Damaged hand
Periodic inspection of hand tools.
tools and 16 8
7 Hand Tools 4 4 Homemade hand tools are not 2 4
Homemade hand High Risk Low Risk
allowed in the site. Color coded
tools being used
Use proper technique while doing
manual handling, Tool box talk
Manual handling, and proper PPE provision.
Back injury and
Lifting, 12 Control of Substances Hazardous 6 / Low
8 hernia, 3 4 2 3
Duct work Medium Risk to health, Provision of mask, all Risk
Skin irritation
Insulation machineries including chain block
should be third party certified.
Proper hazardous waste disposal.
Assessment Prepared By: Safety Engineer Assessment Approved By: Project Manager
(Al Muhanad / Conversion) (Al Muhanad/Conversion)
Signature: Signature:
Date: Date:
RISK ASSESSMENT SHEET
Installation of HVAC Duct
REF. NO. RA-AC-001
5 10 15 20 25
4 8 12 16 20
Probability
3 6 9 12 15
2 4 6 8 10
1 2 3 4 5
Severity
Low If an incident were to occur, there would be some chance Additional controls may be needed.
Medium If an incident were to occur, it would be likely that an Controls will need to be in place before the
injury requiring medical treatment would result. activity is undertaken.
High If an incident were to occur, it would be likely that a Consider alternatives to doing the activity.
permanent, debilitating injury or death would result. Significant control measures will need to be
implemented to ensure safety.