RISK ASSESSMENT SHEET

Installation of HVAC Duct


REF. NO. RA-AC-001

Project Title: Town Square Development Dubai – Zahra Breeze


Probability/ Severity/ Risk Value
Risk Value
Likelihood Impact (After Remarks
Potential Probability/ Severity/ (Before
No: Category/Activity Control Measures (After (After Control or
Hazards Likelihood Impact Control
Control Control Measures) References
Measure)
Measures) Measures)
Use proper PPE & Clothing
should be proper, grinder to be
Damage to eye,
checked before use.
Grinding & face and body 9 6
1 3 3 Check all the cable must be 2 3
Cutting parts. Medium Risk Low Risk
double insulated and should be in
Electrical shock
good condition, connection to
power supply should be proper.
Use only approved scaffolding
erected by trained scaffolders
under competent supervision.
Full body harness to be used
Body injuries,
while working at height and
Personnel fall
9 anchored and to secure location. 3 6
2 Working at height down, Falling 3 3 2
Medium Risk Barricade the area, secure the Low Risk
object (Material
material properly, ensure “toe
or tools)
boards” and hand rails are
installed, use proper PPE. Proper
tagging and proper inspection
RISK ASSESSMENT SHEET
Installation of HVAC Duct
REF. NO. RA-AC-001

Slip, Trip and


Fall hazards, Hit Provide sufficient Lightings,
Insufficient
with stationary Safety vests. Maintain good
Lighting & 8
3 or moving 3 4 12 housekeeping and do visual 2 4
Poor House Low Risk
objects/ Medium Risk inspection of workplace starting
Keeping
Materials/ the work.
Machineries.

Conduct tool box talk on heat


stress, Drink Plenty of Pure water
Working 9 6
4 Heat Stress 3 3 (Min 6 liter a day) and 2 3
environment Risk Medium Risk Low Risk
rehydration drinks.
Shaded rest area to be provided.
Periodic inspection of power tools
Training on proper replacing of
Damaged cable
grinding disk proper cable
or plug, Broken
management and cable should be
disk,
16 placed away from wet ground 8
5 Power Tools Electrocution 4 4 2 4
High Risk Ear plugs used by all workers Low Risk
Improper
constantly exposed to grinding
changing of disk
noise Spark containment utilized
Noise, Spark
Proper gloves and face mask
provided. Color coded.

Conduct tool box talk,


Inhalant of Provision of proper PPE,
chemical & 9 Adequate ventilation and First aid 6
6 Chemical Hazard 3 3 2 3
spillage, Skin Medium Risk facilities. Only competent person Low Risk
irritation use the sealant gun. Proper
housekeeping and segregation of
hazardous waste and placed on
hazardous waste storage area.
RISK ASSESSMENT SHEET
Installation of HVAC Duct
REF. NO. RA-AC-001

Damaged hand
Periodic inspection of hand tools.
tools and 16 8
7 Hand Tools 4 4 Homemade hand tools are not 2 4
Homemade hand High Risk Low Risk
allowed in the site. Color coded
tools being used
Use proper technique while doing
manual handling, Tool box talk
Manual handling, and proper PPE provision.
Back injury and
Lifting, 12 Control of Substances Hazardous 6 / Low
8 hernia, 3 4 2 3
Duct work Medium Risk to health, Provision of mask, all Risk
Skin irritation
Insulation machineries including chain block
should be third party certified.
Proper hazardous waste disposal.

Assessment Prepared By: Safety Engineer Assessment Approved By: Project Manager
(Al Muhanad / Conversion) (Al Muhanad/Conversion)

Signature: Signature:

Date: Date:
RISK ASSESSMENT SHEET
Installation of HVAC Duct
REF. NO. RA-AC-001

5 10 15 20 25

4 8 12 16 20

Probability
3 6 9 12 15

2 4 6 8 10

1 2 3 4 5

Severity

Likelihood (Probability) Consequences (Impact)

5. Almost Certain 5. Fatality

4. Probable 4. Major Injury, resulting in disability

3. Possible 3.Injury Requires, Doctor’s or Hospital attendance

2. Possible (under unfortunate circumstances) 2. Minor Injury, 1st Aid required

1. Rare 1. Minor Injury, 1st Aid not required


RISK ASSESSMENT SHEET
Installation of HVAC Duct
REF. NO. RA-AC-001

Assessed Risk Level Description of Risk Level Actions

Low If an incident were to occur, there would be some chance Additional controls may be needed.

Severity that an injury requiring First Aid would result or not.

Medium If an incident were to occur, it would be likely that an Controls will need to be in place before the
injury requiring medical treatment would result. activity is undertaken.

High If an incident were to occur, it would be likely that a Consider alternatives to doing the activity.
permanent, debilitating injury or death would result. Significant control measures will need to be
implemented to ensure safety.

PTW- PERMIT TO WORK


JSA- JOB SAFETY ANALYSIS
PPE- PERSONAL PROTECTIVE EQUIPMENT