CLIENT : JBF
PMC :TECHNIP INDIA LMITED
PROJECT NO :830
FORMAT-I
Following Non-process system / Process system has been mechanically completed in all
respects with exceptions noted below. The Non-process system / Process system can be
taken up for checking and preparation of checklist.
Exceptions:
1
Signature:
Name:
Date:
1 Mark up P&ID
2 MC Filled Format
Pressure test / Pneumatic test
3 report
4 Punch List
5 Flage joint history sheet
6a. Static
6
6b. Rotary - Without Piping
With Piping
List of Instrument
10 Insulation Report
PLEASE FILL ALL THE BLANK AREAS
1 Civil
POUR CARD ALONG WITH
a SUMMARY SHEET
Electrical
2 (Final Comssioning
Report)
a Lighting
b Cabling
c Earting
d PA System
e FA System
f Telephone System
Instrument
3 ( Final Comssioning
Reprt)
a Cabling
c Sprinkler System
4 Punch List
5 As Built Drawing
SIGNATURE:
NAME:
DATE:
CONTRACTOR TECHNIP
JBF