Você está na página 1de 21

SULIT

POLATE1-(rli14
MALAYSIA

BAHAGIAN PEPERIKSAAN DAN PENILAIAN


JABATAN PENGAJIAN POLITEKNIK
KEMENTERIAN PENDIDIKAN MALAYSIA

JABATAN ICEJURUTERAAN AWAM

PEPERIKSAAN AKHIR
SESI JUN 2014

CC301: QUANTITY MEASUREMENT

TARIKH : 27 OKTOBER 2014


MASA : 11.15 AM - 1.15 PM (2 JAM)

Kertas ini mengandungi ENAM BELAS (16) halaman bercetak.


Bahagian A: Soalan Pendek (10 soalan)
Bahagian B: Struktur (4 soalan)
Dokumen sokongan yang disertakan : Kertas Dimensi

JANGAN BUKA KERTAS SOALAN INI SEHINGGA DIARAHKAN

(CLO yang tertera hanya sebagai rujukan)

SULIT
SULIT CC301: QUANTITY MEASUREMENT

SECTION A: 40 MARKS
BAHAGL4N A: 40 MARKAH

INSTRUCTION:
This section consists of TEN (10) short questions. Answer ALL questions.

ARAHAN :
Bahagian ini mengandungi SEPUL UH (10) soalan pendek. Jawab semua soalan.

CLO1 QUESTION 1
Cl SOALAN 1

a. List THREE (3) methods of Preliminary Estimating.


[3 marks]

b. List TWO (2) examples of unit design capacity construction using Unit Valuation
method.
[I mark]

a Senaraikan TIGA (3) kaedah Anggaran Awalan. [3 markah]


b. Senaraikan DUA (2) contoh bagi sesuatu unit rekabentuk binaan secara kaedah
Penilaian Unit.
[1 markah]

CLO1 QUESTION 2
Cl SOALAN 2

List FOUR (4) purposes of preliminary estimating in the construction work.

Senaraikan EMPAT (4) tujuan anggaran awalan di dalam kerja-kerja pembinaan.


[4 marks]
[4 markah]

2 SULIT
SULIT CC30I: QUANTITY MEASUREMENT

CLO1 QUESTION 3
C2 SOALAN 3

Based on the given data in Table 1, calculate the rate per unit (RM/unit) for BLOCK D
hostel by taking the increasing rate of construction cost 5% per annum. The proposed
project will be constructed in year 2014.

Berdasarkan maklumat yang diberi dalam Jadual 1, kirakan kadar per unit (RM/unit) bagi
pembinaan bangunan asrama baru BLOCK D dengan mengambilkira peningkatan kos
pembinaan sebanyak 5% setahun. Projek yang dicadangkan akan dibina pada tahun
2014.

Table 1/Jadual 1
Year of Construction 2009
Tahun Pembinaan 2009
Hostel Blocks Construction Cost No. of Occupants
Blok Asrama Kos pembinaan Bilangan pengguna
Block A RM 790,000.00 250
Block B RM 850,000.00 280
Block C RM 980,000.00 325

[4 marks]
[4 markah]

CI II IT
SULIT CC301: QUANTITY MEASUREMENT

QUESTION 4 — 5 are based on the data given in Table 2


Table 2 / Jadual 2
Type / Jenis Construction Cost (RM) / No. Of Student /
Harga Pembinaan (RM) Bilangan Pelajar
Hostel A /Asrama A 2,000,500.00 2200

Hostel B I Asrama B 3,500,500.00 2500

CLO1 QUESTION 4
C2 SOALAN 4

Based on Table 2, calculate the following:


a) Unit rate for Hostel A
b) Unit rate for Hostel B

Berdasarkan Jadual 2, kira:


a) Kadar harga Asrama A
b) Kadar harga Asrama B
[4 marks]
[4 markah]

CLO1 QUESTION 5
C2 SOALAN 5

By taking into consideration of the 20% increment rate due to changes in materials,
calculate the total construction cost of the new hostel for a capacity of 3000 students.

Dengan mengambil kira kadar kenaikan sebanyak 20% kerana kenaikan harga bahan,
kirakan jumlah kos pembinaan asrama baru tersebut yang berkapasiti 3000 orang pelajar.
[4 marks]
[4 markah]

4 SULIT
SULIT CC301: QUANTITY MEASUREMENT

CLO1 QUESTION 6
C2 SOALAN 6

Based on Figurel, estimate the cost of building if the rate per unit is RM980.00/m2.

Berdasarkan Rajah 1, buat anggaran kos bangunan sekiranya /radar kos pembinaan
adalah RA/1980.00/m2.
[4 marks]
[4 markah]

28.000
• •

14,000

4,200

• •
3,200
Figure 1/Rajah 1

CLOT QUESTION 7
Cl SOALAN 7

Explain the factors that determine the cost of materials in Build-Up Rate.

Jelaskan faktor yang menentukan kos bagi bahan dalam Bina Kadar Harga.

[4 marks]
[4 markah]

CI II IT
SULIT CC301: QUANTITY MEASUREMENT

CLO1 QUESTION 8
Cl SOALAN 8

Describe TWO (2) factors involved in determining the cost of concrete works that
mixed manually by hand

Terangkan DUA (2) faktor yang terlibat dalam menentukan kadar harga kerja konkrit
yang digaul dengan tangan.
[4 marks]
[4 markah]

QUESTION 9 — 10 are based on the data given in Table 4

Table 4/Jadual 4
Labour rate per day (8 hour/day) / RM 56.00
Kadar upah buruh per hari (8 jam/hart)
Labour output to remove, replace & compact / 7 hours 1m3
Keupayaan buruh untuk membuang, menggantikan, dan 7 jam/m3
memandatkan
Concrete mix ratio 1:3:5
Nisbah campuran konkrit
1m3 cement 28.7 beg
1m3 simen 28.7 kampit
Cement one bag (50kg) / RM 18.00
Satu kampit simen (50 kg)
1.0m3 sand / RM 30.00
/.0m3 pasir
Aggregate /
RM 50.00
Aggregate

CLO1 QUESTION 9
C2 SOALAN 9

Based on the data given in Table 4, determine the material cost for 1m3 concrete.

Berdasarkan maklumat di dalam Jadual 4, tentukan jumlah harga untuk 1m 3 bancuhan


konkrit.
[4 marks]
[4 markah]

6 SULIT
SULIT CC301: QUANTITY MEASUREMENT

CLOI QUESTION 10
C2 SOALAN 10

Calculate the labour cost for removing, replacing and compacting 1.Om3 concrete
mixing.

Kirakan kos buruh untuk kerja membuang, menggantikan, dan memandatkan 1.0m3
bancuhan konrit.
[4 marks]
[4 markah]

CI II IT
SULIT CC301: QUANTITY MEASUREMENT

SECTION B : 60 MARKS
BAHAGIAN B : 60 MARKAH

INSTRUCTION:
This section consists of FOUR (4) structured questions. Answer THREE (3)
questions only.

ARAHAN:
Bahagian ini mengandungi EMPAT(4) soalan struktur. Jawab TIGA (3) soalan
sahaja.

QUESTION 1
SOALAN 1

CLO2 By using TRIANGLE METHOD, prepare the quantity measurement for earthworks
C3
(cut and fill) by referring to the given information (Refer Figure 2).

i) Area of site
[5 marks]

ii) Average height of cutting/filling


[10 marks]

ii) Total volume for earthworks


[5 marks]

Dengan menggunakan Kaedah Tiga Segi, sediakan pengukuran kuantiti bagi kerja-
kerja penambakan/pemotongan dengan merujuk data dan maklumat seperti dibawah:

i) Keluasan tapak
[S markah]

ii) Purata kedalaman/ketinggian penambakan/pemotongan


[10 markah]

ii) Jumlah isipadu kerja tanah


[5 markah]

8 SULIT
SWAT CC301: QUANTITY MEASUREMENT

BI C1 DI
Al
100.20 100.45 100.00
99.80 Grid Interval: 10.0 metre
(Sela)
A2 B2 C2 D2
100.00 100.40 100.20 99.60 Formation Level: 100.00 metre
(Aral Bentukan)
A3 B3 C3 D3
102.00 101.00 99.80 99.20

A4 B4 C4 D4
102.80 102.40 102.00 100.80

Figure 2/Rajah 2

o CI TT TT
SULIT CC301: QUANTITY MEASUREMENT

QUESTION 2
SOALAN 2

CLO2 Refer to drawing No. PSMZA/JKA/CC301/Q1:


C3
i) Give FIVE (5) taking off lists for piling work.
[5 marks]

ii) Prepare the taking off quantities for the following items:
a) Bringing and removal piling plant on site
b) Supply of initial piles
c) Driven depth of piles
d) Jointing of piles
e) Preparing pile head
[15 marks]

Merujuk kepada drawing No. PSMZABICA/CC301/Q1


i) Berikan LIMA (5) senarai kuantiti untuk kerja-kerja cerucuk.
[S markah]

ii) Buat pengiraan kuantiti untuk item yang berikut:


a) Membawa masuk dan membawa keluar jentera cerucuk ke tapak
b) Membekal cerucuk permulaan
c) Kedalaman cerucuk
d) Penyambungan cerucuk
e) Menyediakan kepala cerucuk
[15 markah]

10 SULIT
SULIT CC301: QUANTITY MEASUREMENT

PILING LAYOUT PLAN APPENDIX 1

Dznsing.a PSMIAGICACC3011Q1

IT DESCRIPTION
Type of piles RSterxed ooncete piles, 47sa20Omin
x2COnnn
Etiven depth 23in
Starbapilgs 3.001£L long
attention piles. 3.00 n long mid 6.00 m long
upwpct PI igess to pile with I pile. point
P2 Pim to pile with 2 pile point
P3 rare to pile with 3 pile point
P4 teZets to pile with 4 pile point

SULIT
SULIT CC301: QUANTITY MEASUREMENT

QUESTION 3
SOALAN 3

CLO2 By referring to Drawing No.CC301/Q3/CI&C2 and the information given, calculate the
C3
quantity for the following:

i) Concrete work for Column T3


[5 marks]
ii) Main bar Reinforcement for Column T3
[5 marks]
iii) Reinforcement (links) for Column T3
[5 marks]

iv) Formwork for Column T3


[5 marks]

Dengan merujuk kepada Lukisan No. CC301/Q3/ Cl &C2 dan maklumat-maklumat yang
diberikan, ukur kuantiti untuk:
i) Kerja konkrit bagi Tiang T3
[S markahJ

ii) Tetulang utama bagi Tiang T3


[5 markahJ

iii) Tetulang pengikat bagi tiang T3


[S markah]

iv) Kotak bentuk bagi tiang T3


[5 marIcah]

12 SULIT
SULIT CC301: QUANTITY MEASUREMENT

Drawing No.CC301/Q3/C1

13 SULIT
SULIT CC30I: QUANTITY MEASUREMENT

150 rum x 300 nun

B B
300Gmrn

14810-203mrn nk

4Y12

Ground Level
650 own

Column stump Ground &am

Pad foe ing

column Details Type T3

230 mm
150 rum

D t
230 tom
300 mm

Sccl3on B-B
Sectian Pca

Drawing No.CC301/Q3/C2

14 SUL1T
SULIT CC301: QUANTITY MEASUREMENT

QUESTION 4
SOALAN 4

CLO 2 Based on Drawing No. CC301/Q4/FF, calculate the quantity for the following floor
C3
finishing.
i. Toilet — Cement screed to receive anti slip ceramic tiles
ii. Toilet — Anti slip ceramic tiles
iii. Bedroom 1 & 2 — Cement screed to receive marble files
iv. Bedroom 1 & 2 - Marble tiles

[20 marks]

Berdasarkan Lukisan No. CC30I/Q4/FF, kira kuantiti kemasan lantai untuk:


i. Tandas — Lepaan simen untuk menerima jubin seramik anti gelincir
ii. Tandas — Jubin seramik anti gelincir
iii. BilikTidur I & 2 — Lepaan simen untuk menerima jubin marmar
iv. BilikTidur 1 & 2 —,lubin marmar

[20 markah]

15 SULIT
QUANTITY MEASUREMENT
CC301:
50
1800 <

850
4000 -
2200 -
8000
--4000-
3000
300

!--
45

Drawing No . CC301 /(24/FF


IVIAIVI NIVIVOS

ON
KEMENTERIAN
PENDIDIKAN poi.j-raKrui..<
MALAYSIA MALAYSIA MERLIMAU QUESTION NO.:
TAKING-OFF FORM
PROJECT: DRAWING NO:

ELEMENT:
SUB-ELEMENT: PAGE: OF:
DESCRIPTION

DIMENSION

QTY : TAKER OFF


UNIT : SQUARED BY :
RATE : ABSTRACT BY :
ell I eflltri, rt,./
KEMENTERIAN
PENDIDIKAN
MALAYSIA MALAYSIA
FAL 1. QUESTION NO.:
TAKING-OFF FORM
PROJECT: DRAWING NO:

ELEMENT:
SUB-ELEMENT: PAGE: OF:
DESCRIPTION

DIMENSION

QTY : TAKER OFF :


UNIT : SQUARED BY :
RATE : ABSTRACT BY :
KEMENTERIAN
PENDIDIKAN pcxna•Knip<
MALAYSIA MALAYSIA QUESTION NO.:
TAKING-OFF FORM
PROJECT: DRAWING NO:

ELEMENT:
SUB-ELEMENT: PAGE: OF:
DESCRIPTION

DIMENSION

QTY : TAKER OFF :


UNIT : SQUARED BY :
RATE : ABSTRACT BY :
ICEMENTERIAN
PENDIDIKAN poLiTE-(nil
MALAYSIA MALAYSIA QUESTION NO.:
TAKING-OFF FORM
PROJECT: DRAWING NO:

ELEMENT:
SUB-ELEMENT: PAGE: OF:
DESCRIPTION

DIMENSION

QTY : TAKER OFF :


UNIT : SQUARED BY :
RATE : ABSTRACT BY :
KEMENTERIAN
PENDIDIKAN poi.<mir-I
.3 . ,Kriii4
MALAYSIA MALAYSIA QUESTION NO.:
TAKING-OFF FORM
PROJECT: DRAWING NO:

ELEMENT:
SUB-ELEMENT: PAGE: OF:
DESCRIPTION

DIMENSION

On, : TAKER OFF :


UNIT : SQUARED BY :
RATE : ABSTRACT BY :

Você também pode gostar