Você está na página 1de 5

Azmeel QP/DOC/08 -J-100-01 - 3-Mar-17 - Rev00 REV 00 Contract # 6600033421

AZITP No. APPROVED DATE DISCIPLINE:


AZMEEL CONTRATING INSPECTION PLAN
Metallic Instrumentation and Control Cable AZITP-J-902-01 INSTRUMENTATION
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

NATIONAL GUARD FAMILY COMPOUND (STP) 25-00034-0002 Azmeel Contracting Company

INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

1.00 DOCUMENT REVIEW

Cable and Conduit Seal To be reviewed and approved prior to electrical and
1.01
Installation Procedure
AZIC-P-3004 AZIC-P-3004 RH R instrumentation work at the jobsite.

RECEIVING
2.00
INSPECTION

Cable Storage, Handling,


2.01 and Preservation AZIC-P-3201 AZIC-P-3201 I S Weekly Inspection by Contractor QC
Visual Inspection

For intrinsically safe cable accessories, see AZITP-


J-903-01.

Low Voltage UL/NEC Power and Control Cable and


Wire Material Receiving see AZIC-P-3204
I&C Copper Cable -Shielded Single For FOUNDATION™ Fieldbus Systems,
Twisted Pair / Triad, Multipair / triad, see AZITP-J-904-01.
2.02 Group 2 & 4 AZIC-J-6602 AZIC-J-6602 H W Cable accessories include cable pulling lubricant; cable
Material Receiving (cable Reel) gland connector fittings, hot and cold shrink insulation
Visual Inspection tubing; electrical tape; cable straps and ties; crimp wire
connectors; cable termination kits; bulk terminal blocks
and points; bulk electrical nuts, bolts and washers;
crimping tools & dies; weather-proof cable and duct seal,
hazardous location damming fiber and cement.
Notify SA PID by RFI on initial receipt of each listed
accessory (by type and/or manufacturer).

Page 1 of 5
3/7/2017 8:04 AM
Azmeel QP/DOC/08 -J-100-01 - 3-Mar-17 - Rev00 REV 00 Contract # 6600033421
AZITP No. APPROVED DATE DISCIPLINE:
AZMEEL CONTRATING INSPECTION PLAN
Metallic Instrumentation and Control Cable AZITP-J-902-01 INSTRUMENTATION
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

NATIONAL GUARD FAMILY COMPOUND (STP) 25-00034-0002 Azmeel Contracting Company

INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

1.00 DOCUMENT REVIEW

For intrinsically safe cable accessories,


see AZITP-J-903-01.

For FOUNDATION™ Fieldbus Systems,


see AZITP-J-904-01.

Instrument Cable - Coaxial and Twin axial Cable accessories include cable pulling lubricant; cable
Data Cable gland connector fittings, hot and cold shrink insulation
2.03
Material Receiving (cable Reel)
AZIC-J-6604 AZIC-J-6604 H W tubing; electrical tape; cable straps and ties; crimp wire
Visual Inspection connectors; cable termination kits; bulk terminal blocks
and points; bulk electrical nuts, bolts and washers;
crimping tools & dies; weather-proof cable and duct seal,
hazardous location damming fiber and cement.

Notify SA PID by RFI on initial receipt of each listed


accessory (by type and/or manufacturer).

3.00 INSTALLATION

Cable Pulling See See SA PID shall be notified on start of this activity for each
3.01
Visual Inspection Remarks Remarks
H W process system, and plant area.

See AZITP-Q-001-02 for additional test and inspection


Direct Buried
activities for road crossings.
Cable Trench See See
3.02
Visual Inspection Remarks Remarks
H W See AZITP-A-114-01 for additional direct buried
earthwork QA/QC activities, requirements, and
(Before Cable Laying)
coordination.

Below Grade Cable Laying


See See Hold points for all direct buried cables prior to backfilling
3.03 and Warning Marker Installation
Remarks Remarks
H H of cable and safety warning markers.
Visual Inspection

Page 2 of 5
3/7/2017 8:04 AM
Azmeel QP/DOC/08 -J-100-01 - 3-Mar-17 - Rev00 REV 00 Contract # 6600033421
AZITP No. APPROVED DATE DISCIPLINE:
AZMEEL CONTRATING INSPECTION PLAN
Metallic Instrumentation and Control Cable AZITP-J-902-01 INSTRUMENTATION
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

NATIONAL GUARD FAMILY COMPOUND (STP) 25-00034-0002 Azmeel Contracting Company

INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

1.00 DOCUMENT REVIEW


Cable dressing and termination work (inside cabinet) shall
not proceed until all cable glands, cable route and cable
dressing in tray has been inspected by Contractor QC.
Cable Gland Installation, Cable Dressing,
See See
3.04 Cable Identification and Termination
Remarks Remarks
H W SA PID shall be notified on termination of first ten circuits
Visual Inspection of each signal service level.

SA PID shall be notified on start of this activity for each


process system and plant area.

For intrinsically safe cable accessories,


see AZITP-J-903-01.

For FOUNDATION™ Fieldbus Systems,


see AZITP-J-904-01.
Instrument Cable - Installation,
Cable accessories include cable pulling lubricant; cable
termination, identification, and Pre-
gland connector fittings, hot and cold shrink insulation
3.05 Commissioning AZIC-J-6606 AZIC-J-6606 H W tubing; electrical tape; cable straps and ties; crimp wire
Material Receiving (cable Reel)
connectors; cable termination kits; bulk terminal blocks
Visual Inspection
and points; bulk electrical nuts, bolts and washers;
crimping tools & dies; weather-proof cable and duct seal,
hazardous location damming fiber and cement.

Notify SA PID by RFI on initial receipt of each listed


accessory (by type and/or manufacturer).

4.00 PRE-COMMISSIONING

Page 3 of 5
3/7/2017 8:04 AM
Azmeel QP/DOC/08 -J-100-01 - 3-Mar-17 - Rev00 REV 00 Contract # 6600033421
AZITP No. APPROVED DATE DISCIPLINE:
AZMEEL CONTRATING INSPECTION PLAN
Metallic Instrumentation and Control Cable AZITP-J-902-01 INSTRUMENTATION
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

NATIONAL GUARD FAMILY COMPOUND (STP) 25-00034-0002 Azmeel Contracting Company

INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

1.00 DOCUMENT REVIEW


Instrument Cable - Continuity and
AZIC - J - 6606 Reserved
Insulation Resistance Testing (On Reel)
AZIC - J - 6607 Reserved
Cable Continuity (Volt-Ohm Meter)
SA PID shall be notified on testing of first ten circuits of
and Insulation (Megger) Testing
4.01
(Installed Cable)
AZTR-J-6601 AZTR-J-6601 H W each signal service level.
Apply 500VOLTS for cables rated
SA PID shall be notified on start of this activity for each
600VOLTS and 250VOLTS for cables
process system and plant area.
rated 300VOLTS

Instrument Cable - Continuity, Insulation AZIC - J - 6606 Reserved


Resistance (Installed), and Termination AZIC - J - 6607 Reserved
Torque Testing SA PID shall be notified on testing of first ten circuits of
4.02
Cable Continuity (Volt-Ohm Meter)
AZTR-J-6602 AZTR-J-6602 H W each signal service level.
and Insulation (Megger) Testing (Installed SA PID shall be notified on start of this activity for each
Cable) process system and plant area.

Instrument Cable - Installation,


Termination, Identification, SA PID shall be notified on testing of first ten circuits of
and Pre-Commissioning each signal service level.
4.03
Cable Termination
AZIC-J-6606 AZIC-J-6606 H W SA PID shall be notified on start of this activity for each
Crimp (wire pull-out) and process system and plant area.
Torque Testing

Cable / Conduit See See


4.04
Hazardous Location Sealing Remarks Remarks
H H Hold point for cement pouring

For instrument loop checking requirements see


Cable / Loop See See
4.05
Quality Record Review Remarks Remarks
RH RH AZITP-J-902-02.
Hold point for pre-commissioning of each signal loop.

For instrument loop checking requirements see


Cable / Loop See See
4.06
Final Visual Inspection Remarks Remarks
H H AZITP-J-902-02.
Hold point for pre-commissioning of each signal loop.

Page 4 of 5
3/7/2017 8:04 AM
Azmeel QP/DOC/08 -J-100-01 - 3-Mar-17 - Rev00 REV 00 Contract # 6600033421
AZITP No. APPROVED DATE DISCIPLINE:
AZMEEL CONTRATING INSPECTION PLAN
Metallic Instrumentation and Control Cable AZITP-J-902-01 INSTRUMENTATION
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

NATIONAL GUARD FAMILY COMPOUND (STP) 25-00034-0002 Azmeel Contracting Company

INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

1.00 DOCUMENT REVIEW


GENERAL NOTES

The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the
1
levels of Saudi Aramco participation based upon the Contractor’s performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC
3
organization representative is not present.
Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization
4
representative in attendance.
5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.

LEGEND
H Hold Point for QC Inspection/ Test R Review of Documents
W Witness Inspection/Test RH Review and Approval of Documents
S Surveillance I 100% Contractor Inspection

Page 5 of 5
3/7/2017 8:04 AM