PRIMAVERA P6 is a database based software and you may see database configuration problems when you try to login to
Primavera P6. This problem states: ‘Unable to connect to the database. Would you like to configure the database connection Eagle Point
now?’
Primavera P6
This error is due to the database configuration issue which arises when Primavera P6 is unable to recognize Username or
Password of the person connecting to the database. Be calm if you have this issue as it can be resolved easily. Project Cost Management
In the Primavera P6 login screen, click on the button with three dots against database name. Project Management
Certifications
Project Management
Softwares
Steel
RECENT POSTS
SCHEDULE
PRESENTATION TIPS &
STEP 2: ITS IMPORTANCE
May 6, 2018 | 0 Comments
Click on the Configure button in ‘Edit Database Connections’ screen.
AUTODESK AUTOCAD
CIVIL 3D – AN
INTRODUCTION
January 2, 2018 | 0
Comments
STEP 3:
Make sure that you have following settings in ‘Select or Create Alias’ screen. Click on ‘Next’.
STEP 4:
Make sure that you have ‘XE’ written in ‘Oracle Connection String’ in ‘Configure ORACLE Connection’ screen. If not, you can
simply type XE in in the box. After that, click on ‘Next’.
STEP 5:
Now type pubprm$pm in Username. Then type the password which you have selected during installation of the database. If
you don’t remember it then try putting the password admin, if it works you are lucky otherwise you may have to reinstall the
software.
STEP 6:
If above Username has not worked, then try putting admprm$pm with the password which you have selected during
installation of the database. If you don’t remember it then try putting the password admin.
STEP 7:
If you are still having the same problem then you can contact us through our Contact Us page or simply by writing an email
to info@cemsolutions.org. We’ll try our best to solve your issue.