Você está na página 1de 1

§ 29.61 50 CFR Ch.

I (10–1–17 Edition)

without an operations permit, but you 29.97, Operations Permit: Application,


are required to operate in accordance and all applicable requirements of this
with applicable local, State, and Fed- subpart.
eral laws and regulations, and are sub-
ject to applicable provisions of this § 29.63 What plugging and reclamation
subpart, including requirements for a requirements apply to my pre-exist-
ing operations?
permit when you propose to conduct
new operations or to modify pre-exist- Upon completion of your production
ing operations. operation, you are subject to the rec-
lamation standards in § 29.117(d). You
§ 29.61 What information must I pro- must obtain an operations permit in
vide to the Service? accordance with §§ 29.90 through 29.97,
You must submit the following infor- Operations Permit: Application, and all
mation to the Service where your pre- applicable requirements of this sub-
existing operation is occurring by Feb- part, prior to plugging your well and
ruary 13, 2017 or 90 days after a bound- conducting site reclamation.
ary change or establishment of a new
§ 29.64 What other provisions apply to
refuge: my operations?
(a) Documentation demonstrating
that you hold the right to operate on Your pre-existing operations are also
Service-administered lands or waters. subject to the following regulations in
(b) The names, phone numbers, and this part 29:
addresses of your: (a) § 29.120(b), (d), (f), and (g) and
§ 29.121(a) and (c)–(f);
(1) Primary company representative;
(b) § 29.170(a);
(2) Representative responsible for
(c) §§ 29.180 and 29.181;
field supervision; and
(d) § 29.190; and
(3) Representative responsible for (e) § 29.200.
emergency response.
(c) A brief description of your current TEMPORARY ACCESS PERMITS
operations, and any anticipated
changes to current operations, includ- § 29.70 When do I need a temporary ac-
ing: cess permit?
(1) A scaled map clearly delineating You must apply to the Service and
your existing area of operations; obtain a temporary access permit to
(2) Documentation of the current op- access your proposed area of operations
erating methods, surface equipment, in order to conduct reconnaissance sur-
materials produced or used, and moni- veys within a refuge. This permit will
toring methods; and describe the means, routes, timing, and
(3) Copies of all plans and permits re- other terms and conditions of your ac-
quired by local, State, and Federal cess determined by the Service to re-
agencies, including a Spill Prevention sult in only the minimum disturbance
Control and Countermeasure Plan if re- necessary to perform surveys.
quired by Environmental Protection
Agency regulations at 40 CFR part 112. § 29.71 How do I apply for a temporary
access permit?
§ 29.62 What if I intend to conduct new You must submit the information re-
operations or modify my pre-exist- quested in FWS Form 3–2469 (Oil and
ing operations? Gas Operations Special Use Permit Ap-
(a) You must obtain an operations plication) to the refuge in which you
permit before conducting operations propose to conduct operations. Infor-
that are begun after December 14, 2016 mation includes, but is not limited to:
for those new operations in accordance (a) The name, legal address, and tele-
with §§ 29.90 through 29.97, Operations phone number of the operator, em-
Permit: Application, and all applicable ployee, agent, or contractor respon-
requirements of this subpart. sible for overall management of the
(b) You must obtain an operations proposed operations;
jstallworth on DSKBBY8HB2PROD with CFR

permit prior to modifying your pre-ex- (b) Documentation demonstrating


isting operations for that modification that you hold the right to operate on
in accordance with §§ 29.90 through Service-administered lands or waters;

276

VerDate Sep<11>2014 15:09 Jan 25, 2018 Jkt 241242 PO 00000 Frm 00286 Fmt 8010 Sfmt 8010 Y:\SGML\241242.XXX 241242

Você também pode gostar