Você está na página 1de 3

PROJECT : PTA

CLIENT : JBF
PMC :TECHNIP INDIA LMITED

PROJECT NO :830

UNIT NO: OSBL

REPORT NO: DATE:

FORMAT-I

INTIMATION REGARDING NON-PROCESS / PROCESS SYSTEM COMPLETION

Following Non-process system / Process system has been mechanically completed in all
respects with exceptions noted below. The Non-process system / Process system can be
taken up for checking and preparation of checklist.

Non-Process / Process System No :

Description Drawing no.

Exceptions:
1

NOTE: REFER ANNEXURE -A OR B TO FORMAT -I

Performed by: Checked by: Approved by:

Signature:

Name:

Date:

CONTRACTOR TECHNIP JBF


QUALITY CONTROL FORM :TPIL/JBF/SITE-04A
PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED
PROJECT NO :830
UNIT NO: OSBL
REPORT NO: DATE:

ANNEXURE-A TO FORMAT-I (PROCESS SYSTEM)


SIGNATURE
APPLICABLE /
SL NO. DESCRIPTION NOT
APPLICABLE
Format No No Of sheets
CONTRACTOR TP JBF
REMARKS

1 Mark up P&ID
2 MC Filled Format
Pressure test / Pneumatic test
3 report
4 Punch List
5 Flage joint history sheet

Equipment allignment report

6a. Static
6
6b. Rotary - Without Piping

With Piping

7 Final Box up report

List of Instrument

8 8a. Instrument Installation report

8b.Instrument Calibration Report

8c. Instrument Cold loop Checking

8d. Instrument Hot loop Checking

List of Electrical items

9a. Electrical items Installation


9 report

9b. Motor / other No load run


Report

10 Insulation Report
PLEASE FILL ALL THE BLANK AREAS

Performed by: Checked by: Approved by:


SIGNATURE:
NAME:
DATE:
CONTRACTOR TECHNIP JBF
QUALITY CONTROL FORM :TPIL/JBF/SITE-04B
PROJECT : PTA
CLIENT : JBF
PMC :TECHNIP INDIA LMITED
PROJECT NO :830
UNIT NO: OSBL
REPORT NO: DATE:

ANNEXURE-B TO FORMAT-I (NON-PROCESS SYSTEM)


SIGNATURE
APPLICABLE /
SL NO. DESCRIPTION NOT Format No Of REMARKS
APPLICABLE No sheets CONTRACTOR TP JBF

1 Civil
POUR CARD ALONG WITH
a SUMMARY SHEET

b CHECK LIST FOR BULIDING

c Water Fill Test Report

d EPOXY SCREEDING REPORT

Electrical
2 (Final Comssioning
Report)
a Lighting

b Cabling
c Earting

d PA System

e FA System

f Telephone System

Instrument
3 ( Final Comssioning
Reprt)
a Cabling

b Gas Detection System

c Sprinkler System

d Fire Alarm System

4 Punch List

5 As Built Drawing

PLEASE FILL ALL THE BLANK AREAS

Performed by: Checked by: Approved by: