CONTROL DE SEGUIMIENTO DE ACTIVIDADES

FECHA DE INICIO DEL PROYECTO:


COORDINADOR DEL PROYECTO:
DESCRIPCIÓN DEL PROYECTO:
MES / SEMANA RESULTADO DE AVANCE PERIODO MARZO
Fase o
N° Y SALDO DE OBRA Marzo 2019 % Cumpl. 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Plan
ACTIVIDADES UNIDAD M.R M.A.F Saldo Inicial Final. V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D
1 PUENTE TARUCACHI 0.0
2 OBRAS PRELIMINARES 0.0

3 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb 1.0 0.8 0.170 18/03/2019 23/03/2019 0.0 ▓ ▓ ▓ ▓ ▓ ▓

4 TOPOGRAFIA Y GEOREFERENCIACION m2 3200.9 3003.4 197.46 02/03/2019 23/03/2019 0.0 ▓ ▓ ▓ ▓ ▓ ▓ ▓ ▓ ▓ ▓ ▓ ▓ ▓ ▓ ▓ ▓ ▓ ▓ ▓ ▓ ▓ ▓


5 MANTENIMIENTO DE TRANSITO Y SEGURIDAD VIAL glb 1.0 1.0 0.00 04/03/2019 23/03/2019 0.0 ▓ ▓ ▓ ▓ ▓ ▓ ▓ ▓ ▓ ▓ ▓ ▓ ▓ ▓ ▓ ▓ ▓ ▓ ▓ ▓
ACCESOS A CANTERAS, FUENTES DE AGUA Y DEPOSITO DE MATERIAL
6 km 0.0
EXCEDENTE 0.5 0.5 0.00
7 DESBROCE Y LIMPIEZA DEL TERRENO m2 1529.7 1371.2 158.50 0.0
8 CONCRETO CLASE H3 (F'C = 100 KG/CM2) + 30% PIEDRA GRANDE m3 187.9 187.9 0.00 0.0
9 REMOCION DE CARPETA ASFALTICA m3 97.6 97.6 0.00 0.0
10 DEMOLICION DE ESTRUCTURAS DE CONCRETO SIMPLE m3 304.4 0.0 304.40 19/03/2019 23/03/2019 0.0 ▓ ▓ ▓ ▓ ▓
11 DEMOLICION DE ESTRUCTURAS DE CONCRETO ARMADO EN SECO m3 410.7 401.6 9.02 19/03/2019 23/03/2019 0.0 ▓ ▓ ▓ ▓ ▓
12 DEMOLICION DE ESTRUCTURAS DE CONCRETO SIMPLE BAJO AGUA m3 0.0 0.0 0.00 0.0
13 DEMOLICION DE ESTRUCTURAS DE CONCRETO ARMADO BAJO AGUA m3 398.7 398.7 0.00 0.0
14 EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN EN SECO m3 759.6 759.6 0.00 0.0
15 EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN BAJO AGUA m3 0.0 0.0 0.00 0.0
16 TRANSPORTE DE MATERIALES EXCEDENTES ENTRE 120 M Y 1,000 M m3-km 1811.2 1811.2 0.00 0.0
17 TRANSPORTE DE MATERIALES EXCEDENTES A MAS DE 1,000 M m3-km 18611.6 18611.6 0.00 0.0
18 DESVIO TIPO 1 0.0
19 EXCAVACION EN EXPLANACIONES EN MATERIAL SUELTO m3 404.1 404.1 0.00 0.0
20 PERFILADO Y COMPACTADO DE LA SUBRASANTE m2 586.0 550.0 35.95 0.0
21 ENROCADO PARA DESVIO m3 238.4 238.4 0.00 0.0
22 OBRAS TEMPORALES 0.0
23 ENCAUZAMIENTO DE QUEBRADAS m3 212.6 212.6 0.00 0.0
24 ESTRIBOS 0.0
43 SUPER ESTRUCTURA 0.0
50 LOSAS DE APROXIMACION 0.0
51 CONCRETO CLASE H1 (F'C = 100 KG/CM2) m3 12.5 12.5 0.00 06/03/2019 06/03/2019 0.0 ▓
52 CONCRETO CLASE D1 ( F'C = 210 KG/CM2 ) m3 40.5 40.5 0.00 06/03/2019 06/03/2019 0.0 ▓
53 ENCOFRADO Y DESENCOFRADO EN SECO m2 28.6 28.6 0.00 05/03/2019 06/03/2019 0.0 ▓ ▓
54 ACERO DE REFUERZO FY=4200 KG/CM2 kg 3968.7 3968.7 0.00 04/03/2019 05/03/2019 0.0 ▓ ▓
55 VARIOS 0.0
56 MURO NEW JERSEY m 60.4 42.6 17.80 06/03/2019 06/03/2019 0.0 ▓
68 MOVIMIENTO DE TIERRAS 0.0
69 EXCAVACION EN EXPLANACIONES EN MATERIAL SUELTO m3 3256.9 2923.7 333.23 04/03/2019 08/03/2019 0.0 ▓ ▓ ▓ ▓ ▓
70 CONFORMACION DE TERRAPLENES m3 344.5 120.0 224.51 11/03/2019 13/03/2019 0.0 ▓ ▓ ▓
71 TRANSPORTE DE MATERIALES GRANULARES ENTRE 120 M Y 1,000 M m3-km 447.6 120.0 327.64 07/03/2019 09/03/2019 0.0 ▓ ▓ ▓
72 TRANSPORTE DE MATERIALES GRANULARES A MAS DE 1,000 M m3-km 11999.8 9855.0 2144.80 11/03/2019 13/03/2019 0.0 ▓ ▓ ▓
73 TRANSPORTE DE MATERIALES EXCEDENTES ENTRE 120 M Y 1,000 M m3-km 2294.0 2294.0 0.00 0.0
74 TRANSPORTE DE MATERIALES EXCEDENTES A MAS DE 1,0000 M m3-km 23573.0 20585.0 2988.00 0.0
75 PAVIMENTO FLEXIBLE 0.0
76 PERFILADO Y COMPACTADO DE LA SUBRASANTE m2 1874.8 0.0 1874.81 12/03/2019 13/03/2019 0.0 ▓ ▓
77 BASE GRANULAR m3 363.5 0.0 363.54 11/03/2019 12/03/2019 0.0 ▓ ▓
78 IMPRIMACION ASFALTICA m2 1653.3 0.0 1653.32 14/03/2019 15/03/2019 0.0 ▓ ▓
79 RIEGO DE LIGA m2 439.7 0.0 439.67 14/03/2019 14/03/2019 0.0 ▓
80 CARPETA ASFALTICA EN CALIENTE m3 152.6 0.0 152.55 14/03/2019 15/03/2019 0.0 ▓ ▓
81 CEMENTO ASFALTICO DE PENETRACION 120 / 150 gal 5238.7 0.0 5238.66 14/03/2019 15/03/2019 0.0 ▓ ▓
82 ASFALTO LIQUIDO MC-30 gln 598.7 0.0 598.68 14/03/2019 15/03/2019 0.0 ▓ ▓
83 FILLER MINERAL kg 4989.2 0.0 4989.20 14/03/2019 15/03/2019 0.0 ▓ ▓
84 ADITIVO MEJORADOR DE ADHERENCIA kg 99.8 0.0 99.78 14/03/2019 14/03/2019 0.0 ▓
85 TRANSPORTE DE MATERIALES GRANULARES ENTRE 120 M Y 1,000 M m3-km 248.4 0.0 248.36 04/03/2019 04/03/2019 0.0 ▓
86 TRANSPORTE DE MATERIALES GRANULARES A MAS DE 1,000 M m3-km 6657.7 0.0 6657.70 04/03/2019 05/03/2019 0.0 ▓ ▓
87 TRANSPORTE DE MEZCLA ASFALTICA PARA D <= 1 KM m3-km 124.7 0.0 124.73 14/03/2019 15/03/2019 0.0 ▓ ▓
88 TRANSPORTE DE MEZCLA ASFALTICA PARA D > 1 KM m3-km 15273.2 0.0 15273.20 14/03/2019 15/03/2019 0.0 ▓ ▓
89 MURO DE CONTENCION 0.0
98 SEÑALIZACION Y SEGURIDAD VIAL 0.0
99 SEÑALES PREVENTIVAS u 4.0 0.0 4.00 19/03/2019 21/03/2019 0.0 ▓ ▓ ▓
100 SEÑALES REGLAMENTARIAS u 2.0 0.0 2.00 19/03/2019 21/03/2019 0.0 ▓ ▓ ▓
101 SEÑALES INFORMATIVAS m2 2.4 0.0 2.38 19/03/2019 21/03/2019 0.0 ▓ ▓ ▓
102 POSTES DE CONCRETO PARA SEÑALES u 6.0 0.0 6.00 19/03/2019 21/03/2019 0.0 ▓ ▓ ▓
103 ESTRUCTURAS DE SOPORTE DE SEÑALES TIPO E-1 u 2.0 0.0 2.00 19/03/2019 21/03/2019 0.0 ▓ ▓ ▓
104 POSTES DELINEADORES u 12.0 0.0 12.00 19/03/2019 21/03/2019 0.0 ▓ ▓ ▓
105 TACHA RETROREFLECTIVA u 54.0 0.0 54.00 19/03/2019 21/03/2019 0.0 ▓ ▓ ▓
106 MARCAS EN EL PAVIMENTO m2 86.0 0.0 86.00 19/03/2019 21/03/2019 0.0 ▓ ▓ ▓
107 BARRERAS DE SEGURIDAD LATERAL NIVEL DE CONTENCION P3 m 117.0 0.0 117.00 19/03/2019 21/03/2019 0.0 ▓ ▓ ▓
108 TRANSICION DE BARRERA DE SEGURIDAD A BARRERA RIGIDA u 4.0 0.0 4.00 19/03/2019 21/03/2019 0.0 ▓ ▓ ▓
109 CAPTAFAROS u 48.0 0.0 48.00 19/03/2019 21/03/2019 0.0 ▓ ▓ ▓
110 RETIRO DE SEÑALIZACION EXISTENTE u 3.0 0.0 3.00 19/03/2019 21/03/2019 0.0 ▓ ▓ ▓
111 PINTADO DE PARAPETOS DE MUROS m2 60.0 0.0 60.00 19/03/2019 21/03/2019 0.0 ▓ ▓ ▓
112 OBRAS DE DEFENSA 0.0
113 EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN BAJO AGUA m3 5483.1 3174.9 2308.18 23/03/2019 24/03/2019 0.0 ▓ ▓
114 RELLENOS PARA ESTRUCTURAS BAJO AGUA m3 327.7 105.0 222.70 25/03/2019 25/03/2019 0.0 ▓
115 CONCRETO CLASE D1 ( F'C = 210 KG/CM2 ) m3 232.8 0.0 232.76 27/03/2019 27/03/2019 0.0 ▓
116 ENCOFRADO Y DESENCOFRADO BAJO AGUA m2 331.4 0.0 331.40 26/03/2019 27/03/2019 0.0 ▓ ▓
117 PERFILADO Y COMPACTACION EN ZONA DE CORTE m2 734.1 0.0 734.09 24/03/2019 25/03/2019 0.0 ▓ ▓
118 GAVIONES TIPO COLCHON m3 315.6 0.0 315.60 27/03/2019 29/03/2019 0.0 ▓ ▓ ▓
119 CAMA DE ARENA m3 144.1 0.0 144.11 27/03/2019 29/03/2019 0.0 ▓ ▓ ▓
120 GEOTEXTIL NO TEJIDO (GRAMAJE MINIMO 400) m2 749.6 0.0 749.55 27/03/2019 29/03/2019 0.0 ▓ ▓ ▓
121 TRANSPORTE DE MATERIALES GRANULARES ENTRE 120 M Y 1,000 M m3-km 749.9 250.0 499.93 25/03/2019 26/03/2019 0.0 ▓ ▓
122 TRANSPORTE DE MATERIALES GRANULARES A MAS DE 1,000 M m3-km 20102.2 3250.5 16851.66 25/03/2019 26/03/2019 0.0 ▓ ▓
123 TRANSPORTE DE PIEDRA PARA GAVIONES ENTRE 120 M Y 1,000 M m3-km 328.2 0.0 328.17 25/03/2019 26/03/2019 0.0 ▓ ▓
124 TRANSPORTE DE PIEDRA PARA GAVIONES A MAS DE 1,000 m3-km 8797.3 0.0 8797.30 25/03/2019 26/03/2019 0.0 ▓ ▓
125 TRANSPORTE DE MATERIALES EXCEDENTES ENTRE 120 M Y 1,000 M m3-km 5281.1 2667.1 2613.93 23/03/2019 25/03/2019 0.0 ▓ ▓ ▓
126 TRANSPORTE DE MATERIALES EXCEDENTES A MAS DE 1,000 M m3-km 54268.8 36905.4 17363.45 23/03/2019 25/03/2019 0.0 ▓ ▓ ▓
127 PROTECCIÓN AMBIENTAL 0.0

128 PROGRAMA DE MEDIDAS PREVENTIVAS, MITIGADORAS Y/O CORRECTIVAS 0.0

129 SEÑALES AMBIENTALES TEMPORALES und 8.0 8.0 0.00 0.0


130 PROGRAMA DE MONITOREO AMBIENTAL 0.0
135 PROGRAMA DE CIERRE DE OBRA 0.0
136 ACONDICIONAMIENTO DE MATERIAL EXCEDENTE EN DME m3 14169.6 0.0 14169.57 29/03/2019 31/03/2019 0.0 ▓ ▓ ▓
137 READECUACION AMBIENTAL DE CANTERAS m2 10290.5 0.0 10290.50 0.0
RETIRO Y AMACENAMIENTO TEMPORAL DE TOP SOIL EN INSTALACIONES
138 m3 0.0
TEMPORALES 1525.4 0.0 1525.42
139 REPOCICION DE TOP SOIL DE INSTALACIONES AUXILIARES Y DME m2 10169.5 0.0 10169.50 0.0
140 READECUACION AMBIENTAL DEL DME m2 14900.0 0.0 14900.00 29/03/2019 31/03/2019 0.0 ▓ ▓ ▓
141 READECUACION AMBIENTAL DE PLANTAS m2 10169.5 0.0 10169.50 29/03/2019 31/03/2019 0.0 ▓ ▓ ▓

0 OK= Realizadas 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
:
ES

P= Pendientes 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
L
TA

#N/A
TO

A= Aplazadas 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0