Consultant Date
Vendor
Package Civil finishes
Description of Work INTERNAL PLASTERING -- CEILING/WALL
Wing Dwg.Ref.No Rev Inspection Request
Floor Inspected by By Time
Details :
Location
Sl. No Description YES NO NA Remarks
MEP CLEARANCES
Has the packing for the Electrical conduits and boxes fixed in wall
3 using thermocol, cement mortar, mesh works been completed as per
check list. Has it been accepted & signed by all concerned.
Has the PHE piping works in toilets and kitchen been completed as
4
per check list. Has it been accepted & signed by all concerned.
Has the A/C drain piping works been completed as per check list. Has
5
it been accepted & signed by all concerned
8 Check for bull marks and record the average thickness of plaster
Check if true level surface, right angle, plumb, room dimension &
9
straight edge are available before commencing to plaster the surface
Signature
Name
Date
Time
Distribution Original : CBRE - QS cc : Vendor
Format No. F021-QC-Ch-024/Rev01/Oct2013