without an operations permit, but you 29.97, Operations Permit: Application,
are required to operate in accordance and all applicable requirements of this with applicable local, State, and Fed- subpart. eral laws and regulations, and are sub- ject to applicable provisions of this § 29.63 What plugging and reclamation subpart, including requirements for a requirements apply to my pre-exist- ing operations? permit when you propose to conduct new operations or to modify pre-exist- Upon completion of your production ing operations. operation, you are subject to the rec- lamation standards in § 29.117(d). You § 29.61 What information must I pro- must obtain an operations permit in vide to the Service? accordance with §§ 29.90 through 29.97, You must submit the following infor- Operations Permit: Application, and all mation to the Service where your pre- applicable requirements of this sub- existing operation is occurring by Feb- part, prior to plugging your well and ruary 13, 2017 or 90 days after a bound- conducting site reclamation. ary change or establishment of a new § 29.64 What other provisions apply to refuge: my operations? (a) Documentation demonstrating that you hold the right to operate on Your pre-existing operations are also Service-administered lands or waters. subject to the following regulations in (b) The names, phone numbers, and this part 29: addresses of your: (a) § 29.120(b), (d), (f), and (g) and § 29.121(a) and (c)–(f); (1) Primary company representative; (b) § 29.170(a); (2) Representative responsible for (c) §§ 29.180 and 29.181; field supervision; and (d) § 29.190; and (3) Representative responsible for (e) § 29.200. emergency response. (c) A brief description of your current TEMPORARY ACCESS PERMITS operations, and any anticipated changes to current operations, includ- § 29.70 When do I need a temporary ac- ing: cess permit? (1) A scaled map clearly delineating You must apply to the Service and your existing area of operations; obtain a temporary access permit to (2) Documentation of the current op- access your proposed area of operations erating methods, surface equipment, in order to conduct reconnaissance sur- materials produced or used, and moni- veys within a refuge. This permit will toring methods; and describe the means, routes, timing, and (3) Copies of all plans and permits re- other terms and conditions of your ac- quired by local, State, and Federal cess determined by the Service to re- agencies, including a Spill Prevention sult in only the minimum disturbance Control and Countermeasure Plan if re- necessary to perform surveys. quired by Environmental Protection Agency regulations at 40 CFR part 112. § 29.71 How do I apply for a temporary access permit? § 29.62 What if I intend to conduct new You must submit the information re- operations or modify my pre-exist- quested in FWS Form 3–2469 (Oil and ing operations? Gas Operations Special Use Permit Ap- (a) You must obtain an operations plication) to the refuge in which you permit before conducting operations propose to conduct operations. Infor- that are begun after December 14, 2016 mation includes, but is not limited to: for those new operations in accordance (a) The name, legal address, and tele- with §§ 29.90 through 29.97, Operations phone number of the operator, em- Permit: Application, and all applicable ployee, agent, or contractor respon- requirements of this subpart. sible for overall management of the (b) You must obtain an operations proposed operations; jstallworth on DSKBBY8HB2PROD with CFR
permit prior to modifying your pre-ex- (b) Documentation demonstrating
isting operations for that modification that you hold the right to operate on in accordance with §§ 29.90 through Service-administered lands or waters;
276
VerDate Sep<11>2014 15:09 Jan 25, 2018 Jkt 241242 PO 00000 Frm 00286 Fmt 8010 Sfmt 8010 Y:\SGML\241242.XXX 241242