There are several issues that may be encountered during pile foundation construction.
These problems will cause deficiency in the capacity of the pile unless they tackled
properly.
These pile construction problems and with their causes and required measure to
prevent them are discussed in the following sections.
2. Concrete faults
3. Reinforcement installation issues
This problem can be prevented by supervising casing installation and inspect the work
before concrete placement. Finally, if this problem occurs, the pile should be
withdrawn and reinstall it properly.
2. Concrete Faults
Pile construction problems due to concrete faults involve:
Moreover, if casings are withdrawn, then the withdrawal of casing may lead to create
voids in concrete. Voids can be prevented in this case by cleaning casings and
guarantee that sufficient concrete volume is poured.
3. Reinforcement Installation
Issues
Steel bars are likely to move laterally or being dragged down during compaction.
There are number of reasons that led to reinforcement disposition for example
improper placement of spacers, careless techniques, and defective anchorage of steels
in some pile types.
It is required to check steel cage during fabrication in accordance with specifications
and monitor installation process to prevent such issue. Lastly, pile steel cages shall be
supported firmly at the bottom and spacers need to be provided in accordance with
applicable codes.
o Ground around shaft or beneath base weakened due to improper boring technique.