ACTIVITIES 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Mobilization
Site Clearing
Staking and Layouting
Ground Works
Excavation
1. (column footing & wall
footing)
Termite
2. proofing
Concreting and Formworks
Fabrication
1. of steel frame for columns
and footings
Installation
2. of steel frame
Installation
3. of steel bars for slabs and
beams
Fabrication
4. of formworks
Installation
5. of formworks
Concreting
6. of Footing and Column
Removal
7. of Forms
Masonry Works
Installation
1. of Masonry Reinforcements
CHB
2. Wall Laying
Rough
3. plastering
Plumbing Works
a. Sewer and Drainage
Pipe
1. installation
Storm
2. drains installation
Layout
3. of septic tank
Excavation
4. of Septic Tank
Fabrication
5. of Steel frame for septic tank
Steel
6. frame installation
Concreting
7. of septic tank
WEEK
ACTIVITIES
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

b. Water system
Installation
8. of Pipes
Installation
9. of plumbing fixtures
Electrical Works
Installation
1. of conduits
Installation
2 of wires
.
Installation
1. of switches and outlets
Installation
2. of electrical fixtures
Installation
3. of main power line
Roofing Works
Fabrication
1. of roofing materials
Installation
2. of roofing materials
Miscellaneous Works
Installation
1. of Doors and Windows

Installation
2. of stair railings
Installation
3. ceiling and partition
Finishing Works
Tileworks
1.
Plastering
2.
Painting
3.
Demobilization

Gantt Chart for the Construction of a Two-storey Concrete House


JOSEPH JOSHUA A. PARUNGAO CENG 155- Construction Methods and Project Management
BSCE 5-2 Engr. Roslyn P. Peña and Engr. Ralph T. Crucillo

PROJECT: Two-storey Concrete House


TIMESCALE (WEEKS)
ACTIVITIES
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Ocular Inspection and Surveying


Clearing the Site
Layouting (Staking)
Ground Works
Excavation (column footing &
1.
wall footing)
2. Termite proofing
3. Backfill and compaction
Concreting and Formworks
Fabrication of steel frame for
1.
columns and footings
2. Installation of steel frame
Installation of steel bars for slabs
3.
and beams
4. Fabrication of formworks
5. Installation of formworks
6. Concreting
Masonry Works
1. CHB Wall Laying
2. Rough plastering
Plumbing Works
a. Sewer and Drainage
1. Installation of pipes
2. Installation of storm drains
3. Layout of septic tank
4. Excavation of Septic Tank
Fabrication of Steel frame for
5.
septic tank
6. Installation of steel frame
7. Concreting of septic tank
TIMESCALE (WEEKS)
ACTIVITIES
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

b. Water system
8. Installation of Pipes
9. Installation of plumbing fixtures
Electrical Works
1. Installation of conduits
2. Installation of wires
1. Installation of switches and outlets
2. Installation of electrical fixtures
3. Installation of main power line
Roofing Works
1. Fabrication of roofing materials
2. Installation of roofing materials
Miscellaneous Works

1. Installation of Doors and Windows

2. Installation of stair railings


3. Installation ceiling and partition
Finishing Works
1. Smooth plastering
2. Painting
3. Installation of tiles
Final walkthrough
Turnover