140.6 kg
16 mm Ø Bar = 100 pcs x 11.84 kg/pc. = 1184 kg Req'd Plywood
Total Weigth = 1324.6 kg
Wood Frame
•Stirrups, B-1: ( using 10 mm Ø x 10.5 m commercial length )
Cut Length = 0.879 m C.W. Nails ( 8d )
Req'd = 449 pcs. C.W. Nails ( 2d )

No. of pcs./Bar = 10.5 m ÷ 0.879m = 11 pcs.


No. of Bars = 449 pcs ÷ 11 pcs/bar = 40.818 pcs. ......... 41 ( 10.5 m commercial length ) BEAMS

Equivalent Weight: I2. Scaffolding Total Length


10 mm Ø Bar = 41 pcs x 3.70 kg/pc. = 151.7 kg
Total Weight = 151.7 kg For vertical support

•Lateral Ties, C-1 ( using 10 mm Ø x 6 m commercial length ) For horizontal supp


Cut Length = 0.880 m
Req'd = 630 pcs.

No. of pcs./Bar = 6 m ÷ 0.880m = 6 pcs. Common Wire Nai


No. of Bars = 630 pcs ÷ 6 pcs/bar = 105 pcs. 105
SLAB

Equivalent Weight: J2. Scaffolding ( Using 2" x 3" l


6.0 m Bar = 105 pcs x 5.33 kg/pc. = 559.65 kg Scaffolding
10.5 m Bar = 79 pcs x 9.32 kg/pc = 736.28 kg
Total = 1295.93 kg C.W. Nails =

J4. Forms Floor Area = 111


Plywood

C.W. Nails ( 2d )
TWO - STOREY RESIDENTIAL HOUSE Page: 7/16 Project : TWO - STOREY RESID
BRGY. MATOBATO, CALB. CITY Location : BRGY. MATOBATO, C

QUANTITY TAKE - OFF Subjects : QUANTITY TAKE - OFF

ESTIMATED QUANTITIES

10mm 16mmRS C.W. Tie Ply II. STRUCTURAL


COMPUTATION Lumb Wood CONCRETE
RSB B Nails Wire (bd.ft)
(pcs) (pcs) (kg) (kg) (pcs)

F. Footing & Footing : ( with 10% w


Column ol. of CF =
= 15 pcs. x 4.25 m (concrete)ol. of WF =
= 63.8 m Column: ( with 5% wa
Vol. of C-1 =
2" x 3" lumber Vert. Support = 63.8 x 7.0 = 446 bd.ft.
2" x 2" lumber Hor. Support = 63.8 x 21 = 1339 bd.ft.
2" x 2" lumber Diag. Support = 63.8 x 11.7 = 746 bd.ft.
Total Vol. = 2531 bd.ft. ......... ......... 2531 Using Class A Concrete Mix
Cement =
Common Wire Nails ( 4" ) = 63.8 x 0.73 = 46.6 kg , say.. ......... ......... 47 Sand =
Gravel =
= 2( 0.3+0.3 ) + 0.20 = 1.4m
Area = 1.4 x 4.25 x 21 pcs = 124.95 m² Gravel Fill:
Total Area = 124.95 m² CF =
WF =

= 272.29 m² ÷ 2.88 m²/pc = 94.55 pcs. , say.. ......... ......... ......... .................. 95 Gravel Req'd.=

= 40 pc x 25.06 bd.ft./pc = 1002 bd.ft. ......... ......... 1002 H. Concrete Slab Vol. =
Slab
C.W. Nails ( 8d ) = 272.29 m² x 0.08 kg/m² = 21.78 kg. Using Class C Concrete Mix
C.W. Nails ( 2d ) = 40 pcs. x 0.055 kg/pc = 2.2 kg. Cement =
23.98 kg. , say.. ......... ......... 24 Sand =
Gravel =

Gravel Fill =
= 76.0 m
K. Beams andBeams: ( with 5% wa
For vertical support using 2" x 3" lumber: Slab Vol. =
76.0 x 6.00 = 456.0 bd.ft. ( concrete Slab: ( with 10% w
For horizontal support using 2" x 2" lumber: Vol. =
76.0 x 4.70 = 357.2 bd.ft.
Total = 813.2 bd.ft. ......... ......... 813.2
Using Class A Concrete Mix
Common Wire Nails ( 4" ) = 76.0 x 0.73 = 55.5 kg , say.. ......... ......... 56 Cement =
Sand =
Gravel =

( Using 2" x 3" lumber ) M. Column Column: ( with 5% wa


= 104 m² x 9.10 bd.ft./m² = 946.4 bd.ft ......... 946.4 (concrete) Vol. of C-1 =

C.W. Nails = 104 m² x 0.17 kg/m² = 17.68 kg.

Floor Area = 111 m² Using Class A Concrete Mix


= 104 m² ÷ 2.88 m²/pc = 36.11 pcs. , say.. ......... ......... ......... 37 Cement =
Sand =
C.W. Nails ( 2d ) = 37 pcs. x 0.055 kg/pc = 2.035 kg. 3 Gravel =

O. Roof BeamRoof Beams: ( with 5% wa


(concrete) Total Vol.

Using Class A Concrete Mix


Cement =
Sand =
Gravel =
TWO - STOREY RESIDENTIAL HOUSE Page: 8/16 Project : TWO - STOREY RESIDEN
BRGY. MATOBATO, CALB. CITY Location : BRGY. MATOBATO, CA

QUANTITY TAKE - OFF Subjects : QUANTITY TAKE - OFF

ESTIMATED QUANTITIES

COMPUTATION 12mm Lumb. Tie Ply III. MASONRY


Cem. Sand Grav WORKS
RSB (bd.ft Wire Wood
(bags) (m³) (m³) (pcs) ) (kg) (pcs)

( with 10% wastage allowance) P. CHB CHB :


1 x 1 x 0.2 x 1.1 x 21 = 4.62 m³ Wall Area =
0.1 x 0.2 x 1.1 x 94 = 2.068 m³ Less:(openings) =
( with 5% wastage allowance)
0.3 x 0.3 x 6.0 x 21 x 1.05 = 11.907 m³
Total Concrete Vol. = 11.907 m³ ( Using 13.0 pcs of CHB
No. of CHB =

Using Class A Concrete Mixture:


11.907 x 7.85 = 93.47 bags , say.. 94 Rebars: ( using 10 m
11.907 x 0.42 = 5.00094 m³ 6 Vert. Bars =
11.907 x 0.84 = 10.002 m³ , say.. .................. 11 Hor. Bars =

1 x 1 x 0.1 x 21 = 2.1 m³ No. of Rebars =


0.1 x 0.2 x 94 = 1.88 m³
Total = 3.98 m³
Tie Wire: ( Using No.
3.98 m³ + 10.002 m³ = 13.982 m³ , say.. .................. 14 No. of kg =

0.12 m x 91.724 m² = 11.007 m³


Cement Mortar:
Using Class C Concrete Mixture: Cement =
11.007 x 5.49 = 60.43 bags , say.. 61 Sand =
11.007 x 0.44 = 4.84 m³ , say.. ......... 5
11.007 x 0.89 = 9.796 m³ , say.. .................. 10

10 + ( 91.724 x 0.1 ) = 10.97 m³ , say.. .................. 11 Q. Cement Cement Plaster:


Plaster Total Area =
( with 5% wastage allowance) =
110.5m x 0.2m x 0.4m x 1.05 = 9.282 m²
( with 10% wastage allowance) Cement =
91.724 m² x 0.12 m x 1.05 = 11.557 m² Sand =
Total Concrete Vol. = 20.839 m²

Using Class A Concrete Mixture:


20.839 x 7.85 = 163.59 bags , say.. 164 ........................... R. Tiles Floor Tiles: ( Using 0.3
20.839 x 0.42 = 8.75 m³ , say.. ......... 9 ........................... Floor Area =
20.839 x 0.84 = 17.50 m³ , say.. .................. 18 ........................... =

( with 5% wastage allowance) No. of Tiles =


0.3 x 0.3 x 6 x 21 x 1.05 = 11.907 m³
Total Concrete Vol. = 11.907 m³
Cement Mortar:
Total Area =
Using Class A Concrete Mixture:
11.907 x 7.85 = 93.47 bags 94 Cement =
11.907 x 0.42 = 5.00094 m³ , say.. ......... 6 Sand =
11.907 x 0.84 = 10.002 m³ , say.. .................. 11

( with 5% wastage allowance)


110.5m x 0.2m x 0.4m x 1.05 = 9.282 m²

Using Class A Concrete Mixture:


9.282 x 7.85 = 72.864 bags , say.. 73
9.282 x 0.42 = 3.898 m³ , say.. ......... 4
9.282 x 0.84 = 7.797 m³ , say.. .................. 8
WO - STOREY RESIDENTIAL HOUSE Page: 9/16 Project : TWO - STOREY RESIDE
BRGY. MATOBATO, CALB. CITY Location : BRGY. MATOBATO, CA

QUANTITY TAKE - OFF Subjects : QUANTITY TAKE - OFF

ESTIMATED QUANTITIES
San IV. DOORS AND
COMPUTATION 10mm Tie 0.3x 0.2x
CHB Cem. d
RSB Wire (bags) 0.3 0.2 WINDOWS
(pcs) (m³ tiles
(pcs) (kg) tiles
)

BY DIRECT COUNTING :
(77.3 x 3) + (62.91 x 3) = 420.63 m²
(12 x 2) + (24.84 x 1) = 48.84 m² S. Doors Doors:
Net Area = 371.79 m² D-1, Wooden
D-2, Wooden
( Using 13.0 pcs of CHB per m² to give allowance for wastage ) D-3, Wooden
371.79 m² x 13 pcs/m² = 4833.27 pcs. , say..4834 D-4, Wooden
D-5, Wooden Pa
D-6, Glass
( using 10 mm Ø x 6 m commercial length ) D-7, Steel
371.79 m² x 2.13 m/m² = 791.92 m D-8, Steel
371.79 m² x 2.15 m/m² = 799.35 m D-9, PV
Total = 1591.27 m

1591.27 ÷ 6 = 265.21 pcs. , say........... 266


T. Windows Windows:
W-1, Aluminum (Fixe
( Using No. 16 Tie Wire at 0.30 cm long ) W-2, Aluminum (Awnin
371.79 m² x 0.032 kg/m² = 11.90 kg , say.................... 12 W-3, Steel (Fixed &
W-4, Aluminum (Fi
W-5, Aluminum (Fixe
( Using Class A (1 : 3) Mix ) W-6, Aluminum (Fixed &
4834 x 0.0734 = 354.82 bags , say.................... ........ 355 W-7, Steel (Fixed &
4834 x 0.0059 = 28.52 m³ , say.................... ........ ........ 29 W-8, Steel (Fix
W-9, Steel (Slid
W-10, Aluminum (Slidin
W-11, Aluminum (Single H
( At average thickness of 12mm, Class C Mix ) W-12, Aluminum (Fixe
2 x 371.79 m²
743.58 m²

743.58 m² x 0.108 = 80.31 bags , say.................... ........ 81


743.58 m² x 0.012 = 8.92 m³ , say.................... ........ ........ 9

( Using 0.3 m x 0.3 m tiles )


93.38 + 103.47
196.85 m²

196.85 m² x 11.11pcs/m² x 1.05 = 2296.35 pcs. , say.................... ........ ........ ....... 2297
( with 5% allowance for breakage )

( Using Class A Mixture )


196.85 m²

0.45 x 196.85 = 88.58 bags , say.................... ........ 89


0.025 x 196.85 = 4.92 m³ , say.................... ........ ........ 5
TWO - STOREY RESIDENTIAL HOUSE Page: 10/16 Project : TWO - STOREY RESIDENTI
BRGY. MATOBATO, CALB. CITY Location : BRGY. MATOBATO, CALB

QUANTITY TAKE - OFF Subjects : QUANTITY TAKE - OFF

ESTIMATED QUANTITIES

COMPUTATION V. TRUSS AND


ROOFING

DIRECT COUNTING : U. Truss / Purlins 2" x 6" x 4.80 m Lauaan L


Top Chord:

D-1, Wooden Panel Door (2.0m x 1.00m) = 1 unit


D-2, Wooden Panel Door (2.0m x 0.90m) = 5 units
D-3, Wooden Panel Door (2.0m x 0.70m) = 1 unit Bottom Chord
D-4, Wooden Panel Door (2.0m x 0.80m) = 1 unit
D-5, Wooden Panel Door (2.0m x 0.70m) = 1 unit
D-6, Glass Sliding Door (2.0m x 1.40m) = 2 units
D-7, Steel Panel Door (2.0m x 0.80m) = 1 unit Collar Beam:
D-8, Steel Panel Door (2.0m x 0.80m) = 5 units
D-9, PVC Panel Door (2.0m x 0.8m) = 4 units Wood Connect
21 units
Rafters:

W-1, Aluminum (Fixed Type) (2.40m x 1.60m) = 1 unit


W-2, Aluminum (Awning Type) (2.40m x 2.40m) = 2 units 2" x 4" x 4.80 m Lauaan L
W-3, Steel (Fixed & Awning) (2.00m x 1.60m) = 8 units Vertical & Dia
W-4, Aluminum (Fixed Type) (3.00m x 2.40m) = 2 units
W-5, Aluminum (Fixed Type) (4.00m x 4.00m) = 1 unit
W-6, Aluminum (Fixed & Awning) (1.60m x 3.00m) = 2 units
W-7, Steel (Fixed & Hopper) (0.80m x 0.60m) = 4 units
W-8, Steel (Fixed Type) (1.16m x 3.00m) = 4 units
W-9, Steel (Sliding Type) (3.25m x 2.40m) = 2 units 2" x 3" x 4.80 m Lauaan L
W-10, Aluminum (Sliding Type) (2.40m x 3.00m) = 2 units Purlins:
W-11, Aluminum (Single Hung Type) (1.60m x 2.00m) = 4 units
W-12, Aluminum (Fixed Type) (4.80m x 5.20m) = 1 unit
33 units

2" x 2" x 4.80 m Lauaan L


Cleats:

Equivalent Volume:

2" x 6" lumber =


2" x 4" lumber =
2" x 3" lumber =
2" x 2" lumber =
TWO - STOREY RESIDENTIAL HOUSE Page:11/16 Project : TWO - STOREY RESIDENT
BRGY. MATOBATO, CALB. CITY Location : BRGY. MATOBATO, CALB

QUANTITY TAKE - OFF Subjects : QUANTITY TAKE - OFF

ESTIMATED QUANTITIES

COMPUTATION V. TRUSS AND C


ROOFING

2" x 6" x 4.80 m Lauaan Lumber: V. Roofing * Roofing Sheets:


Top Chord:
6 pcs. of 3.83 m ≈ 6 pcs. of lumber Area - 1: ( 16.55 m x 5
15 pcs. of 2.42 m ≈ 8 pcs. of lumber
1 pc. Of 5.44 m ≈ 2 pcs. of lumber
Bottom Chord: Area - 2: ( 13.85 m x 4
4 pcs. of 3.94 m ≈ 4 pcs. of lumber
5 pcs. of 3.01 m ≈ 5 pcs. of lumber
6 pcs. of 5.37 ≈ 7 pcs. of lumber Area - 3: ( 4.6 m x 2.9
Collar Beam:
7 pcs. of 0.90 m ≈ 2 pcs. of lumber
Wood Connectors: Area - 4: ( 10.65 m x 1
22 pcs. of 0.48 m ≈ 3 pcs. of lumber
Rafters:
7 pcs. of 4.00 m ≈ 7 pcs. of lumber Roof. Sheets =
Total = 44 pcs.

2" x 4" x 4.80 m Lauaan Lumber: * Ridge Roll:


Vertical & Diagonal Members: =
Total length of 128.747 m ≈ 27 pcs. of lumber
Total = 27 pcs.
* Fascia Flashings: ( Ga. 26 at
=

2" x 3" x 4.80 m Lauaan Lumber:


Purlins: * Gutter:
12 pcs. of 12.00 m ≈ 36 pcs. of lumber =
10 pcs. of 4.00 m ≈ 10 pcs. of lumber
Total = 46 pcs.
* Roof Nails:
2" x 2" x 4.80 m Lauaan Lumber: =
Cleats:
55 pcs. of 0.3 m ≈ 4 pcs. of lumber
Total = 4 pcs. * C.W. Nails:
Truss =
Purlins =
44 pcs x 16.00 bd.ft./pc = 704.00 bd.ft.
27 pcs x 10.66 bd.ft./pc = 287.82 bd.ft.
46 pcs x 8.00 bd.ft./pc = 368.00 bd.ft.
4 pcs x 5.33 bd.ft./pc = 21.32 bd.ft.
Total = 1381.14 bd.ft.
TWO - STOREY RESIDENTIAL HOUSE Page: 12/16 Project : TWO - STOREY RESIDENT
BRGY. MATOBATO, CALB. CITY Location : BRGY. MATOBATO, CALB

QUANTITY TAKE - OFF Subjects : QUANTITY TAKE - OFF

ESTIMATED QUANTITIES

COMPUTATION Roof Ridge Fascia Gut- Roof C.W. VI. PLUMBING CO


Sheet Roll Flash ter Nail Nail WORKS
(pcs) (pcs) (pcs) (pcs) (kg) (kg)

( 0.81m x 3.60m Ga. 26 Corr. G.I. Roofing Sheet ) W. Plumbing Work BY DIRECT COUNTING:
Materials and
( 16.55 m x 5.09 m ) Accessories
16.55 ÷ 0.70 = 24 rows Water Closet
5.09 ÷ 3.35 = 2 pcs per row Lavatory
( 13.85 m x 4.51 m ) Kitchen Sink
13.85 ÷ 0.70 = 20 rows Bath Tub
4.51 ÷ 3.35 = 1.5 pc per row Water meter
( 4.6 m x 2.9 m ) Gate valve
4.6 ÷ 0.70 = 7 rows Faucet
2.9 ÷ 3.35 = 1 pc per row Shower Head
( 10.65 m x 1.7 m )
1.7 ÷ 0.70 = 3 rows
10.65 ÷ 3.35 = 3.5 pcs. per row Sanitary pipes and fittings:
(24 x 2)+(20 x 1.5)+(7 x 1) = 85 pcs. , say.. 85 Pipes, 100mm dia x 3.0
Pipes, 75mm dia x 3.00

( Ga. 26 at 2.40 m Ready-made G.I. Ridge Rolls )


14.5 m ÷ 2.1 m/pc = 6.9 pcs. , say.. ......... 7 Sanitary Tee, 100mm di
Sanitary Tee, 70mm dia
45 deg. Elbow, 100mm
Fascia Flashings: ( Ga. 26 at 2.4 m Ready-made G.I. Fascia Flashings ) 45 deg. Elbow, 75mm
( 59.749 ) ÷ 2.40 = 24.9 pcs. , say.. ......... ......... 25 Sanitary Wye, 100mm

( Ga. 26 at 2.40 m Ready-made G.I. Gutter ) Coupling,100mm dia


( 59.749 ) ÷ 2.4 = 24.9 pcs. , say.. ......... ......... ......... 25 Floor Drain Trap, 50mm
Clean-out w/plug, 100m

Water Pipes And Fittings, S


[(85/0.1)*2]pcs ÷ 120 pcs/kg = 8.40 kg. , say.. ......... ......... ......... ......... 14 Pipe, 12mm dia x 6.00m
Elbow 90 deg, 12mm dia
Tee, 12mm dia
( Using 40d Common Wire Nails ) Coupling, 12mm dia
(150 x 2)pcs ÷ 37 pcs/kg = 8.11 kg. Teflon Tape, Big
148.42 m² x 0.20 kg/m² = 29.68 kg.
37.79 kg. , say.. ......... ......... ......... ......... ......... 38
TWO - STOREY RESIDENTIAL HOUSE Page: 13/16 Project : TWO - STOREY RESIDENT
BRGY. MATOBATO, CALB. CITY Location : BRGY. MATOBATO, CALB

QUANTITY TAKE - OFF Subjects : QUANTITY TAKE - OFF

ESTIMATED QUANTITIES

COMPUTATION VI. PLUMBING CO


WORKS

BY DIRECT COUNTING: X. Septic Tank* CHB For Walls:

No. of CHB =
= 4 sets
= 1 sets
= 2 sets * Cement Mortar
= 1 set Cement =
= 1 set Sand =
= 5 sets
= 8 sets
= 3 sets * Structural Concrete:

Sanitary pipes and fittings: Slab Vol. =


Pipes, 100mm dia x 3.00m = 10 pcs. Cover Vol. =
Pipes, 75mm dia x 3.00m = 4 pcs.

Sanitary Tee, 100mm dia = 12 pcs.


Sanitary Tee, 70mm dia = 15 pcs. Using Class A Concrete Mixtur
45 deg. Elbow, 100mm dia = 14 pcs. Cement =
45 deg. Elbow, 75mm dia = 12 pcs. Sand =
Sanitary Wye, 100mm dia = 16 pcs. Gravel =

Coupling,100mm dia = 9 pcs.


Floor Drain Trap, 50mm dia = 4 pcs.
Clean-out w/plug, 100mm dia = 8 pcs. * Cement Plaster
Total Area =
Water Pipes And Fittings, Shedule 40: =
Pipe, 12mm dia x 6.00m = 10 pcs.
Elbow 90 deg, 12mm dia = 16 pcs. Cement =
= 9 pcs. Sand =
Coupling, 12mm dia = pcs.
= 10 pcs.
* Rebars:
For CHB Wall:
Vert. Bars =
Hor. Bars =

No. of Bars =

For Concrete Reinforcement:


Total Area =

No. of Bars =

Equivalent Weigth:
10 mm Bar =
12 mm Bar =
* Tie Wire: ( Using No. 16
For CHB Wall:
No. of kg =
For Concrete Reinforcement:
No. of kg =
TWO - STOREY RESIDENTIAL HOUSE Page: 14/16 Project : TWO - STOREY RESIDEN
BRGY. MATOBATO, CALB. CITY Location : BRGY. MATOBATO, CAL

QUANTITY TAKE - OFF Subjects : QUANTITY TAKE - OFF

ESTIMATED QUANTITIES

COMPUTATION Cem. Sand Grav 10mm 12mm Tie VII. CEILING


CHB (bags . RSB RSB Wire WORKS
(pcs)
) (m³) (m³) (pcs) (pcs) (kg)

( With Total Wall Area of 60.8 m² ) Y. Ceiling * Ceiling Board: ( Using 6 m


Total Area =
60.8 m² x 13 pcs/m² = 790.4 pcs , say.. 791
Ceiling Board =

( Using Class A (1 : 3) Mixture )


791 x 0.0734 = 58.06 bags , say........... 59
791 x 0.0059 = 4.67 m³ , say.................... 5.0 * Ceiling Joists: ( Using 2" x
Area A =
Area B =
* Structural Concrete: Area C =
Area D =
Area E =
2( 0.15 m x 1.8 m x 4.0 m ) = 2.16 m²
2( 0.2 m x 3.0 m x 1.8 m ) = 2.16 m² No. of Full Length Joists:
Total Vol. = 4.32 m² Area A =
Area B =
Area C =
Area D =
Using Class A Concrete Mixture: Area E =
4.32 x 7.85 = 33.91 bags , say........... 34
4.32 x 0.42 = 1.81 m³ , say.................... 2.0 No. of Cut-Length Joists:
4.32 x 0.84 = 3.63 m³ , say............................ 4.0 Area A =
Area B =
Area C =
Area D =
Area E =
( At average thickness of 12mm, Class A Mix )
60.8 m² + 7.20 m²
68.0 m² Req'd. Lumber =

68.0 m² x 0.216 = 14.69 bags , say........... 15 Equivalent Vol.:


68.0 m² x 0.012 = 0.816 m³ , say.................... 1.0 2" x 2" Lumber = 94

* C.W. Nails ( Using 8d


Total Joist =
( using 10 mm Ø x 6 m commercial length ) =
60.8 m² x 2.13 m/m² = 129.50 m
60.8 m² x 2.15 m/m² = 130.72 m No. of kg =
Total = 260.22 m
* Finishing Nails ( Using 2d
260.22 m ÷ 6.0 m/pc = 43.37 pcs. , say............................ ........ 44 No. of kg =

For Concrete Reinforcement: (using 12 mm Ø x 6 m commercial length ) * Wood Mouldings:


2( 1.8m x 4m + 3m x 1.8m ) = 25.2 m² Req'd. No. =

25.2 m² x 1.980 pcs/m² = 49.90 pcs. , say............................ ................. 50

Equivalent Weigth:
44 pcs x 3.70 kg/pc. = 162.80 kg
50 pcs x 5.33 kg/pc. = 266.50 kg
429.30 kg
( Using No. 16 Tie Wire at 0.30 cm long )

462.89 m² x 0.032 kg/m² = 14.81 kg


For Concrete Reinforcement:
60.8 m² x 0.132 kg/m² = 7.92 kg
Total Weight = 22.73 kg. , say............................ ................. ......... 23
TWO - STOREY RESIDENTIAL HOUSE Page: 15/16 Project : TWO - STOREY RESIDENTIA
BRGY. MATOBATO, CALB. CITY Location : BRGY. MATOBATO, CALB.

QUANTITY TAKE - OFF Subjects : QUANTITY TAKE - OFF

ESTIMATED QUANTITIES

COMPUTATION Ceiling Good C.W. Fin. Mould VIII. PAINTING C


Board Lumber Nails Nails -ings WORKS
(pcs) (pcs) (kg) (kg) (pcs)

( Using 6 mm x 1.20 m x 2.40 m Board ) Z. Paints


115 m² Total Area:

(115 m² ÷ 2.88 m²/pc) x 1.10 = 43.92 pcs. , say.. 44 * Primer Paint: ( With Cove
( with 10% allowance for wastage)
Coverage =

( Using 2" x 2" x 4.80 m Lumber ) Primer Paint =


(2.8 x 4.15) m
(3.1 x 12.7) m
(2.7 x 10) m * Top Coat Paint: ( With Cove
(3.3 x 7) m
(3.1 x 4) m Coverage =

No. of Full Length Joists: Top Coat Paint =


1(2.8 ÷ 0.6) = 5 pcs
2.7 (3.1 ÷ 0.6 ) = 14 pcs
2.1 (2.7 ÷ 0.6 ) = 10 pcs
1.5 (3.3 ÷ 0.6 ) = 9 pcs
1(3.1 ÷ 0.6 ) = 6 pcs
Total = 44 pcs.
No. of Cut-Length Joists:
0.59( 4.15 / 0.6) = 5 pcs.
0.64( 12.7 / 0.6) = 14 pcs.
0.57( 10 / 0.6) = 10 pcs.
0.69( 7 / 0.6) = 9 pcs.
0.65( 4 / 0.6) = 5 pcs.
Total = 43 pcs.

44 + 43 + 7 = 94 pcs.

2" x 2" Lumber = 94 pcs x 5.33 bd.ft./pc = 501.02 bd.ft ......... 501.02

( Using 8d Common Wire Nails )


No. of Joist X x No. of Joist Y
316 pcs.

316 joist x 0.027 kg/joist = 8.53 kg. , say.. ......... ......... 9

( Using 2d Finishing Nails )


44 sheets x 0.055 kg/sheet = 2.42 kg. , say.. ......... ......... ......... 3

(4m commercial length)


50.9 / 4 = 12.725 pcs. say… ......... ......... ......... ......... 13
TWO - STOREY RESIDENTIAL HOUSE Page:16/16
BRGY. MATOBATO, CALB. CITY

QUANTITY TAKE - OFF

ESTIMATED QUANTITIES

COMPUTATION

842 m²

( With Coverage of 30 m² per 4 L )

30 m² ÷ 4 L = 7.50 m²/L

842 m² ÷ 7.50 m²/L = 112.27 L

( With Coverage of 40 m² per 4 L )

40 m² ÷ 4 L = 10.0 m²/L

842 m² ÷ 10.0 m²/L = 84.2 L


Project : TWO - STOREY RESIDENTIAL HOUSE
Location : BRGY. MATOBATO, CALB. CITY

Subjects : BILL OF MATERIALS

Quantity Unit Description Unit cost Total Cost


Bag Portland Cement ₱ 240.00 ₱ 0.00
Cu. m. Washed Sand ₱ 700.00 ₱ 0.00
Cu. m. Gravel or Crushed Stones ₱ 800.00 ₱ 0.00
Sheet Marine Plywood, 6mm x 1.20m x 2.40m ₱ 475.00 ₱ 0.00
Bd. Ft. Coco lumber ₱ 11.25 ₱ 0.00
Piece 10mm dia x 6.00 m RSB ₱ 135.00 ₱ 0.00
Piece 12mm dia x 6.00 m RSB ₱ 205.00 ₱ 0.00
Piece 12mm dia x 10.50 m RSB ₱ 360.00 ₱ 0.00
Piece 16mm dia x 6.00 m RSB ₱ 380.00 ₱ 0.00
Kilo Wire No. 16 for Tying ₱ 65.00 ₱ 0.00
Piece CHB, 150 x 200 x 400mm ₱ 15.00 ₱ 0.00
Piece Tiles, 0.3 x 0.3 m ₱ 30.00 ₱ 0.00
Piece Tiles, 0.2 x 0.2 m ₱ 20.00 ₱ 0.00
Set D-1 ₱ - ₱ 0.00
Set D-2 ₱ - ₱ 0.00
Set D-3 ₱ - ₱ 0.00
Set D-4 ₱ - ₱ 0.00
Set D-5 ₱ -
Set D-6 ₱ -
Set D-7 ₱ -
Set D-8 ₱ -
Set D-9 ₱ - ₱ 0.00
Set W-1 ₱ - ₱ 0.00
Set W-2 ₱ - ₱ 0.00
Set W-3 ₱ - ₱ 0.00
Set W-4 ₱ - ₱ 0.00
Set W-5 ₱ - ₱ 0.00
Set W-6 ₱ - ₱ 0.00
Set W-7 ₱ - ₱ 0.00
Set W-8 ₱ - ₱ 0.00
Set W-9 ₱ - ₱ 0.00
Set W-10 ₱ - ₱ 0.00
Set W-11 ₱ - ₱ 0.00
Set W-12 ₱ - ₱ 0.00
Bd. Ft. Good lumber, Lauaan ₱ 40.00 ₱ 0.00
Piece Mouldings ₱ 60.00 ₱ 0.00
Kilo Common Wre Nails, assorted ₱ 60.00 ₱ 0.00
Sheet Corr. GI Roofing Sheet, Ga. 26 ₱ 300.00 ₱ 0.00
Piece Plain Gl ridge roll, Ga. 26 450mmx 2. ₱ 280.00 ₱ 0.00
Piece Plain Gl flashing, Ga.26 450mmx 2.44m ₱ 285.00 ₱ 0.00
Piece Plain Gl gutter, Ga. 16 450mm x 2.44 ₱ 200.00 ₱ 0.00
Kilo Roof Nails ₱ 65.00 ₱ 0.00
16L Can Flatwall Enamel Paint, White ₱ 2,200.00 ₱ 0.00
4L Can Flatwall Enamel Paint, White ₱ 550.00 ₱ 0.00
16L Can Epoxy Primer Paint ₱ 2,200.00 ₱ 0.00
4L Can Paint Thinner ₱ 120.00 ₱ 0.00
Box Sandpapers (Assorted) ₱ 150.00 ₱ 0.00
Piece Roller Brush ₱ 35.00 ₱ 0.00
Piece 3'' Paint Brush ₱ 25.00 ₱ 0.00
Set Water Closet ₱ 4,500.00 ₱ 0.00
Set Lavatory ₱ 2,000.00 ₱ 0.00
Set Kitchen Sink ₱ 1,700.00 ₱ 0.00
Set Bath Tub ₱ 6,500.00 ₱ 0.00
Set Shower Head ₱ 800.00 ₱ 0.00
Piece Pipes, 100mm dia x 3.00m ₱ 420.00 ₱ 0.00
Piece Pipes, 75mm dia x 3.00m ₱ 350.00 ₱ 0.00
Piece Sanitary Tee, 100mm dia ₱ 150.00 ₱ 0.00
Piece Sanitary Tee, 75mm dia ₱ 90.00 ₱ 0.00
Piece 45 deg. Elbow, 100mm dia ₱ 150.00 ₱ 0.00
Piece 45 deg. Elbow, 75mm dia ₱ 110.00 ₱ 0.00
Piece 90 deg. Elbow, 50mm dia ₱ 90.00 ₱ 0.00
Piece Sanitary Wye, 100mm dia ₱ 150.00 ₱ 0.00
Piece Coupling,100mm dia ₱ 120.00 ₱ 0.00
Piece Floor Drain Trap, 50mm dia ₱ 180.00 ₱ 0.00
Piece Clean-out w/plug, 100mm dia ₱ 170.00 ₱ 0.00
Set Water meter ₱ 1,500.00 ₱ 0.00
Project : TWO - STOREY RESIDENTIAL HOUSE Page:
Location : BRGY. MATOBATO, CALB. CITY

Subjects : LABOR COST

ITEMS Quantity & Unit Engineer Foreman Carpenter Mason Steelman Laborer Output / Day

I. EXCAVATION
A. Clearing, Grabbing, and Layout sq.m. sq.m.
B. Excavation cu.m. cu.m.
C. Earth Fill cu.m. cu.m.

II. STRUCTURAL WORKS


D. Footings
D1. Cutting & Bending of Bars kg. kg.
D2. Installation of Bars kg. kg.
E. Column
E1. Cutting & Bending of Bars kg. kg.
E2. Installation of Scaffoldings bd.ft. bd.ft.
E3. Installation of Bars kg. kg.
E4. Installation of Forms sq.m. sq.m.
F. Concreting of Footing & Column cu.m. cu.m.
G. Slab on Ground
G1. Cutting & Bending of Bars kg. kg.
G2. Installation of Bars kg. kg.
H. Concreting of Slab on Ground cu.m. cu.m.
I. Beams
I1. Cutting & Bending of Bars kg. kg.
I2. Installation of Scaffoldings bd.ft. bd.ft.
I3. Installation of Bars kg. kg.
I4. Installation of Forms sq.m. sq.m.
J. Slab (2nd Floor)
J1. Cutting & Bending of Bars kg. kg.
J2. Installation of Scaffoldings bd.ft. bd.ft.
J3. Installation of Bars kg. kg.
J4. Installation of Forms sq.m. sq.m.
K. Concreting of Slab & Beam cu.m. cu.m.
L. Column (2nd Floor)
L1. Cutting & Bending of Bars kg. kg.
L2. Installation of Scaffoldings bd.ft. bd.ft.
L3. Installation of Bars kg. kg.
L4. Installation of Forms sq.m. sq.m.
M. Concreting of Column cu.m. cu.m.
Page:

N. Roof Beams
N1. Cutting & Bending of Bars kg. kg.
N2. Installation of Scaffoldings bd.ft. bd.ft.
N3. Installation of Bars kg. kg.
N4. Installation of Forms sq.m. sq.m.
O. Concreting of Roof Beams cu.m. cu.m.

III. MASONRY WORKS


P. Chb Walling sq.m. sq.m.
Q. Plastering/ Finishing sq.m. sq.m.
R. Tiles Intstallation sq.m. sq.m.

IV. DOORS AND WINDOWS


S. Installation of Windows units units
T. Installation of Doors units units

V. TRUSS & ROOFING


U. Truss and Purlin Installation bd.ft. bd.ft.
V. Roofing sq.m. sq.m.

VI. PLUMBING WORKS


W. Pipe / Accessories Installation sets sets
X. Septic Tank units units

VII. CEILING WORKS


Y. Ceiling Installation sq.m. sq.m.

VIII. PAINTING WORKS


Z. Ceiling sq.m. sq.m.

WORKERS RATE PER DAY LABOR COST


ENGINEER ₱ 700.00 ₱ 0.00
FOREMAN ₱ 500.00 ₱ 0.00
CARPENTER ₱ 400.00 ₱ 0.00
MASON ₱ 400.00 ₱ 0.00
STEELMAN ₱ 400.00 ₱ 0.00
LABORER ₱ 300.00 ₱ 0.00
TOTAL LABOR COST ₱ 0.00
1 / 2

Duration (days)
2/2
Project : TWO - STOREY RESIDENTIAL HOUSE
Location : BRGY. SAN POLICARPO CALB. CITY

Subjects : S - CURVE

S - CURVE
₱ 2,000,000.00

₱ 1,800,000.00
Amount

₱ 1,600,000.00

₱ 1,400,000.00

₱ 1,200,000.00

₱ 1,000,000.00

₱ 800,000.00

₱ 600,000.00
### 2 3 4 5 6 7 8 9 10 11 12 13 14 15
###### ### ₱ 17,924.00 ### ### ₱ 42,512.00 ₱ 50,708.00 ###
### ₱ 87,118.00 ₱ 106,978.00 ₱ 126,838.00 ₱ 146,698.00 ###
₱ 400,000.00

₱ 200,000.00

₱ 0.00

Days
Project : TWO - STOREY RESIDENTIAL HOUSE Page: 1/5
Location : BRGY. SAN POLICARPO CALB. CITY

Subjects : MANPOWER SCHEDULE


N O. O F M A N P O W E R

MANPOWER SCHEDULE (FOREMAN)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
DAYS
N O. O F M A N P O W E R

MANPOWER SCHEDULE (FOREMAN)

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81
DAYS
MANPOWER SCHEDULE (CARPENTER)
Project : TWO - STOREY RESIDENTIAL HOUSE Page: 2/5
Location : BRGY. SAN POLICARPO CALB. CITY

Subjects : MANPOWER SCHEDULE


N O. O F M A N P O W E R

MANPOWER SCHEDULE (CARPENTER)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
DAYS
N O. O F M A N P O W E R

MANPOWER SCHEDULE (CARPENTER)

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81
DAYS
MANPOWER SCHEDULE (MASON)
Project : TWO - STOREY RESIDENTIAL HOUSE Page: 3/5
Location : BRGY. SAN POLICARPO CALB. CITY

Subjects : MANPOWER SCHEDULE


N O. O F M A N P O W E R

MANPOWER SCHEDULE (MASON)


12
11
10
9
8
7
6
5
4
3
2
1
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
DAYS
N O. O F M A N P O W E R

MANPOWER SCHEDULE (MASON)

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81
DAYS
Project : TWO - STOREY RESIDENTIAL HOUSE Page: 4/5
Location : BRGY. SAN POLICARPO CALB. CITY

Subjects : MANPOWER SCHEDULE


N O. O F M A N P O W E R

MANPOWER SCHEDULE (STEELMAN)


12
11
10
9
8
7
6
5
4
3
2
1
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
DAYS
N O. O F M A N P O W E R

MANPOWER SCHEDULE (STEELMAN)

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81
DAYS
Project : TWO - STOREY RESIDENTIAL HOUSE Page: 5/5
Location : BRGY. SAN POLICARPO CALB. CITY

Subjects : MANPOWER SCHEDULE


N O. O F M A N P O W E R

MANPOWER SCHEDULE (LABORER)


12
11
10
9
8
7
6
5
4
3
2
1
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
DAYS
N O. O F M A N P O W E R

MANPOWER SCHEDULE (LABORER)

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81