efficiency of the tire crusher is at 95% and the rest of the equipment is at 98%.
Table _
Mass Balance for Design Option 1
Remover
m4= m2(0.98)
m4= 10780 kg/d (0.98)
Tire Cutter m2 Tire Cutter m4 =10564.4kg/d of cutted
tire
m5=10564.4kg/d (0.02)
m5=211.288 kg/d
m6= m4(0.95)
m6= 10564.4 kg/d (0.95)
Tire m4 Tire Crusher m6 =10036.18 kg/d of
crushed tire
Crusher
m7=10036.18 kg/d (0.05)
m7=501.809 kg/d
M8=0.98(m6)(0.47)+(m6)(0
m8 .03)
m6 Reactor m8=0.98(10036.18)(0.47)+
M9
( 10036.18)(0.03)
Reactor M10 m8 = 4923.75 kg/d Liquid
0 and Gas product
m9=0.98(m6) (0.43) +
0.98(m6) (0.03)
m9=0.98(10036.18) (0.47)
+
0.98(10036.18) (0.03)
m9 = 4917.73 kg/d Solid
Product
m10 = m6 – m8 – m9
m10 = 10036.18 – 4923.75
– 4917.73
m10 = 194.7 kg/d Gas
product
m11 = (m8)(0.98)(0.5)
m11 = (4923.75)(0.98)(0.5)
m11 = 2412.64 kg/d of
M8 Manifold M11 Heavy Oil
Manifold m12 = (m8 – m11)
M12
m12 = (4923.75– 2412.64)
m12 = 2511.11 kg/d Gas
m13 = (m12)(0.98)(1 –
0.0008)
Oil and m13 = (2511.11)(0.98)(1 –
m12 Oil and Water m13 0.0008)
Water Separator
m13 = 2458.92 kg/d
Separator m14
Pyrolysis Oil
m14 = (m12 – m13)
m14 = (2511.11 – 2458.92)
m14 = 52.19 kg/d Water
m15 = (m9)(0.98)(0.93)
m15 =
(4917.73)(0.98)(0.93)
m9 Magnetizer m15
m15 = 4482.02 kg/d
Magnetizer Carbon Black
m16
m16 = 4917.73 – 4482.02
m16 = 435.71 kg/d Steel
Wire
Dedusting m17 =
(m10)(0.98)(0.98)
Energy Balance
Cp = 690.36 J/kg
Q = mCp(T2-T1)
Steel Wires:
Cp = 470 J/kgC
= 312.8639861 J/s or W
Fuel Oil
Cp = 2090 J / kgC
Gas
Cp = 1091.6 J/kg K
= 319.7857364 J/s or W
S Bala