The Environment (Protection) Rules, 1986

Schedule VI

General Standards for discharge of environmental pollutants

Part A - Effluents

Sl.No. Parameter Standards

Inland Public Land for Marine coastal areas


Surface Sewers irrigation
water

1 2 3(a) 3(b) 3(c) 3(d)

1. Colour and odour See 6 of - See 6 of See 6 of Annexure-I


Annexure-I Annexure-I

2. Suspended solids 100 600 200 (a) For process waste


mg/l, Max. water-100.

(b) For cooling water


effluent 10 per cent above
total suspended matter of
influent.

3. Particle size of shall pass 850 - (a) Floatable solids, max. 3


suspended solids. micron IS mm.
Sieve
(b) Settleable solids, max.
850 microns.

4. [*Omitted*]

5. pH value. 5.5 to 9.0 5.5 to 9.0 5.5 to 9.0 5.5 to 9.0

0
6. Temperature shall not - - shall not exceed 5 C
o
exceed 5 C above the receiving water
above the temperature
receiving
water
temperature

7. Oil and grease 10 20 10 20


mg/l,
Max.

8. Total residual 1.0 - - 1.0


chlorine mg/l, Max.

PAGE 1 OF 5
Sewerage Project, Begusarai (NGRBA) Annexure A-1

Sl.No. Parameter Standards

Inland Public Land for Marine coastal areas


Surface Sewers irrigation
water

1 2 3(a) 3(b) 3(c) 3(d)

9. Ammonical 50 50 - 50
nitrogen (as N),
mg/l Max.

10. Total Kjeldahl 100 - - 100


nitrogen [(N)] mg/l,
Max.

11. Free ammonia 5.0 - - 5.0


[(NH3)] mg/l, Max.

12. [Biochemical 30 350 100 100


oxygen demand (5
0
days at 20 C)]
[mg/l, Max.]

13. Chemical Oxygen 250 - - 250


demand, mg/l,
Max.

14. Arsenic (as As) 0.2 0.2 0.2 0.2


[mg/l, Max.]

15. Mercury (As Hg), 0.01 0.01 - 0.01


mg/l, Max.

16. Lead (as Pb) mg/l, 0.1 1.0 - 2.0


Max.

17. Cadmium (as Cd) 2.0 1.0 - 2.0


mg/l, Max.

18. Hexavalent 0.1 2.0 - 1.0


chromium (as Cr +
6), mg/l, Max.

19. Total chromium 2.0 2.0 - 2.0


(as Cr) mg/l, Max.

20. Copper (as Cu) 3.0 3.0 - 3.0


mg/l, Max.

21. Zinc (as Zn) mg/l, 5.0 15 - 15


Max.

PAGE 2 OF 5
Sewerage Project, Begusarai (NGRBA) Annexure A-1

Sl.No. Parameter Standards

Inland Public Land for Marine coastal areas


Surface Sewers irrigation
water

1 2 3(a) 3(b) 3(c) 3(d)

22. Selenium (as Se) 0.05 0.05 - 0.05


mg/l, Max.

23. Nickel (as Ni) mg/l, 3.0 3.0 5.0


Max.

[24. * * * * *]

[25. * * * * *]

[26. * * * * *]

27. Cyanide (as CN) 0.2 2.0 0.2 0.2


mg/l, Max.

[28. Omitted ]

29. [Fluoride] (as F) 2.0 15 - 15


mg/l , Max.

30. Dissolved 5.0 - - -


phosphates (as P),
mg/l, Max.

[31. Omitted ]

32. Sulphide (as S) 2.0 - - 5.0


mg/l, Max.

33. Phenolic 1.0 5.0 - 5.0


compounds [as
C6H5OH] mg/l,
Max.

34. Radioactive
materials :

-7 -7 -8 -7
(a) Alpha emitters 10 10 [10 ] 10
[Micro curie/ml]
Max.

-6 -6 -7 -6
(b) Beta emitters 10 10 10 [10 ]
[Micro curie/ml]
Max.

PAGE 3 OF 5
Sewerage Project, Begusarai (NGRBA) Annexure A-1

Sl.No. Parameter Standards

Inland Public Land for Marine coastal areas


Surface Sewers irrigation
water

1 2 3(a) 3(b) 3(c) 3(d)

35. Bio-assay test 90% survival 90% survival 90% 90% survival of fish after
of fish after 96 of fish after 96 survival of 96 hours in 100% effluent
hours in 100% hours in fish after
effluent 100% effluent 96 hours in
100%
effluent

36. Manganese (as 2 mg/l 2 mg/l 2 mg/l


Mn)

37. Iron (as Fe) 3 mg/l 3 mg/l 3 mg/l

38. Vanadium (as V) 0.2 mg/l 0.2 mg/l 0.2 mg/l

39. Nitrate Nitrogen 10 mg/l - - 20 mg/l

[40. Pesticides : ]
(microgram per lit.,
Maximum)

(i) Benzene 10 - 10 10
hexachloride

(ii) Carboryl 10 - 10 10

(iii) DDT 10 - 10 10

(iv) Endosulfan 10 - 10 10

(v) Diamethoate 450 - 450 450

(vi) Penitrothion 10 - 10 10

(vii) Malathion 10 - 10 10

(viii) Phorate 10 - 10 10

(ix) Methyl 10 - 10 10
Parathion

(x) Phenthoate 10 - 10 10

(xi) Pyrethrums 10 - 10 10

PAGE 4 OF 5
Sewerage Project, Begusarai (NGRBA) Annexure A-1

Sl.No. Parameter Standards

Inland Public Land for Marine coastal areas


Surface Sewers irrigation
water

1 2 3(a) 3(b) 3(c) 3(d)

(xii) Copper 9600 - 9600 9600


Oxychloride

(xiii) Copper 50 - 50 50
Sulphate

(xiv) Ziram 1000 - 1000 1000

(xv) Sulphur 30 - 30 30

(xvi) Paraquat 2300 - 2300 2300

(xvii) Proponil 7300 - 7300 7300

(xviii) Nitrogen 780 - 780 780

PAGE 5 OF 5
Sewerage Project, Begusarai Annexure A-2 : Population Projections
NGRBA

Population Projection of Begusarai Town

A Historical Population

S.No. Year Population


1 1921 9062
2 1931 7739
3 1941 12803
4 1951 15141
5 1961 27346
6 1971 35736
7 1981 56633
8 1991 71424
9 2001 93741

B Population Growth Trend

S.No. Year Population Decadal Growth Geometric Incremental


(Increase in Increase in Increase
Population per Population per
Decade) Decade

1 1921 9062
2 1931 7739 -1323 -14.60%
3 1941 12803 5064 65.43% 6387
4 1951 15141 2338 18.26% -2726
5 1961 27346 12205 80.61% 9867
6 1971 35736 8390 30.68% -3815
7 1981 56633 20897 58.48% 12507
8 1991 71424 14791 26.12% -6106
9 2001 93741 22317 31.25% 7526

Average per Decade 10585 37.0% 3377

25000
80.61%
80.00%

20000 65.43%

58.48%
60.00%
15000

40.00%
10000 30.68% 31.25%
26.12%
18.26%
20.00%
5000

0 0.00%
1931 1941 1951 1961 1971 1981 1991 2001

-5000 -14.60% -20.00%

Arithmatic Increase Percentage Increase


Sewerage Project, Begusarai Annexure A-2 : Population Projections
NGRBA

C Historical Population figures adopted for Projection

S.No Census Population


Year
1 1961 27346
2 1971 35736
3 1981 56633
4 1991 71424
5 2001 93741

D Population Projections

i Arithmetical Progression Method

S.No Census Population Increase in


Year Population
1 1961 27346
2 1971 35736 8390
3 1981 56633 20897
4 1991 71424 14791
5 2001 93741 22317

Average Decadal Increase 16600


Adopting Average Decadal Increase 16600

Projected Population by Arithematical Projection Method

S.No Year Projected


Population
1 2001 93741
2 2008 105361
3 2011 110341
4 2021 126941
5 2026 135241
6 2031 143541
7 2041 160141

ii Geometrical Increase Method

S.No Census Population Increase in Geometric


Year Population Increase
Facotr
1 1961 27346
2 1971 35736 8390 0.307
3 1981 56633 20897 0.585
4 1991 71424 14791 0.261
5 2001 93741 22317 0.312

Average Decadal Geometric Increase 0.3478


Adopting Average Decadal Geometric Increase 0.3478

Projected Population by Geometric Projection Method

S.No Year Projected


Population
1 2001 93741
2 2008 115526
3 2011 126349
4 2021 170299
5 2026 197712
6 2031 229538
7 2041 309382
Sewerage Project, Begusarai Annexure A-2 : Population Projections
NGRBA

iii Incremental Increase Method

S.No Census Population Increase in Incremental


Year Population Increase
1 1961 27346
2 1971 35736 8390
3 1981 56633 20897 12507
4 1991 71424 14791 -6106
5 2001 93741 22317 7526

Average Decadal Increase 16599 4642

Projected Population by Incremental Increase Method Method

S.No Year Projected


Population
1 2001 93741
2 2008 108122
3 2011 114982
4 2021 140866
5 2026 155548
6 2031 171391
7 2041 206559

Projected Population by Graphical Method Method

S.No Census Population Projected


Year Population
## 1 1961 27346 26388
2 1971 35736 38575
3 1981 56633 53869
4 1991 71424 72270
5 2001 93741 93778
6 2011 118393
7 2021 146114
9 2031 176942
10 2041 210877

Population projection by Graphical Method

250000
y = 1,553.4x2 + 7,527.2x + 17,306.6

200000

150000

100000

50000

0
1 2 3 4 5 6 7 8 9

Base Population Projected Population Poly. (Base Population)


Sewerage Project, Begusarai Annexure A-2 : Population Projections
NGRBA

D Summary of Results

S.No Year Projected Population


Arithmetical Geometric Method Incremental Graphical Average of
Progression Increase Projection four
Method Method Method methods
1 2001 93741 93741 93741 93741 93741
2 2008 105361 115526 108122 110682 109923
3 2011 110341 126349 114982 118393 117516
4 2021 126941 170299 140866 146114 146055
5 2026 135241 197712 155548 161140 162410
6 2031 143541 229538 171391 176942 180353
7 2041 160141 309382 206559 210877 221740

350000

300000

250000

200000

150000

100000

50000

0
2001 2008 2011 2021 2026 2031 2041

Arithmetical Progression Method Geometric Method Incremental Increase Method

Graphical Projection Method Average of four methods

E Adopted Projected Populations

The adopted Projected populations are as arrived by average of four projection methods. The adopted
population figures for design of infrastructural components is as provided below:

S.No Census Year Population

1 2001 93741
2 2008 109923
3 2011 117516
4 2021 146055
5 2026 162410
6 2031 180353
7 2041 221740
Sewerage Project, Begusarai Annex -A-3: Hydraulic Design of Sewer Network
NGRBA

Sewerage Project, Begusarai


Under NGRBA

Mannings N 0.011 Water Supply 135 lpcd


Peak Factor Throw away Coefficient 80%
Upto 20000 3 Per Capita wastewater 108 lpcd
20000-50000 2.5 Infiltration 250 lpd/manhole
50000-750000 2.25 Min Cover 1 m
More Than 750000 2

Link ID Start End Node Upstrem Downstream Population Population Cum Cum Flow 2011 Flow 2041 Infiltration Full Flow Design Design Diameter Slope Length Upstream Downstream Upstream Downstream Full Flow Actual Actual Upstream Downstream Average Depth of
Node Ground Ground Level 2011 2041 Population Population Flow 2011 Flow 2041 Invert Invert Crown Crown Velocity Velocity Velocity Depth Depth Depth Flow
Level 2011 2041 2011 2041
m m souls souls souls souls lps lps lps lps lps lps mm 1 in m m m m m m/s m/s m/s m m m %age
1 134 135 95.226 95.212 69 131 69 131 0.0862 0.1637 0.0042 14.23 0.2629 0.495 150 160 43.54 94.076 93.803 94.226 93.953 0.81 0.31 0.38 1.15 1.409 1.279 12.80%
2 202 135 95.202 95.212 68 128 68 128 0.085 0.16 0.0041 14.23 0.2591 0.484 150 160 42.04 94.052 93.79 94.202 93.94 0.81 0.31 0.37 1.15 1.423 1.286 12.60%
3 135 136 95.212 95.106 152 287 289 546 0.3612 0.6825 0.0201 25.03 1.1039 2.068 200 240 123.11 93.74 93.227 93.94 93.427 0.8 0.4 0.48 1.473 1.879 1.676 19.40%
4 208 205 95.094 95.02 171 322 171 322 0.2137 0.4025 0.0136 25.03 0.6548 1.221 200 240 140.9 93.894 93.306 94.094 93.506 0.8 0.34 0.41 1.2 1.714 1.457 15.00%
5 203 204 95.124 95.018 164 310 164 310 0.205 0.3875 0.013 25.03 0.628 1.175 200 240 134.76 93.924 93.362 94.124 93.562 0.8 0.34 0.41 1.2 1.656 1.428 14.70%
6 204 205 95.018 95.02 70 132 234 442 0.2925 0.5525 0.0173 25.03 0.8948 1.675 200 240 44.29 93.362 93.177 93.562 93.377 0.8 0.38 0.45 1.656 1.843 1.75 17.50%
7 205 206 95.02 95.015 62 117 467 881 0.5837 1.1013 0.0344 25.03 1.7857 3.338 200 240 36.72 93.177 93.024 93.377 93.224 0.8 0.46 0.55 1.843 1.991 1.917 24.70%
8 206 207 95.015 95.088 127 240 594 1121 0.7425 1.4013 0.044 25.03 2.2715 4.248 200 240 99.26 93.024 92.611 93.224 92.811 0.8 0.49 0.59 1.991 2.477 2.234 27.90%
9 207 136 95.088 95.106 73 139 667 1260 0.8337 1.575 0.0486 25.03 2.5498 4.774 200 240 47.59 92.611 92.413 92.811 92.613 0.8 0.51 0.61 2.477 2.693 2.585 29.60%
10 136 137 95.106 95.107 62 118 1018 1924 1.2725 2.405 0.0723 25.03 3.8898 7.287 200 240 37.01 92.413 92.258 92.613 92.458 0.8 0.58 0.69 2.693 2.849 2.771 37.00%
11 237 238 95.163 95.13 141 266 141 266 0.1762 0.3325 0.0109 25.03 0.5396 1.008 200 240 112.52 93.963 93.494 94.163 93.694 0.8 0.32 0.39 1.2 1.635 1.418 13.70%
12 238 137 95.13 95.107 69 131 210 397 0.2625 0.4962 0.015 25.03 0.8025 1.504 200 240 43.49 93.494 93.313 93.694 93.513 0.8 0.36 0.44 1.635 1.794 1.715 16.60%
13 137 138 95.107 95.169 215 407 1443 2728 1.8037 3.41 0.1051 25.03 5.5163 10.335 200 240 183.98 92.258 91.492 92.458 91.692 0.8 0.64 0.76 2.849 3.677 3.263 44.80%
14 138 139 95.169 95.356 80 150 1523 2878 1.9037 3.5975 0.1102 25.03 5.8215 10.903 200 240 53.53 91.492 91.269 91.692 91.469 0.8 0.65 0.77 3.677 4.087 3.882 46.20%
15 231 232 95.704 95.347 110 208 110 208 0.1375 0.26 0.008 25.57 0.4205 0.788 200 230 82.95 94.504 94.144 94.704 94.344 0.81 0.3 0.37 1.2 1.204 1.202 12.00%
16 232 139 95.347 95.356 93 175 203 383 0.2537 0.4787 0.0144 25.03 0.7756 1.451 200 240 66.31 94.144 93.867 94.344 94.067 0.8 0.36 0.43 1.204 1.488 1.346 16.30%
17 139 140 95.356 95.319 114 215 1840 3476 2.3 4.345 0.133 25.03 7.033 13.168 200 240 86.55 91.269 90.908 91.469 91.108 0.8 0.68 0.81 4.087 4.411 4.249 51.50%
18 140 141 95.319 95.405 49 91 1889 3567 2.3612 4.4588 0.1352 25.03 7.219 13.511 200 240 23.57 90.908 90.81 91.108 91.01 0.8 0.69 0.81 4.411 4.595 4.503 52.30%
19 268 269 94.988 95.088 48 91 48 91 0.06 0.1137 0.0023 14.23 0.1823 0.344 150 160 23.54 93.838 93.691 93.988 93.841 0.81 0.28 0.34 1.15 1.397 1.274 10.70%
20 269 270 95.088 95.401 55 103 103 194 0.1287 0.2425 0.0051 25.03 0.3914 0.733 200 240 29.53 93.641 93.518 93.841 93.718 0.8 0.29 0.35 1.447 1.883 1.665 11.80%
21 270 141 95.401 95.405 50 95 153 289 0.1912 0.3612 0.0076 25.03 0.5813 1.091 200 240 25.3 93.518 93.412 93.718 93.612 0.8 0.33 0.4 1.883 1.993 1.938 14.20%
22 141 142 95.405 95.444 132 249 2174 4105 2.7175 5.1313 0.1528 23.6 8.3053 15.547 200 270 103.8 90.81 90.426 91.01 90.626 0.75 0.69 0.8 4.595 5.018 4.807 59.20%
23 240 241 95.792 95.555 81 152 81 152 0.1013 0.19 0.0052 14.23 0.309 0.575 150 160 54.41 94.642 94.302 94.792 94.452 0.81 0.33 0.39 1.15 1.253 1.202 13.70%
24 244 241 95.527 95.555 58 109 58 109 0.0725 0.1363 0.0031 14.23 0.2206 0.412 150 160 32.45 94.377 94.174 94.527 94.324 0.81 0.3 0.36 1.15 1.381 1.265 11.70%
25 246 241 95.546 95.555 63 119 63 119 0.0787 0.1487 0.0036 14.23 0.2399 0.45 150 160 37.84 94.396 94.159 94.546 94.309 0.81 0.3 0.37 1.15 1.396 1.273 12.20%
26 241 242 95.555 95.632 90 170 292 550 0.365 0.6875 0.0181 25.03 1.1131 2.081 200 240 63.45 94.109 93.845 94.309 94.045 0.8 0.4 0.48 1.446 1.787 1.616 19.50%
27 249 242 95.434 95.632 99 187 99 187 0.1237 0.2338 0.007 25.03 0.3782 0.708 200 240 72.15 94.234 93.933 94.434 94.133 0.8 0.29 0.35 1.2 1.699 1.45 11.60%
28 242 243 95.632 95.518 51 96 442 833 0.5525 1.0412 0.0276 25.03 1.6851 3.151 200 240 26.15 93.845 93.736 94.045 93.936 0.8 0.45 0.54 1.787 1.782 1.785 24.00%
29 245 243 95.533 95.518 73 138 73 138 0.0912 0.1725 0.0046 14.23 0.2783 0.522 150 160 47.2 94.383 94.088 94.533 94.238 0.81 0.32 0.38 1.15 1.43 1.29 13.10%
30 243 142 95.518 95.444 89 168 604 1139 0.755 1.4238 0.0382 25.03 2.3032 4.309 200 240 62.76 93.736 93.475 93.936 93.675 0.8 0.5 0.6 1.782 1.969 1.876 28.10%
31 142 143 95.444 95.636 73 138 2851 5382 3.5637 6.7275 0.1956 22.39 10.8868 20.378 200 300 47.21 90.426 90.268 90.626 90.468 0.71 0.71 0.81 5.018 5.368 5.193 74.90%
32 230 143 95.757 95.636 79 149 79 149 0.0987 0.1863 0.0051 14.23 0.3014 0.564 150 160 53.05 94.607 94.276 94.757 94.426 0.81 0.32 0.39 1.15 1.36 1.255 13.60%
33 143 144 95.636 95.485 88 166 3018 5697 3.7725 7.1213 0.2066 22.39 11.5241 21.57 200 300 61.31 90.268 90.064 90.468 90.264 0.71 0.72 0.81 5.368 5.421 5.394 78.90%
34 265 144 95.685 95.485 126 238 126 238 0.1575 0.2975 0.0095 25.03 0.482 0.902 200 240 98.04 94.485 94.076 94.685 94.276 0.8 0.31 0.38 1.2 1.409 1.304 13.00%
35 266 144 95.477 95.485 89 168 89 168 0.1112 0.21 0.006 25.03 0.3398 0.636 200 240 62.39 94.277 94.017 94.477 94.217 0.8 0.28 0.34 1.2 1.468 1.334 11.00%
36 144 132 95.485 95.493 127 239 3360 6342 4.2 7.9275 0.2316 25.03 12.8316 24.014 200 240 98.76 90.064 89.652 90.264 89.852 0.8 0.8 0.91 5.421 5.841 5.631 78.50%
37 267 123 94.217 94.365 178 336 178 336 0.2225 0.42 0.0143 25.03 0.6818 1.274 200 240 147.79 93.017 92.401 93.217 92.601 0.8 0.35 0.42 1.2 1.964 1.582 15.30%
38 123 124 94.365 94.48 135 255 313 591 0.3913 0.7387 0.0246 25.03 1.1983 2.241 200 240 106.78 92.401 91.956 92.601 92.156 0.8 0.41 0.49 1.964 2.524 2.244 20.20%
39 222 124 94.928 94.48 130 246 130 246 0.1625 0.3075 0.0099 26.14 0.4974 0.932 200 220 102.29 93.728 93.263 93.928 93.463 0.83 0.32 0.39 1.2 1.218 1.209 12.90%
40 124 125 94.48 95.02 105 199 548 1036 0.685 1.295 0.042 25.03 2.097 3.927 200 240 78.23 91.956 91.63 92.156 91.83 0.8 0.48 0.58 2.524 3.39 2.957 26.80%
41 223 125 95.021 95.02 124 234 124 234 0.155 0.2925 0.0093 25.03 0.4743 0.887 200 240 95.91 93.821 93.422 94.021 93.622 0.8 0.31 0.37 1.2 1.599 1.399 12.90%
42 125 126 95.02 95.041 51 96 723 1366 0.9038 1.7075 0.0537 25.03 2.765 5.176 200 240 26.1 91.63 91.522 91.83 91.722 0.8 0.52 0.63 3.39 3.52 3.455 30.90%

Page 1 of 26
Sewerage Project, Begusarai Annex -A-3: Hydraulic Design of Sewer Network
NGRBA

Link ID Start End Node Upstrem Downstream Population Population Cum Cum Flow 2011 Flow 2041 Infiltration Full Flow Design Design Diameter Slope Length Upstream Downstream Upstream Downstream Full Flow Actual Actual Upstream Downstream Average Depth of
Node Ground Ground Level 2011 2041 Population Population Flow 2011 Flow 2041 Invert Invert Crown Crown Velocity Velocity Velocity Depth Depth Depth Flow
Level 2011 2041 2011 2041
m m souls souls souls souls lps lps lps lps lps lps mm 1 in m m m m m m/s m/s m/s m m m %age
43 224 126 95.135 95.041 125 235 125 235 0.1563 0.2937 0.0093 25.03 0.4781 0.891 200 240 96.71 93.935 93.532 94.135 93.732 0.8 0.31 0.38 1.2 1.509 1.355 12.90%
44 126 127 95.041 95.125 53 100 901 1701 1.1263 2.1263 0.0658 25.03 3.4445 6.445 200 240 27.89 91.522 91.405 91.722 91.605 0.8 0.56 0.67 3.52 3.72 3.62 34.60%
45 225 127 95.154 95.125 130 246 130 246 0.1625 0.3075 0.0099 25.03 0.4974 0.932 200 240 102.15 93.954 93.528 94.154 93.728 0.8 0.31 0.38 1.2 1.597 1.398 13.20%
46 127 128 95.125 95.01 67 127 1098 2074 1.3725 2.5925 0.0796 25.03 4.1971 7.857 200 240 41.72 91.405 91.232 91.605 91.432 0.8 0.59 0.7 3.72 3.778 3.749 38.50%
47 128 129 95.01 95.631 125 236 1223 2310 1.5288 2.8875 0.089 25.03 4.6753 8.752 200 240 97.25 91.232 90.826 91.432 91.026 0.8 0.61 0.73 3.778 4.804 4.291 40.80%
48 239 152 95.366 95.397 53 101 53 101 0.0662 0.1262 0.0027 14.23 0.2015 0.381 150 160 28.31 94.216 94.039 94.366 94.189 0.81 0.29 0.35 1.15 1.358 1.254 11.30%
49 218 219 94.999 95.374 151 286 151 286 0.1887 0.3575 0.0118 25.03 0.5781 1.084 200 240 122.5 93.799 93.289 93.999 93.489 0.8 0.33 0.4 1.2 2.086 1.643 14.20%
50 219 220 95.374 95.365 41 77 192 363 0.24 0.4537 0.0134 25.03 0.7334 1.375 200 240 16.32 93.289 93.221 93.489 93.421 0.8 0.35 0.43 2.086 2.144 2.115 15.90%
51 221 220 95.113 95.365 95 180 95 180 0.1187 0.225 0.0066 25.03 0.3629 0.682 200 240 68.61 93.913 93.627 94.113 93.827 0.8 0.29 0.35 1.2 1.737 1.469 11.30%
52 220 151 95.365 95.391 96 181 383 724 0.4787 0.905 0.0267 25.03 1.4629 2.742 200 240 69.02 93.221 92.933 93.421 93.133 0.8 0.43 0.52 2.144 2.457 2.3 22.30%
53 217 150 95.297 95.357 137 258 137 258 0.1713 0.3225 0.0105 25.03 0.5242 0.978 200 240 108.39 94.097 93.646 94.297 93.846 0.8 0.32 0.39 1.2 1.711 1.456 13.50%
54 211 212 95.279 95.263 132 249 132 249 0.165 0.3113 0.01 25.03 0.505 0.944 200 240 103.53 94.079 93.648 94.279 93.848 0.8 0.32 0.38 1.2 1.615 1.408 13.30%
55 215 212 95.223 95.263 52 98 52 98 0.065 0.1225 0.0026 14.23 0.1976 0.37 150 160 26.99 94.073 93.904 94.223 94.054 0.81 0.29 0.35 1.15 1.358 1.254 11.10%
56 212 213 95.263 95.36 57 107 241 454 0.3012 0.5675 0.0156 25.03 0.9194 1.718 200 240 31.48 93.648 93.516 93.848 93.716 0.8 0.38 0.46 1.615 1.843 1.729 17.70%
57 214 213 95.304 95.36 122 231 122 231 0.1525 0.2887 0.0091 25.03 0.4666 0.875 200 240 94.4 94.104 93.71 94.304 93.91 0.8 0.31 0.37 1.2 1.649 1.425 12.80%
58 213 149 95.36 95.405 65 123 428 808 0.535 1.01 0.0285 25.03 1.6335 3.059 200 240 39.58 93.516 93.352 93.716 93.552 0.8 0.45 0.54 1.843 2.053 1.948 23.60%
59 216 149 95.327 95.405 136 256 136 256 0.17 0.32 0.0104 25.03 0.5204 0.97 200 240 107.41 94.127 93.68 94.327 93.88 0.8 0.32 0.38 1.2 1.725 1.462 13.50%
60 209 148 95.343 95.335 135 255 135 255 0.1688 0.3187 0.0103 25.03 0.5166 0.967 200 240 106.88 94.143 93.698 94.343 93.898 0.8 0.32 0.38 1.2 1.637 1.419 13.40%
61 210 147 95.273 95.301 61 116 61 116 0.0763 0.145 0.0035 14.23 0.2322 0.438 150 160 36.04 94.123 93.898 94.273 94.048 0.81 0.3 0.36 1.15 1.404 1.277 12.00%
62 145 146 95.232 95.296 132 249 132 249 0.165 0.3113 0.01 25.03 0.505 0.944 200 240 103.78 94.032 93.599 94.232 93.799 0.8 0.32 0.38 1.2 1.696 1.448 13.30%
63 234 235 95.202 95.184 143 271 143 271 0.1787 0.3388 0.0111 25.03 0.5473 1.027 200 240 114.85 94.002 93.523 94.202 93.723 0.8 0.32 0.39 1.2 1.661 1.43 13.80%
64 235 236 95.184 95.264 67 127 210 398 0.2625 0.4975 0.0151 25.03 0.8026 1.508 200 240 41.8 93.523 93.349 93.723 93.549 0.8 0.36 0.44 1.661 1.916 1.788 16.60%
65 236 146 95.264 95.296 61 116 271 514 0.3388 0.6425 0.0186 25.03 1.0348 1.946 200 240 35.85 93.349 93.2 93.549 93.4 0.8 0.39 0.47 1.916 2.096 2.006 18.90%
66 146 147 95.296 95.301 64 121 467 884 0.5837 1.105 0.0323 25.03 1.7835 3.347 200 240 38.4 93.2 93.04 93.4 93.24 0.8 0.46 0.55 2.096 2.262 2.179 24.70%
67 147 148 95.301 95.335 66 124 594 1124 0.7425 1.405 0.0396 25.03 2.2671 4.255 200 240 40.14 93.04 92.872 93.24 93.072 0.8 0.49 0.59 2.262 2.463 2.362 27.90%
68 148 149 95.335 95.405 130 245 859 1624 1.0737 2.03 0.0597 25.03 3.281 6.15 200 240 101.67 92.872 92.449 93.072 92.649 0.8 0.55 0.66 2.463 2.956 2.709 33.80%
69 149 150 95.405 95.357 121 229 1544 2917 1.93 3.6462 0.1077 25.03 5.8977 11.046 200 240 93.35 92.449 92.06 92.649 92.26 0.8 0.65 0.77 2.956 3.297 3.126 46.50%
70 150 151 95.357 95.391 60 112 1741 3287 2.1762 4.1087 0.1214 25.03 6.6502 12.448 200 240 34.25 92.06 91.917 92.26 92.117 0.8 0.67 0.8 3.297 3.474 3.385 49.80%
71 233 151 95.41 95.391 99 187 99 187 0.1237 0.2338 0.0069 25.03 0.3782 0.708 200 240 71.99 94.21 93.91 94.41 94.11 0.8 0.29 0.35 1.2 1.481 1.34 11.60%
72 151 152 95.391 95.397 96 181 2319 4379 2.8987 5.4738 0.1617 23.17 8.8579 16.583 200 280 69.11 91.917 91.67 92.117 91.87 0.74 0.69 0.8 3.474 3.727 3.6 62.60%
73 152 153 95.397 95.668 63 119 2435 4599 3.0437 5.7487 0.168 23.17 9.2993 17.414 200 280 37.43 91.67 91.536 91.87 91.736 0.74 0.7 0.81 3.727 4.131 3.929 64.70%
74 153 154 95.668 95.648 57 108 2492 4707 3.115 5.8837 0.1711 22.77 9.5161 17.822 200 290 32.17 91.536 91.426 91.736 91.626 0.72 0.69 0.8 4.131 4.222 4.177 66.60%
75 154 129 95.648 95.631 93 176 2585 4883 3.2312 6.1037 0.1776 22.77 9.8713 18.489 200 290 66.76 91.426 91.195 91.626 91.395 0.72 0.7 0.81 4.222 4.435 4.329 68.40%
76 129 130 95.631 95.689 73 138 3881 7331 4.8512 9.1637 0.2711 35.6 14.8249 27.762 250 390 47.42 90.776 90.655 91.026 90.905 0.72 0.69 0.8 4.854 5.034 4.944 66.40%
77 130 131 95.689 95.2 133 251 4014 7582 5.0175 9.4775 0.2812 35.6 15.3337 28.714 250 390 104.7 90.655 90.386 90.905 90.636 0.72 0.7 0.81 5.034 4.814 4.924 68.10%
78 226 227 95.3 95.232 57 108 57 108 0.0712 0.135 0.0031 14.23 0.2168 0.408 150 160 32.03 94.15 93.949 94.3 94.099 0.81 0.29 0.36 1.15 1.282 1.216 11.60%
79 228 227 95.425 95.232 72 136 72 136 0.09 0.17 0.0045 14.23 0.2745 0.514 150 160 46.39 94.275 93.985 94.425 94.135 0.81 0.32 0.38 1.15 1.246 1.198 13.00%
80 227 131 95.232 95.2 96 181 225 425 0.2813 0.5313 0.0142 25.03 0.858 1.608 200 240 69.27 93.899 93.611 94.099 93.811 0.8 0.37 0.45 1.332 1.59 1.461 17.20%
81 229 131 94.987 95.2 120 227 120 227 0.15 0.2837 0.0089 25.03 0.4589 0.86 200 240 92.59 93.787 93.402 93.987 93.602 0.8 0.31 0.37 1.2 1.799 1.499 12.70%
82 131 132 95.2 95.493 155 292 4514 8526 5.6425 10.6575 0.3165 34.72 17.244 32.289 250 410 125.71 90.386 90.08 90.636 90.33 0.71 0.71 0.8 4.814 5.414 5.114 76.30%
83 132 133 95.493 95.523 91 171 7965 15039 9.9563 18.7987 0.5544 69.26 30.4231 56.951 350 620 64.21 89.502 89.399 89.852 89.749 0.72 0.7 0.8 5.991 6.124 6.058 69.10%
84 133 88 95.523 95.834 165 311 8130 15350 10.1625 19.1875 0.5674 68.71 31.0549 58.13 350 630 135.41 89.399 89.184 89.749 89.534 0.71 0.7 0.8 6.124 6.65 6.387 70.60%
85 247 248 95.508 96.052 139 262 139 262 0.1737 0.3275 0.0107 25.03 0.5319 0.993 200 240 110.54 94.308 93.848 94.508 94.048 0.8 0.32 0.39 1.2 2.205 1.702 13.60%
86 248 87 96.052 96.282 87 164 226 426 0.2825 0.5325 0.0165 25.03 0.864 1.614 200 240 60.64 93.848 93.595 94.048 93.795 0.8 0.37 0.45 2.205 2.687 2.446 17.20%
87 252 250 95.638 95.528 68 128 68 128 0.085 0.16 0.0041 14.23 0.2591 0.484 150 160 42.21 94.488 94.224 94.638 94.374 0.81 0.31 0.37 1.15 1.304 1.227 12.60%
88 253 254 95.663 95.477 72 136 72 136 0.09 0.17 0.0045 14.23 0.2745 0.514 150 160 46.18 94.513 94.224 94.663 94.374 0.81 0.32 0.38 1.15 1.253 1.201 13.00%
89 254 250 95.477 95.528 136 257 208 393 0.26 0.4912 0.0149 25.03 0.7949 1.489 200 240 107.88 94.174 93.725 94.374 93.924 0.8 0.36 0.44 1.303 1.804 1.553 16.50%
90 250 251 95.528 96.127 202 381 478 902 0.5975 1.1275 0.0354 25.03 1.8279 3.418 200 240 171.04 93.725 93.012 93.924 93.212 0.8 0.46 0.56 1.804 3.115 2.459 25.00%

Page 2 of 26
Sewerage Project, Begusarai Annex -A-3: Hydraulic Design of Sewer Network
NGRBA

Link ID Start End Node Upstrem Downstream Population Population Cum Cum Flow 2011 Flow 2041 Infiltration Full Flow Design Design Diameter Slope Length Upstream Downstream Upstream Downstream Full Flow Actual Actual Upstream Downstream Average Depth of
Node Ground Ground Level 2011 2041 Population Population Flow 2011 Flow 2041 Invert Invert Crown Crown Velocity Velocity Velocity Depth Depth Depth Flow
Level 2011 2041 2011 2041
m m souls souls souls souls lps lps lps lps lps lps mm 1 in m m m m m m/s m/s m/s m m m %age
91 251 87 96.127 96.282 72 136 550 1038 0.6875 1.2975 0.0399 25.03 2.1024 3.932 200 240 46.19 93.012 92.819 93.212 93.019 0.8 0.48 0.58 3.115 3.463 3.289 26.80%
92 317 300 96.659 97.663 163 308 163 308 0.2037 0.385 0.0129 25.03 0.6242 1.168 200 240 133.78 95.459 94.901 95.659 95.101 0.8 0.34 0.41 1.2 2.761 1.981 14.70%
93 319 300 97.785 97.663 62 118 62 118 0.0775 0.1475 0.0036 14.23 0.2361 0.446 150 160 36.88 96.635 96.405 96.785 96.555 0.81 0.3 0.37 1.15 1.258 1.204 12.10%
94 329 330 97.332 97.688 85 160 85 160 0.1062 0.2 0.0056 14.23 0.3244 0.606 150 160 58.32 96.182 95.818 96.332 95.968 0.81 0.33 0.4 1.15 1.87 1.51 14.10%
95 297 298 97.142 97.465 189 357 189 357 0.2362 0.4462 0.0153 25.03 0.7241 1.354 200 240 158.64 95.942 95.281 96.142 95.481 0.8 0.35 0.42 1.2 2.184 1.692 15.80%
96 298 299 97.465 97.689 118 222 307 579 0.3837 0.7237 0.024 25.03 1.1752 2.195 200 240 90.02 95.281 94.906 95.481 95.106 0.8 0.41 0.49 2.184 2.783 2.483 20.00%
97 299 330 97.689 97.688 54 102 361 681 0.4512 0.8512 0.0268 25.03 1.3805 2.581 200 240 29.2 94.906 94.784 95.106 94.984 0.8 0.43 0.51 2.783 2.904 2.843 21.70%
98 330 300 97.688 97.663 67 126 513 967 0.6413 1.2088 0.0364 25.03 1.9601 3.663 200 240 41.05 94.784 94.613 94.984 94.813 0.8 0.47 0.57 2.904 3.05 2.977 25.80%
99 300 301 97.663 97.058 70 132 808 1525 1.01 1.9063 0.0571 25.03 3.0871 5.776 200 240 43.99 94.613 94.43 94.813 94.63 0.8 0.54 0.65 3.05 2.628 2.839 32.70%
100 314 301 96.882 97.058 136 257 136 257 0.17 0.3212 0.0104 25.03 0.5204 0.974 200 240 108.01 95.682 95.232 95.882 95.432 0.8 0.32 0.39 1.2 1.826 1.513 13.50%
101 328 301 97.411 97.058 76 142 76 142 0.095 0.1775 0.0048 15.22 0.2898 0.537 150 140 49.52 96.261 95.908 96.411 96.058 0.86 0.34 0.4 1.15 1.151 1.15 12.90%
102 301 302 97.058 96.826 114 216 1134 2140 1.4175 2.675 0.0807 25.03 4.3332 8.106 200 240 86.79 94.43 94.068 94.63 94.268 0.8 0.6 0.71 2.628 2.757 2.693 39.10%
103 302 303 96.826 96.605 74 140 1208 2280 1.51 2.85 0.0853 25.03 4.6153 8.635 200 240 48.33 94.068 93.867 94.268 94.067 0.8 0.61 0.72 2.757 2.738 2.748 40.50%
104 320 321 97.182 96.769 72 135 72 135 0.09 0.1688 0.0044 17.17 0.2744 0.511 150 110 45.86 96.032 95.615 96.182 95.765 0.97 0.36 0.43 1.15 1.154 1.152 11.80%
105 323 321 96.577 96.769 75 141 75 141 0.0938 0.1762 0.0047 14.23 0.286 0.533 150 160 49.05 95.427 95.12 95.577 95.27 0.81 0.32 0.39 1.15 1.649 1.4 13.20%
106 321 322 96.769 96.621 54 102 201 378 0.2512 0.4725 0.012 25.03 0.7657 1.429 200 240 29.12 95.07 94.949 95.27 95.149 0.8 0.36 0.43 1.699 1.672 1.686 16.20%
107 324 322 96.29 96.621 105 198 105 198 0.1312 0.2475 0.0075 25.03 0.4012 0.75 200 240 77.56 95.09 94.767 95.29 94.967 0.8 0.29 0.36 1.2 1.854 1.527 11.90%
108 322 303 96.621 96.605 63 120 369 696 0.4613 0.87 0.0231 25.03 1.4068 2.633 200 240 37.89 94.767 94.609 94.967 94.809 0.8 0.43 0.52 1.854 1.996 1.925 21.90%
109 303 304 96.605 96.408 73 138 1650 3114 2.0625 3.8925 0.113 25.03 6.3005 11.79 200 240 47.16 93.867 93.67 94.067 93.87 0.8 0.66 0.78 2.738 2.737 2.738 48.30%
110 304 305 96.408 96.336 53 99 1703 3213 2.1288 4.0162 0.1156 25.03 6.5019 12.164 200 240 27.5 93.67 93.556 93.87 93.756 0.8 0.67 0.79 2.737 2.781 2.759 49.20%
111 305 306 96.336 96.237 90 169 1793 3382 2.2413 4.2275 0.1217 25.03 6.8454 12.804 200 240 62.99 93.556 93.293 93.756 93.493 0.8 0.68 0.8 2.781 2.944 2.862 50.70%
112 307 306 96.17 96.237 69 131 69 131 0.0862 0.1637 0.0042 14.23 0.263 0.495 150 160 43.71 95.02 94.746 95.17 94.896 0.81 0.31 0.38 1.15 1.491 1.321 12.80%
113 308 309 98.029 96.703 84 158 84 158 0.105 0.1975 0.0055 28.47 0.3205 0.598 150 40 57.31 96.879 95.446 97.029 95.596 1.61 0.54 0.65 1.15 1.257 1.204 10.00%
114 315 316 96.892 96.991 130 246 130 246 0.1625 0.3075 0.0098 25.03 0.4973 0.932 200 240 102.07 95.692 95.267 95.892 95.467 0.8 0.31 0.38 1.2 1.724 1.462 13.20%
115 316 309 96.991 96.703 83 157 213 403 0.2662 0.5037 0.0153 25.03 0.8141 1.527 200 240 57.05 95.267 95.029 95.467 95.229 0.8 0.37 0.44 1.724 1.674 1.699 16.80%
116 309 310 96.703 96.261 125 237 422 798 0.5275 0.9975 0.0303 25.03 1.6128 3.023 200 240 97.49 95.029 94.623 95.229 94.823 0.8 0.45 0.54 1.674 1.638 1.656 23.50%
117 310 311 96.261 96.213 144 271 566 1069 0.7075 1.3362 0.0414 25.03 2.1639 4.05 200 240 115.12 94.623 94.143 94.823 94.343 0.8 0.49 0.59 1.638 2.07 1.854 27.20%
118 312 313 96.773 96.299 87 165 87 165 0.1088 0.2062 0.0059 35.4 0.3321 0.625 200 120 61.04 95.573 95.064 95.773 95.264 1.13 0.35 0.43 1.2 1.235 1.217 9.20%
119 313 311 96.299 96.213 69 131 156 296 0.195 0.37 0.0101 25.03 0.5951 1.12 200 240 43.63 95.064 94.882 95.264 95.082 0.8 0.33 0.4 1.235 1.331 1.283 14.40%
120 311 306 96.213 96.237 87 164 809 1529 1.0113 1.9112 0.0573 25.03 3.0911 5.791 200 240 60.65 94.143 93.891 94.343 94.091 0.8 0.54 0.65 2.07 2.347 2.208 32.70%
121 306 74 96.237 96.184 113 213 2784 5255 3.48 6.5687 0.1915 22.39 10.6315 19.898 200 300 85.28 93.293 93.009 93.493 93.209 0.71 0.7 0.8 2.944 3.175 3.06 73.40%
122 318 282 97.716 97.89 84 158 84 158 0.105 0.1975 0.0056 14.23 0.3206 0.598 150 160 57.65 96.566 96.206 96.716 96.356 0.81 0.33 0.4 1.15 1.685 1.417 14.00%
123 277 278 98.267 98.343 217 409 217 409 0.2712 0.5112 0.0179 25.03 0.8316 1.552 200 240 185.27 97.067 96.295 97.267 96.495 0.8 0.37 0.44 1.2 2.048 1.624 16.90%
124 278 279 98.343 98.175 84 158 301 567 0.3762 0.7087 0.0234 25.03 1.1522 2.15 200 240 57.62 96.295 96.055 96.495 96.255 0.8 0.4 0.49 2.048 2.12 2.084 19.80%
125 279 280 98.175 97.9 87 163 388 730 0.485 0.9125 0.0292 25.03 1.4842 2.767 200 240 60.24 96.055 95.804 96.255 96.004 0.8 0.44 0.52 2.12 2.096 2.108 22.40%
126 280 281 97.9 97.876 95 180 483 910 0.6037 1.1375 0.0359 25.03 1.8471 3.448 200 240 68.57 95.804 95.519 96.004 95.719 0.8 0.47 0.56 2.096 2.357 2.227 25.10%
127 281 282 97.876 97.89 130 246 613 1156 0.7662 1.445 0.0457 25.03 2.3445 4.381 200 240 102.3 95.519 95.092 95.719 95.292 0.8 0.5 0.6 2.357 2.798 2.578 28.30%
128 282 283 97.89 97.636 112 212 809 1526 1.0112 1.9075 0.0594 25.03 3.0932 5.782 200 240 84.72 95.092 94.739 95.292 94.939 0.8 0.54 0.65 2.798 2.897 2.848 32.70%
129 285 286 97.682 97.741 63 119 63 119 0.0787 0.1487 0.0037 14.23 0.2399 0.45 150 160 37.86 96.532 96.296 96.682 96.446 0.81 0.3 0.37 1.15 1.445 1.298 12.20%
130 286 287 97.741 97.552 87 163 150 282 0.1875 0.3525 0.0095 25.03 0.572 1.067 200 240 60.2 96.246 95.995 96.446 96.195 0.8 0.33 0.4 1.495 1.558 1.526 14.10%
131 292 293 98.238 98.497 65 123 65 123 0.0812 0.1538 0.0038 14.23 0.2476 0.465 150 160 39.73 97.088 96.84 97.238 96.99 0.81 0.31 0.37 1.15 1.658 1.404 12.40%
132 293 294 98.497 98.295 54 102 119 225 0.1487 0.2813 0.0066 25.03 0.4529 0.85 200 240 28.83 96.79 96.67 96.99 96.87 0.8 0.31 0.37 1.708 1.625 1.666 12.60%
133 294 295 98.295 98.451 51 95 170 320 0.2125 0.4 0.0091 25.03 0.6466 1.209 200 240 25.66 96.67 96.563 96.87 96.763 0.8 0.34 0.41 1.625 1.889 1.757 14.90%
134 295 296 98.451 98.299 69 130 239 450 0.2987 0.5625 0.0133 25.03 0.9095 1.701 200 240 43.3 96.563 96.382 96.763 96.582 0.8 0.38 0.45 1.889 1.916 1.902 17.60%
135 296 290 98.299 97.852 77 145 316 595 0.395 0.7437 0.0182 25.03 1.2032 2.249 200 240 51.01 96.382 96.17 96.582 96.37 0.8 0.41 0.49 1.916 1.682 1.799 20.30%
136 481 290 97.463 97.852 94 178 94 178 0.1175 0.2225 0.0065 25.03 0.359 0.674 200 240 67.74 96.263 95.981 96.463 96.181 0.8 0.28 0.34 1.2 1.871 1.535 11.30%
137 290 291 97.852 97.996 88 166 498 939 0.6225 1.1737 0.0306 25.03 1.8981 3.552 200 240 61.41 95.981 95.725 96.181 95.925 0.8 0.47 0.56 1.871 2.271 2.071 25.40%
138 291 287 97.996 97.552 104 197 602 1136 0.7525 1.42 0.0381 25.03 2.2956 4.298 200 240 77.23 95.725 95.403 95.925 95.603 0.8 0.5 0.6 2.271 2.149 2.21 28.00%

Page 3 of 26
Sewerage Project, Begusarai Annex -A-3: Hydraulic Design of Sewer Network
NGRBA

Link ID Start End Node Upstrem Downstream Population Population Cum Cum Flow 2011 Flow 2041 Infiltration Full Flow Design Design Diameter Slope Length Upstream Downstream Upstream Downstream Full Flow Actual Actual Upstream Downstream Average Depth of
Node Ground Ground Level 2011 2041 Population Population Flow 2011 Flow 2041 Invert Invert Crown Crown Velocity Velocity Velocity Depth Depth Depth Flow
Level 2011 2041 2011 2041
m m souls souls souls souls lps lps lps lps lps lps mm 1 in m m m m m m/s m/s m/s m m m %age
139 287 288 97.552 97.553 84 158 836 1576 1.045 1.97 0.0531 25.03 3.1881 5.963 200 240 57.32 95.403 95.165 95.603 95.365 0.8 0.55 0.65 2.149 2.389 2.269 33.20%
140 288 283 97.553 97.636 131 248 967 1824 1.2088 2.28 0.063 25.03 3.6893 6.903 200 240 103.2 95.165 94.735 95.365 94.935 0.8 0.57 0.68 2.389 2.902 2.645 35.90%
141 283 284 97.636 97.245 116 220 1892 3570 2.365 4.4625 0.1311 25.03 7.2261 13.519 200 240 88.89 94.735 94.364 94.935 94.564 0.8 0.69 0.81 2.902 2.881 2.891 52.30%
142 284 73 97.245 96.678 172 325 2064 3895 2.58 4.8688 0.1448 24.05 7.8848 14.751 200 260 142.22 94.364 93.817 94.564 94.017 0.77 0.69 0.8 2.881 2.861 2.871 56.60%
143 485 486 97.801 97.783 95 179 95 179 0.1187 0.2237 0.0066 25.03 0.3628 0.678 200 240 68.05 96.601 96.318 96.801 96.518 0.8 0.29 0.35 1.2 1.465 1.332 11.30%
144 486 326 97.783 97.767 44 82 139 261 0.1737 0.3262 0.0084 25.03 0.5296 0.987 200 240 18.97 96.318 96.239 96.518 96.439 0.8 0.32 0.39 1.465 1.528 1.496 13.60%
145 326 327 97.767 97.594 81 153 220 414 0.275 0.5175 0.0137 25.03 0.8387 1.566 200 240 54.72 96.239 96.011 96.439 96.211 0.8 0.37 0.44 1.528 1.583 1.555 17.00%
146 327 289 97.594 97.75 69 131 289 545 0.3613 0.6812 0.0179 25.03 1.1016 2.062 200 240 43.52 96.011 95.83 96.211 96.03 0.8 0.4 0.48 1.583 1.92 1.751 19.40%
147 482 483 98.314 98.535 109 206 109 206 0.1363 0.2575 0.0079 25.03 0.4167 0.78 200 240 82.05 97.114 96.772 97.314 96.972 0.8 0.3 0.36 1.2 1.764 1.482 12.10%
148 483 484 98.535 97.93 117 220 226 426 0.2825 0.5325 0.0165 25.03 0.864 1.614 200 240 89.21 96.772 96.4 96.972 96.6 0.8 0.37 0.45 1.764 1.53 1.647 17.20%
149 484 289 97.93 97.75 45 85 271 511 0.3388 0.6388 0.0185 25.03 1.0347 1.935 200 240 20.46 96.4 96.315 96.6 96.515 0.8 0.39 0.47 1.53 1.435 1.482 18.80%
150 289 487 97.75 96.47 85 160 645 1216 0.8063 1.52 0.042 38.78 2.4608 4.602 200 100 58.5 95.83 95.245 96.03 95.445 1.23 0.69 0.83 1.92 1.225 1.573 23.30%
151 487 488 96.47 96.359 70 133 715 1349 0.8938 1.6862 0.0463 25.03 2.7276 5.105 200 240 44.69 95.245 95.058 95.445 95.258 0.8 0.52 0.63 1.225 1.3 1.263 30.60%
152 488 73 96.359 96.678 84 159 799 1508 0.9988 1.885 0.0519 25.03 3.0482 5.707 200 240 58.06 95.058 94.816 95.258 95.016 0.8 0.54 0.65 1.3 1.862 1.581 32.50%
153 194 195 97.032 96.925 139 262 139 262 0.1737 0.3275 0.0106 25.03 0.5319 0.993 200 240 110.2 95.832 95.372 96.032 95.572 0.8 0.32 0.39 1.2 1.553 1.376 13.60%
154 195 196 96.925 96.745 222 420 361 682 0.4513 0.8525 0.029 25.03 1.3828 2.587 200 240 190.73 95.372 94.578 95.572 94.778 0.8 0.43 0.51 1.553 2.167 1.86 21.70%
155 196 73 96.745 96.678 113 213 474 895 0.5925 1.1187 0.0373 25.03 1.8148 3.394 200 240 85.47 94.578 94.222 94.778 94.422 0.8 0.46 0.56 2.167 2.457 2.312 24.90%
156 73 74 96.678 96.184 61 115 3398 6413 4.2475 8.0162 0.2374 25.03 12.9799 24.286 200 240 35.66 93.817 93.669 94.017 93.869 0.8 0.8 0.91 2.861 2.515 2.688 79.40%
157 74 75 96.184 96.077 111 209 6293 11877 7.8663 14.8462 0.4369 50.14 24.0356 44.976 300 520 83.28 92.909 92.749 93.209 93.049 0.71 0.7 0.8 3.275 3.328 3.301 74.00%
158 75 76 96.077 95.897 87 164 6380 12041 7.975 15.0512 0.4427 50.14 24.3677 45.596 300 520 60.44 92.749 92.633 93.049 92.933 0.71 0.7 0.8 3.328 3.265 3.296 74.80%
159 76 77 95.897 95.913 59 112 6439 12153 8.0487 15.1912 0.446 50.14 24.5922 46.02 300 520 34.12 92.633 92.567 92.933 92.867 0.71 0.71 0.8 3.265 3.346 3.306 75.40%
160 271 272 96.146 96.015 99 187 99 187 0.1237 0.2338 0.007 25.03 0.3782 0.708 200 240 72.21 94.946 94.645 95.146 94.845 0.8 0.29 0.35 1.2 1.369 1.285 11.60%
161 273 272 96.132 96.015 107 202 107 202 0.1337 0.2525 0.0077 25.03 0.409 0.765 200 240 79.99 94.932 94.599 95.132 94.799 0.8 0.3 0.36 1.2 1.415 1.308 12.00%
162 272 274 96.015 96.013 50 94 256 483 0.32 0.6037 0.0171 25.03 0.9771 1.828 200 240 24.86 94.599 94.496 94.799 94.696 0.8 0.39 0.46 1.415 1.518 1.467 18.30%
163 274 77 96.013 95.913 155 293 411 776 0.5137 0.97 0.0293 25.03 1.5705 2.939 200 240 126.29 94.496 93.969 94.696 94.169 0.8 0.44 0.53 1.518 1.944 1.731 23.10%
164 77 78 95.913 95.917 55 104 6905 13033 8.6313 16.2912 0.4781 51.13 26.3719 49.352 300 500 29.92 92.567 92.507 92.867 92.807 0.72 0.73 0.82 3.346 3.41 3.378 79.00%
165 275 78 95.944 95.917 104 195 104 195 0.13 0.2437 0.0074 25.03 0.3974 0.739 200 240 76.45 94.744 94.425 94.944 94.625 0.8 0.29 0.35 1.2 1.491 1.346 11.80%
166 78 79 95.917 95.907 62 117 7071 13345 8.8388 16.6812 0.489 52.74 27.0053 50.533 300 470 36.39 92.507 92.43 92.807 92.73 0.75 0.75 0.85 3.41 3.477 3.444 78.40%
167 276 79 95.956 95.907 133 251 133 251 0.1662 0.3137 0.0101 25.03 0.5088 0.951 200 240 104.69 94.756 94.319 94.956 94.519 0.8 0.32 0.38 1.2 1.588 1.394 13.30%
168 79 80 95.907 95.984 126 237 7330 13833 9.1625 17.2912 0.5086 70.41 27.9961 52.382 350 600 97.83 92.38 92.217 92.73 92.567 0.73 0.69 0.8 3.527 3.768 3.648 64.30%
169 80 81 95.984 96.213 312 591 7642 14424 9.5525 18.03 0.5353 69.83 29.1928 54.625 350 610 277.05 92.217 91.762 92.567 92.112 0.73 0.69 0.8 3.768 4.451 4.109 66.60%
170 169 170 97.746 97.63 152 287 152 287 0.19 0.3587 0.0119 25.03 0.5819 1.088 200 240 123.29 96.546 96.032 96.746 96.232 0.8 0.33 0.4 1.2 1.598 1.399 14.20%
171 170 171 97.63 97.67 43 82 195 369 0.2437 0.4612 0.0137 25.03 0.7449 1.397 200 240 18.65 96.032 95.954 96.232 96.154 0.8 0.36 0.43 1.598 1.716 1.657 16.00%
172 171 172 97.67 97.494 69 130 264 499 0.33 0.6237 0.0178 25.03 1.0078 1.889 200 240 43.1 95.954 95.775 96.154 95.975 0.8 0.39 0.47 1.716 1.72 1.718 18.60%
173 172 173 97.494 97.471 50 94 314 593 0.3925 0.7412 0.0203 25.03 1.1978 2.244 200 240 25.14 95.775 95.67 95.975 95.87 0.8 0.41 0.49 1.72 1.801 1.76 20.20%
174 173 174 97.471 97.444 83 156 397 749 0.4962 0.9362 0.0257 25.03 1.5145 2.834 200 240 56.5 95.67 95.434 95.87 95.634 0.8 0.44 0.53 1.801 2.01 1.905 22.70%
175 174 175 97.444 97.436 91 171 488 920 0.61 1.15 0.0319 25.03 1.8619 3.482 200 240 64.08 95.434 95.167 95.634 95.367 0.8 0.47 0.56 2.01 2.269 2.139 25.20%
176 176 175 97.713 97.436 146 276 146 276 0.1825 0.345 0.0113 25.03 0.5588 1.046 200 240 117.64 96.513 96.023 96.713 96.223 0.8 0.33 0.39 1.2 1.413 1.307 13.90%
177 175 177 97.436 97.277 75 142 709 1338 0.8862 1.6725 0.048 25.03 2.7067 5.065 200 240 49.21 95.167 94.962 95.367 95.162 0.8 0.52 0.62 2.269 2.314 2.292 30.50%
178 187 177 97.017 97.277 124 234 124 234 0.155 0.2925 0.0093 25.03 0.4743 0.887 200 240 95.91 95.817 95.417 96.017 95.617 0.8 0.31 0.37 1.2 1.86 1.53 12.90%
179 177 178 97.277 97.091 68 129 901 1701 1.1263 2.1263 0.0613 25.03 3.4401 6.44 200 240 42.53 94.962 94.785 95.162 94.985 0.8 0.56 0.67 2.314 2.306 2.31 34.60%
180 178 179 97.091 97.079 95 178 996 1879 1.245 2.3488 0.0679 25.03 3.8029 7.114 200 240 67.81 94.785 94.503 94.985 94.703 0.8 0.57 0.69 2.306 2.577 2.441 36.50%
181 188 189 97.093 97.115 86 162 86 162 0.1075 0.2025 0.0058 14.23 0.3283 0.613 150 160 59.67 95.943 95.57 96.093 95.72 0.81 0.33 0.4 1.15 1.545 1.348 14.20%
182 190 189 97.115 97.115 49 92 49 92 0.0612 0.115 0.0023 14.23 0.1861 0.347 150 160 23.89 95.965 95.816 96.115 95.966 0.81 0.28 0.34 1.15 1.299 1.225 10.80%
183 189 179 97.115 97.079 50 94 185 348 0.2312 0.435 0.0105 25.03 0.7042 1.315 200 240 24.83 95.52 95.417 95.72 95.617 0.8 0.35 0.42 1.595 1.663 1.629 15.60%
184 179 180 97.079 97.046 56 106 1237 2333 1.5462 2.9162 0.0813 25.03 4.7201 8.83 200 240 30.81 94.503 94.374 94.703 94.574 0.8 0.61 0.73 2.577 2.672 2.624 41.00%
185 180 181 97.046 97.043 57 108 1294 2441 1.6175 3.0512 0.0844 25.03 4.9369 9.238 200 240 32.07 94.374 94.241 94.574 94.441 0.8 0.62 0.74 2.672 2.803 2.737 42.10%
186 181 182 97.043 97.036 70 133 1364 2574 1.705 3.2175 0.0887 25.03 5.2037 9.741 200 240 44.53 94.241 94.055 94.441 94.255 0.8 0.63 0.75 2.803 2.98 2.891 43.30%

Page 4 of 26
Sewerage Project, Begusarai Annex -A-3: Hydraulic Design of Sewer Network
NGRBA

Link ID Start End Node Upstrem Downstream Population Population Cum Cum Flow 2011 Flow 2041 Infiltration Full Flow Design Design Diameter Slope Length Upstream Downstream Upstream Downstream Full Flow Actual Actual Upstream Downstream Average Depth of
Node Ground Ground Level 2011 2041 Population Population Flow 2011 Flow 2041 Invert Invert Crown Crown Velocity Velocity Velocity Depth Depth Depth Flow
Level 2011 2041 2011 2041
m m souls souls souls souls lps lps lps lps lps lps mm 1 in m m m m m m/s m/s m/s m m m %age
187 182 183 97.036 97.087 83 156 1447 2730 1.8087 3.4125 0.0941 25.03 5.5204 10.332 200 240 56.34 94.055 93.82 94.255 94.02 0.8 0.64 0.76 2.98 3.267 3.124 44.80%
188 183 184 97.087 96.376 77 146 1524 2876 1.905 3.595 0.0991 25.03 5.8141 10.884 200 240 51.31 93.82 93.607 94.02 93.807 0.8 0.65 0.77 3.267 2.77 3.018 46.10%
189 184 185 96.376 96.155 64 121 1588 2997 1.985 3.7462 0.1028 25.03 6.0578 11.342 200 240 38.83 93.607 93.445 93.807 93.645 0.8 0.66 0.78 2.77 2.71 2.74 47.20%
190 185 186 96.155 96.194 53 100 1641 3097 2.0512 3.8712 0.1056 25.03 6.2593 11.719 200 240 28.22 93.445 93.327 93.645 93.527 0.8 0.66 0.78 2.71 2.867 2.788 48.10%
191 186 160 96.194 96.168 80 152 1721 3249 2.1512 4.0612 0.1108 25.03 6.5645 12.295 200 240 54.28 93.327 93.101 93.527 93.301 0.8 0.67 0.79 2.867 3.067 2.967 49.50%
192 161 162 96.867 96.816 117 221 117 221 0.1462 0.2763 0.0086 25.03 0.4474 0.837 200 240 89.54 95.667 95.293 95.867 95.493 0.8 0.31 0.37 1.2 1.523 1.361 12.50%
193 162 163 96.816 96.745 68 129 185 350 0.2312 0.4375 0.0127 25.03 0.7065 1.325 200 240 42.64 95.293 95.116 95.493 95.316 0.8 0.35 0.42 1.523 1.63 1.576 15.60%
194 163 164 96.745 96.639 258 488 443 838 0.5537 1.0475 0.0344 25.03 1.6957 3.177 200 240 224.66 95.116 94.18 95.316 94.38 0.8 0.45 0.55 1.63 2.459 2.044 24.10%
195 164 165 96.639 96.375 154 290 597 1128 0.7462 1.41 0.0465 25.03 2.2852 4.276 200 240 124.78 94.18 93.66 94.38 93.86 0.8 0.5 0.59 2.459 2.716 2.587 28.00%
196 191 192 97.069 97.01 151 285 151 285 0.1887 0.3562 0.0118 25.03 0.578 1.081 200 240 122.04 95.869 95.36 96.069 95.56 0.8 0.33 0.4 1.2 1.65 1.425 14.20%
197 192 193 97.01 96.569 113 213 264 498 0.33 0.6225 0.02 25.03 1.01 1.888 200 240 85.6 95.36 95.004 95.56 95.204 0.8 0.39 0.47 1.65 1.566 1.608 18.60%
198 193 165 96.569 96.375 143 269 407 767 0.5087 0.9587 0.031 25.03 1.5573 2.907 200 240 113.99 95.004 94.529 95.204 94.729 0.8 0.44 0.53 1.566 1.847 1.706 23.00%
199 165 166 96.375 96.23 91 171 1095 2066 1.3687 2.5825 0.0837 25.03 4.1899 7.831 200 240 64.24 93.66 93.392 93.86 93.592 0.8 0.59 0.7 2.716 2.838 2.777 38.40%
200 166 167 96.23 96.012 90 169 1185 2235 1.4812 2.7937 0.0898 25.03 4.5335 8.471 200 240 63.09 93.392 93.129 93.592 93.329 0.8 0.6 0.72 2.838 2.883 2.861 40.10%
201 198 199 95.127 95.747 241 455 241 455 0.3012 0.5687 0.0201 25.03 0.9239 1.726 200 240 208.44 93.927 93.059 94.127 93.259 0.8 0.38 0.46 1.2 2.688 1.944 17.80%
202 199 200 95.747 95.732 166 313 407 768 0.5087 0.96 0.0332 25.03 1.5595 2.913 200 240 136.11 93.059 92.492 93.259 92.692 0.8 0.44 0.53 2.688 3.24 2.964 23.00%
203 200 201 95.732 95.666 103 194 510 962 0.6375 1.2025 0.0406 25.03 1.9531 3.648 200 240 75.98 92.492 92.175 92.692 92.375 0.8 0.47 0.57 3.24 3.491 3.366 25.80%
204 201 167 95.666 96.012 144 272 654 1234 0.8175 1.5425 0.0517 25.03 2.5042 4.679 200 240 115.25 92.175 91.695 92.375 91.895 0.8 0.51 0.61 3.491 4.317 3.904 29.30%
205 167 168 96.012 96.076 130 245 1969 3714 2.4612 4.6425 0.1513 24.52 7.535 14.079 200 250 101.82 91.695 91.288 91.895 91.488 0.78 0.69 0.81 4.317 4.789 4.553 54.30%
206 264 168 95.958 96.076 103 195 103 195 0.1287 0.2437 0.0073 25.03 0.3936 0.739 200 240 76.19 94.758 94.44 94.958 94.64 0.8 0.29 0.35 1.2 1.636 1.418 11.80%
207 168 159 96.076 96.135 103 194 2175 4103 2.7187 5.1287 0.1659 23.6 8.3222 15.552 200 270 75.83 91.288 91.007 91.488 91.207 0.75 0.69 0.8 4.789 5.128 4.959 59.30%
208 155 156 95.159 95.39 129 243 129 243 0.1612 0.3037 0.0097 25.03 0.4935 0.921 200 240 100.65 93.959 93.539 94.159 93.739 0.8 0.31 0.38 1.2 1.85 1.525 13.10%
209 156 157 95.39 95.376 142 268 271 511 0.3388 0.6387 0.0207 25.03 1.0369 1.937 200 240 113.46 93.539 93.067 93.739 93.267 0.8 0.39 0.47 1.85 2.31 2.08 18.80%
210 157 158 95.376 95.97 267 505 538 1016 0.6725 1.27 0.0432 25.03 2.0607 3.853 200 240 233.44 93.067 92.094 93.267 92.294 0.8 0.48 0.58 2.31 3.876 3.093 26.50%
211 158 159 95.97 96.135 83 156 621 1172 0.7763 1.465 0.0486 25.03 2.3774 4.444 200 240 56.65 92.094 91.858 92.294 92.058 0.8 0.5 0.6 3.876 4.277 4.077 28.50%
212 159 160 96.135 96.168 69 130 2865 5405 3.5812 6.7562 0.2187 22.39 10.9625 20.487 200 300 43.22 91.007 90.863 91.207 91.063 0.71 0.71 0.81 5.128 5.305 5.217 75.20%
213 160 81 96.168 96.213 142 268 4728 8922 5.91 11.1525 0.3404 35.15 18.0704 33.798 250 400 113.34 90.813 90.529 91.063 90.779 0.72 0.72 0.82 5.355 5.684 5.519 78.70%
214 81 82 96.213 96.204 46 86 12416 23432 15.52 29.29 0.8777 90.51 47.4377 74.103 400 740 20.86 90.379 90.351 90.779 90.751 0.72 0.73 0.8 5.834 5.853 5.843 68.80%
215 261 262 95.207 95.084 168 318 168 318 0.21 0.3975 0.0134 25.03 0.6434 1.206 200 240 138.77 94.007 93.429 94.207 93.629 0.8 0.34 0.41 1.2 1.655 1.427 14.90%
216 262 263 95.084 95.428 182 344 350 662 0.4375 0.8275 0.028 25.03 1.3405 2.511 200 240 151.96 93.429 92.796 93.629 92.996 0.8 0.42 0.51 1.655 2.632 2.144 21.40%
217 263 82 95.428 96.204 144 271 494 933 0.6175 1.1662 0.0391 25.03 1.8916 3.538 200 240 115.07 92.796 92.316 92.996 92.516 0.8 0.47 0.56 2.632 3.888 3.26 25.40%
218 82 83 96.204 96.254 110 207 13020 24572 16.275 30.715 0.9248 89.31 49.7498 77.712 400 760 82.54 90.351 90.242 90.751 90.642 0.71 0.73 0.8 5.853 6.011 5.932 72.10%
219 260 83 95.219 96.254 144 271 144 271 0.18 0.3388 0.0111 25.03 0.5511 1.027 200 240 114.99 94.019 93.54 94.219 93.74 0.8 0.32 0.39 1.2 2.714 1.957 13.80%
220 83 84 96.254 96.045 108 205 13272 25048 16.59 31.31 0.9438 89.31 50.7138 79.219 400 760 81.23 90.242 90.136 90.642 90.536 0.71 0.73 0.8 6.011 5.91 5.96 73.30%
221 257 258 95.09 95.076 91 171 91 171 0.1137 0.2137 0.0062 25.03 0.3474 0.647 200 240 64 93.89 93.623 94.09 93.823 0.8 0.28 0.34 1.2 1.453 1.326 11.10%
222 258 259 95.076 94.952 105 197 196 368 0.245 0.46 0.0136 25.03 0.7486 1.394 200 240 77.48 93.623 93.301 93.823 93.501 0.8 0.36 0.43 1.453 1.652 1.552 16.00%
223 259 84 94.952 96.045 253 478 449 846 0.5612 1.0575 0.0349 25.03 1.7186 3.207 200 240 220.2 93.301 92.383 93.501 92.583 0.8 0.46 0.55 1.652 3.662 2.657 24.20%
224 84 85 96.045 96.126 208 392 13929 26286 17.4113 32.8575 0.9957 88.73 53.2294 83.139 400 770 176.52 90.136 89.906 90.536 90.306 0.71 0.74 0.8 5.91 6.219 6.064 76.80%
225 255 256 95.682 96.087 74 139 74 139 0.0925 0.1737 0.0046 14.23 0.2821 0.526 150 160 48.03 94.532 94.232 94.682 94.382 0.81 0.32 0.38 1.15 1.856 1.503 13.10%
226 256 85 96.087 96.126 63 118 137 257 0.1713 0.3212 0.0082 25.03 0.522 0.972 200 240 37.37 94.182 94.026 94.382 94.226 0.8 0.32 0.38 1.906 2.1 2.003 13.50%
227 85 86 96.126 96.443 136 256 14202 26799 17.7525 33.4987 1.0142 88.73 54.2718 84.761 400 770 107.3 89.906 89.767 90.306 90.167 0.71 0.74 0.8 6.219 6.676 6.448 78.20%
228 86 87 96.443 96.282 176 333 14378 27132 17.9725 33.915 1.0284 89.31 54.9459 85.816 400 760 146.37 89.767 89.574 90.167 89.974 0.71 0.75 0.81 6.676 6.708 6.692 78.60%
229 87 88 96.282 95.834 67 127 15221 28723 19.0263 35.9037 1.0888 114.94 58.1675 90.848 450 860 41.71 89.524 89.476 89.974 89.926 0.72 0.72 0.8 6.758 6.358 6.558 67.10%
230 88 89 95.834 97.704 Pumping Link
231 89 90 97.704 96.181 181 342 23532 44415 29.415 55.5187 1.6708 470.58 75.2083 140.468 500 90 151.27 96.204 94.523 96.704 95.023 2.4 1.75 2.09 1.5 1.658 1.579 37.50%
232 1281 981 97.075 96.883 89 168 89 168 0.1112 0.21 0.0061 25.03 0.3398 0.636 200 240 62.74 95.875 95.614 96.075 95.814 0.8 0.28 0.34 1.2 1.269 1.234 11.00%
233 978 979 96.963 97.01 56 106 56 106 0.07 0.1325 0.003 14.23 0.213 0.401 150 160 31.17 95.813 95.618 95.963 95.768 0.81 0.29 0.35 1.15 1.393 1.271 11.50%
234 979 980 97.01 96.88 66 125 122 231 0.1525 0.2887 0.0069 25.03 0.4644 0.873 200 240 40.56 95.568 95.399 95.768 95.599 0.8 0.31 0.37 1.443 1.481 1.462 12.80%

Page 5 of 26
Sewerage Project, Begusarai Annex -A-3: Hydraulic Design of Sewer Network
NGRBA

Link ID Start End Node Upstrem Downstream Population Population Cum Cum Flow 2011 Flow 2041 Infiltration Full Flow Design Design Diameter Slope Length Upstream Downstream Upstream Downstream Full Flow Actual Actual Upstream Downstream Average Depth of
Node Ground Ground Level 2011 2041 Population Population Flow 2011 Flow 2041 Invert Invert Crown Crown Velocity Velocity Velocity Depth Depth Depth Flow
Level 2011 2041 2011 2041
m m souls souls souls souls lps lps lps lps lps lps mm 1 in m m m m m m/s m/s m/s m m m %age
235 980 981 96.88 96.883 62 116 184 347 0.23 0.4337 0.0104 25.03 0.7004 1.312 200 240 36.17 95.399 95.248 95.599 95.448 0.8 0.35 0.42 1.481 1.634 1.558 15.60%
236 981 970 96.883 97.682 191 360 464 875 0.58 1.0938 0.0319 25.03 1.7719 3.313 200 240 160.2 95.248 94.581 95.448 94.781 0.8 0.46 0.55 1.634 3.101 2.368 24.60%
237 969 970 97.735 97.682 194 366 194 366 0.2425 0.4575 0.0158 25.03 0.7433 1.388 200 240 163.43 96.535 95.854 96.735 96.054 0.8 0.36 0.43 1.2 1.828 1.514 16.00%
238 970 971 97.682 97.644 57 108 715 1349 0.8938 1.6862 0.0507 25.03 2.732 5.109 200 240 31.89 94.581 94.448 94.781 94.648 0.8 0.52 0.63 3.101 3.196 3.149 30.70%
239 973 971 97.562 97.644 125 235 125 235 0.1563 0.2937 0.0093 25.03 0.4781 0.891 200 240 96.73 96.362 95.959 96.562 96.159 0.8 0.31 0.38 1.2 1.685 1.442 12.90%
240 971 972 97.644 96.74 164 309 1004 1893 1.255 2.3663 0.073 25.03 3.838 7.172 200 240 134.32 94.448 93.888 94.648 94.088 0.8 0.58 0.69 3.196 2.852 3.024 36.60%
241 972 90 96.74 96.181 134 254 1138 2147 1.4225 2.6838 0.0833 25.03 4.3508 8.135 200 240 106.15 93.888 93.446 94.088 93.646 0.8 0.6 0.71 2.852 2.735 2.794 39.20%
242 90 91 96.181 96.338 110 208 24780 46770 30.975 58.4625 1.762 154.03 79.1996 147.918 500 840 82.72 93.146 93.047 93.646 93.547 0.78 0.79 0.89 3.035 3.291 3.163 78.60%
243 91 92 96.338 96.292 62 118 24842 46888 31.0525 58.61 1.7656 154.03 79.3969 148.291 500 840 36.99 93.047 93.003 93.547 93.503 0.78 0.79 0.89 3.291 3.289 3.29 78.80%
244 1066 1067 96.315 96.885 163 307 163 307 0.2037 0.3837 0.0129 25.03 0.6241 1.164 200 240 133.3 95.115 94.56 95.315 94.76 0.8 0.34 0.41 1.2 2.325 1.762 14.70%
245 1067 1064 96.885 97.569 80 152 243 459 0.3037 0.5738 0.0181 25.03 0.9293 1.739 200 240 54.21 94.56 94.334 94.76 94.534 0.8 0.38 0.46 2.325 3.235 2.78 17.90%
246 1068 1069 96.445 97.723 206 388 206 388 0.2575 0.485 0.0168 25.03 0.7893 1.472 200 240 174.64 95.245 94.518 95.445 94.718 0.8 0.36 0.44 1.2 3.205 2.203 16.50%
247 1069 1064 97.723 97.569 153 289 359 677 0.4487 0.8462 0.0288 25.03 1.3751 2.568 200 240 124.28 94.518 94 94.718 94.2 0.8 0.43 0.51 3.205 3.569 3.387 21.60%
248 1064 1017 97.569 97.637 272 516 874 1652 1.0925 2.065 0.07 25.03 3.3475 6.265 200 240 238.92 94 93.004 94.2 93.204 0.8 0.55 0.66 3.569 4.633 4.101 34.10%
249 1065 1017 97.816 97.637 181 342 181 342 0.2262 0.4275 0.0146 25.03 0.6933 1.297 200 240 151.1 96.616 95.986 96.816 96.186 0.8 0.35 0.42 1.2 1.651 1.425 15.50%
250 1017 1018 97.637 96.245 143 270 1198 2264 1.4975 2.83 0.0956 25.03 4.5881 8.586 200 240 114.48 93.004 92.527 93.204 92.727 0.8 0.61 0.72 4.633 3.718 4.175 40.40%
251 1018 1019 96.245 96.199 74 139 1272 2403 1.59 3.0038 0.1002 25.03 4.8702 9.111 200 240 47.62 92.527 92.329 92.727 92.529 0.8 0.62 0.73 3.718 3.87 3.794 41.70%
252 1019 1020 96.199 96.153 57 107 1329 2510 1.6612 3.1375 0.1032 25.03 5.087 9.516 200 240 31.78 92.329 92.197 92.529 92.397 0.8 0.62 0.74 3.87 3.956 3.913 42.80%
253 1023 1024 96.318 96.299 55 104 55 104 0.0688 0.13 0.0029 14.23 0.2091 0.393 150 160 29.87 95.168 94.981 95.318 95.131 0.81 0.29 0.35 1.15 1.317 1.234 11.40%
254 1024 1020 96.299 96.153 70 131 125 235 0.1563 0.2937 0.0071 25.03 0.4759 0.888 200 240 43.82 94.931 94.749 95.131 94.949 0.8 0.31 0.37 1.367 1.404 1.386 12.90%
255 1020 1021 96.153 96.15 53 100 1507 2845 1.8837 3.5563 0.113 25.03 5.7643 10.782 200 240 27.76 92.197 92.081 92.397 92.281 0.8 0.65 0.77 3.956 4.069 4.012 45.90%
256 1021 1022 96.15 96.265 120 227 1627 3072 2.0337 3.84 0.122 25.03 6.2232 11.642 200 240 92.62 92.081 91.695 92.281 91.895 0.8 0.66 0.78 4.069 4.57 4.319 47.90%
257 1025 1026 96.591 96.497 66 124 66 124 0.0825 0.155 0.0039 14.23 0.2514 0.469 150 160 40.42 95.441 95.189 95.591 95.339 0.81 0.31 0.37 1.15 1.308 1.229 12.40%
258 1026 1022 96.497 96.265 97 184 163 308 0.2037 0.385 0.0107 25.03 0.622 1.166 200 240 70.54 95.139 94.845 95.339 95.045 0.8 0.34 0.41 1.358 1.42 1.389 14.70%
259 1022 92 96.265 96.292 98 185 1888 3565 2.36 4.4563 0.1395 25.03 7.2195 13.508 200 240 71.4 91.695 91.398 91.895 91.598 0.8 0.69 0.81 4.57 4.894 4.732 52.30%
260 92 93 96.292 96.355 54 102 26784 50555 33.48 63.1937 1.908 149.64 85.608 144.094 500 890 29.02 91.098 91.065 91.598 91.565 0.76 0.79 0.87 5.194 5.29 5.242 78.80%
261 1008 1009 96.45 96.375 84 159 84 159 0.105 0.1987 0.0056 14.23 0.3206 0.602 150 160 57.87 95.3 94.938 95.45 95.088 0.81 0.33 0.4 1.15 1.436 1.293 14.00%
262 1009 93 96.375 96.355 54 101 138 260 0.1725 0.325 0.0083 25.03 0.5258 0.983 200 240 28.65 94.888 94.769 95.088 94.969 0.8 0.32 0.39 1.486 1.585 1.536 13.50%
263 974 975 97.011 96.771 114 215 114 215 0.1425 0.2687 0.0083 25.03 0.4358 0.815 200 240 86.5 95.811 95.451 96.011 95.651 0.8 0.3 0.37 1.2 1.32 1.26 12.40%
264 975 93 96.771 96.355 86 163 200 378 0.25 0.4725 0.0141 27.42 0.7641 1.432 200 200 59.98 95.451 95.151 95.651 95.351 0.87 0.38 0.46 1.32 1.204 1.262 15.50%
265 93 94 96.355 96.558 99 187 27221 51380 34.0263 64.225 1.9374 152.23 87.003 146.444 500 860 72.37 91.065 90.981 91.565 91.481 0.77 0.8 0.88 5.29 5.577 5.433 78.70%
266 94 95 96.558 96.539 75 142 27296 51522 34.12 64.4025 1.9422 152.23 87.2422 146.848 500 860 49.4 90.981 90.923 91.481 91.423 0.77 0.8 0.88 5.577 5.616 5.596 78.90%
267 95 96 96.539 96.412 73 137 27369 51659 34.2113 64.5737 1.9467 153.12 87.4748 147.238 500 850 46.64 90.923 90.869 91.423 91.369 0.78 0.81 0.89 5.616 5.544 5.58 78.70%
268 976 977 96.686 96.685 53 99 53 99 0.0662 0.1237 0.0026 14.23 0.2014 0.374 150 160 27.47 95.536 95.365 95.686 95.515 0.81 0.29 0.35 1.15 1.32 1.235 11.20%
269 977 96 96.685 96.412 74 140 127 239 0.1587 0.2987 0.0073 25.03 0.4835 0.904 200 240 48.08 95.315 95.114 95.515 95.314 0.8 0.31 0.38 1.37 1.298 1.334 13.00%
270 96 97 96.412 96.419 74 140 27570 52038 34.4625 65.0475 1.9586 154.03 88.1149 148.316 500 840 48.55 90.869 90.811 91.369 91.311 0.78 0.81 0.89 5.544 5.608 5.576 78.80%
271 1003 1004 96.636 96.439 96 180 96 180 0.12 0.225 0.0066 25.03 0.3666 0.682 200 240 68.78 95.436 95.15 95.636 95.35 0.8 0.29 0.35 1.2 1.289 1.245 11.30%
272 1004 97 96.439 96.419 61 116 157 296 0.1962 0.37 0.0101 25.03 0.5989 1.12 200 240 36.01 95.15 95 95.35 95.2 0.8 0.33 0.4 1.289 1.419 1.354 14.40%
273 97 98 96.419 96.486 83 157 27810 52491 34.7625 65.6138 1.9743 155.9 88.8805 149.605 500 820 57.17 90.811 90.741 91.311 91.241 0.79 0.82 0.9 5.608 5.745 5.676 78.60%
274 98 99 96.486 96.604 99 187 27909 52678 34.8862 65.8475 1.9812 207.84 89.1968 150.138 600 1220 72.08 90.641 90.582 91.241 91.182 0.73 0.71 0.8 5.845 6.022 5.933 63.00%
275 1005 99 96.65 96.604 137 259 137 259 0.1713 0.3237 0.0105 25.03 0.5243 0.982 200 240 109.06 95.45 94.995 95.65 95.195 0.8 0.32 0.39 1.2 1.609 1.404 13.50%
276 1006 1007 97.095 96.857 100 189 100 189 0.125 0.2362 0.0071 25.03 0.3821 0.716 200 240 73.25 95.895 95.59 96.095 95.79 0.8 0.29 0.35 1.2 1.267 1.233 11.60%
277 1007 99 96.857 96.604 103 195 203 384 0.2537 0.48 0.0144 25.03 0.7757 1.454 200 240 76.23 95.59 95.272 95.79 95.472 0.8 0.36 0.43 1.267 1.332 1.299 16.40%
278 99 100 96.604 96.76 270 511 28519 53832 35.6488 67.29 2.0289 206.99 91.1508 153.431 600 1230 236.4 90.582 90.39 91.182 90.99 0.73 0.71 0.8 6.022 6.37 6.196 64.10%
279 1283 880 97.911 98.021 154 290 154 290 0.1925 0.3625 0.012 25.03 0.5895 1.1 200 240 124.59 96.711 96.192 96.911 96.392 0.8 0.33 0.4 1.2 1.829 1.514 14.30%
280 1282 881 97.36 96.682 133 252 133 252 0.1662 0.315 0.0101 31.66 0.5089 0.955 200 150 105.05 96.16 95.46 96.36 95.66 1.01 0.37 0.45 1.2 1.222 1.211 11.90%
281 881 880 96.682 98.021 136 258 269 510 0.3363 0.6375 0.0206 25.03 1.0293 1.933 200 240 108.1 95.46 95.009 95.66 95.209 0.8 0.39 0.47 1.222 3.012 2.117 18.80%
282 939 880 97.81 98.021 72 135 72 135 0.09 0.1688 0.0044 14.23 0.2744 0.511 150 160 45.97 96.66 96.373 96.81 96.523 0.81 0.32 0.38 1.15 1.648 1.399 13.00%

Page 6 of 26
Sewerage Project, Begusarai Annex -A-3: Hydraulic Design of Sewer Network
NGRBA

Link ID Start End Node Upstrem Downstream Population Population Cum Cum Flow 2011 Flow 2041 Infiltration Full Flow Design Design Diameter Slope Length Upstream Downstream Upstream Downstream Full Flow Actual Actual Upstream Downstream Average Depth of
Node Ground Ground Level 2011 2041 Population Population Flow 2011 Flow 2041 Invert Invert Crown Crown Velocity Velocity Velocity Depth Depth Depth Flow
Level 2011 2041 2011 2041
m m souls souls souls souls lps lps lps lps lps lps mm 1 in m m m m m m/s m/s m/s m m m %age
283 880 895 98.021 97.382 107 201 602 1136 0.7525 1.42 0.0447 25.03 2.3022 4.305 200 240 79.34 95.009 94.679 95.209 94.879 0.8 0.5 0.6 3.012 2.703 2.857 28.10%
284 895 896 97.382 97.359 55 104 657 1240 0.8212 1.55 0.0476 25.03 2.5113 4.698 200 240 30.24 94.679 94.553 94.879 94.753 0.8 0.51 0.61 2.703 2.806 2.754 29.40%
285 896 897 97.359 97.197 107 203 764 1443 0.955 1.8037 0.0553 25.03 2.9203 5.467 200 240 80.1 94.553 94.219 94.753 94.419 0.8 0.53 0.64 2.806 2.977 2.892 31.70%
286 897 898 97.197 96.779 105 198 869 1641 1.0862 2.0512 0.0628 25.03 3.3216 6.217 200 240 77.8 94.219 93.895 94.419 94.095 0.8 0.55 0.66 2.977 2.884 2.931 34.00%
287 898 100 96.779 96.76 114 215 983 1856 1.2287 2.32 0.0711 25.03 3.7574 7.031 200 240 86.25 93.895 93.536 94.095 93.736 0.8 0.57 0.68 2.884 3.225 3.054 36.20%
288 965 100 97.246 96.76 238 449 238 449 0.2975 0.5612 0.0198 25.03 0.9123 1.704 200 240 205.62 96.046 95.189 96.246 95.389 0.8 0.38 0.45 1.2 1.571 1.386 17.70%
289 100 101 96.76 96.885 157 297 29897 56434 37.3713 70.5425 2.1322 204.51 95.5604 160.853 600 1260 127.98 90.39 90.288 90.99 90.888 0.72 0.71 0.8 6.37 6.596 6.483 66.80%
290 1010 1011 96.539 96.765 105 199 105 199 0.1312 0.2488 0.0075 25.03 0.4013 0.754 200 240 78.08 95.339 95.013 95.539 95.213 0.8 0.29 0.36 1.2 1.752 1.476 11.90%
291 1011 1012 96.765 96.825 96 181 201 380 0.2512 0.475 0.0142 25.03 0.7679 1.439 200 240 69.02 95.013 94.726 95.213 94.926 0.8 0.36 0.43 1.752 2.099 1.925 16.30%
292 1012 1013 96.825 96.675 78 147 279 527 0.3487 0.6587 0.0192 25.03 1.0654 1.995 200 240 51.83 94.726 94.51 94.926 94.71 0.8 0.4 0.48 2.099 2.165 2.132 19.10%
293 1013 1014 96.675 97.093 119 225 398 752 0.4975 0.94 0.028 25.03 1.5205 2.848 200 240 91.67 94.51 94.128 94.71 94.328 0.8 0.44 0.53 2.165 2.965 2.565 22.80%
294 1014 1015 97.093 96.939 76 143 474 895 0.5925 1.1187 0.0328 25.03 1.8103 3.389 200 240 49.65 94.128 93.921 94.328 94.121 0.8 0.46 0.56 2.965 3.018 2.991 24.90%
295 1015 1016 96.939 96.977 77 145 551 1040 0.6887 1.3 0.0377 25.03 2.104 3.938 200 240 50.67 93.921 93.71 94.121 93.91 0.8 0.48 0.58 3.018 3.267 3.142 26.80%
296 1016 101 96.977 96.885 93 175 644 1215 0.805 1.5187 0.0441 25.03 2.4591 4.6 200 240 65.97 93.71 93.435 93.91 93.635 0.8 0.51 0.61 3.267 3.449 3.358 29.00%
297 101 102 96.885 96.918 184 348 30725 57997 38.4063 72.4962 2.1912 203.7 98.2068 165.308 600 1270 154.31 90.288 90.167 90.888 90.767 0.72 0.71 0.8 6.596 6.752 6.674 68.40%
298 102 103 96.918 97.093 118 223 30843 58220 38.5537 72.775 2.1999 202.91 98.5843 165.944 600 1280 90.72 90.167 90.096 90.767 90.696 0.72 0.71 0.8 6.752 6.997 6.874 68.80%
299 945 946 97.382 97.507 83 157 83 157 0.1037 0.1962 0.0055 14.23 0.3167 0.594 150 160 56.97 96.232 95.876 96.382 96.026 0.81 0.33 0.4 1.15 1.631 1.39 13.90%
300 947 946 97.244 97.507 96 182 96 182 0.12 0.2275 0.0067 25.03 0.3667 0.689 200 240 69.55 96.044 95.754 96.244 95.954 0.8 0.29 0.35 1.2 1.752 1.476 11.40%
301 946 900 97.507 97.186 95 178 274 517 0.3425 0.6463 0.0187 25.03 1.0462 1.957 200 240 67.81 95.754 95.472 95.954 95.672 0.8 0.39 0.47 1.752 1.714 1.733 18.90%
302 940 941 97.849 97.308 78 147 78 147 0.0975 0.1837 0.005 18.98 0.2975 0.556 150 90 51.62 96.699 96.126 96.849 96.276 1.07 0.4 0.48 1.15 1.182 1.166 11.80%
303 942 941 97.679 97.308 95 179 95 179 0.1187 0.2237 0.0066 28.9 0.3628 0.678 200 180 68.27 96.479 96.099 96.679 96.299 0.92 0.32 0.38 1.2 1.209 1.204 10.60%
304 941 943 97.308 97.357 76 144 249 470 0.3113 0.5875 0.0164 25.03 0.9502 1.779 200 240 50.44 96.076 95.866 96.276 96.066 0.8 0.38 0.46 1.232 1.491 1.362 18.10%
305 944 943 97.433 97.357 106 200 106 200 0.1325 0.25 0.0076 25.03 0.4051 0.758 200 240 78.9 96.233 95.905 96.433 96.105 0.8 0.3 0.36 1.2 1.452 1.326 11.90%
306 943 899 97.357 97.183 64 121 419 791 0.5238 0.9887 0.0278 25.03 1.599 2.994 200 240 38.54 95.866 95.705 96.066 95.905 0.8 0.45 0.54 1.491 1.478 1.485 23.40%
307 899 900 97.183 97.186 94 177 513 968 0.6413 1.21 0.0342 25.03 1.958 3.664 200 240 66.98 95.705 95.426 95.905 95.626 0.8 0.47 0.57 1.478 1.76 1.619 25.90%
308 900 901 97.186 96.979 131 247 918 1732 1.1475 2.165 0.0629 25.03 3.5054 6.558 200 240 102.81 95.426 94.998 95.626 95.198 0.8 0.56 0.67 1.76 1.981 1.87 34.90%
309 901 902 96.979 97.034 96 181 1014 1913 1.2675 2.3912 0.0695 25.03 3.872 7.243 200 240 69.1 94.998 94.71 95.198 94.91 0.8 0.58 0.69 1.981 2.324 2.152 36.80%
310 902 903 97.034 97.176 84 158 1098 2071 1.3725 2.5887 0.0751 25.03 4.1926 7.841 200 240 57.3 94.71 94.471 94.91 94.671 0.8 0.59 0.7 2.324 2.705 2.514 38.50%
311 952 953 97.568 97.619 51 96 51 96 0.0637 0.12 0.0025 14.23 0.1938 0.363 150 160 25.99 96.418 96.256 96.568 96.406 0.81 0.28 0.34 1.15 1.363 1.257 11.00%
312 953 903 97.619 97.176 88 165 139 261 0.1737 0.3262 0.0084 25.03 0.5297 0.987 200 240 61.21 96.206 95.951 96.406 96.151 0.8 0.32 0.39 1.413 1.225 1.319 13.60%
313 903 904 97.176 97.297 52 98 1289 2430 1.6113 3.0375 0.0861 25.03 4.9198 9.199 200 240 26.91 94.471 94.359 94.671 94.559 0.8 0.62 0.74 2.705 2.938 2.821 42.00%
314 960 961 97.546 97.585 62 116 62 116 0.0775 0.145 0.0035 14.23 0.236 0.438 150 160 36.12 96.396 96.17 96.546 96.32 0.81 0.3 0.36 1.15 1.415 1.282 12.00%
315 961 904 97.585 97.297 98 184 160 300 0.2 0.375 0.0103 25.03 0.6103 1.135 200 240 70.84 96.12 95.825 96.32 96.025 0.8 0.33 0.4 1.465 1.472 1.468 14.50%
316 962 904 97.353 97.297 89 167 89 167 0.1112 0.2087 0.006 25.03 0.3397 0.632 200 240 62.18 96.153 95.894 96.353 96.094 0.8 0.28 0.34 1.2 1.403 1.301 11.00%
317 904 905 97.297 97.221 91 172 1629 3069 2.0363 3.8362 0.1086 25.03 6.2174 11.617 200 240 64.54 94.359 94.09 94.559 94.29 0.8 0.66 0.78 2.938 3.131 3.034 47.90%
318 963 964 97.398 97.483 52 98 52 98 0.065 0.1225 0.0026 14.23 0.1976 0.37 150 160 27.11 96.248 96.079 96.398 96.229 0.81 0.29 0.35 1.15 1.404 1.277 11.10%
319 964 957 97.483 97.46 45 84 97 182 0.1212 0.2275 0.0045 25.03 0.3683 0.687 200 240 19.73 96.029 95.947 96.229 96.147 0.8 0.29 0.35 1.454 1.513 1.484 11.40%
320 968 957 97.397 97.46 41 78 41 78 0.0512 0.0975 0.0016 14.23 0.1554 0.294 150 160 16.72 96.247 96.143 96.397 96.293 0.81 0.27 0.32 1.15 1.317 1.234 10.00%
321 955 956 98.37 97.675 125 236 125 236 0.1563 0.295 0.0094 34.01 0.4781 0.894 200 130 97.19 97.17 96.423 97.37 96.623 1.08 0.39 0.47 1.2 1.252 1.226 11.20%
322 958 959 97.663 97.559 85 159 85 159 0.1062 0.1987 0.0056 14.23 0.3244 0.602 150 160 58.21 96.513 96.149 96.663 96.299 0.81 0.33 0.4 1.15 1.41 1.28 14.00%
323 959 956 97.559 97.675 63 119 148 278 0.185 0.3475 0.0092 25.03 0.5642 1.052 200 240 37.47 96.099 95.943 96.299 96.143 0.8 0.33 0.39 1.46 1.732 1.596 14.00%
324 956 957 97.675 97.46 63 118 336 632 0.42 0.79 0.0222 25.03 1.2822 2.392 200 240 37.27 95.943 95.788 96.143 95.988 0.8 0.42 0.5 1.732 1.672 1.702 20.90%
325 957 905 97.46 97.221 107 203 581 1095 0.7263 1.3687 0.0361 25.03 2.2148 4.142 200 240 80.25 95.788 95.453 95.988 95.653 0.8 0.49 0.59 1.672 1.768 1.72 27.50%
326 905 906 97.221 97.146 88 166 2298 4330 2.8725 5.4125 0.1506 23.6 8.7681 16.388 200 270 61.63 94.09 93.862 94.29 94.062 0.75 0.7 0.81 3.131 3.284 3.207 61.30%
327 966 906 96.765 97.146 207 390 207 390 0.2587 0.4875 0.0169 25.03 0.7932 1.479 200 240 175.5 95.565 94.834 95.765 95.034 0.8 0.36 0.44 1.2 2.312 1.756 16.50%
328 967 906 97.422 97.146 65 123 65 123 0.0812 0.1538 0.0038 15.22 0.2476 0.465 150 140 39.63 96.272 95.989 96.422 96.139 0.86 0.32 0.39 1.15 1.157 1.153 12.00%
329 906 907 97.146 97.319 87 165 2657 5008 3.3213 6.26 0.1772 22.77 10.141 18.957 200 290 60.88 93.862 93.652 94.062 93.852 0.72 0.7 0.81 3.284 3.667 3.475 69.70%
330 907 103 97.319 97.093 193 365 2850 5373 3.5625 6.7163 0.1929 22.39 10.8804 20.342 200 300 162.71 93.652 93.11 93.852 93.31 0.71 0.71 0.81 3.667 3.983 3.825 74.80%

Page 7 of 26
Sewerage Project, Begusarai Annex -A-3: Hydraulic Design of Sewer Network
NGRBA

Link ID Start End Node Upstrem Downstream Population Population Cum Cum Flow 2011 Flow 2041 Infiltration Full Flow Design Design Diameter Slope Length Upstream Downstream Upstream Downstream Full Flow Actual Actual Upstream Downstream Average Depth of
Node Ground Ground Level 2011 2041 Population Population Flow 2011 Flow 2041 Invert Invert Crown Crown Velocity Velocity Velocity Depth Depth Depth Flow
Level 2011 2041 2011 2041
m m souls souls souls souls lps lps lps lps lps lps mm 1 in m m m m m m/s m/s m/s m m m %age
331 103 22 97.093 97.153 52 98 33745 63691 42.1812 79.6137 2.3955 199.81 107.8486 181.526 600 1320 26.79 90.096 90.075 90.696 90.675 0.71 0.72 0.8 6.997 7.078 7.037 74.80%
332 824 825 97.032 97.244 98 185 98 185 0.1225 0.2312 0.0069 25.03 0.3744 0.701 200 240 71.4 95.832 95.535 96.032 95.735 0.8 0.29 0.35 1.2 1.709 1.454 11.50%
333 826 825 97.256 97.244 62 116 62 116 0.0775 0.145 0.0035 14.23 0.236 0.438 150 160 36.2 96.106 95.88 96.256 96.03 0.81 0.3 0.36 1.15 1.364 1.257 12.00%
334 825 19 97.244 97.317 123 232 283 533 0.3537 0.6662 0.0195 25.03 1.0808 2.018 200 240 94.87 95.535 95.14 95.735 95.34 0.8 0.4 0.48 1.709 2.177 1.943 19.20%
335 846 847 97.807 97.328 56 105 56 105 0.07 0.1312 0.0029 23.25 0.2129 0.397 150 60 30.38 96.657 96.151 96.807 96.301 1.31 0.41 0.5 1.15 1.177 1.163 9.10%
336 847 848 97.328 97.556 51 97 107 202 0.1337 0.2525 0.0055 25.03 0.4067 0.763 200 240 26.24 96.101 95.992 96.301 96.192 0.8 0.3 0.36 1.227 1.565 1.396 12.00%
337 848 849 97.556 97.291 72 136 179 338 0.2237 0.4225 0.0099 25.03 0.6812 1.277 200 240 46.17 95.992 95.799 96.192 95.999 0.8 0.35 0.42 1.565 1.492 1.528 15.40%
338 850 849 97.026 97.291 96 181 96 181 0.12 0.2262 0.0067 25.03 0.3667 0.685 200 240 69.13 95.826 95.538 96.026 95.738 0.8 0.29 0.35 1.2 1.753 1.476 11.40%
339 849 18 97.291 97.369 68 129 343 648 0.4288 0.81 0.0207 25.03 1.307 2.451 200 240 42.72 95.538 95.36 95.738 95.56 0.8 0.42 0.51 1.753 2.008 1.881 21.10%
340 717 718 98.655 98.276 73 138 73 138 0.0912 0.1725 0.0046 16.44 0.2783 0.522 150 120 47.52 97.505 97.109 97.655 97.259 0.93 0.35 0.42 1.15 1.167 1.158 12.20%
341 718 719 98.276 97.783 115 216 188 354 0.235 0.4425 0.013 28.9 0.718 1.34 200 180 87.11 97.059 96.575 97.259 96.775 0.92 0.39 0.47 1.217 1.208 1.212 14.70%
342 719 720 97.783 97.468 89 167 277 521 0.3462 0.6513 0.019 27.42 1.0577 1.973 200 200 62.04 96.575 96.265 96.775 96.465 0.87 0.42 0.51 1.208 1.203 1.206 18.20%
343 720 721 97.468 97.662 103 194 380 715 0.475 0.8938 0.0263 25.03 1.4513 2.708 200 240 75.6 96.265 95.95 96.465 96.15 0.8 0.43 0.52 1.203 1.712 1.458 22.20%
344 721 722 97.662 98.561 77 146 457 861 0.5712 1.0762 0.0312 25.03 1.745 3.26 200 240 51.38 95.95 95.736 96.15 95.936 0.8 0.46 0.55 1.712 2.825 2.269 24.40%
345 851 852 98.037 98.141 57 107 57 107 0.0712 0.1337 0.0031 14.23 0.2168 0.404 150 160 31.75 96.887 96.688 97.037 96.838 0.81 0.29 0.35 1.15 1.453 1.302 11.60%
346 852 722 98.141 98.561 73 138 130 245 0.1625 0.3062 0.0076 25.03 0.4951 0.926 200 240 47.46 96.638 96.44 96.838 96.64 0.8 0.31 0.38 1.503 2.12 1.812 13.10%
347 722 17 98.561 98.557 71 134 658 1240 0.8225 1.55 0.0432 25.03 2.5107 4.693 200 240 45.46 95.736 95.546 95.936 95.746 0.8 0.51 0.61 2.825 3.011 2.918 29.30%
348 1288 14 97.859 97.616 107 201 107 201 0.1337 0.2512 0.0077 25.03 0.4089 0.761 200 240 79.55 96.659 96.327 96.859 96.527 0.8 0.3 0.36 1.2 1.289 1.244 12.00%
349 621 622 98.078 97.74 78 147 78 147 0.0975 0.1837 0.005 14.7 0.2975 0.556 150 150 51.81 96.928 96.583 97.078 96.733 0.83 0.33 0.4 1.15 1.156 1.153 13.30%
350 622 11 97.74 97.519 78 146 156 293 0.195 0.3662 0.01 25.03 0.595 1.109 200 240 51.45 96.533 96.319 96.733 96.519 0.8 0.33 0.4 1.206 1.201 1.203 14.30%
351 1287 617 98.356 98.256 70 133 70 133 0.0875 0.1662 0.0043 14.23 0.2668 0.503 150 160 44.5 97.206 96.928 97.356 97.078 0.81 0.31 0.38 1.15 1.328 1.239 12.90%
352 617 618 98.256 97.747 87 164 157 297 0.1962 0.3712 0.0101 28.9 0.5989 1.124 200 180 60.42 96.878 96.543 97.078 96.743 0.92 0.37 0.44 1.378 1.204 1.291 13.50%
353 618 9 97.747 97.643 83 157 240 454 0.3 0.5675 0.0156 25.03 0.9156 1.718 200 240 57.17 96.543 96.304 96.743 96.504 0.8 0.38 0.46 1.204 1.339 1.271 17.70%
354 608 9 97.802 97.643 79 148 79 148 0.0987 0.185 0.0051 14.23 0.3013 0.56 150 160 52.56 96.652 96.324 96.802 96.474 0.81 0.32 0.39 1.15 1.319 1.235 13.50%
355 589 8 97.304 97.822 190 359 190 359 0.2375 0.4487 0.0154 25.03 0.7279 1.362 200 240 159.92 96.104 95.437 96.304 95.637 0.8 0.35 0.43 1.2 2.385 1.792 15.80%
356 587 588 97.283 97.341 117 220 117 220 0.1462 0.275 0.0086 25.03 0.4474 0.834 200 240 89.17 96.083 95.712 96.283 95.912 0.8 0.31 0.37 1.2 1.629 1.414 12.50%
357 588 584 97.341 97.411 88 167 205 387 0.2562 0.4837 0.0146 25.03 0.7833 1.466 200 240 62.01 95.712 95.453 95.912 95.653 0.8 0.36 0.44 1.629 1.958 1.793 16.40%
358 584 585 97.411 97.536 49 92 254 479 0.3175 0.5987 0.0169 25.03 0.9694 1.813 200 240 23.99 95.453 95.353 95.653 95.553 0.8 0.38 0.46 1.958 2.182 2.07 18.20%
359 586 585 97.298 97.536 171 322 171 322 0.2137 0.4025 0.0136 25.03 0.6549 1.221 200 240 141.03 96.098 95.511 96.298 95.711 0.8 0.34 0.41 1.2 2.025 1.612 15.00%
360 585 7 97.536 97.581 76 144 501 945 0.6263 1.1812 0.0353 25.03 1.9141 3.579 200 240 50.22 95.353 95.144 95.553 95.344 0.8 0.47 0.56 2.182 2.437 2.309 25.50%
361 571 572 96.907 96.889 110 208 110 208 0.1375 0.26 0.008 25.03 0.4205 0.788 200 240 82.71 95.707 95.362 95.907 95.562 0.8 0.3 0.36 1.2 1.527 1.363 12.20%
362 594 572 97.25 96.889 150 283 150 283 0.1875 0.3537 0.0117 25.03 0.5742 1.073 200 240 121.03 96.05 95.545 96.25 95.745 0.8 0.33 0.4 1.2 1.343 1.272 14.10%
363 572 573 96.889 97.039 62 118 322 609 0.4025 0.7612 0.0232 25.03 1.2307 2.307 200 240 37.01 95.362 95.208 95.562 95.408 0.8 0.41 0.5 1.527 1.831 1.679 20.50%
364 593 573 97.279 97.039 148 279 148 279 0.185 0.3487 0.0115 25.03 0.5665 1.058 200 240 118.96 96.079 95.584 96.279 95.784 0.8 0.33 0.39 1.2 1.455 1.328 14.00%
365 573 574 97.039 97.078 62 117 532 1005 0.665 1.2562 0.0382 25.03 2.0332 3.807 200 240 36.72 95.208 95.055 95.408 95.255 0.8 0.48 0.58 1.831 2.024 1.927 26.40%
366 591 592 97.359 97.089 107 201 107 201 0.1337 0.2512 0.0077 25.03 0.4089 0.761 200 240 79.4 96.159 95.828 96.359 96.028 0.8 0.3 0.36 1.2 1.26 1.23 12.00%
367 592 574 97.089 97.078 65 123 172 324 0.215 0.405 0.0115 25.03 0.6565 1.226 200 240 39.67 95.828 95.663 96.028 95.863 0.8 0.34 0.41 1.26 1.415 1.338 15.10%
368 574 575 97.078 97.028 87 165 791 1494 0.9887 1.8675 0.0556 25.03 3.0218 5.658 200 240 60.81 95.055 94.801 95.255 95.001 0.8 0.54 0.64 2.024 2.227 2.125 32.30%
369 576 577 97.414 97.441 78 147 78 147 0.0975 0.1837 0.005 14.23 0.2975 0.556 150 160 51.79 96.264 95.94 96.414 96.09 0.81 0.32 0.39 1.15 1.501 1.325 13.50%
370 577 578 97.441 97.546 111 210 189 357 0.2362 0.4462 0.0131 25.03 0.7218 1.352 200 240 83.89 95.89 95.541 96.09 95.741 0.8 0.35 0.42 1.551 2.006 1.778 15.80%
371 578 579 97.546 97.244 82 154 271 511 0.3388 0.6387 0.0184 25.03 1.0347 1.935 200 240 55.59 95.541 95.309 95.741 95.509 0.8 0.39 0.47 2.006 1.935 1.97 18.80%
372 595 596 97.448 97.447 132 248 132 248 0.165 0.31 0.01 25.03 0.505 0.94 200 240 103.39 96.248 95.817 96.448 96.017 0.8 0.32 0.38 1.2 1.629 1.415 13.30%
373 596 597 97.447 97.3 91 172 223 420 0.2788 0.525 0.0162 25.03 0.8524 1.591 200 240 64.46 95.817 95.549 96.017 95.749 0.8 0.37 0.45 1.629 1.752 1.69 17.10%
374 597 579 97.3 97.244 64 121 287 541 0.3587 0.6762 0.0199 25.03 1.0962 2.049 200 240 38.62 95.549 95.388 95.749 95.588 0.8 0.4 0.48 1.752 1.856 1.804 19.30%
375 579 580 97.244 97.281 88 165 646 1217 0.8075 1.5212 0.0443 25.03 2.4668 4.608 200 240 61.08 95.309 95.055 95.509 95.255 0.8 0.51 0.61 1.935 2.226 2.08 29.10%
376 580 581 97.281 97.284 63 118 709 1335 0.8863 1.6687 0.0478 25.03 2.7066 5.054 200 240 37.15 95.055 94.9 95.255 95.1 0.8 0.52 0.62 2.226 2.384 2.305 30.50%
377 581 582 97.284 97.359 62 117 771 1452 0.9638 1.815 0.0514 25.03 2.9426 5.496 200 240 36.57 94.9 94.748 95.1 94.948 0.8 0.53 0.64 2.384 2.611 2.497 31.80%
378 582 583 97.359 97.4 78 147 849 1599 1.0612 1.9987 0.0564 25.03 3.2401 6.053 200 240 52.05 94.748 94.531 94.948 94.731 0.8 0.55 0.66 2.611 2.869 2.74 33.50%

Page 8 of 26
Sewerage Project, Begusarai Annex -A-3: Hydraulic Design of Sewer Network
NGRBA

Link ID Start End Node Upstrem Downstream Population Population Cum Cum Flow 2011 Flow 2041 Infiltration Full Flow Design Design Diameter Slope Length Upstream Downstream Upstream Downstream Full Flow Actual Actual Upstream Downstream Average Depth of
Node Ground Ground Level 2011 2041 Population Population Flow 2011 Flow 2041 Invert Invert Crown Crown Velocity Velocity Velocity Depth Depth Depth Flow
Level 2011 2041 2011 2041
m m souls souls souls souls lps lps lps lps lps lps mm 1 in m m m m m m/s m/s m/s m m m %age
379 583 590 97.4 97.268 114 215 963 1814 1.2038 2.2675 0.0647 25.03 3.676 6.867 200 240 86.3 94.531 94.171 94.731 94.371 0.8 0.57 0.68 2.869 3.097 2.983 35.80%
380 590 575 97.268 97.028 67 126 1030 1940 1.2875 2.425 0.0687 25.03 3.9312 7.344 200 240 41.28 94.171 93.999 94.371 94.199 0.8 0.58 0.69 3.097 3.029 3.063 37.10%
381 575 6 97.028 97.265 66 125 1887 3559 2.3587 4.4487 0.1282 25.03 7.2044 13.474 200 240 40.59 93.999 93.83 94.199 94.03 0.8 0.69 0.81 3.029 3.435 3.232 52.20%
382 523 524 96.938 97.07 214 405 214 405 0.2675 0.5062 0.0177 25.03 0.8202 1.536 200 240 183.04 95.738 94.976 95.938 95.176 0.8 0.37 0.44 1.2 2.094 1.647 16.80%
383 525 526 97.484 97.212 83 157 83 157 0.1037 0.1962 0.0055 14.23 0.3167 0.594 150 160 56.81 96.334 95.979 96.484 96.129 0.81 0.33 0.4 1.15 1.233 1.191 13.90%
384 526 524 97.212 97.07 51 97 134 254 0.1675 0.3175 0.008 25.03 0.5105 0.961 200 240 26.23 95.929 95.82 96.129 96.02 0.8 0.32 0.38 1.283 1.25 1.266 13.40%
385 524 522 97.07 97.119 60 113 408 772 0.51 0.965 0.029 25.03 1.559 2.924 200 240 34.81 94.976 94.83 95.176 95.03 0.8 0.44 0.53 2.094 2.289 2.192 23.10%
386 530 517 97.032 97.042 133 251 133 251 0.1662 0.3137 0.0101 25.03 0.5088 0.951 200 240 104.64 95.832 95.396 96.032 95.596 0.8 0.32 0.38 1.2 1.646 1.423 13.30%
387 532 516 97.107 97.227 140 264 140 264 0.175 0.33 0.0108 25.03 0.5358 1.001 200 240 111.47 95.907 95.443 96.107 95.643 0.8 0.32 0.39 1.2 1.784 1.492 13.70%
388 534 515 97.229 97.177 131 248 131 248 0.1637 0.31 0.0099 25.03 0.5012 0.94 200 240 103.14 96.029 95.599 96.229 95.799 0.8 0.32 0.38 1.2 1.578 1.389 13.30%
389 536 514 97.366 97.107 120 226 120 226 0.15 0.2825 0.0089 25.03 0.4589 0.856 200 240 92.22 96.166 95.782 96.366 95.982 0.8 0.31 0.37 1.2 1.325 1.263 12.70%
390 537 538 97.351 97.899 73 138 73 138 0.0912 0.1725 0.0046 14.23 0.2783 0.522 150 160 47.22 96.201 95.906 96.351 96.056 0.81 0.32 0.38 1.15 1.992 1.571 13.10%
391 538 513 97.899 97.945 152 287 225 425 0.2813 0.5313 0.0164 25.03 0.8602 1.61 200 240 122.97 95.856 95.344 96.056 95.544 0.8 0.37 0.45 2.042 2.601 2.322 17.20%
392 513 514 97.945 97.107 74 140 299 565 0.3738 0.7063 0.0211 25.03 1.1423 2.14 200 240 48.24 95.344 95.143 95.544 95.343 0.8 0.4 0.49 2.601 1.964 2.283 19.80%
393 514 515 97.107 97.177 75 141 494 932 0.6175 1.165 0.0347 25.03 1.8872 3.53 200 240 48.74 95.143 94.94 95.343 95.14 0.8 0.47 0.56 1.964 2.238 2.101 25.40%
394 515 516 97.177 97.227 64 121 689 1301 0.8612 1.6262 0.0483 25.03 2.6321 4.927 200 240 38.58 94.94 94.779 95.14 94.979 0.8 0.52 0.62 2.238 2.448 2.343 30.10%
395 516 517 97.227 97.042 84 158 913 1723 1.1413 2.1537 0.0646 25.03 3.4884 6.526 200 240 57.52 94.779 94.539 94.979 94.739 0.8 0.56 0.67 2.448 2.503 2.475 34.80%
396 517 518 97.042 97.001 115 216 1161 2190 1.4512 2.7375 0.0831 25.03 4.4369 8.296 200 240 87.15 94.539 94.176 94.739 94.376 0.8 0.6 0.72 2.503 2.824 2.664 39.60%
397 518 542 97.001 97.196 60 114 1221 2304 1.5263 2.88 0.0865 25.03 4.6653 8.727 200 240 35.04 94.176 94.03 94.376 94.23 0.8 0.61 0.73 2.824 3.165 2.995 40.70%
398 546 542 97.5 97.196 261 494 261 494 0.3262 0.6175 0.022 25.03 1.0007 1.874 200 240 227.97 96.3 95.35 96.5 95.55 0.8 0.39 0.47 1.2 1.846 1.523 18.50%
399 542 541 97.196 97.184 55 103 1537 2901 1.9212 3.6263 0.1114 25.03 5.8751 10.99 200 240 29.61 94.03 93.907 94.23 94.107 0.8 0.65 0.77 3.165 3.278 3.222 46.40%
400 545 541 97.403 97.184 261 494 261 494 0.3262 0.6175 0.022 25.03 1.0007 1.874 200 240 227.94 96.203 95.253 96.403 95.453 0.8 0.39 0.47 1.2 1.931 1.566 18.50%
401 541 540 97.184 97.175 66 124 1864 3519 2.33 4.3988 0.1372 25.03 7.1272 13.333 200 240 39.96 93.907 93.74 94.107 93.94 0.8 0.69 0.81 3.278 3.435 3.356 51.90%
402 543 544 97.294 97.246 100 188 100 188 0.125 0.235 0.007 25.03 0.382 0.712 200 240 72.93 96.094 95.791 96.294 95.991 0.8 0.29 0.35 1.2 1.455 1.328 11.60%
403 544 540 97.246 97.175 189 356 289 544 0.3612 0.68 0.0223 25.03 1.1061 2.062 200 240 158.32 95.791 95.131 95.991 95.331 0.8 0.4 0.48 1.455 2.044 1.75 19.40%
404 540 521 97.175 97.3 65 122 2218 4185 2.7725 5.2313 0.1633 23.6 8.4808 15.857 200 270 39.24 93.74 93.595 93.94 93.795 0.75 0.69 0.81 3.435 3.705 3.57 60.00%
405 527 528 97.269 97.501 118 224 118 224 0.1475 0.28 0.0088 25.03 0.4513 0.849 200 240 90.79 96.069 95.691 96.269 95.891 0.8 0.31 0.37 1.2 1.81 1.505 12.60%
406 528 521 97.501 97.3 158 299 276 523 0.345 0.6538 0.0212 25.03 1.0562 1.982 200 240 129.13 95.691 95.153 95.891 95.353 0.8 0.39 0.48 1.81 2.147 1.979 19.00%
407 521 522 97.3 97.119 86 162 2580 4870 3.225 6.0875 0.1902 22.77 9.8652 18.453 200 290 59.68 93.595 93.389 93.795 93.589 0.72 0.7 0.81 3.705 3.73 3.718 68.30%
408 522 6 97.119 97.265 70 132 3058 5774 3.8225 7.2175 0.2235 22.77 11.691 21.876 200 290 44.04 93.389 93.237 93.589 93.437 0.72 0.73 0.83 3.73 4.028 3.879 78.60%
409 529 5 97.078 97.332 154 292 154 292 0.1925 0.365 0.0121 25.03 0.5896 1.107 200 240 125.43 95.878 95.355 96.078 95.555 0.8 0.33 0.4 1.2 1.977 1.588 14.30%
410 531 4 97.125 97.376 140 265 140 265 0.175 0.3312 0.0108 25.03 0.5358 1.005 200 240 111.91 95.925 95.458 96.125 95.658 0.8 0.32 0.39 1.2 1.918 1.559 13.70%
411 533 3 97.244 97.486 143 270 143 270 0.1787 0.3375 0.011 25.03 0.5473 1.024 200 240 114.19 96.044 95.568 96.244 95.768 0.8 0.32 0.39 1.2 1.918 1.559 13.80%
412 535 2 97.367 97.47 145 274 145 274 0.1812 0.3425 0.0112 25.03 0.555 1.039 200 240 116.36 96.167 95.682 96.367 95.882 0.8 0.33 0.39 1.2 1.788 1.494 13.90%
413 336 335 97.089 99.065 331 625 331 625 0.4137 0.7813 0.0284 25.03 1.2696 2.372 200 240 294.26 95.889 94.663 96.089 94.863 0.8 0.42 0.5 1.2 4.402 2.801 20.80%
414 337 338 98.302 98.311 67 126 67 126 0.0837 0.1575 0.004 14.23 0.2552 0.476 150 160 40.98 97.152 96.896 97.302 97.046 0.81 0.31 0.37 1.15 1.415 1.282 12.50%
415 338 335 98.311 99.065 100 189 167 315 0.2087 0.3938 0.011 25.03 0.6373 1.192 200 240 73.1 96.846 96.541 97.046 96.741 0.8 0.34 0.41 1.465 2.523 1.994 14.80%
416 1277 471 96.679 96.711 139 263 139 263 0.1737 0.3287 0.0107 25.03 0.5319 0.997 200 240 110.82 95.479 95.017 95.679 95.217 0.8 0.32 0.39 1.2 1.694 1.447 13.60%
417 471 472 96.711 97.225 163 308 302 571 0.3775 0.7138 0.0236 25.03 1.1561 2.165 200 240 133.61 95.017 94.461 95.217 94.661 0.8 0.41 0.49 1.694 2.764 2.229 19.90%
418 475 472 97.298 97.225 93 175 93 175 0.1163 0.2188 0.0064 25.03 0.3551 0.663 200 240 66.26 96.098 95.821 96.298 96.021 0.8 0.28 0.34 1.2 1.403 1.302 11.20%
419 472 473 97.225 98.623 76 143 471 889 0.5888 1.1113 0.0348 25.03 1.801 3.369 200 240 49.62 94.461 94.254 94.661 94.454 0.8 0.46 0.56 2.764 4.369 3.566 24.80%
420 474 473 97.477 98.623 147 277 147 277 0.1837 0.3462 0.0114 25.03 0.5626 1.05 200 240 117.89 96.277 95.786 96.477 95.986 0.8 0.33 0.39 1.2 2.837 2.018 14.00%
421 473 335 98.623 99.065 36 69 654 1235 0.8175 1.5437 0.0473 25.03 2.4998 4.679 200 240 11.99 94.254 94.204 94.454 94.404 0.8 0.51 0.61 4.369 4.861 4.615 29.30%
422 335 334 99.065 98.49 155 293 1307 2468 1.6337 3.085 0.0988 25.03 5.0001 9.354 200 240 125.87 94.204 93.679 94.404 93.879 0.8 0.62 0.74 4.861 4.81 4.836 42.30%
423 512 334 98.358 98.49 99 186 99 186 0.1237 0.2325 0.0069 25.03 0.3782 0.704 200 240 71.66 97.158 96.86 97.358 97.06 0.8 0.29 0.35 1.2 1.63 1.415 11.50%
424 334 333 98.49 98.247 180 340 1586 2994 1.9825 3.7425 0.1202 25.03 6.0677 11.348 200 240 150.24 93.679 93.053 93.879 93.253 0.8 0.66 0.78 4.81 5.193 5.002 47.20%
425 478 477 96.904 97.072 90 170 90 170 0.1125 0.2125 0.0061 25.03 0.3436 0.644 200 240 63.54 95.704 95.439 95.904 95.639 0.8 0.28 0.34 1.2 1.633 1.416 11.00%
426 477 476 97.072 97.159 52 99 142 269 0.1775 0.3362 0.0088 25.03 0.5413 1.018 200 240 27.3 95.439 95.325 95.639 95.525 0.8 0.32 0.39 1.633 1.834 1.733 13.80%

Page 9 of 26
Sewerage Project, Begusarai Annex -A-3: Hydraulic Design of Sewer Network
NGRBA

Link ID Start End Node Upstrem Downstream Population Population Cum Cum Flow 2011 Flow 2041 Infiltration Full Flow Design Design Diameter Slope Length Upstream Downstream Upstream Downstream Full Flow Actual Actual Upstream Downstream Average Depth of
Node Ground Ground Level 2011 2041 Population Population Flow 2011 Flow 2041 Invert Invert Crown Crown Velocity Velocity Velocity Depth Depth Depth Flow
Level 2011 2041 2011 2041
m m souls souls souls souls lps lps lps lps lps lps mm 1 in m m m m m m/s m/s m/s m m m %age
427 476 378 97.159 97.275 70 133 212 402 0.265 0.5025 0.0131 25.03 0.8081 1.521 200 240 44.54 95.325 95.139 95.525 95.339 0.8 0.36 0.44 1.834 2.136 1.985 16.70%
428 378 379 97.275 97.337 114 215 326 617 0.4075 0.7712 0.0214 25.03 1.2439 2.335 200 240 86.4 95.139 94.779 95.339 94.979 0.8 0.41 0.5 2.136 2.558 2.347 20.60%
429 379 380 97.337 97.324 68 128 394 745 0.4925 0.9312 0.0254 25.03 1.5029 2.819 200 240 41.97 94.779 94.605 94.979 94.805 0.8 0.44 0.53 2.558 2.72 2.639 22.70%
430 457 380 97.407 97.324 76 144 76 144 0.095 0.18 0.0049 14.23 0.2899 0.545 150 160 50.42 96.257 95.942 96.407 96.092 0.81 0.32 0.39 1.15 1.382 1.266 13.40%
431 380 381 97.324 97.32 41 78 511 967 0.6387 1.2087 0.0319 25.03 1.9482 3.658 200 240 16.68 94.605 94.535 94.805 94.735 0.8 0.47 0.57 2.72 2.785 2.752 25.80%
432 381 382 97.32 97.338 40 75 551 1042 0.6887 1.3025 0.0334 25.03 2.0996 3.941 200 240 15.35 94.535 94.471 94.735 94.671 0.8 0.48 0.58 2.785 2.867 2.826 26.80%
433 382 371 97.338 97.428 62 117 613 1159 0.7662 1.4487 0.0369 25.03 2.3357 4.383 200 240 36.76 94.471 94.318 94.671 94.518 0.8 0.5 0.6 2.867 3.11 2.988 28.30%
434 439 440 97.719 97.796 76 143 76 143 0.095 0.1787 0.0048 14.23 0.2898 0.541 150 160 50.04 96.569 96.256 96.719 96.406 0.81 0.32 0.39 1.15 1.54 1.345 13.30%
435 440 441 97.796 97.814 49 92 125 235 0.1563 0.2937 0.0071 25.03 0.4759 0.888 200 240 23.79 96.206 96.107 96.406 96.307 0.8 0.31 0.37 1.59 1.707 1.649 12.90%
436 441 442 97.814 97.747 141 266 266 501 0.3325 0.6262 0.018 25.03 1.0155 1.897 200 240 112.37 96.107 95.639 96.307 95.839 0.8 0.39 0.47 1.707 2.108 1.907 18.60%
437 442 443 97.747 97.732 70 133 336 634 0.42 0.7925 0.0223 25.03 1.2823 2.4 200 240 44.59 95.639 95.453 95.839 95.653 0.8 0.42 0.5 2.108 2.278 2.193 20.90%
438 443 444 97.732 97.757 72 136 408 770 0.51 0.9625 0.0267 25.03 1.5567 2.914 200 240 46.19 95.453 95.261 95.653 95.461 0.8 0.44 0.53 2.278 2.496 2.387 23.00%
439 449 450 97.896 97.878 55 103 55 103 0.0688 0.1287 0.0028 14.23 0.2091 0.389 150 160 29.41 96.746 96.562 96.896 96.712 0.81 0.29 0.35 1.15 1.316 1.233 11.40%
440 452 450 98 97.878 61 114 61 114 0.0763 0.1425 0.0034 14.23 0.2322 0.431 150 160 35.31 96.85 96.629 97 96.779 0.81 0.3 0.36 1.15 1.248 1.199 11.90%
441 450 451 97.878 97.828 66 125 182 342 0.2275 0.4275 0.0101 25.03 0.6926 1.293 200 240 40.45 96.512 96.343 96.712 96.543 0.8 0.35 0.42 1.366 1.485 1.425 15.40%
442 453 451 98.073 97.828 91 173 91 173 0.1137 0.2163 0.0063 25.03 0.3475 0.655 200 240 64.88 96.873 96.602 97.073 96.802 0.8 0.28 0.34 1.2 1.226 1.213 11.10%
443 451 444 97.828 97.757 125 235 398 750 0.4975 0.9375 0.0257 25.03 1.5182 2.838 200 240 96.79 96.343 95.94 96.543 96.14 0.8 0.44 0.53 1.485 1.817 1.651 22.70%
444 455 444 97.854 97.757 83 156 83 156 0.1037 0.195 0.0054 14.23 0.3167 0.59 150 160 56.42 96.704 96.351 96.854 96.501 0.81 0.33 0.4 1.15 1.405 1.278 13.90%
445 444 445 97.757 97.804 108 204 997 1880 1.2463 2.35 0.0657 25.03 3.8044 7.116 200 240 80.76 95.261 94.924 95.461 95.124 0.8 0.58 0.69 2.496 2.88 2.688 36.50%
446 445 446 97.804 97.621 111 210 1108 2090 1.385 2.6125 0.0738 25.03 4.2288 7.911 200 240 83.82 94.924 94.575 95.124 94.775 0.8 0.59 0.71 2.88 3.046 2.963 38.60%
447 460 446 97.55 97.621 141 265 141 265 0.1762 0.3312 0.0108 25.03 0.5396 1.005 200 240 112.04 96.35 95.883 96.55 96.083 0.8 0.32 0.39 1.2 1.738 1.469 13.70%
448 446 447 97.621 97.583 68 128 1317 2483 1.6463 3.1037 0.0886 25.03 5.0274 9.4 200 240 42.18 94.575 94.399 94.775 94.599 0.8 0.62 0.74 3.046 3.184 3.115 42.50%
449 447 448 97.583 97.485 104 196 1421 2679 1.7763 3.3487 0.0961 25.03 5.4248 10.142 200 240 76.94 94.399 94.079 94.599 94.279 0.8 0.64 0.75 3.184 3.406 3.295 44.30%
450 458 459 97.607 97.506 116 219 116 219 0.145 0.2738 0.0085 25.03 0.4435 0.83 200 240 88.49 96.407 96.038 96.607 96.238 0.8 0.3 0.37 1.2 1.467 1.334 12.50%
451 459 448 97.506 97.485 54 102 170 321 0.2125 0.4013 0.0113 25.03 0.6488 1.215 200 240 29.18 96.038 95.917 96.238 96.117 0.8 0.34 0.41 1.467 1.568 1.518 15.00%
452 448 371 97.485 97.428 57 108 1648 3108 2.06 3.885 0.1105 25.03 6.2905 11.765 200 240 31.81 94.079 93.946 94.279 94.146 0.8 0.66 0.78 3.406 3.481 3.444 48.20%
453 456 370 97.376 97.481 83 156 83 156 0.1037 0.195 0.0055 14.23 0.3167 0.59 150 160 56.52 96.226 95.872 96.376 96.022 0.81 0.33 0.4 1.15 1.609 1.379 13.90%
454 1291 369 97.407 97.395 141 267 141 267 0.1762 0.3337 0.0109 25.03 0.5396 1.012 200 240 112.79 96.207 95.737 96.407 95.937 0.8 0.32 0.39 1.2 1.658 1.429 13.70%
455 431 432 97.75 97.526 91 171 91 171 0.1137 0.2137 0.0062 25.03 0.3474 0.647 200 240 64.1 96.55 96.283 96.75 96.483 0.8 0.28 0.34 1.2 1.243 1.222 11.10%
456 433 432 97.585 97.526 52 98 52 98 0.065 0.1225 0.0026 14.23 0.1976 0.37 150 160 27.19 96.435 96.266 96.585 96.416 0.81 0.29 0.35 1.15 1.26 1.205 11.10%
457 432 369 97.526 97.395 183 345 326 614 0.4075 0.7675 0.0235 25.03 1.246 2.326 200 240 152.65 96.216 95.579 96.416 95.779 0.8 0.41 0.5 1.31 1.816 1.563 20.60%
458 368 369 97.323 97.395 169 320 169 320 0.2112 0.4 0.0135 25.03 0.6472 1.213 200 240 139.88 96.123 95.54 96.323 95.74 0.8 0.34 0.41 1.2 1.855 1.528 15.00%
459 369 370 97.395 97.481 279 528 915 1729 1.1437 2.1612 0.0715 25.03 3.5028 6.555 200 240 245.06 95.54 94.519 95.74 94.719 0.8 0.56 0.67 1.855 2.962 2.409 34.90%
460 461 370 97.551 97.481 63 119 63 119 0.0787 0.1487 0.0036 14.23 0.2399 0.45 150 160 37.6 96.401 96.166 96.551 96.316 0.81 0.3 0.37 1.15 1.315 1.233 12.20%
461 370 371 97.481 97.428 103 195 1164 2199 1.455 2.7487 0.088 25.03 4.453 8.334 200 240 76.11 94.519 94.202 94.719 94.402 0.8 0.6 0.72 2.962 3.226 3.094 39.70%
462 371 372 97.428 97.425 90 170 3515 6636 4.3938 8.295 0.2415 36.55 13.4228 25.127 250 370 63.67 93.896 93.724 94.146 93.974 0.74 0.69 0.8 3.532 3.701 3.616 60.90%
463 383 384 97.336 97.324 86 162 86 162 0.1075 0.2025 0.0057 14.23 0.3282 0.613 150 160 59.39 96.186 95.815 96.336 95.965 0.81 0.33 0.4 1.15 1.509 1.329 14.20%
464 384 372 97.324 97.425 91 171 177 333 0.2212 0.4162 0.0119 25.03 0.6757 1.261 200 240 64.08 95.765 95.498 95.965 95.698 0.8 0.35 0.42 1.559 1.927 1.743 15.30%
465 462 372 97.442 97.425 58 110 58 110 0.0725 0.1375 0.0032 14.23 0.2207 0.416 150 160 33.15 96.292 96.084 96.442 96.234 0.81 0.3 0.36 1.15 1.341 1.246 11.70%
466 372 373 97.425 97.342 76 142 3826 7221 4.7825 9.0262 0.2614 36.07 14.6089 27.34 250 380 49.58 93.724 93.594 93.974 93.844 0.73 0.7 0.81 3.701 3.748 3.725 65.10%
467 373 374 97.342 97.322 86 161 3912 7382 4.89 9.2275 0.2671 35.6 14.9371 27.95 250 390 59.21 93.594 93.442 93.844 93.692 0.72 0.69 0.8 3.748 3.88 3.814 66.70%
468 374 375 97.322 97.229 65 122 3977 7504 4.9713 9.38 0.2709 35.6 15.1846 28.411 250 390 39.13 93.442 93.341 93.692 93.591 0.72 0.7 0.81 3.88 3.888 3.884 67.50%
469 376 375 97.204 97.229 56 105 56 105 0.07 0.1312 0.0029 14.23 0.2129 0.397 150 160 30.36 96.054 95.864 96.204 96.014 0.81 0.29 0.35 1.15 1.366 1.258 11.50%
470 377 375 97.26 97.229 63 118 63 118 0.0787 0.1475 0.0036 14.23 0.2398 0.446 150 160 37.12 96.11 95.878 96.26 96.028 0.81 0.3 0.37 1.15 1.351 1.251 12.10%
471 375 344 97.229 97.177 71 135 4167 7862 5.2087 9.8275 0.2818 35.15 15.908 29.764 250 400 45.55 93.341 93.228 93.591 93.478 0.72 0.7 0.8 3.888 3.95 3.919 70.60%
472 393 394 97.477 97.382 79 148 79 148 0.0987 0.185 0.0051 14.23 0.3013 0.56 150 160 52.56 96.327 95.998 96.477 96.148 0.81 0.32 0.39 1.15 1.383 1.267 13.50%
473 395 394 97.41 97.382 86 163 86 163 0.1075 0.2037 0.0058 14.23 0.3283 0.617 150 160 59.87 96.259 95.885 96.41 96.035 0.81 0.33 0.4 1.15 1.496 1.323 14.20%
474 396 394 97.373 97.382 91 171 91 171 0.1137 0.2137 0.0062 25.03 0.3475 0.647 200 240 64.3 96.173 95.905 96.373 96.105 0.8 0.28 0.34 1.2 1.476 1.338 11.10%

Page 10 of 26
Sewerage Project, Begusarai Annex -A-3: Hydraulic Design of Sewer Network
NGRBA

Link ID Start End Node Upstrem Downstream Population Population Cum Cum Flow 2011 Flow 2041 Infiltration Full Flow Design Design Diameter Slope Length Upstream Downstream Upstream Downstream Full Flow Actual Actual Upstream Downstream Average Depth of
Node Ground Ground Level 2011 2041 Population Population Flow 2011 Flow 2041 Invert Invert Crown Crown Velocity Velocity Velocity Depth Depth Depth Flow
Level 2011 2041 2011 2041
m m souls souls souls souls lps lps lps lps lps lps mm 1 in m m m m m m/s m/s m/s m m m %age
475 394 344 97.382 97.177 121 228 377 710 0.4712 0.8875 0.026 25.03 1.4398 2.689 200 240 93.11 95.835 95.447 96.035 95.647 0.8 0.43 0.52 1.546 1.73 1.638 22.10%
476 470 469 96.646 96.776 109 205 109 205 0.1363 0.2562 0.0078 25.03 0.4166 0.777 200 240 81.34 95.446 95.107 95.646 95.307 0.8 0.3 0.36 1.2 1.669 1.434 12.10%
477 469 340 96.776 97.716 65 122 174 327 0.2175 0.4087 0.0116 25.03 0.6641 1.238 200 240 39.4 95.107 94.943 95.307 95.143 0.8 0.34 0.41 1.669 2.773 2.221 15.10%
478 340 467 97.716 97.741 169 318 343 645 0.4287 0.8062 0.025 25.03 1.3113 2.444 200 240 138.97 94.943 94.364 95.143 94.564 0.8 0.42 0.51 2.773 3.378 3.075 21.10%
479 467 342 97.741 97.202 106 199 449 844 0.5612 1.055 0.0326 25.03 1.7164 3.198 200 240 78.4 94.364 94.037 94.564 94.237 0.8 0.46 0.55 3.378 3.165 3.271 24.10%
480 342 343 97.202 97.116 52 98 501 942 0.6262 1.1775 0.0352 25.03 1.914 3.568 200 240 27.08 94.037 93.924 94.237 94.124 0.8 0.47 0.56 3.165 3.191 3.178 25.50%
481 343 344 97.116 97.177 104 196 605 1138 0.7562 1.4225 0.0427 25.03 2.3114 4.31 200 240 77.03 93.924 93.603 94.124 93.803 0.8 0.5 0.6 3.191 3.574 3.383 28.10%
482 344 345 97.177 97.405 188 355 5337 10065 6.6712 12.5812 0.3657 52.18 20.3794 38.109 300 480 157.85 93.178 92.849 93.478 93.149 0.74 0.69 0.81 4 4.556 4.278 63.40%
483 349 348 96.916 96.952 58 108 58 108 0.0725 0.135 0.0031 14.23 0.2206 0.408 150 160 32.23 95.766 95.565 95.916 95.715 0.81 0.3 0.36 1.15 1.387 1.269 11.60%
484 348 347 96.952 97.204 81 153 139 261 0.1737 0.3262 0.0084 25.03 0.5297 0.987 200 240 55.04 95.515 95.285 95.715 95.485 0.8 0.32 0.39 1.437 1.919 1.678 13.60%
485 347 346 97.204 97.206 46 87 185 348 0.2312 0.435 0.0105 25.03 0.7042 1.315 200 240 21.37 95.285 95.196 95.485 95.396 0.8 0.35 0.42 1.919 2.009 1.964 15.60%
486 350 346 97.284 97.206 52 98 52 98 0.065 0.1225 0.0026 14.23 0.1976 0.37 150 160 26.77 96.134 95.966 96.284 96.116 0.81 0.29 0.35 1.15 1.239 1.195 11.10%
487 346 345 97.206 97.405 147 277 384 723 0.48 0.9038 0.0244 25.03 1.4644 2.736 200 240 117.93 95.196 94.705 95.396 94.905 0.8 0.43 0.52 2.009 2.7 2.355 22.30%
488 345 333 97.405 98.247 121 228 5842 11016 7.3025 13.77 0.3991 51.13 22.3066 41.709 300 500 93.21 92.849 92.662 93.149 92.962 0.72 0.7 0.81 4.556 5.585 5.07 68.60%
489 385 386 97.432 97.511 113 213 113 213 0.1412 0.2662 0.0082 25.03 0.432 0.807 200 240 85.19 96.232 95.877 96.432 96.077 0.8 0.3 0.36 1.2 1.634 1.417 12.30%
490 386 387 97.511 98.177 108 204 221 417 0.2763 0.5213 0.016 25.03 0.8448 1.58 200 240 81.1 95.877 95.539 96.077 95.739 0.8 0.37 0.44 1.634 2.638 2.136 17.00%
491 392 387 98.374 98.177 52 98 52 98 0.065 0.1225 0.0026 15.79 0.1976 0.37 150 130 26.73 97.224 97.018 97.374 97.168 0.89 0.31 0.37 1.15 1.158 1.154 10.60%
492 387 388 98.177 98.524 63 119 336 634 0.42 0.7925 0.0222 25.03 1.2822 2.4 200 240 37.5 95.539 95.383 95.739 95.583 0.8 0.42 0.5 2.638 3.141 2.889 20.90%
493 388 389 98.524 98.551 50 95 386 729 0.4825 0.9112 0.0247 25.03 1.4722 2.758 200 240 25.41 95.383 95.277 95.583 95.477 0.8 0.44 0.52 3.141 3.274 3.207 22.40%
494 390 391 97.72 98.185 68 128 68 128 0.085 0.16 0.0041 14.23 0.2591 0.484 150 160 42.02 96.57 96.307 96.72 96.457 0.81 0.31 0.37 1.15 1.878 1.514 12.60%
495 391 389 98.185 98.551 100 188 168 316 0.21 0.395 0.0111 25.03 0.6411 1.196 200 240 72.79 96.257 95.954 96.457 96.154 0.8 0.34 0.41 1.928 2.597 2.263 14.90%
496 389 361 98.551 98.526 50 94 604 1139 0.755 1.4237 0.0382 25.03 2.3032 4.309 200 240 24.94 95.277 95.173 95.477 95.373 0.8 0.5 0.6 3.274 3.353 3.314 28.10%
497 359 360 98.415 98.542 122 231 122 231 0.1525 0.2887 0.0091 25.03 0.4666 0.875 200 240 94.33 97.215 96.822 97.415 97.022 0.8 0.31 0.37 1.2 1.72 1.46 12.80%
498 360 361 98.542 98.526 114 214 236 445 0.295 0.5562 0.0174 25.03 0.9024 1.686 200 240 86.19 96.822 96.463 97.022 96.663 0.8 0.38 0.45 1.72 2.063 1.892 17.60%
499 361 333 98.526 98.247 203 383 1043 1967 1.3037 2.4587 0.0722 25.03 3.9834 7.448 200 240 171.88 95.173 94.457 95.373 94.657 0.8 0.58 0.69 3.353 3.79 3.572 37.40%
500 333 1 98.247 98.341 37 69 8508 16046 10.635 20.0575 0.5927 68.17 32.4977 60.765 350 640 12.34 92.612 92.593 92.962 92.943 0.71 0.7 0.8 5.635 5.748 5.691 73.60%
501 1 2 98.341 97.47 215 407 8723 16453 10.9038 20.5662 0.6104 68.17 33.3217 62.309 350 640 183.88 92.593 92.306 92.943 92.656 0.71 0.7 0.8 5.748 5.164 5.456 75.20%
502 2 3 97.47 97.486 71 134 8939 16861 11.1737 21.0763 0.626 68.17 34.1473 63.855 350 640 45.46 92.306 92.235 92.656 92.585 0.71 0.71 0.81 5.164 5.251 5.208 76.80%
503 3 4 97.486 97.376 71 134 9153 17265 11.4412 21.5812 0.6414 68.17 34.9652 65.385 350 640 45.47 92.235 92.164 92.585 92.514 0.71 0.71 0.81 5.251 5.213 5.232 78.50%
504 4 5 97.376 97.332 96 182 9389 17712 11.7362 22.14 0.6589 69.83 35.8677 67.079 350 610 69.53 92.164 92.05 92.514 92.4 0.73 0.73 0.83 5.213 5.282 5.247 78.60%
505 5 6 97.332 97.265 117 222 9660 18226 12.075 22.7825 0.6797 71.61 36.9047 69.027 350 580 89.81 92.05 91.895 92.4 92.245 0.74 0.75 0.85 5.282 5.37 5.326 78.90%
506 6 7 97.265 97.581 179 338 14784 27897 18.48 34.8713 1.0457 91.76 56.4857 88.224 400 720 148.86 91.845 91.638 92.245 92.038 0.73 0.77 0.83 5.42 5.943 5.682 78.70%
507 7 8 97.581 97.822 60 114 15345 28956 19.1812 36.195 1.0845 114.94 58.6282 91.572 450 860 34.98 91.588 91.547 92.038 91.997 0.72 0.73 0.8 5.993 6.275 6.134 67.50%
508 8 9 97.822 97.643 135 254 15670 29569 19.5875 36.9613 1.1101 114.28 59.8726 93.513 450 870 106.38 91.547 91.425 91.997 91.875 0.72 0.73 0.8 6.275 6.218 6.246 68.80%
509 9 10 97.643 97.546 72 136 16061 30307 20.0763 37.8838 1.1353 113.63 61.3641 95.845 450 880 46.36 91.425 91.372 91.875 91.822 0.71 0.73 0.8 6.218 6.173 6.196 70.40%
510 619 620 98.259 97.63 92 174 92 174 0.115 0.2175 0.0063 38.78 0.3513 0.659 200 100 65.78 97.059 96.401 97.259 96.601 1.23 0.38 0.47 1.2 1.229 1.215 9.10%
511 620 10 97.63 97.546 86 162 178 336 0.2225 0.42 0.0121 25.03 0.6796 1.272 200 240 59.7 96.401 96.152 96.601 96.352 0.8 0.35 0.42 1.229 1.393 1.311 15.30%
512 10 11 97.546 97.519 107 202 16346 30845 20.4325 38.5562 1.1551 113.63 62.4526 97.546 450 880 80.02 91.372 91.281 91.822 91.731 0.71 0.73 0.8 6.173 6.238 6.206 71.40%
513 11 12 97.519 97.559 54 102 16556 31240 20.695 39.05 1.1679 112.99 63.2529 98.793 450 890 29.19 91.281 91.249 91.731 91.699 0.71 0.73 0.8 6.238 6.31 6.274 72.40%
514 12 13 97.559 97.284 150 284 16706 31524 20.8825 39.405 1.1796 112.99 63.8271 99.692 450 890 121.42 91.249 91.112 91.699 91.562 0.71 0.73 0.8 6.31 6.172 6.241 73.00%
515 13 14 97.284 97.616 151 285 16857 31809 21.0712 39.7612 1.1914 112.99 64.4051 100.595 450 890 122.18 91.112 90.975 91.562 91.425 0.71 0.73 0.8 6.172 6.641 6.406 73.50%
516 14 117 97.616 97.618 43 82 17007 32092 21.2587 40.115 1.2009 112.99 64.9771 101.488 450 890 18.57 90.975 90.954 91.425 91.404 0.71 0.73 0.8 6.641 6.664 6.652 74.00%
517 117 115 97.618 97.541 147 278 17154 32370 21.4425 40.4625 1.2123 112.36 65.5398 102.369 450 900 118.42 90.954 90.822 91.404 91.272 0.71 0.73 0.8 6.664 6.719 6.691 75.00%
518 570 563 97.013 97.923 104 196 104 196 0.13 0.245 0.0074 25.03 0.3974 0.742 200 240 77.01 95.813 95.492 96.013 95.692 0.8 0.29 0.36 1.2 2.431 1.815 11.80%
519 562 563 98.113 97.923 50 95 50 95 0.0625 0.1187 0.0024 15.79 0.1899 0.359 150 130 25.27 96.963 96.769 97.113 96.919 0.89 0.3 0.37 1.15 1.154 1.152 10.40%
520 563 564 97.923 97.809 170 321 324 612 0.405 0.765 0.0234 25.03 1.2384 2.318 200 240 140.1 95.492 94.909 95.692 95.109 0.8 0.41 0.5 2.431 2.9 2.666 20.60%
521 569 567 96.876 96.848 56 106 56 106 0.07 0.1325 0.003 14.23 0.213 0.401 150 160 31.19 95.726 95.531 95.876 95.681 0.81 0.29 0.35 1.15 1.317 1.233 11.50%
522 566 567 96.895 96.848 80 151 80 151 0.1 0.1887 0.0052 14.23 0.3052 0.571 150 160 53.85 95.745 95.408 95.895 95.558 0.81 0.33 0.39 1.15 1.439 1.295 13.70%

Page 11 of 26
Sewerage Project, Begusarai Annex -A-3: Hydraulic Design of Sewer Network
NGRBA

Link ID Start End Node Upstrem Downstream Population Population Cum Cum Flow 2011 Flow 2041 Infiltration Full Flow Design Design Diameter Slope Length Upstream Downstream Upstream Downstream Full Flow Actual Actual Upstream Downstream Average Depth of
Node Ground Ground Level 2011 2041 Population Population Flow 2011 Flow 2041 Invert Invert Crown Crown Velocity Velocity Velocity Depth Depth Depth Flow
Level 2011 2041 2011 2041
m m souls souls souls souls lps lps lps lps lps lps mm 1 in m m m m m m/s m/s m/s m m m %age
523 567 568 96.848 96.838 102 192 238 449 0.2975 0.5612 0.0154 25.03 0.9079 1.699 200 240 74.54 95.358 95.048 95.558 95.248 0.8 0.38 0.45 1.489 1.791 1.64 17.60%
524 568 564 96.838 97.809 93 175 331 624 0.4137 0.78 0.0218 25.03 1.263 2.362 200 240 65.96 95.048 94.773 95.248 94.973 0.8 0.42 0.5 1.791 3.036 2.413 20.80%
525 564 565 97.809 97.692 194 366 849 1602 1.0612 2.0025 0.0609 25.03 3.2446 6.068 200 240 163.46 94.773 94.092 94.973 94.292 0.8 0.55 0.66 3.036 3.6 3.318 33.50%
526 867 868 97.925 97.914 72 135 72 135 0.09 0.1688 0.0044 14.23 0.2744 0.511 150 160 45.82 96.775 96.488 96.925 96.638 0.81 0.32 0.38 1.15 1.425 1.288 13.00%
527 869 870 96.753 97.247 119 224 119 224 0.1487 0.28 0.0088 25.03 0.455 0.849 200 240 91.21 95.553 95.173 95.753 95.373 0.8 0.31 0.37 1.2 2.074 1.637 12.60%
528 871 872 97.006 97.289 94 177 94 177 0.1175 0.2212 0.0065 25.03 0.359 0.67 200 240 67.02 95.806 95.527 96.006 95.727 0.8 0.28 0.34 1.2 1.762 1.481 11.30%
529 873 872 97.375 97.289 55 103 55 103 0.0688 0.1287 0.0029 14.23 0.2091 0.389 150 160 29.71 96.225 96.039 96.375 96.189 0.81 0.29 0.35 1.15 1.25 1.2 11.40%
530 872 870 97.289 97.247 51 96 200 376 0.25 0.47 0.0118 25.03 0.7618 1.422 200 240 25.91 95.527 95.419 95.727 95.619 0.8 0.36 0.43 1.762 1.828 1.795 16.20%
531 870 868 97.247 97.914 107 201 426 801 0.5325 1.0013 0.0283 25.03 1.6258 3.032 200 240 79.34 95.173 94.842 95.373 95.042 0.8 0.45 0.54 2.074 3.072 2.573 23.50%
532 868 565 97.914 97.692 199 375 697 1311 0.8713 1.6388 0.0489 25.03 2.6627 4.965 200 240 168.02 94.842 94.142 95.042 94.342 0.8 0.52 0.62 3.072 3.55 3.311 30.20%
533 565 105 97.692 96.571 110 209 1656 3122 2.07 3.9025 0.1178 25.03 6.3278 11.825 200 240 83.15 94.092 93.745 94.292 93.945 0.8 0.66 0.79 3.6 2.826 3.213 48.40%
534 908 909 97.283 96.651 89 168 89 168 0.1112 0.21 0.006 40.87 0.3398 0.636 200 90 62.36 96.083 95.39 96.283 95.59 1.3 0.39 0.48 1.2 1.261 1.23 8.70%
535 910 909 96.733 96.651 93 176 93 176 0.1163 0.22 0.0064 25.03 0.3552 0.666 200 240 66.82 95.533 95.255 95.733 95.455 0.8 0.28 0.34 1.2 1.397 1.298 11.20%
536 909 105 96.651 96.571 54 102 236 446 0.295 0.5575 0.0153 25.03 0.9003 1.688 200 240 28.95 95.255 95.134 95.455 95.334 0.8 0.38 0.45 1.397 1.437 1.417 17.60%
537 105 106 96.571 96.739 96 180 1988 3748 2.485 4.685 0.1397 24.52 7.5947 14.195 200 250 68.85 93.745 93.47 93.945 93.67 0.78 0.69 0.81 2.826 3.269 3.047 54.60%
538 106 107 96.739 96.771 164 310 2152 4058 2.69 5.0725 0.1527 24.05 8.2227 15.37 200 260 134.93 93.47 92.951 93.67 93.151 0.77 0.69 0.81 3.269 3.82 3.544 58.10%
539 489 490 98.095 98.009 85 161 85 161 0.1062 0.2013 0.0057 14.23 0.3244 0.609 150 160 58.74 96.945 96.578 97.095 96.728 0.81 0.33 0.4 1.15 1.431 1.291 14.10%
540 490 491 98.009 97.788 97 183 182 344 0.2275 0.43 0.0124 25.03 0.6949 1.302 200 240 70 96.528 96.236 96.728 96.436 0.8 0.35 0.42 1.481 1.552 1.516 15.50%
541 508 509 98.107 98.142 160 303 160 303 0.2 0.3787 0.0126 25.03 0.6126 1.149 200 240 130.99 96.907 96.361 97.107 96.561 0.8 0.34 0.4 1.2 1.781 1.491 14.60%
542 509 510 98.142 98.089 115 217 275 520 0.3438 0.65 0.0211 25.03 1.0523 1.971 200 240 87.59 96.361 95.996 96.561 96.196 0.8 0.39 0.47 1.781 2.092 1.937 19.00%
543 510 511 98.089 97.955 117 221 392 741 0.49 0.9262 0.0297 25.03 1.4997 2.808 200 240 89.45 95.996 95.624 96.196 95.824 0.8 0.44 0.53 2.092 2.331 2.212 22.60%
544 511 491 97.955 97.788 141 266 533 1007 0.6662 1.2587 0.0406 25.03 2.0393 3.817 200 240 112.49 95.624 95.155 95.824 95.355 0.8 0.48 0.58 2.331 2.633 2.482 26.40%
545 560 561 98.137 98.059 87 164 87 164 0.1088 0.205 0.0059 25.03 0.3321 0.621 200 240 60.65 96.937 96.685 97.137 96.885 0.8 0.28 0.34 1.2 1.374 1.287 10.90%
546 561 491 98.059 97.788 97 183 184 347 0.23 0.4337 0.0126 25.03 0.7026 1.314 200 240 70.08 96.685 96.393 96.885 96.593 0.8 0.35 0.42 1.374 1.395 1.385 15.60%
547 491 492 97.788 96.955 115 217 1014 1915 1.2675 2.3937 0.074 25.03 3.8765 7.255 200 240 87.52 95.155 94.79 95.355 94.99 0.8 0.58 0.69 2.633 2.165 2.399 36.90%
548 492 493 96.955 96.882 133 250 1147 2165 1.4337 2.7062 0.0841 25.03 4.3854 8.203 200 240 104.48 94.79 94.355 94.99 94.555 0.8 0.6 0.71 2.165 2.527 2.346 39.40%
549 558 493 96.862 96.882 106 200 106 200 0.1325 0.25 0.0076 25.03 0.4051 0.758 200 240 78.69 95.662 95.334 95.862 95.534 0.8 0.3 0.36 1.2 1.548 1.374 11.90%
550 559 493 96.968 96.882 61 114 61 114 0.0763 0.1425 0.0034 14.23 0.2321 0.431 150 160 35.19 95.818 95.598 95.968 95.748 0.81 0.3 0.36 1.15 1.284 1.217 11.90%
551 493 494 96.882 97.006 53 101 1367 2580 1.7087 3.225 0.0978 25.03 5.2241 9.773 200 240 28.3 94.355 94.237 94.555 94.437 0.8 0.63 0.75 2.527 2.769 2.648 43.40%
552 1279 519 97.006 97.148 102 192 102 192 0.1275 0.24 0.0072 25.03 0.3897 0.727 200 240 74.66 95.806 95.495 96.006 95.695 0.8 0.29 0.35 1.2 1.653 1.427 11.70%
553 547 548 96.892 96.922 68 128 68 128 0.085 0.16 0.0041 14.23 0.2591 0.484 150 160 42.3 95.742 95.478 95.892 95.628 0.81 0.31 0.37 1.15 1.444 1.297 12.60%
554 548 549 96.922 96.909 52 97 120 225 0.15 0.2813 0.0066 25.03 0.4566 0.85 200 240 26.57 95.428 95.317 95.628 95.517 0.8 0.31 0.37 1.494 1.592 1.543 12.60%
555 549 519 96.909 97.148 83 156 203 381 0.2537 0.4762 0.0121 25.03 0.7733 1.441 200 240 56.42 95.317 95.082 95.517 95.282 0.8 0.36 0.43 1.592 2.066 1.829 16.30%
556 519 520 97.148 97.052 112 211 417 784 0.5213 0.98 0.0274 25.03 1.5912 2.967 200 240 84.51 95.082 94.73 95.282 94.93 0.8 0.45 0.54 2.066 2.322 2.194 23.30%
557 520 494 97.052 97.006 134 252 551 1036 0.6888 1.295 0.0376 25.03 2.1038 3.923 200 240 105.28 94.73 94.291 94.93 94.491 0.8 0.48 0.58 2.322 2.715 2.519 26.80%
558 494 495 97.006 96.858 133 250 2051 3866 2.5638 4.8325 0.1455 24.05 7.8367 14.643 200 260 104.47 94.237 93.835 94.437 94.035 0.77 0.68 0.8 2.769 3.023 2.896 56.30%
559 495 496 96.858 96.87 81 152 2132 4018 2.665 5.0225 0.1507 24.05 8.1457 15.218 200 260 54.54 93.835 93.626 94.035 93.826 0.77 0.69 0.81 3.023 3.245 3.134 57.70%
560 505 506 97.805 97.508 87 164 87 164 0.1088 0.205 0.0058 27.42 0.3321 0.621 200 200 60.54 96.605 96.302 96.805 96.502 0.87 0.3 0.36 1.2 1.206 1.203 10.40%
561 550 551 97.401 97.57 46 87 46 87 0.0575 0.1088 0.0021 14.23 0.1746 0.328 150 160 21.61 96.251 96.116 96.401 96.266 0.81 0.28 0.33 1.15 1.454 1.302 10.50%
562 551 552 97.57 97.305 80 150 126 237 0.1575 0.2962 0.0073 25.03 0.4798 0.896 200 240 53.63 96.066 95.842 96.266 96.042 0.8 0.31 0.38 1.504 1.463 1.483 12.90%
563 552 506 97.305 97.508 49 92 175 329 0.2188 0.4112 0.0096 25.03 0.6658 1.243 200 240 24.11 95.842 95.742 96.042 95.942 0.8 0.34 0.41 1.463 1.767 1.615 15.20%
564 506 507 97.508 97.016 67 127 329 620 0.4112 0.775 0.0194 25.03 1.2532 2.344 200 240 41.64 95.742 95.568 95.942 95.768 0.8 0.42 0.5 1.767 1.448 1.607 20.70%
565 507 496 97.016 96.87 74 140 403 760 0.5037 0.95 0.0241 25.03 1.5353 2.874 200 240 48.17 95.568 95.367 95.768 95.567 0.8 0.44 0.53 1.448 1.503 1.475 22.90%
566 496 497 96.87 96.857 64 120 2599 4898 3.2487 6.1225 0.1785 22.77 9.9248 18.546 200 290 38.35 93.626 93.493 93.826 93.693 0.72 0.7 0.81 3.245 3.363 3.304 68.60%
567 497 498 96.857 96.807 81 153 2680 5051 3.35 6.3137 0.1838 22.39 10.2338 19.125 200 300 54.99 93.493 93.31 93.693 93.51 0.71 0.7 0.8 3.363 3.497 3.43 71.10%
568 498 499 96.807 96.783 97 183 2777 5234 3.4712 6.5425 0.1906 22.39 10.6044 19.818 200 300 70.23 93.31 93.076 93.51 93.276 0.71 0.7 0.8 3.497 3.707 3.602 73.20%
569 499 107 96.783 96.771 106 200 2883 5434 3.6037 6.7925 0.1982 22.39 11.0095 20.576 200 300 78.77 93.076 92.813 93.276 93.013 0.71 0.71 0.81 3.707 3.957 3.832 75.50%
570 874 875 97.791 97.67 68 129 68 129 0.085 0.1612 0.0041 14.23 0.2591 0.488 150 160 42.75 96.641 96.374 96.791 96.524 0.81 0.31 0.37 1.15 1.296 1.223 12.70%

Page 12 of 26
Sewerage Project, Begusarai Annex -A-3: Hydraulic Design of Sewer Network
NGRBA

Link ID Start End Node Upstrem Downstream Population Population Cum Cum Flow 2011 Flow 2041 Infiltration Full Flow Design Design Diameter Slope Length Upstream Downstream Upstream Downstream Full Flow Actual Actual Upstream Downstream Average Depth of
Node Ground Ground Level 2011 2041 Population Population Flow 2011 Flow 2041 Invert Invert Crown Crown Velocity Velocity Velocity Depth Depth Depth Flow
Level 2011 2041 2011 2041
m m souls souls souls souls lps lps lps lps lps lps mm 1 in m m m m m m/s m/s m/s m m m %age
571 875 876 97.67 97.655 145 273 213 402 0.2662 0.5025 0.0153 25.03 0.8141 1.523 200 240 116.16 96.324 95.84 96.524 96.04 0.8 0.37 0.44 1.346 1.815 1.58 16.70%
572 990 991 97.412 97.321 75 141 75 141 0.0938 0.1762 0.0047 14.23 0.286 0.533 150 160 48.95 96.262 95.957 96.412 96.107 0.81 0.32 0.39 1.15 1.364 1.257 13.20%
573 992 991 97.155 97.321 51 97 51 97 0.0637 0.1212 0.0025 14.23 0.1938 0.366 150 160 26.22 96.005 95.841 96.155 95.991 0.81 0.28 0.34 1.15 1.48 1.315 11.00%
574 991 983 97.321 97.397 48 91 174 329 0.2175 0.4112 0.0095 25.03 0.662 1.243 200 240 23.52 95.791 95.693 95.991 95.893 0.8 0.34 0.41 1.53 1.704 1.617 15.20%
575 1280 982 97.085 97.051 57 108 57 108 0.0712 0.135 0.0031 14.23 0.2168 0.408 150 160 31.92 95.935 95.736 96.085 95.886 0.81 0.29 0.36 1.15 1.316 1.233 11.60%
576 993 982 97.145 97.051 56 106 56 106 0.07 0.1325 0.003 14.23 0.213 0.4 150 160 31.06 95.995 95.801 96.145 95.951 0.81 0.29 0.35 1.15 1.251 1.2 11.50%
577 982 983 97.051 97.397 70 132 183 346 0.2287 0.4325 0.0103 25.03 0.6966 1.308 200 240 44.32 95.686 95.501 95.886 95.701 0.8 0.35 0.42 1.366 1.896 1.631 15.50%
578 988 983 97.4 97.397 53 100 53 100 0.0662 0.125 0.0027 14.23 0.2014 0.378 150 160 27.91 96.25 96.076 96.4 96.226 0.81 0.29 0.35 1.15 1.321 1.236 11.20%
579 983 984 97.397 97.379 44 82 454 857 0.5675 1.0712 0.0244 25.03 1.7269 3.238 200 240 19.06 95.501 95.421 95.701 95.621 0.8 0.46 0.55 1.896 1.958 1.927 24.30%
580 987 984 97.631 97.379 84 158 84 158 0.105 0.1975 0.0055 14.23 0.3205 0.598 150 160 57.44 96.481 96.122 96.631 96.272 0.81 0.33 0.4 1.15 1.257 1.204 14.00%
581 984 985 97.379 97.565 58 109 596 1124 0.745 1.405 0.0331 25.03 2.2681 4.248 200 240 32.36 95.421 95.287 95.621 95.487 0.8 0.49 0.59 1.958 2.278 2.118 27.90%
582 986 985 97.589 97.565 87 164 87 164 0.1088 0.205 0.0058 25.03 0.3321 0.621 200 240 60.58 96.389 96.136 96.589 96.336 0.8 0.28 0.34 1.2 1.429 1.314 10.90%
583 985 876 97.565 97.655 66 125 749 1413 0.9362 1.7663 0.0428 25.03 2.8516 5.342 200 240 40.86 95.287 95.116 95.487 95.316 0.8 0.53 0.63 2.278 2.539 2.409 31.40%
584 876 877 97.655 97.647 67 126 1029 1941 1.2862 2.4262 0.0622 25.03 3.9209 7.341 200 240 41.32 95.116 94.944 95.316 95.144 0.8 0.58 0.69 2.539 2.703 2.621 37.10%
585 921 922 97.433 97.426 57 108 57 108 0.0712 0.135 0.0031 14.23 0.2169 0.408 150 160 32.2 96.283 96.082 96.433 96.232 0.81 0.29 0.36 1.15 1.344 1.247 11.60%
586 922 877 97.426 97.647 90 170 147 278 0.1838 0.3475 0.0092 25.03 0.5605 1.052 200 240 63.33 96.032 95.768 96.232 95.968 0.8 0.33 0.39 1.394 1.879 1.636 14.00%
587 877 878 97.647 97.693 166 313 1342 2532 1.6775 3.165 0.0845 25.03 5.117 9.58 200 240 136.49 94.944 94.375 95.144 94.575 0.8 0.63 0.74 2.703 3.317 3.01 42.90%
588 883 884 97.402 97.484 55 103 55 103 0.0688 0.1287 0.0028 14.23 0.2091 0.389 150 160 29.54 96.252 96.067 96.402 96.217 0.81 0.29 0.35 1.15 1.417 1.284 11.40%
589 994 995 97.122 97.235 132 250 132 250 0.165 0.3125 0.01 25.03 0.505 0.948 200 240 104.11 95.922 95.488 96.122 95.688 0.8 0.32 0.38 1.2 1.747 1.473 13.30%
590 995 996 97.235 97.62 77 146 209 396 0.2612 0.495 0.015 25.03 0.7987 1.5 200 240 51.31 95.488 95.275 95.688 95.475 0.8 0.36 0.44 1.747 2.345 2.046 16.60%
591 996 884 97.62 97.484 90 169 299 565 0.3737 0.7063 0.0211 25.03 1.1423 2.14 200 240 63.22 95.275 95.011 95.475 95.211 0.8 0.4 0.49 2.345 2.473 2.409 19.80%
592 884 879 97.484 97.893 101 190 455 858 0.5687 1.0725 0.031 25.03 1.7373 3.249 200 240 73.57 95.011 94.705 95.211 94.905 0.8 0.46 0.55 2.473 3.189 2.831 24.30%
593 879 878 97.893 97.693 119 224 574 1082 0.7175 1.3525 0.0398 25.03 2.1923 4.097 200 240 91.13 94.705 94.325 94.905 94.525 0.8 0.49 0.59 3.189 3.368 3.278 27.40%
594 997 998 97.469 97.596 62 116 62 116 0.0775 0.145 0.0035 14.23 0.236 0.439 150 160 36.32 96.319 96.092 96.469 96.242 0.81 0.3 0.36 1.15 1.503 1.327 12.00%
595 1000 998 97.447 97.596 54 102 54 102 0.0675 0.1275 0.0028 14.23 0.2053 0.385 150 160 28.76 96.297 96.117 96.447 96.267 0.81 0.29 0.35 1.15 1.479 1.314 11.30%
596 998 999 97.596 97.635 43 80 159 298 0.1987 0.3725 0.008 25.03 0.6043 1.126 200 240 17.94 96.042 95.968 96.242 96.168 0.8 0.33 0.4 1.553 1.668 1.61 14.40%
597 999 878 97.635 97.693 90 169 249 467 0.3112 0.5837 0.0141 25.03 0.9478 1.765 200 240 63.1 95.968 95.705 96.168 95.905 0.8 0.38 0.46 1.668 1.988 1.828 18.00%
598 878 911 97.693 97.492 98 186 2263 4267 2.8287 5.3337 0.1454 23.6 8.6316 16.147 200 270 71.58 94.325 94.06 94.525 94.26 0.75 0.69 0.81 3.368 3.432 3.4 60.70%
599 1284 920 97.897 97.593 79 149 79 149 0.0987 0.1863 0.0051 14.23 0.3014 0.564 150 160 53.02 96.747 96.415 96.897 96.565 0.81 0.32 0.39 1.15 1.177 1.164 13.60%
600 920 911 97.593 97.492 154 291 233 440 0.2912 0.55 0.0172 25.03 0.8909 1.667 200 240 125.17 96.365 95.844 96.565 96.044 0.8 0.38 0.45 1.227 1.649 1.438 17.50%
601 911 912 97.492 97.295 58 109 2554 4816 3.1925 6.02 0.1657 22.77 9.7432 18.226 200 290 32.47 94.06 93.948 94.26 94.148 0.72 0.7 0.81 3.432 3.348 3.39 67.70%
602 912 913 97.295 97.113 74 139 2628 4955 3.285 6.1937 0.1703 22.77 10.0253 18.752 200 290 47.65 93.948 93.784 94.148 93.984 0.72 0.7 0.81 3.348 3.33 3.339 69.10%
603 914 915 97.144 97.054 84 159 84 159 0.105 0.1987 0.0056 14.23 0.3206 0.602 150 160 58.1 95.994 95.631 96.144 95.781 0.81 0.33 0.4 1.15 1.424 1.287 14.00%
604 918 915 96.879 97.054 58 110 58 110 0.0725 0.1375 0.0032 14.23 0.2207 0.416 150 160 32.99 95.729 95.523 95.879 95.673 0.81 0.3 0.36 1.15 1.531 1.341 11.70%
605 915 916 97.054 97.08 54 101 196 370 0.245 0.4625 0.0115 25.03 0.7465 1.399 200 240 28.61 95.473 95.354 95.673 95.554 0.8 0.36 0.43 1.581 1.726 1.653 16.10%
606 917 916 96.914 97.08 66 124 66 124 0.0825 0.155 0.0039 14.23 0.2514 0.469 150 160 39.95 95.764 95.514 95.914 95.664 0.81 0.31 0.37 1.15 1.566 1.358 12.40%
607 916 913 97.08 97.113 55 103 317 597 0.3962 0.7463 0.0182 25.03 1.207 2.257 200 240 29.39 95.354 95.231 95.554 95.431 0.8 0.41 0.49 1.726 1.882 1.804 20.30%
608 913 107 97.113 96.771 136 257 3081 5809 3.8512 7.2613 0.1989 23.17 11.7526 21.983 200 280 107.75 93.784 93.399 93.984 93.599 0.74 0.74 0.84 3.33 3.372 3.351 77.70%
609 107 108 96.771 96.621 82 155 8198 15456 10.2475 19.32 0.5552 68.71 31.2977 58.515 350 630 56.14 92.663 92.574 93.013 92.924 0.71 0.7 0.8 4.107 4.047 4.077 70.90%
610 108 109 96.621 96.658 70 132 8268 15588 10.335 19.485 0.5595 68.71 31.5645 59.015 350 630 44.48 92.574 92.504 92.924 92.854 0.71 0.7 0.8 4.047 4.154 4.101 71.40%
611 109 110 96.658 96.813 72 136 8340 15724 10.425 19.655 0.564 68.71 31.839 59.529 350 630 46.29 92.504 92.43 92.854 92.78 0.71 0.7 0.8 4.154 4.383 4.268 71.90%
612 504 110 97.173 96.813 78 147 78 147 0.0975 0.1837 0.005 15.22 0.2975 0.556 150 140 52.02 96.023 95.651 96.173 95.801 0.86 0.34 0.41 1.15 1.162 1.156 13.10%
613 110 111 96.813 96.844 73 137 8491 16008 10.6137 20.01 0.5735 68.17 32.4148 60.604 350 640 46.97 92.43 92.357 92.78 92.707 0.71 0.7 0.8 4.383 4.487 4.435 73.40%
614 111 112 96.844 97.281 127 240 8618 16248 10.7725 20.31 0.5831 68.17 32.9006 61.513 350 640 99.12 92.357 92.202 92.707 92.552 0.71 0.7 0.8 4.487 5.079 4.783 74.30%
615 500 501 97.818 97.744 76 143 76 143 0.095 0.1787 0.0048 14.23 0.2898 0.541 150 160 49.68 96.668 96.357 96.818 96.507 0.81 0.32 0.39 1.15 1.387 1.268 13.30%
616 501 502 97.744 97.554 79 149 155 292 0.1937 0.365 0.0099 25.03 0.5912 1.105 200 240 53.1 96.307 96.086 96.507 96.286 0.8 0.33 0.4 1.437 1.468 1.452 14.30%
617 503 502 97.252 97.554 96 181 96 181 0.12 0.2262 0.0067 25.03 0.3667 0.685 200 240 69.09 96.052 95.764 96.252 95.964 0.8 0.29 0.35 1.2 1.79 1.495 11.40%
618 502 112 97.554 97.281 71 134 322 607 0.4025 0.7587 0.021 25.03 1.2285 2.297 200 240 45.41 95.764 95.575 95.964 95.774 0.8 0.41 0.5 1.79 1.707 1.749 20.50%

Page 13 of 26
Sewerage Project, Begusarai Annex -A-3: Hydraulic Design of Sewer Network
NGRBA

Link ID Start End Node Upstrem Downstream Population Population Cum Cum Flow 2011 Flow 2041 Infiltration Full Flow Design Design Diameter Slope Length Upstream Downstream Upstream Downstream Full Flow Actual Actual Upstream Downstream Average Depth of
Node Ground Ground Level 2011 2041 Population Population Flow 2011 Flow 2041 Invert Invert Crown Crown Velocity Velocity Velocity Depth Depth Depth Flow
Level 2011 2041 2011 2041
m m souls souls souls souls lps lps lps lps lps lps mm 1 in m m m m m m/s m/s m/s m m m %age
619 112 113 97.281 97.341 97 184 9037 17039 11.2962 21.2987 0.6109 68.17 34.4996 64.507 350 640 70.51 92.202 92.092 92.552 92.442 0.71 0.71 0.81 5.079 5.249 5.164 77.50%
620 553 554 97.461 97.405 121 229 121 229 0.1512 0.2862 0.009 25.03 0.4628 0.868 200 240 93.63 96.261 95.871 96.461 96.071 0.8 0.31 0.37 1.2 1.533 1.367 12.80%
621 555 554 97.469 97.405 63 119 63 119 0.0787 0.1487 0.0036 14.23 0.2399 0.45 150 160 37.81 96.319 96.082 96.469 96.232 0.81 0.3 0.37 1.15 1.322 1.236 12.20%
622 554 113 97.405 97.341 105 198 289 546 0.3612 0.6825 0.0202 25.03 1.104 2.068 200 240 78 95.871 95.546 96.071 95.746 0.8 0.4 0.48 1.533 1.795 1.664 19.40%
623 113 114 97.341 97.622 158 298 9484 17883 11.855 22.3537 0.6435 70.41 36.2085 67.705 350 600 128.65 92.092 91.877 92.442 92.227 0.73 0.74 0.83 5.249 5.745 5.497 78.70%
624 556 557 97.335 97.522 181 343 181 343 0.2262 0.4287 0.0146 25.03 0.6933 1.301 200 240 151.36 96.135 95.504 96.335 95.704 0.8 0.35 0.42 1.2 2.018 1.609 15.50%
625 557 114 97.522 97.622 86 162 267 505 0.3337 0.6312 0.0203 25.03 1.0216 1.914 200 240 59.55 95.504 95.256 95.704 95.456 0.8 0.39 0.47 2.018 2.366 2.192 18.70%
626 114 115 97.622 97.541 45 84 9796 18472 12.245 23.09 0.6657 72.88 37.4007 69.936 350 560 19.76 91.877 91.842 92.227 92.192 0.76 0.76 0.86 5.745 5.699 5.722 78.60%
627 115 116 97.541 97.131 76 143 27026 50985 33.7825 63.7312 1.8828 151.35 86.3391 145.278 500 870 49.72 90.772 90.715 91.272 91.215 0.77 0.8 0.88 6.769 6.415 6.592 78.60%
628 934 935 97.334 97.267 53 100 53 100 0.0662 0.125 0.0027 14.23 0.2014 0.378 150 160 27.78 96.184 96.01 96.334 96.16 0.81 0.29 0.35 1.15 1.257 1.204 11.20%
629 936 935 97.624 97.267 137 258 137 258 0.1713 0.3225 0.0104 25.03 0.5242 0.978 200 240 108.25 96.424 95.973 96.624 96.173 0.8 0.32 0.39 1.2 1.294 1.247 13.50%
630 935 116 97.267 97.131 94 178 284 536 0.355 0.67 0.0197 25.03 1.0847 2.03 200 240 67.7 95.96 95.678 96.16 95.878 0.8 0.4 0.48 1.307 1.453 1.38 19.30%
631 116 932 97.131 97.194 92 173 27402 51694 34.2525 64.6175 1.9087 153.12 87.54 147.298 500 850 65.34 90.715 90.638 91.215 91.138 0.78 0.81 0.89 6.415 6.556 6.486 78.70%
632 933 932 97.305 97.194 76 143 76 143 0.095 0.1787 0.0048 14.23 0.2898 0.541 150 160 49.65 96.155 95.845 96.305 95.995 0.81 0.32 0.39 1.15 1.35 1.25 13.30%
633 932 891 97.194 97.381 94 177 27572 52014 34.465 65.0175 1.92 154.03 88.0825 148.209 500 840 66.98 90.638 90.559 91.138 91.059 0.78 0.81 0.89 6.556 6.822 6.689 78.80%
634 926 927 97.18 97.224 66 124 66 124 0.0825 0.155 0.0039 14.23 0.2514 0.469 150 160 40.3 96.03 95.778 96.18 95.928 0.81 0.31 0.37 1.15 1.446 1.298 12.40%
635 927 888 97.224 97.141 79 148 145 272 0.1812 0.34 0.009 25.03 0.5527 1.029 200 240 52.53 95.728 95.509 95.928 95.709 0.8 0.33 0.39 1.496 1.632 1.564 13.80%
636 924 925 97.055 97.269 99 187 99 187 0.1237 0.2338 0.0069 25.03 0.3782 0.708 200 240 72.05 95.855 95.555 96.055 95.755 0.8 0.29 0.35 1.2 1.715 1.457 11.60%
637 925 887 97.269 97.314 55 104 154 291 0.1925 0.3637 0.0098 25.03 0.5873 1.101 200 240 29.93 95.555 95.43 95.755 95.63 0.8 0.33 0.4 1.715 1.884 1.799 14.30%
638 885 886 97.883 97.408 100 188 100 188 0.125 0.235 0.007 31.66 0.382 0.712 200 150 72.77 96.683 96.198 96.883 96.398 1.01 0.34 0.41 1.2 1.211 1.205 10.40%
639 923 886 97.609 97.408 78 148 78 148 0.0975 0.185 0.0051 14.23 0.2976 0.56 150 160 52.37 96.459 96.132 96.609 96.282 0.81 0.32 0.39 1.15 1.276 1.213 13.50%
640 886 887 97.408 97.314 67 127 245 463 0.3062 0.5788 0.0161 25.03 0.9348 1.752 200 240 41.75 96.082 95.908 96.282 96.108 0.8 0.38 0.46 1.326 1.406 1.366 17.90%
641 887 888 97.314 97.141 64 121 463 875 0.5787 1.0938 0.0296 25.03 1.7659 3.311 200 240 38.48 95.43 95.269 95.63 95.469 0.8 0.46 0.55 1.884 1.872 1.878 24.60%
642 888 889 97.141 97.271 68 129 676 1276 0.845 1.595 0.0427 25.03 2.5777 4.828 200 240 42.67 95.269 95.092 95.469 95.292 0.8 0.51 0.62 1.872 2.18 2.026 29.80%
643 928 929 97.086 96.781 104 196 104 196 0.13 0.245 0.0074 25.03 0.3974 0.742 200 240 76.84 95.886 95.566 96.086 95.766 0.8 0.29 0.36 1.2 1.215 1.208 11.80%
644 929 930 96.781 97.206 162 306 266 502 0.3325 0.6275 0.0202 25.03 1.0177 1.903 200 240 132.56 95.566 95.014 95.766 95.214 0.8 0.39 0.47 1.215 2.192 1.704 18.70%
645 930 889 97.206 97.271 158 298 424 800 0.53 1 0.0326 25.03 1.6226 3.033 200 240 128.58 95.014 94.478 95.214 94.678 0.8 0.45 0.54 2.192 2.793 2.492 23.50%
646 889 890 97.271 97.472 131 248 1231 2324 1.5387 2.905 0.0853 25.03 4.7015 8.8 200 240 103.04 94.478 94.049 94.678 94.249 0.8 0.61 0.73 2.793 3.423 3.108 40.90%
647 890 891 97.472 97.381 136 257 1367 2581 1.7087 3.2262 0.0956 25.03 5.2219 9.774 200 240 107.59 94.049 93.601 94.249 93.801 0.8 0.63 0.75 3.423 3.78 3.602 43.40%
648 891 892 97.381 97.451 93 176 29032 54771 36.29 68.4637 2.022 206.15 92.7471 156.065 600 1240 66.59 90.459 90.405 91.059 91.005 0.73 0.71 0.8 6.922 7.046 6.984 65.00%
649 1290 948 97.609 97.661 78 148 78 148 0.0975 0.185 0.005 14.23 0.2975 0.56 150 160 52.29 96.459 96.132 96.609 96.282 0.81 0.32 0.39 1.15 1.529 1.34 13.50%
650 950 951 97.44 97.57 63 119 63 119 0.0787 0.1487 0.0036 14.23 0.2399 0.45 150 160 37.53 96.29 96.055 96.44 96.205 0.81 0.3 0.37 1.15 1.515 1.332 12.20%
651 951 948 97.57 97.661 76 143 139 262 0.1737 0.3275 0.0084 25.03 0.5297 0.991 200 240 49.96 96.005 95.797 96.205 95.997 0.8 0.32 0.39 1.565 1.865 1.715 13.60%
652 954 948 98.168 97.661 118 223 118 223 0.1475 0.2788 0.0087 29.74 0.4512 0.845 200 170 90.57 96.968 96.436 97.168 96.636 0.95 0.34 0.42 1.2 1.226 1.213 11.60%
653 948 892 97.661 97.451 105 198 440 831 0.55 1.0387 0.0297 25.03 1.6797 3.146 200 240 78 95.797 95.472 95.997 95.672 0.8 0.45 0.54 1.865 1.979 1.922 23.90%
654 892 893 97.451 98.193 115 218 29587 55820 36.9838 69.775 2.0603 205.33 94.5197 159.054 600 1250 87.93 90.405 90.335 91.005 90.935 0.73 0.71 0.8 7.046 7.858 7.452 66.10%
655 937 938 97.473 97.825 67 126 67 126 0.0837 0.1575 0.004 14.23 0.2552 0.476 150 160 41.13 96.323 96.065 96.473 96.215 0.81 0.31 0.37 1.15 1.759 1.455 12.50%
656 938 893 97.825 98.193 66 125 133 251 0.1662 0.3137 0.0079 25.03 0.5066 0.949 200 240 40.47 96.015 95.847 96.215 96.047 0.8 0.32 0.38 1.809 2.346 2.077 13.30%
657 893 17 98.193 98.557 84 159 29804 56230 37.255 70.2875 2.0737 204.51 95.2112 160.221 600 1260 58.03 90.335 90.289 90.935 90.889 0.72 0.71 0.8 7.858 8.268 8.063 66.60%
658 768 769 97.846 98.124 91 172 91 172 0.1137 0.215 0.0062 25.03 0.3475 0.651 200 240 64.54 96.646 96.377 96.846 96.577 0.8 0.28 0.34 1.2 1.747 1.473 11.10%
659 772 769 98.106 98.124 102 192 102 192 0.1275 0.24 0.0072 25.03 0.3897 0.727 200 240 74.92 96.906 96.593 97.106 96.793 0.8 0.29 0.35 1.2 1.531 1.365 11.70%
660 769 770 98.124 98.164 79 149 272 513 0.34 0.6413 0.0186 25.03 1.0386 1.942 200 240 52.9 96.377 96.157 96.577 96.357 0.8 0.39 0.47 1.747 2.007 1.877 18.80%
661 773 770 98.084 98.164 68 129 68 129 0.085 0.1612 0.0041 14.23 0.2591 0.488 150 160 42.48 96.934 96.669 97.084 96.819 0.81 0.31 0.37 1.15 1.495 1.322 12.70%
662 770 771 98.164 98.797 92 174 432 816 0.54 1.02 0.029 25.03 1.649 3.089 200 240 65.42 96.157 95.884 96.357 96.084 0.8 0.45 0.54 2.007 2.913 2.46 23.70%
663 771 16 98.797 98.431 61 114 493 930 0.6162 1.1625 0.0324 25.03 1.8811 3.52 200 240 35.24 95.884 95.737 96.084 95.937 0.8 0.47 0.56 2.913 2.694 2.803 25.30%
664 673 674 97.75 97.592 166 313 166 313 0.2075 0.3912 0.0131 25.03 0.6356 1.187 200 240 136.12 96.55 95.983 96.75 96.183 0.8 0.34 0.41 1.2 1.61 1.405 14.80%
665 707 674 97.471 97.592 145 273 145 273 0.1812 0.3413 0.0112 25.03 0.5549 1.035 200 240 115.98 96.271 95.787 96.471 95.987 0.8 0.33 0.39 1.2 1.805 1.503 13.90%
666 674 661 97.592 97.629 79 150 390 736 0.4875 0.92 0.0295 25.03 1.492 2.789 200 240 53.34 95.787 95.565 95.987 95.765 0.8 0.44 0.53 1.805 2.063 1.934 22.50%

Page 14 of 26
Sewerage Project, Begusarai Annex -A-3: Hydraulic Design of Sewer Network
NGRBA

Link ID Start End Node Upstrem Downstream Population Population Cum Cum Flow 2011 Flow 2041 Infiltration Full Flow Design Design Diameter Slope Length Upstream Downstream Upstream Downstream Full Flow Actual Actual Upstream Downstream Average Depth of
Node Ground Ground Level 2011 2041 Population Population Flow 2011 Flow 2041 Invert Invert Crown Crown Velocity Velocity Velocity Depth Depth Depth Flow
Level 2011 2041 2011 2041
m m souls souls souls souls lps lps lps lps lps lps mm 1 in m m m m m m/s m/s m/s m m m %age
667 1275 661 97.917 97.629 206 390 206 390 0.2575 0.4875 0.0169 25.03 0.7894 1.479 200 240 175.19 96.717 95.987 96.917 96.187 0.8 0.36 0.44 1.2 1.641 1.421 16.50%
668 661 662 97.629 97.517 169 318 765 1444 0.9563 1.805 0.0598 25.03 2.9285 5.475 200 240 138.97 95.565 94.986 95.765 95.186 0.8 0.53 0.64 2.063 2.531 2.297 31.80%
669 699 700 97.2 97.409 111 209 111 209 0.1388 0.2612 0.008 25.03 0.4243 0.792 200 240 83.2 96 95.654 96.2 95.854 0.8 0.3 0.36 1.2 1.756 1.478 12.20%
670 700 701 97.409 97.287 99 186 210 395 0.2625 0.4937 0.015 25.03 0.8025 1.496 200 240 71.82 95.654 95.355 95.854 95.555 0.8 0.36 0.44 1.756 1.932 1.844 16.60%
671 701 702 97.287 97.598 106 201 316 596 0.395 0.745 0.0226 25.03 1.2076 2.258 200 240 79.28 95.355 95.024 95.555 95.224 0.8 0.41 0.49 1.932 2.574 2.253 20.30%
672 702 703 97.598 97.739 70 132 386 728 0.4825 0.91 0.0269 25.03 1.4744 2.757 200 240 44.16 95.024 94.84 95.224 95.04 0.8 0.44 0.52 2.574 2.899 2.736 22.40%
673 703 704 97.739 97.771 78 146 464 874 0.58 1.0925 0.0318 25.03 1.7718 3.309 200 240 51.53 94.84 94.625 95.04 94.825 0.8 0.46 0.55 2.899 3.145 3.022 24.60%
674 704 705 97.771 97.588 87 164 551 1038 0.6887 1.2975 0.0377 25.03 2.1039 3.93 200 240 60.71 94.625 94.373 94.825 94.573 0.8 0.48 0.58 3.145 3.216 3.181 26.80%
675 705 706 97.588 97.425 71 134 622 1172 0.7775 1.465 0.0421 25.03 2.3746 4.437 200 240 45.4 94.373 94.183 94.573 94.383 0.8 0.5 0.6 3.216 3.241 3.228 28.50%
676 706 662 97.425 97.517 86 162 708 1334 0.885 1.6675 0.0478 25.03 2.7028 5.05 200 240 59.56 94.183 93.935 94.383 94.135 0.8 0.52 0.62 3.241 3.582 3.412 30.50%
677 662 663 97.517 97.541 93 176 1566 2954 1.9575 3.6925 0.114 25.03 5.9865 11.191 200 240 66.39 93.935 93.659 94.135 93.859 0.8 0.65 0.77 3.582 3.882 3.732 46.90%
678 675 676 97.654 98.011 156 295 156 295 0.195 0.3688 0.0123 25.03 0.5973 1.119 200 240 127.28 96.454 95.923 96.654 96.123 0.8 0.33 0.4 1.2 2.087 1.644 14.40%
679 676 677 98.011 98.117 56 105 212 400 0.265 0.5 0.0152 25.03 0.8102 1.515 200 240 30.55 95.923 95.796 96.123 95.996 0.8 0.36 0.44 2.087 2.321 2.204 16.70%
680 677 678 98.117 98.407 61 115 273 515 0.3413 0.6438 0.0187 25.03 1.0424 1.95 200 240 35.79 95.796 95.647 95.996 95.847 0.8 0.39 0.47 2.321 2.76 2.54 18.90%
681 685 678 98.417 98.407 63 119 63 119 0.0787 0.1487 0.0036 14.23 0.2399 0.45 150 160 37.58 97.267 97.032 97.417 97.182 0.81 0.3 0.37 1.15 1.374 1.262 12.20%
682 678 679 98.407 98.364 78 147 414 781 0.5175 0.9762 0.0273 25.03 1.5798 2.956 200 240 51.89 95.647 95.431 95.847 95.631 0.8 0.44 0.53 2.76 2.934 2.847 23.20%
683 681 682 98.421 98.296 88 167 88 167 0.11 0.2087 0.006 25.03 0.336 0.632 200 240 61.85 97.221 96.963 97.421 97.163 0.8 0.28 0.34 1.2 1.333 1.267 11.00%
684 684 683 97.776 98.007 60 113 60 113 0.075 0.1412 0.0033 14.23 0.2283 0.427 150 160 34.72 96.626 96.409 96.776 96.559 0.81 0.3 0.36 1.15 1.598 1.374 11.90%
685 683 682 98.007 98.296 116 218 176 331 0.22 0.4137 0.0119 25.03 0.6719 1.253 200 240 88.2 96.359 95.991 96.559 96.191 0.8 0.34 0.42 1.648 2.305 1.976 15.20%
686 682 679 98.296 98.364 73 138 337 636 0.4212 0.795 0.0224 25.03 1.2862 2.407 200 240 47.49 95.991 95.793 96.191 95.993 0.8 0.42 0.5 2.305 2.571 2.438 21.00%
687 679 680 98.364 97.98 59 111 810 1528 1.0125 1.91 0.0529 25.03 3.0904 5.783 200 240 33.36 95.431 95.292 95.631 95.492 0.8 0.54 0.65 2.934 2.688 2.811 32.70%
688 680 663 97.98 97.541 286 541 1096 2069 1.37 2.5862 0.0772 25.03 4.1872 7.836 200 240 251.62 95.292 94.243 95.492 94.443 0.8 0.59 0.7 2.688 3.298 2.993 38.40%
689 663 664 97.541 97.792 183 346 2845 5369 3.5562 6.7112 0.2059 22.39 10.8747 20.34 200 300 153.13 93.659 93.148 93.859 93.348 0.71 0.71 0.81 3.882 4.643 4.263 74.80%
690 686 687 98.126 97.539 146 275 146 275 0.1825 0.3438 0.0113 28.13 0.5588 1.043 200 190 116.94 96.926 96.311 97.126 96.511 0.9 0.35 0.43 1.2 1.228 1.214 13.20%
691 687 688 97.539 97.56 71 134 217 409 0.2712 0.5113 0.0157 25.03 0.8294 1.549 200 240 45.33 96.311 96.122 96.511 96.322 0.8 0.37 0.44 1.228 1.438 1.333 16.90%
692 688 664 97.56 97.792 117 221 334 630 0.4175 0.7875 0.0243 25.03 1.2768 2.387 200 240 89.25 96.122 95.75 96.322 95.95 0.8 0.42 0.5 1.438 2.041 1.74 20.90%
693 689 690 97.525 97.659 191 361 191 361 0.2387 0.4512 0.0155 25.03 0.7317 1.369 200 240 160.64 96.325 95.655 96.525 95.855 0.8 0.35 0.43 1.2 2.004 1.602 15.90%
694 692 693 97.601 97.684 279 528 279 528 0.3487 0.66 0.0236 25.03 1.0699 2.004 200 240 244.89 96.401 95.38 96.601 95.58 0.8 0.4 0.48 1.2 2.304 1.752 19.10%
695 694 693 97.675 97.684 80 150 80 150 0.1 0.1875 0.0052 14.23 0.3052 0.568 150 160 53.44 96.525 96.191 96.675 96.341 0.81 0.33 0.39 1.15 1.493 1.321 13.60%
696 693 690 97.684 97.659 87 163 446 841 0.5575 1.0512 0.0346 25.03 1.7071 3.188 200 240 60.18 95.38 95.13 95.58 95.33 0.8 0.46 0.55 2.304 2.53 2.417 24.10%
697 690 664 97.659 97.792 100 190 737 1392 0.9212 1.74 0.0572 25.03 2.8209 5.277 200 240 73.49 95.13 94.824 95.33 95.024 0.8 0.53 0.63 2.53 2.968 2.749 31.20%
698 664 665 97.792 97.798 59 112 3975 7503 4.9688 9.3787 0.2906 35.6 15.1969 28.427 250 390 34.03 93.098 93.011 93.348 93.261 0.72 0.7 0.81 4.693 4.787 4.74 67.60%
699 691 665 97.683 97.798 118 222 118 222 0.1475 0.2775 0.0087 25.03 0.4512 0.841 200 240 89.92 96.483 96.109 96.683 96.309 0.8 0.31 0.37 1.2 1.69 1.445 12.60%
700 665 666 97.798 97.624 145 274 4238 7999 5.2975 9.9987 0.3106 35.15 16.2031 30.307 250 400 116.65 93.011 92.719 93.261 92.969 0.72 0.7 0.81 4.787 4.905 4.846 71.60%
701 708 666 97.473 97.624 112 212 112 212 0.14 0.265 0.0082 25.03 0.4282 0.803 200 240 84.84 96.273 95.919 96.473 96.119 0.8 0.3 0.36 1.2 1.705 1.452 12.30%
702 666 667 97.624 97.49 252 476 4602 8687 5.7525 10.8588 0.3399 34.72 17.5974 32.916 250 410 218.93 92.719 92.185 92.969 92.435 0.71 0.71 0.8 4.905 5.305 5.105 77.70%
703 710 711 97.694 97.413 95 179 95 179 0.1187 0.2237 0.0066 25.03 0.3628 0.678 200 240 68.31 96.494 96.21 96.694 96.41 0.8 0.29 0.35 1.2 1.204 1.202 11.30%
704 711 712 97.413 97.537 82 154 177 333 0.2212 0.4162 0.0119 25.03 0.6757 1.261 200 240 55.45 96.21 95.979 96.41 96.178 0.8 0.35 0.42 1.204 1.558 1.381 15.30%
705 712 667 97.537 97.49 90 170 267 503 0.3338 0.6287 0.0181 25.03 1.0193 1.904 200 240 63.53 95.979 95.714 96.178 95.914 0.8 0.39 0.47 1.558 1.776 1.667 18.70%
706 667 668 97.49 97.67 87 164 4956 9354 6.195 11.6925 0.3637 37.06 18.9487 35.441 250 360 60.34 92.185 92.018 92.435 92.268 0.75 0.76 0.86 5.305 5.653 5.479 78.30%
707 728 729 97.415 97.318 183 345 183 345 0.2287 0.4312 0.0147 25.03 0.701 1.308 200 240 152.42 96.215 95.58 96.415 95.78 0.8 0.35 0.42 1.2 1.737 1.469 15.50%
708 730 729 97.378 97.318 97 183 97 183 0.1212 0.2287 0.0068 25.03 0.3705 0.693 200 240 70.37 96.178 95.885 96.378 96.085 0.8 0.29 0.35 1.2 1.433 1.316 11.40%
709 729 668 97.318 97.67 124 233 404 761 0.505 0.9512 0.0307 25.03 1.5457 2.884 200 240 95.69 95.58 95.181 95.78 95.381 0.8 0.44 0.53 1.737 2.489 2.113 22.90%
710 668 669 97.67 97.716 53 100 5413 10215 6.7663 12.7688 0.3972 51.65 20.6959 38.703 300 490 28.06 91.968 91.91 92.268 92.21 0.73 0.69 0.8 5.703 5.805 5.754 64.60%
711 713 669 97.729 97.716 83 157 83 157 0.1037 0.1962 0.0055 14.23 0.3167 0.594 150 160 56.92 96.579 96.224 96.729 96.374 0.81 0.33 0.4 1.15 1.492 1.321 13.90%
712 669 670 97.716 97.653 102 192 5598 10564 6.9975 13.205 0.4099 51.13 21.4024 40.025 300 500 74.81 91.91 91.761 92.21 92.061 0.72 0.69 0.8 5.805 5.893 5.849 66.60%
713 723 724 98.764 98.265 57 108 57 108 0.0712 0.135 0.0031 23.25 0.2168 0.408 150 60 31.96 97.614 97.081 97.764 97.231 1.31 0.41 0.5 1.15 1.183 1.167 9.20%
714 724 725 98.265 98.169 133 251 190 359 0.2375 0.4487 0.0132 25.03 0.7257 1.359 200 240 104.55 97.031 96.596 97.231 96.796 0.8 0.35 0.43 1.233 1.574 1.403 15.80%

Page 15 of 26
Sewerage Project, Begusarai Annex -A-3: Hydraulic Design of Sewer Network
NGRBA

Link ID Start End Node Upstrem Downstream Population Population Cum Cum Flow 2011 Flow 2041 Infiltration Full Flow Design Design Diameter Slope Length Upstream Downstream Upstream Downstream Full Flow Actual Actual Upstream Downstream Average Depth of
Node Ground Ground Level 2011 2041 Population Population Flow 2011 Flow 2041 Invert Invert Crown Crown Velocity Velocity Velocity Depth Depth Depth Flow
Level 2011 2041 2011 2041
m m souls souls souls souls lps lps lps lps lps lps mm 1 in m m m m m m/s m/s m/s m m m %age
715 725 726 98.169 98.119 73 137 263 496 0.3287 0.62 0.0177 25.03 1.0039 1.878 200 240 46.94 96.596 96.4 96.796 96.6 0.8 0.39 0.47 1.574 1.719 1.646 18.50%
716 767 726 97.894 98.119 106 200 106 200 0.1325 0.25 0.0076 25.03 0.4051 0.758 200 240 78.71 96.694 96.366 96.894 96.566 0.8 0.3 0.36 1.2 1.753 1.476 11.90%
717 726 727 98.119 97.918 139 262 508 958 0.635 1.1975 0.0359 25.03 1.9409 3.628 200 240 110.51 96.366 95.906 96.566 96.106 0.8 0.47 0.57 1.753 2.013 1.883 25.70%
718 727 670 97.918 97.653 73 137 581 1095 0.7262 1.3687 0.0405 25.03 2.2192 4.147 200 240 46.84 95.906 95.711 96.106 95.911 0.8 0.49 0.59 2.013 1.943 1.978 27.50%
719 670 671 97.653 98.029 116 219 6295 11878 7.8688 14.8475 0.4589 50.14 24.0651 45.001 300 520 88.41 91.761 91.591 92.061 91.891 0.71 0.7 0.8 5.893 6.438 6.165 74.00%
720 774 775 98.054 97.998 72 136 72 136 0.09 0.17 0.0045 14.23 0.2745 0.514 150 160 46.21 96.904 96.615 97.054 96.765 0.81 0.32 0.38 1.15 1.383 1.267 13.00%
721 776 775 97.929 97.998 64 120 64 120 0.08 0.15 0.0037 14.23 0.2437 0.454 150 160 37.99 96.779 96.542 96.929 96.692 0.81 0.3 0.37 1.15 1.456 1.303 12.20%
722 775 671 97.998 98.029 89 169 225 425 0.2813 0.5313 0.0142 25.03 0.8579 1.608 200 240 62.88 96.492 96.23 96.692 96.43 0.8 0.37 0.45 1.506 1.799 1.653 17.20%
723 671 672 98.029 98.108 84 159 6604 12462 8.255 15.5775 0.4786 50.14 25.2436 47.211 300 520 57.85 91.591 91.479 91.891 91.779 0.71 0.71 0.81 6.438 6.629 6.533 77.20%
724 672 15 98.108 97.847 124 235 6728 12697 8.41 15.8712 0.4879 50.14 25.7179 48.102 300 520 96.38 91.479 91.294 91.779 91.594 0.71 0.71 0.81 6.629 6.553 6.591 78.50%
725 709 72 97.78 97.917 92 174 92 174 0.115 0.2175 0.0063 25.03 0.3513 0.659 200 240 65.59 96.58 96.307 96.78 96.507 0.8 0.28 0.34 1.2 1.611 1.405 11.20%
726 628 629 97.841 97.728 63 118 63 118 0.0787 0.1475 0.0036 14.23 0.2398 0.446 150 160 37.16 96.691 96.459 96.841 96.609 0.81 0.3 0.37 1.15 1.269 1.21 12.10%
727 629 630 97.728 97.577 59 111 122 229 0.1525 0.2862 0.0068 25.03 0.4643 0.866 200 240 33.53 96.409 96.269 96.609 96.469 0.8 0.31 0.37 1.319 1.308 1.314 12.70%
728 630 631 97.577 97.453 73 138 195 367 0.2438 0.4588 0.0114 25.03 0.7426 1.388 200 240 47.25 96.269 96.072 96.469 96.272 0.8 0.36 0.43 1.308 1.381 1.345 16.00%
729 631 632 97.453 97.448 46 87 241 454 0.3013 0.5675 0.0134 25.03 0.9172 1.716 200 240 21.17 96.072 95.984 96.272 96.184 0.8 0.38 0.46 1.381 1.464 1.422 17.70%
730 636 637 97.982 97.502 155 293 155 293 0.1937 0.3662 0.0122 25.03 0.5934 1.111 200 240 126.07 96.782 96.257 96.982 96.457 0.8 0.33 0.4 1.2 1.246 1.223 14.40%
731 637 638 97.502 97.408 59 110 214 403 0.2675 0.5037 0.0154 25.03 0.8179 1.527 200 240 33.19 96.257 96.118 96.457 96.318 0.8 0.37 0.44 1.246 1.289 1.268 16.80%
732 640 641 97.593 97.479 93 175 93 175 0.1163 0.2188 0.0064 25.03 0.3551 0.663 200 240 66.25 96.393 96.117 96.593 96.317 0.8 0.28 0.34 1.2 1.361 1.281 11.20%
733 641 642 97.479 97.384 48 90 141 265 0.1762 0.3313 0.0086 25.03 0.5373 1.002 200 240 22.7 96.117 96.023 96.317 96.223 0.8 0.32 0.39 1.361 1.361 1.361 13.70%
734 643 642 97.643 97.384 106 201 106 201 0.1325 0.2512 0.0076 25.03 0.4051 0.761 200 240 79.29 96.443 96.112 96.643 96.312 0.8 0.3 0.36 1.2 1.272 1.236 12.00%
735 642 638 97.384 97.408 55 103 302 569 0.3775 0.7112 0.0191 25.03 1.1516 2.153 200 240 29.44 96.023 95.9 96.223 96.1 0.8 0.4 0.49 1.361 1.507 1.434 19.80%
736 638 639 97.408 97.428 53 100 569 1072 0.7112 1.34 0.0371 25.03 2.1709 4.057 200 240 28 95.9 95.784 96.1 95.984 0.8 0.49 0.59 1.507 1.645 1.576 27.20%
737 644 639 97.512 97.428 58 109 58 109 0.0725 0.1363 0.0032 14.23 0.2207 0.412 150 160 32.69 96.362 96.157 96.512 96.307 0.81 0.3 0.36 1.15 1.271 1.21 11.70%
738 639 632 97.428 97.448 44 83 671 1264 0.8387 1.58 0.0422 25.03 2.5584 4.782 200 240 19.4 95.784 95.703 95.984 95.903 0.8 0.51 0.61 1.645 1.745 1.695 29.60%
739 632 633 97.448 97.886 76 144 988 1862 1.235 2.3275 0.0604 25.03 3.7654 7.043 200 240 50.34 95.703 95.493 95.903 95.693 0.8 0.57 0.68 1.745 2.393 2.069 36.30%
740 634 633 97.868 97.886 63 119 63 119 0.0787 0.1487 0.0036 14.23 0.2399 0.45 150 160 37.42 96.718 96.484 96.868 96.634 0.81 0.3 0.37 1.15 1.402 1.276 12.20%
741 633 635 97.886 98.172 46 87 1097 2068 1.3713 2.585 0.0661 25.03 4.1799 7.821 200 240 21.51 95.493 95.403 95.693 95.603 0.8 0.59 0.7 2.393 2.769 2.581 38.40%
742 635 602 98.172 98.106 89 167 1186 2235 1.4825 2.7938 0.0721 25.03 4.5196 8.453 200 240 62.08 95.403 95.145 95.603 95.345 0.8 0.6 0.72 2.769 2.961 2.865 40.00%
743 623 624 98.524 98.348 60 113 60 113 0.075 0.1412 0.0033 14.23 0.2283 0.427 150 160 34.58 97.374 97.158 97.524 97.308 0.81 0.3 0.36 1.15 1.189 1.17 11.90%
744 624 625 98.348 98.065 132 249 192 362 0.24 0.4525 0.0134 25.03 0.7334 1.371 200 240 103.94 97.108 96.675 97.308 96.875 0.8 0.35 0.43 1.239 1.39 1.315 15.90%
745 625 626 98.065 98.11 53 100 245 462 0.3062 0.5775 0.016 25.03 0.9348 1.749 200 240 27.76 96.675 96.559 96.875 96.759 0.8 0.38 0.46 1.39 1.55 1.47 17.90%
746 626 627 98.11 98.252 105 198 350 660 0.4375 0.825 0.0235 25.03 1.336 2.499 200 240 77.83 96.559 96.235 96.759 96.435 0.8 0.42 0.51 1.55 2.017 1.784 21.30%
747 627 600 98.252 98.101 114 215 464 875 0.58 1.0938 0.0319 25.03 1.7719 3.313 200 240 86.51 96.235 95.875 96.435 96.075 0.8 0.46 0.55 2.017 2.226 2.121 24.60%
748 650 651 97.341 97.332 114 215 114 215 0.1425 0.2687 0.0083 25.03 0.4358 0.815 200 240 86.39 96.141 95.781 96.341 95.981 0.8 0.3 0.37 1.2 1.551 1.376 12.40%
749 695 651 97.447 97.332 189 357 189 357 0.2362 0.4462 0.0153 25.03 0.7241 1.354 200 240 158.73 96.247 95.586 96.447 95.786 0.8 0.35 0.42 1.2 1.746 1.473 15.80%
750 651 652 97.332 97.372 66 125 369 697 0.4613 0.8712 0.0275 25.03 1.4113 2.641 200 240 40.48 95.586 95.417 95.786 95.617 0.8 0.43 0.52 1.746 1.955 1.851 21.90%
751 696 697 97.515 97.416 134 253 134 253 0.1675 0.3162 0.0102 25.03 0.5127 0.959 200 240 105.63 96.315 95.875 96.515 96.075 0.8 0.32 0.38 1.2 1.541 1.37 13.40%
752 698 697 97.448 97.416 103 194 103 194 0.1287 0.2425 0.0073 25.03 0.3936 0.735 200 240 75.75 96.248 95.933 96.448 96.133 0.8 0.29 0.35 1.2 1.483 1.342 11.80%
753 697 652 97.416 97.372 89 167 326 614 0.4075 0.7675 0.0235 25.03 1.246 2.326 200 240 62.23 95.875 95.615 96.075 95.815 0.8 0.41 0.5 1.541 1.756 1.649 20.60%
754 652 653 97.372 97.387 80 151 775 1462 0.9688 1.8275 0.0562 25.03 2.9625 5.539 200 240 53.78 95.417 95.193 95.617 95.393 0.8 0.53 0.64 1.955 2.194 2.074 32.00%
755 657 658 97.577 97.486 79 150 79 150 0.0987 0.1875 0.0051 14.23 0.3014 0.568 150 160 53.24 96.427 96.095 96.577 96.245 0.81 0.32 0.39 1.15 1.391 1.271 13.60%
756 659 658 97.529 97.486 125 236 125 236 0.1563 0.295 0.0094 25.03 0.4781 0.894 200 240 97.15 96.329 95.925 96.529 96.125 0.8 0.31 0.38 1.2 1.561 1.381 12.90%
757 658 653 97.486 97.387 89 167 293 553 0.3662 0.6912 0.0205 25.03 1.1192 2.094 200 240 62.1 95.925 95.666 96.125 95.866 0.8 0.4 0.48 1.561 1.721 1.641 19.60%
758 653 654 97.387 97.401 55 103 1123 2118 1.4038 2.6475 0.0796 25.03 4.2908 8.022 200 240 29.69 95.193 95.069 95.393 95.269 0.8 0.6 0.71 2.194 2.332 2.263 38.90%
759 660 654 97.386 97.401 66 125 66 125 0.0825 0.1563 0.0039 14.23 0.2514 0.473 150 160 40.77 96.236 95.981 96.386 96.131 0.81 0.31 0.37 1.15 1.42 1.285 12.50%
760 654 655 97.401 97.492 149 281 1338 2524 1.6725 3.155 0.0951 25.03 5.1126 9.56 200 240 120.03 95.069 94.569 95.269 94.769 0.8 0.63 0.74 2.332 2.923 2.627 42.90%
761 655 656 97.492 97.416 48 91 1386 2615 1.7325 3.2687 0.0973 25.03 5.2948 9.904 200 240 23.26 94.569 94.472 94.769 94.672 0.8 0.63 0.75 2.923 2.944 2.933 43.70%
762 656 600 97.416 98.101 107 201 1493 2816 1.8662 3.52 0.105 25.03 5.7038 10.665 200 240 79.47 94.472 94.141 94.672 94.341 0.8 0.65 0.76 2.944 3.96 3.452 45.60%

Page 16 of 26
Sewerage Project, Begusarai Annex -A-3: Hydraulic Design of Sewer Network
NGRBA

Link ID Start End Node Upstrem Downstream Population Population Cum Cum Flow 2011 Flow 2041 Infiltration Full Flow Design Design Diameter Slope Length Upstream Downstream Upstream Downstream Full Flow Actual Actual Upstream Downstream Average Depth of
Node Ground Ground Level 2011 2041 Population Population Flow 2011 Flow 2041 Invert Invert Crown Crown Velocity Velocity Velocity Depth Depth Depth Flow
Level 2011 2041 2011 2041
m m souls souls souls souls lps lps lps lps lps lps mm 1 in m m m m m m/s m/s m/s m m m %age
763 647 648 97.106 97.168 88 165 88 165 0.11 0.2062 0.0059 25.03 0.3359 0.625 200 240 61.17 95.906 95.651 96.106 95.851 0.8 0.28 0.34 1.2 1.517 1.358 10.90%
764 648 649 97.168 97.383 116 219 204 384 0.255 0.48 0.0145 25.03 0.7795 1.454 200 240 88.66 95.651 95.281 95.851 95.481 0.8 0.36 0.43 1.517 2.102 1.809 16.40%
765 649 599 97.383 98.031 115 216 319 600 0.3988 0.75 0.0229 25.03 1.2191 2.273 200 240 87.1 95.281 94.918 95.481 95.118 0.8 0.41 0.5 2.102 3.113 2.607 20.40%
766 352 353 98.185 98.18 119 225 119 225 0.1487 0.2813 0.0088 25.03 0.4551 0.853 200 240 91.69 96.985 96.603 97.185 96.803 0.8 0.31 0.37 1.2 1.577 1.388 12.60%
767 435 353 98.025 98.18 117 221 117 221 0.1462 0.2763 0.0086 25.03 0.4474 0.837 200 240 89.42 96.825 96.452 97.025 96.652 0.8 0.31 0.37 1.2 1.727 1.464 12.50%
768 353 354 98.18 98.146 117 221 353 667 0.4412 0.8338 0.0261 25.03 1.3499 2.527 200 240 89.73 96.452 96.078 96.652 96.278 0.8 0.42 0.51 1.727 2.068 1.898 21.50%
769 417 354 98.044 98.146 104 196 104 196 0.13 0.245 0.0074 25.03 0.3974 0.742 200 240 77.02 96.844 96.523 97.044 96.723 0.8 0.29 0.36 1.2 1.623 1.412 11.80%
770 354 355 98.146 98.136 63 119 520 982 0.65 1.2275 0.0372 25.03 1.9872 3.72 200 240 37.57 96.078 95.922 96.278 96.122 0.8 0.48 0.57 2.068 2.214 2.141 26.00%
771 416 355 98.031 98.136 104 196 104 196 0.13 0.245 0.0074 25.03 0.3974 0.742 200 240 76.73 96.831 96.511 97.031 96.711 0.8 0.29 0.36 1.2 1.625 1.413 11.80%
772 355 356 98.136 98.082 201 380 825 1558 1.0313 1.9475 0.061 25.03 3.1548 5.904 200 240 170.39 95.922 95.212 96.122 95.412 0.8 0.54 0.65 2.214 2.87 2.542 33.10%
773 454 356 97.922 98.082 108 203 108 203 0.135 0.2537 0.0078 25.03 0.4128 0.769 200 240 80.48 96.722 96.387 96.922 96.587 0.8 0.3 0.36 1.2 1.695 1.448 12.00%
774 356 357 98.082 98.192 117 221 1050 1982 1.3125 2.4775 0.0774 25.03 4.0149 7.51 200 240 89.59 95.212 94.839 95.412 95.039 0.8 0.58 0.7 2.87 3.354 3.112 37.60%
775 1274 358 98.391 98.298 172 325 172 325 0.215 0.4063 0.0137 25.03 0.6587 1.232 200 240 142.42 97.191 96.597 97.391 96.797 0.8 0.34 0.41 1.2 1.7 1.45 15.10%
776 358 357 98.298 98.192 186 351 358 676 0.4475 0.845 0.0287 25.03 1.3712 2.564 200 240 155.58 96.597 95.949 96.797 96.149 0.8 0.43 0.51 1.7 2.243 1.972 21.60%
777 357 598 98.192 98.191 47 89 1455 2747 1.8188 3.4337 0.1083 25.03 5.5645 10.41 200 240 22.18 94.839 94.746 95.039 94.946 0.8 0.64 0.76 3.354 3.445 3.4 45.00%
778 598 599 98.191 98.031 156 294 1611 3041 2.0138 3.8012 0.1205 25.03 6.1617 11.524 200 240 126.53 94.746 94.219 94.946 94.419 0.8 0.66 0.78 3.445 3.812 3.629 47.70%
779 599 600 98.031 98.101 222 420 2152 4061 2.69 5.0763 0.1617 24.05 8.2317 15.39 200 260 190.52 94.219 93.486 94.419 93.686 0.77 0.69 0.81 3.812 4.614 4.213 58.10%
780 600 601 98.101 98.099 165 311 4274 8063 5.3425 10.0788 0.3117 35.15 16.3392 30.548 250 400 135.15 93.436 93.098 93.686 93.348 0.72 0.7 0.81 4.664 5.001 4.833 72.10%
781 601 602 98.099 98.106 130 245 4404 8308 5.505 10.385 0.3215 34.72 16.8365 31.476 250 410 101.57 93.098 92.851 93.348 93.101 0.71 0.7 0.8 5.001 5.255 5.128 74.60%
782 602 603 98.106 98.283 113 213 5703 10756 7.1288 13.445 0.4018 51.13 21.788 40.737 300 500 85.21 92.801 92.63 93.101 92.93 0.72 0.69 0.8 5.305 5.653 5.479 67.50%
783 615 612 97.375 97.336 64 120 64 120 0.08 0.15 0.0037 14.23 0.2437 0.454 150 160 37.99 96.225 95.987 96.375 96.137 0.81 0.3 0.37 1.15 1.349 1.25 12.20%
784 609 610 97.77 97.421 138 261 138 261 0.1725 0.3262 0.0106 25.03 0.5281 0.989 200 240 109.79 96.57 96.113 96.77 96.313 0.8 0.32 0.39 1.2 1.309 1.254 13.60%
785 610 611 97.421 97.294 113 212 251 473 0.3137 0.5912 0.0188 25.03 0.9601 1.793 200 240 85.15 96.113 95.758 96.313 95.958 0.8 0.38 0.46 1.309 1.536 1.422 18.10%
786 611 612 97.294 97.336 57 107 308 580 0.385 0.725 0.0218 25.03 1.1768 2.197 200 240 31.47 95.758 95.627 95.958 95.827 0.8 0.41 0.49 1.536 1.709 1.623 20.00%
787 612 603 97.336 98.283 176 333 548 1033 0.685 1.2912 0.0396 25.03 2.0946 3.913 200 240 146.43 95.627 95.017 95.827 95.217 0.8 0.48 0.58 1.709 3.266 2.488 26.70%
788 603 604 98.283 98.297 55 104 6306 11893 7.8825 14.8663 0.4443 50.14 24.0918 45.043 300 520 29.93 92.63 92.573 92.93 92.873 0.71 0.7 0.8 5.653 5.724 5.688 74.10%
789 613 604 97.297 98.297 166 313 166 313 0.2075 0.3912 0.0131 25.03 0.6356 1.187 200 240 136.31 96.097 95.529 96.297 95.729 0.8 0.34 0.41 1.2 2.768 1.984 14.80%
790 604 605 98.297 98.425 108 204 6580 12410 8.225 15.5125 0.4652 50.14 25.1402 47.003 300 520 80.86 92.573 92.417 92.873 92.717 0.71 0.71 0.81 5.724 6.008 5.866 76.90%
791 614 605 97.412 98.425 168 318 168 318 0.21 0.3975 0.0134 25.03 0.6434 1.206 200 240 138.93 96.212 95.634 96.412 95.834 0.8 0.34 0.41 1.2 2.791 1.996 14.90%
792 605 606 98.425 98.348 191 360 6939 13088 8.6738 16.36 0.4941 51.65 26.5153 49.574 300 490 160.15 92.417 92.09 92.717 92.39 0.73 0.74 0.83 6.008 6.258 6.133 78.60%
793 606 616 98.348 98.357 40 75 6979 13163 8.7238 16.4538 0.4956 52.18 26.6668 49.857 300 480 15.37 92.09 92.058 92.39 92.358 0.74 0.74 0.84 6.258 6.299 6.278 78.20%
794 616 645 98.357 98.734 63 118 7042 13281 8.8025 16.6012 0.4992 52.18 26.9067 50.303 300 480 37.37 92.058 91.98 92.358 92.28 0.74 0.74 0.84 6.299 6.754 6.526 78.90%
795 645 69 98.734 98.219 57 107 7099 13388 8.8738 16.735 0.5022 52.74 27.1234 50.707 300 470 31.49 91.98 91.913 92.28 92.213 0.75 0.75 0.85 6.754 6.305 6.53 78.70%
796 69 70 98.219 98.077 115 216 7214 13604 9.0175 17.005 0.5106 53.9 27.5631 51.526 300 450 87.2 91.913 91.72 92.213 92.02 0.76 0.77 0.87 6.305 6.357 6.331 78.30%
797 70 71 98.077 97.889 89 168 7303 13772 9.1288 17.215 0.5167 70.41 27.9029 52.162 350 600 62.7 91.67 91.565 92.02 91.915 0.73 0.69 0.8 6.407 6.324 6.366 64.10%
798 71 72 97.889 97.917 78 146 7381 13918 9.2263 17.3975 0.5216 70.41 28.2004 52.714 350 600 51.57 91.565 91.479 91.915 91.829 0.73 0.69 0.8 6.324 6.438 6.381 64.50%
799 72 15 97.917 97.847 174 328 7647 14420 9.5588 18.025 0.5418 69.83 29.2181 54.617 350 610 143.89 91.479 91.243 91.829 91.593 0.73 0.69 0.8 6.438 6.604 6.521 66.60%
800 15 16 97.847 98.431 159 300 14534 27417 18.1675 34.2713 1.0423 89.91 55.5448 86.72 400 750 129.7 91.193 91.02 91.593 91.42 0.72 0.75 0.81 6.654 7.411 7.032 78.90%
801 16 17 98.431 98.557 163 308 15190 28655 18.9875 35.8187 1.0875 114.94 58.05 90.634 450 860 133.51 90.97 90.815 91.42 91.265 0.72 0.72 0.8 7.461 7.742 7.601 66.90%
802 17 18 98.557 97.369 148 280 45800 86405 57.25 108.0062 3.216 272.06 146.341 246.23 700 1620 119.61 90.189 90.115 90.889 90.815 0.71 0.72 0.8 8.368 7.254 7.811 74.50%
803 18 19 97.369 97.317 131 248 46274 87301 57.8425 109.1262 3.2467 272.06 147.8529 248.781 700 1620 103 90.115 90.051 90.815 90.751 0.71 0.72 0.8 7.254 7.265 7.26 75.20%
804 19 20 97.317 97.464 72 135 46629 87969 58.2862 109.9612 3.2706 272.06 148.9862 250.683 700 1620 45.93 90.051 90.023 90.751 90.723 0.71 0.72 0.8 7.265 7.442 7.353 75.70%
805 20 21 97.464 97.47 81 152 46710 88121 58.3875 110.1512 3.2759 272.06 149.2446 251.116 700 1620 54.35 90.023 89.989 90.723 90.689 0.71 0.72 0.8 7.442 7.481 7.461 75.80%
806 21 22 97.47 97.153 213 402 46923 88523 58.6537 110.6537 3.2934 271.23 149.9277 252.264 700 1630 181.73 89.989 89.878 90.689 90.578 0.7 0.72 0.8 7.481 7.275 7.378 76.30%
807 22 23 97.153 97.144 60 113 80728 152327 100.91 190.4087 5.6922 450.22 232.7397 434.112 900 2260 34.53 89.678 89.663 90.578 90.563 0.71 0.71 0.81 7.475 7.482 7.479 78.90%
808 821 23 97.164 97.144 100 188 100 188 0.125 0.235 0.007 25.03 0.382 0.712 200 240 72.62 95.964 95.661 96.164 95.861 0.8 0.29 0.35 1.2 1.483 1.342 11.60%
809 23 24 97.144 97.214 132 249 80960 152764 101.2 190.955 5.7092 451.22 233.4091 435.358 900 2250 103.49 89.663 89.617 90.563 90.517 0.71 0.72 0.81 7.482 7.598 7.54 79.00%
810 860 861 97.187 97.202 65 123 65 123 0.0812 0.1538 0.0038 14.23 0.2476 0.465 150 160 39.45 96.037 95.79 96.187 95.94 0.81 0.31 0.37 1.15 1.412 1.281 12.40%

Page 17 of 26
Sewerage Project, Begusarai Annex -A-3: Hydraulic Design of Sewer Network
NGRBA

Link ID Start End Node Upstrem Downstream Population Population Cum Cum Flow 2011 Flow 2041 Infiltration Full Flow Design Design Diameter Slope Length Upstream Downstream Upstream Downstream Full Flow Actual Actual Upstream Downstream Average Depth of
Node Ground Ground Level 2011 2041 Population Population Flow 2011 Flow 2041 Invert Invert Crown Crown Velocity Velocity Velocity Depth Depth Depth Flow
Level 2011 2041 2011 2041
m m souls souls souls souls lps lps lps lps lps lps mm 1 in m m m m m m/s m/s m/s m m m %age
811 861 855 97.202 97.407 85 161 150 284 0.1875 0.355 0.0095 25.03 0.572 1.074 200 240 58.88 95.74 95.495 95.94 95.695 0.8 0.33 0.4 1.462 1.912 1.687 14.10%
812 859 854 97 97.273 210 397 210 397 0.2625 0.4963 0.0172 25.03 0.8047 1.506 200 240 178.78 95.8 95.055 96 95.255 0.8 0.36 0.44 1.2 2.218 1.709 16.60%
813 853 854 97.55 97.273 133 251 133 251 0.1662 0.3137 0.0101 25.03 0.5089 0.951 200 240 104.72 96.35 95.914 96.55 96.114 0.8 0.32 0.38 1.2 1.359 1.279 13.30%
814 854 855 97.273 97.407 96 181 439 829 0.5487 1.0362 0.034 25.03 1.6803 3.143 200 240 69.22 95.055 94.766 95.255 94.966 0.8 0.45 0.54 2.218 2.641 2.429 23.90%
815 855 856 97.407 97.499 93 175 682 1288 0.8525 1.61 0.0499 25.03 2.6074 4.88 200 240 66.21 94.766 94.49 94.966 94.69 0.8 0.52 0.62 2.641 3.009 2.825 29.90%
816 862 863 96.794 96.845 115 218 115 218 0.1437 0.2725 0.0085 25.03 0.4397 0.826 200 240 87.77 95.594 95.228 95.794 95.428 0.8 0.3 0.37 1.2 1.617 1.408 12.50%
817 864 863 97.091 96.845 58 109 58 109 0.0725 0.1363 0.0031 15.79 0.2206 0.412 150 130 32.36 95.941 95.693 96.091 95.843 0.89 0.32 0.38 1.15 1.152 1.151 11.10%
818 863 865 96.845 96.801 55 103 228 430 0.285 0.5375 0.0144 25.03 0.8694 1.627 200 240 29.64 95.228 95.105 95.428 95.305 0.8 0.37 0.45 1.617 1.696 1.657 17.30%
819 865 866 96.801 97.32 70 133 298 563 0.3725 0.7038 0.0188 25.03 1.1363 2.13 200 240 44.7 95.105 94.918 95.305 95.118 0.8 0.4 0.49 1.696 2.402 2.049 19.70%
820 866 856 97.32 97.499 66 124 364 687 0.455 0.8587 0.0227 25.03 1.3877 2.599 200 240 40.39 94.918 94.75 95.118 94.95 0.8 0.43 0.51 2.402 2.749 2.576 21.80%
821 856 857 97.499 97.562 89 168 1135 2143 1.4187 2.6788 0.0786 25.03 4.3348 8.115 200 240 62.61 94.49 94.23 94.69 94.43 0.8 0.6 0.71 3.009 3.332 3.171 39.20%
822 857 858 97.562 97.361 110 208 1245 2351 1.5562 2.9388 0.0866 25.03 4.7553 8.903 200 240 83.01 94.23 93.884 94.43 94.084 0.8 0.61 0.73 3.332 3.477 3.405 41.20%
823 1040 1041 96.576 96.448 116 219 116 219 0.145 0.2738 0.0085 25.03 0.4435 0.83 200 240 88.54 95.376 95.007 95.576 95.207 0.8 0.3 0.37 1.2 1.441 1.32 12.50%
824 1073 1074 96.861 96.869 106 200 106 200 0.1325 0.25 0.0076 25.03 0.4051 0.758 200 240 78.92 95.661 95.332 95.861 95.532 0.8 0.3 0.36 1.2 1.537 1.369 11.90%
825 1074 1041 96.869 96.448 85 159 191 359 0.2387 0.4487 0.0132 25.03 0.7295 1.359 200 240 58.21 95.332 95.09 95.532 95.29 0.8 0.35 0.43 1.537 1.359 1.448 15.80%
826 1041 1042 96.448 96.469 70 132 377 710 0.4712 0.8875 0.0261 25.03 1.4398 2.689 200 240 44.44 95.007 94.822 95.207 95.022 0.8 0.43 0.52 1.441 1.646 1.544 22.10%
827 1042 1043 96.469 96.473 58 109 435 819 0.5437 1.0237 0.0292 25.03 1.6605 3.1 200 240 32.71 94.822 94.686 95.022 94.886 0.8 0.45 0.54 1.646 1.787 1.717 23.80%
828 1043 1044 96.473 96.618 80 151 515 970 0.6437 1.2125 0.0344 25.03 1.9657 3.672 200 240 53.95 94.686 94.461 94.886 94.661 0.8 0.47 0.57 1.787 2.156 1.972 25.90%
829 1044 1028 96.618 96.642 65 123 580 1093 0.725 1.3663 0.0382 25.03 2.2132 4.137 200 240 39.64 94.461 94.296 94.661 94.496 0.8 0.49 0.59 2.156 2.346 2.251 27.50%
830 1046 1030 96.426 96.293 93 176 93 176 0.1163 0.22 0.0064 25.03 0.3552 0.666 200 240 66.62 95.226 94.949 95.426 95.149 0.8 0.28 0.34 1.2 1.344 1.272 11.20%
831 1045 1031 96.49 96.207 113 212 113 212 0.1412 0.265 0.0082 25.03 0.432 0.803 200 240 85.12 95.29 94.936 95.49 95.136 0.8 0.3 0.36 1.2 1.271 1.236 12.30%
832 1047 1032 96.23 96.101 69 130 69 130 0.0862 0.1625 0.0042 14.23 0.2629 0.492 150 160 43.48 95.08 94.808 95.23 94.958 0.81 0.31 0.38 1.15 1.293 1.221 12.70%
833 1039 1038 96.859 96.276 79 148 79 148 0.0987 0.185 0.0051 18.98 0.3013 0.56 150 90 52.51 95.709 95.126 95.859 95.276 1.07 0.4 0.48 1.15 1.15 1.15 11.80%
834 1038 1037 96.276 96.072 50 94 129 242 0.1612 0.3025 0.0075 35.4 0.4912 0.915 200 120 25.1 95.076 94.866 95.276 95.066 1.13 0.4 0.48 1.2 1.206 1.203 11.10%
835 1037 1036 96.072 96.159 56 105 185 347 0.2312 0.4338 0.0104 25.03 0.7042 1.312 200 240 30.53 94.866 94.739 95.066 94.939 0.8 0.35 0.42 1.206 1.42 1.313 15.60%
836 1036 1035 96.159 96.041 43 81 228 428 0.285 0.535 0.0122 25.03 0.8672 1.617 200 240 18.51 94.739 94.662 94.939 94.862 0.8 0.37 0.45 1.42 1.379 1.399 17.20%
837 1048 1049 96.531 96.33 66 125 66 125 0.0825 0.1563 0.0039 14.23 0.2514 0.473 150 160 40.85 95.381 95.126 95.531 95.276 0.81 0.31 0.37 1.15 1.204 1.177 12.50%
838 1056 1055 96.331 96.313 115 217 115 217 0.1437 0.2712 0.0084 25.03 0.4397 0.822 200 240 87.59 95.131 94.766 95.331 94.966 0.8 0.3 0.37 1.2 1.547 1.374 12.40%
839 1058 1059 96.042 96.166 95 180 95 180 0.1187 0.225 0.0066 25.03 0.3629 0.682 200 240 68.6 94.842 94.556 95.042 94.756 0.8 0.29 0.35 1.2 1.609 1.405 11.30%
840 1059 1055 96.166 96.313 85 160 180 340 0.225 0.425 0.0123 25.03 0.6873 1.287 200 240 58.72 94.556 94.312 94.756 94.512 0.8 0.35 0.42 1.609 2.001 1.805 15.40%
841 1055 1054 96.313 96.364 75 142 370 699 0.4625 0.8737 0.0255 25.03 1.413 2.647 200 240 49.27 94.312 94.106 94.512 94.306 0.8 0.43 0.52 2.001 2.258 2.13 22.00%
842 1054 1053 96.364 96.505 98 186 468 885 0.585 1.1062 0.0324 25.03 1.7874 3.351 200 240 71.57 94.106 93.808 94.306 94.008 0.8 0.46 0.55 2.258 2.697 2.477 24.70%
843 1062 1053 96.504 96.505 106 200 106 200 0.1325 0.25 0.0076 25.03 0.4051 0.758 200 240 78.6 95.304 94.976 95.504 95.176 0.8 0.3 0.36 1.2 1.529 1.364 11.90%
844 1053 1052 96.505 96.648 87 164 661 1249 0.8262 1.5612 0.0458 25.03 2.5245 4.73 200 240 60.48 93.808 93.556 94.008 93.756 0.8 0.51 0.61 2.697 3.092 2.894 29.50%
845 1061 1052 96.384 96.648 105 198 105 198 0.1312 0.2475 0.0075 25.03 0.4012 0.75 200 240 77.6 95.184 94.861 95.384 95.061 0.8 0.29 0.36 1.2 1.787 1.494 11.90%
846 1052 1051 96.648 96.824 69 129 835 1576 1.0437 1.97 0.0574 25.03 3.1887 5.967 200 240 42.8 93.556 93.378 93.756 93.578 0.8 0.55 0.65 3.092 3.446 3.269 33.20%
847 1051 1049 96.824 96.33 129 243 964 1819 1.205 2.2737 0.0671 25.03 3.6821 6.888 200 240 100.93 93.378 92.957 93.578 93.157 0.8 0.57 0.68 3.446 3.373 3.41 35.90%
848 1049 1050 96.33 96.181 95 180 1125 2124 1.4062 2.655 0.0777 25.03 4.2965 8.043 200 240 68.61 92.957 92.671 93.157 92.871 0.8 0.6 0.71 3.373 3.51 3.441 39.00%
849 1050 1035 96.181 96.041 77 146 1202 2270 1.5025 2.8375 0.0826 25.03 4.5901 8.595 200 240 51.24 92.671 92.458 92.871 92.658 0.8 0.61 0.72 3.51 3.583 3.546 40.40%
850 1035 1034 96.041 96.013 69 130 1499 2828 1.8737 3.535 0.099 25.03 5.7203 10.704 200 240 43.41 92.458 92.277 92.658 92.477 0.8 0.65 0.77 3.583 3.736 3.66 45.70%
851 1070 1071 96.454 96.172 92 173 92 173 0.115 0.2163 0.0063 25.57 0.3513 0.655 200 230 65.3 95.254 94.97 95.454 95.17 0.81 0.29 0.35 1.2 1.202 1.201 11.00%
852 1072 1071 96.128 96.172 72 135 72 135 0.09 0.1688 0.0044 14.23 0.2744 0.511 150 160 45.68 94.978 94.692 95.128 94.842 0.81 0.32 0.38 1.15 1.48 1.315 13.00%
853 1071 1034 96.172 96.013 87 165 251 473 0.3137 0.5913 0.0166 25.03 0.9578 1.79 200 240 61 94.642 94.388 94.842 94.588 0.8 0.38 0.46 1.53 1.625 1.577 18.10%
854 1034 1033 96.013 96.048 74 140 1824 3441 2.28 4.3012 0.1203 25.03 6.9603 13.024 200 240 48.33 92.277 92.076 92.477 92.276 0.8 0.68 0.8 3.736 3.973 3.855 51.20%
855 1033 1032 96.048 96.101 66 124 1890 3565 2.3625 4.4563 0.1242 25.03 7.2117 13.493 200 240 40.12 92.076 91.908 92.276 92.108 0.8 0.69 0.81 3.973 4.193 4.083 52.30%
856 1032 1031 96.101 96.207 78 147 2037 3842 2.5462 4.8025 0.1334 24.05 7.7721 14.541 200 260 52.08 91.908 91.708 92.108 91.908 0.77 0.68 0.8 4.193 4.499 4.346 56.10%
857 1031 1030 96.207 96.293 61 115 2211 4169 2.7637 5.2113 0.145 23.6 8.4363 15.779 200 270 35.53 91.708 91.577 91.908 91.777 0.75 0.69 0.8 4.499 4.716 4.608 59.80%
858 1030 1029 96.293 96.426 99 188 2403 4533 3.0037 5.6663 0.1584 23.17 9.1697 17.157 200 280 72.53 91.577 91.318 91.777 91.518 0.74 0.69 0.81 4.716 5.108 4.912 64.00%

Page 18 of 26
Sewerage Project, Begusarai Annex -A-3: Hydraulic Design of Sewer Network
NGRBA

Link ID Start End Node Upstrem Downstream Population Population Cum Cum Flow 2011 Flow 2041 Infiltration Full Flow Design Design Diameter Slope Length Upstream Downstream Upstream Downstream Full Flow Actual Actual Upstream Downstream Average Depth of
Node Ground Ground Level 2011 2041 Population Population Flow 2011 Flow 2041 Invert Invert Crown Crown Velocity Velocity Velocity Depth Depth Depth Flow
Level 2011 2041 2011 2041
m m souls souls souls souls lps lps lps lps lps lps mm 1 in m m m m m m/s m/s m/s m m m %age
859 1029 1028 96.426 96.642 90 170 2493 4703 3.1162 5.8788 0.1646 22.77 9.5133 17.801 200 290 63.79 91.318 91.098 91.518 91.298 0.72 0.69 0.8 5.108 5.545 5.326 66.50%
860 1028 1027 96.642 96.711 63 120 3136 5916 3.92 7.395 0.2065 23.6 11.9665 22.391 200 270 37.92 91.098 90.957 91.298 91.157 0.75 0.75 0.85 5.545 5.754 5.65 77.70%
861 1027 858 96.711 97.361 189 357 3325 6273 4.1562 7.8413 0.2218 25.03 12.6906 23.746 200 240 158.91 90.957 90.295 91.157 90.495 0.8 0.8 0.91 5.754 7.066 6.41 77.70%
862 858 24 97.361 97.214 59 111 4629 8735 5.7862 10.9188 0.3117 34.72 17.6704 33.068 250 410 33.74 90.245 90.163 90.495 90.413 0.71 0.71 0.8 7.116 7.052 7.084 78.00%
863 24 25 97.214 97.534 205 388 85794 161887 107.2425 202.3587 6.0376 478.59 247.3332 461.345 900 2000 174.47 89.513 89.425 90.413 90.325 0.75 0.76 0.86 7.702 8.109 7.905 78.90%
864 789 68 97.415 97.102 119 224 119 224 0.1487 0.28 0.0088 25.03 0.455 0.849 200 240 90.95 96.215 95.836 96.415 96.036 0.8 0.31 0.37 1.2 1.266 1.233 12.60%
865 820 68 97.153 97.102 106 199 106 199 0.1325 0.2488 0.0076 25.03 0.4051 0.754 200 240 78.52 95.953 95.626 96.153 95.826 0.8 0.3 0.36 1.2 1.476 1.338 11.90%
866 822 823 97.013 97.301 96 182 96 182 0.12 0.2275 0.0067 25.03 0.3667 0.689 200 240 69.45 95.813 95.524 96.013 95.724 0.8 0.29 0.35 1.2 1.778 1.489 11.40%
867 823 67 97.301 97.128 109 205 205 387 0.2562 0.4837 0.0146 25.03 0.7833 1.466 200 240 81.59 95.524 95.184 95.724 95.384 0.8 0.36 0.44 1.778 1.944 1.861 16.40%
868 834 835 97.082 97.286 84 159 84 159 0.105 0.1987 0.0056 14.23 0.3206 0.602 150 160 57.93 95.932 95.57 96.082 95.72 0.81 0.33 0.4 1.15 1.716 1.433 14.00%
869 836 835 97.407 97.286 87 165 87 165 0.1088 0.2062 0.0059 25.03 0.3321 0.625 200 240 60.9 96.207 95.953 96.407 96.153 0.8 0.28 0.34 1.2 1.332 1.266 10.90%
870 835 837 97.286 97.242 42 80 213 404 0.2663 0.505 0.0132 25.03 0.8119 1.528 200 240 17.66 95.52 95.446 95.72 95.646 0.8 0.36 0.44 1.766 1.796 1.781 16.80%
871 837 838 97.242 97.303 62 117 275 521 0.3438 0.6513 0.0167 25.03 1.0479 1.97 200 240 36.48 95.446 95.294 95.646 95.494 0.8 0.39 0.47 1.796 2.009 1.902 19.00%
872 838 839 97.303 97.2 51 95 326 616 0.4075 0.77 0.0192 25.03 1.2417 2.329 200 240 25.67 95.294 95.187 95.494 95.387 0.8 0.41 0.5 2.009 2.013 2.011 20.60%
873 845 839 97.11 97.2 67 126 67 126 0.0837 0.1575 0.004 14.23 0.2552 0.476 150 160 41.08 95.96 95.703 96.11 95.853 0.81 0.31 0.37 1.15 1.498 1.324 12.50%
874 839 840 97.2 97.313 55 104 448 846 0.56 1.0575 0.026 25.03 1.706 3.199 200 240 29.86 95.187 95.063 95.387 95.263 0.8 0.46 0.55 2.013 2.25 2.131 24.10%
875 840 841 97.313 97.155 104 196 552 1042 0.69 1.3025 0.0334 25.03 2.1034 3.941 200 240 76.82 95.063 94.743 95.263 94.943 0.8 0.48 0.58 2.25 2.412 2.331 26.80%
876 841 842 97.155 97.161 48 91 600 1133 0.75 1.4162 0.0357 25.03 2.2857 4.284 200 240 23.52 94.743 94.645 94.943 94.845 0.8 0.5 0.59 2.412 2.516 2.464 28.00%
877 844 842 97.134 97.161 57 108 57 108 0.0712 0.135 0.0031 14.23 0.2168 0.408 150 160 31.83 95.984 95.785 96.134 95.935 0.81 0.29 0.36 1.15 1.376 1.263 11.60%
878 842 843 97.161 97.122 98 185 755 1426 0.9438 1.7825 0.0456 25.03 2.8769 5.393 200 240 71.1 94.645 94.349 94.845 94.549 0.8 0.53 0.64 2.516 2.773 2.645 31.50%
879 843 66 97.122 97.102 51 97 806 1523 1.0075 1.9038 0.0481 25.03 3.0706 5.759 200 240 26.28 94.349 94.239 94.549 94.439 0.8 0.54 0.65 2.773 2.863 2.818 32.60%
880 818 819 97.102 97.104 60 112 60 112 0.075 0.14 0.0033 14.23 0.2283 0.423 150 160 34.28 95.952 95.738 96.102 95.888 0.81 0.3 0.36 1.15 1.366 1.258 11.80%
881 819 65 97.104 97.13 103 193 163 305 0.2037 0.3812 0.0106 25.03 0.6218 1.154 200 240 75.48 95.688 95.373 95.888 95.573 0.8 0.34 0.41 1.416 1.756 1.586 14.60%
882 827 828 97.707 97.433 133 250 133 250 0.1662 0.3125 0.0101 25.03 0.5088 0.948 200 240 104.42 96.507 96.072 96.707 96.272 0.8 0.32 0.38 1.2 1.361 1.281 13.30%
883 833 828 97.41 97.433 96 181 96 181 0.12 0.2262 0.0067 25.03 0.3667 0.685 200 240 69.34 96.21 95.921 96.41 96.121 0.8 0.29 0.35 1.2 1.512 1.356 11.40%
884 828 829 97.433 97.213 107 201 336 632 0.42 0.79 0.0244 25.03 1.2844 2.394 200 240 79.41 95.921 95.59 96.121 95.79 0.8 0.42 0.5 1.512 1.623 1.568 20.90%
885 832 829 97.171 97.213 52 97 52 97 0.065 0.1212 0.0026 14.23 0.1976 0.366 150 160 26.69 96.021 95.854 96.171 96.004 0.81 0.29 0.34 1.15 1.359 1.254 11.00%
886 829 830 97.213 97.197 66 125 454 854 0.5675 1.0675 0.0309 25.03 1.7334 3.233 200 240 40.86 95.59 95.42 95.79 95.62 0.8 0.46 0.55 1.623 1.777 1.7 24.30%
887 831 830 97.127 97.197 59 112 59 112 0.0737 0.14 0.0033 14.23 0.2245 0.423 150 160 34.04 95.977 95.764 96.127 95.914 0.81 0.3 0.36 1.15 1.433 1.291 11.80%
888 830 65 97.197 97.13 69 131 582 1097 0.7275 1.3712 0.0384 25.03 2.2209 4.152 200 240 43.53 95.42 95.239 95.62 95.439 0.8 0.49 0.59 1.777 1.891 1.834 27.60%
889 817 64 97.116 97.209 142 268 142 268 0.1775 0.335 0.0109 25.03 0.5434 1.016 200 240 113.18 95.916 95.444 96.116 95.644 0.8 0.32 0.39 1.2 1.765 1.483 13.80%
890 799 800 96.976 97.045 106 200 106 200 0.1325 0.25 0.0076 25.03 0.4051 0.758 200 240 79 95.776 95.447 95.976 95.647 0.8 0.3 0.36 1.2 1.598 1.399 11.90%
891 800 801 97.045 97.102 106 200 212 400 0.265 0.5 0.0152 25.03 0.8102 1.515 200 240 78.88 95.447 95.118 95.647 95.318 0.8 0.36 0.44 1.598 1.984 1.791 16.70%
892 801 802 97.102 97.302 73 137 285 537 0.3562 0.6712 0.0198 25.03 1.0885 2.034 200 240 46.93 95.118 94.923 95.318 95.123 0.8 0.4 0.48 1.984 2.379 2.181 19.30%
893 803 802 97.301 97.302 167 316 167 316 0.2087 0.395 0.0133 25.03 0.6395 1.198 200 240 137.81 96.101 95.527 96.301 95.727 0.8 0.34 0.41 1.2 1.775 1.488 14.90%
894 802 813 97.302 97.306 55 103 507 956 0.6338 1.195 0.0359 25.03 1.9372 3.621 200 240 29.72 94.923 94.799 95.123 94.999 0.8 0.47 0.57 2.379 2.507 2.443 25.70%
895 813 62 97.306 97.227 129 243 636 1199 0.795 1.4987 0.0456 25.03 2.4306 4.542 200 240 100.84 94.799 94.379 94.999 94.579 0.8 0.5 0.6 2.507 2.848 2.678 28.80%
896 805 806 97.116 97.203 57 107 57 107 0.0712 0.1337 0.0031 14.23 0.2168 0.404 150 160 31.72 95.966 95.768 96.116 95.918 0.81 0.29 0.35 1.15 1.435 1.293 11.60%
897 806 807 97.203 97.095 62 117 119 224 0.1488 0.28 0.0066 25.03 0.4528 0.847 200 240 36.58 95.718 95.565 95.918 95.765 0.8 0.31 0.37 1.485 1.53 1.508 12.60%
898 807 808 97.095 97.264 82 154 201 378 0.2512 0.4725 0.0119 25.03 0.7657 1.429 200 240 55.4 95.565 95.334 95.765 95.534 0.8 0.36 0.43 1.53 1.93 1.73 16.20%
899 808 809 97.264 97.833 52 98 253 476 0.3162 0.595 0.0145 25.03 0.9633 1.8 200 240 26.9 95.334 95.222 95.534 95.422 0.8 0.38 0.46 1.93 2.611 2.27 18.20%
900 815 816 97.666 97.748 55 103 55 103 0.0688 0.1287 0.0028 14.23 0.2091 0.389 150 160 29.47 96.516 96.332 96.666 96.482 0.81 0.29 0.35 1.15 1.416 1.283 11.40%
901 816 809 97.748 97.833 60 113 115 216 0.1437 0.27 0.0062 25.03 0.4374 0.816 200 240 34.53 96.282 96.138 96.482 96.338 0.8 0.3 0.37 1.466 1.695 1.58 12.40%
902 809 810 97.833 97.14 82 155 450 847 0.5625 1.0587 0.0261 25.03 1.7136 3.202 200 240 56 95.222 94.989 95.422 95.189 0.8 0.46 0.55 2.611 2.151 2.381 24.20%
903 810 811 97.14 97.33 94 177 544 1024 0.68 1.28 0.0326 25.03 2.0726 3.873 200 240 67.27 94.989 94.709 95.189 94.909 0.8 0.48 0.58 2.151 2.621 2.386 26.60%
904 814 811 97.312 97.33 54 101 54 101 0.0675 0.1262 0.0028 14.23 0.2053 0.382 150 160 28.72 96.162 95.983 96.312 96.133 0.81 0.29 0.35 1.15 1.347 1.248 11.30%
905 811 812 97.33 97.409 45 84 643 1209 0.8037 1.5113 0.0373 25.03 2.4485 4.571 200 240 19.78 94.709 94.626 94.909 94.826 0.8 0.51 0.61 2.621 2.783 2.702 28.90%
906 812 61 97.409 97.363 105 198 748 1407 0.935 1.7587 0.0448 25.03 2.8498 5.321 200 240 77.92 94.626 94.302 94.826 94.502 0.8 0.53 0.63 2.783 3.061 2.922 31.30%

Page 19 of 26
Sewerage Project, Begusarai Annex -A-3: Hydraulic Design of Sewer Network
NGRBA

Link ID Start End Node Upstrem Downstream Population Population Cum Cum Flow 2011 Flow 2041 Infiltration Full Flow Design Design Diameter Slope Length Upstream Downstream Upstream Downstream Full Flow Actual Actual Upstream Downstream Average Depth of
Node Ground Ground Level 2011 2041 Population Population Flow 2011 Flow 2041 Invert Invert Crown Crown Velocity Velocity Velocity Depth Depth Depth Flow
Level 2011 2041 2011 2041
m m souls souls souls souls lps lps lps lps lps lps mm 1 in m m m m m m/s m/s m/s m m m %age
907 714 715 98.777 98.715 52 99 52 99 0.065 0.1237 0.0026 14.23 0.1976 0.374 150 160 27.4 97.627 97.456 97.777 97.606 0.81 0.29 0.35 1.15 1.258 1.204 11.20%
908 715 716 98.715 98.617 64 120 116 219 0.145 0.2737 0.0063 25.03 0.4413 0.828 200 240 38.26 97.406 97.247 97.606 97.447 0.8 0.3 0.37 1.308 1.371 1.339 12.50%
909 716 60 98.617 97.878 79 149 195 368 0.2437 0.46 0.0114 40.87 0.7427 1.391 200 90 52.72 97.247 96.661 97.447 96.861 1.3 0.5 0.6 1.371 1.217 1.294 12.60%
910 733 734 97.375 97.308 110 208 110 208 0.1375 0.26 0.008 25.03 0.4205 0.788 200 240 83.02 96.175 95.829 96.375 96.029 0.8 0.3 0.36 1.2 1.479 1.34 12.20%
911 734 735 97.308 97.352 64 120 174 328 0.2175 0.41 0.0117 25.03 0.6642 1.242 200 240 38.15 95.829 95.67 96.029 95.87 0.8 0.34 0.41 1.479 1.683 1.581 15.10%
912 735 736 97.352 97.439 67 127 241 455 0.3012 0.5687 0.0157 25.03 0.9195 1.722 200 240 41.66 95.67 95.496 95.87 95.696 0.8 0.38 0.46 1.683 1.943 1.813 17.80%
913 736 737 97.439 97.473 54 101 295 556 0.3687 0.695 0.0185 25.03 1.1247 2.103 200 240 28.46 95.496 95.377 95.696 95.577 0.8 0.4 0.48 1.943 2.096 2.019 19.60%
914 756 737 97.651 97.473 84 159 84 159 0.105 0.1987 0.0056 14.23 0.3206 0.602 150 160 57.89 96.501 96.139 96.651 96.289 0.81 0.33 0.4 1.15 1.334 1.242 14.00%
915 737 738 97.473 97.462 81 153 460 868 0.575 1.085 0.0293 25.03 1.7543 3.284 200 240 55.07 95.377 95.148 95.577 95.348 0.8 0.46 0.55 2.096 2.314 2.205 24.50%
916 738 739 97.462 97.506 59 111 519 979 0.6488 1.2237 0.0326 25.03 1.9788 3.704 200 240 33.68 95.148 95.008 95.348 95.208 0.8 0.48 0.57 2.314 2.498 2.406 26.00%
917 739 740 97.506 97.623 61 115 580 1094 0.725 1.3675 0.036 25.03 2.211 4.139 200 240 35.73 95.008 94.859 95.208 95.059 0.8 0.49 0.59 2.498 2.764 2.631 27.50%
918 740 741 97.623 97.667 158 298 738 1392 0.9225 1.74 0.0484 25.03 2.8159 5.268 200 240 128.53 94.859 94.323 95.059 94.523 0.8 0.53 0.63 2.764 3.344 3.054 31.10%
919 741 742 97.667 97.714 66 125 804 1517 1.005 1.8962 0.0524 25.03 3.0674 5.741 200 240 40.69 94.323 94.154 94.523 94.354 0.8 0.54 0.65 3.344 3.56 3.452 32.60%
920 742 743 97.714 98.012 172 325 976 1842 1.22 2.3025 0.0661 25.03 3.7261 6.974 200 240 142.22 94.154 93.561 94.354 93.761 0.8 0.57 0.68 3.56 4.451 4.005 36.10%
921 745 746 97.55 97.418 106 200 106 200 0.1325 0.25 0.0076 25.03 0.4051 0.758 200 240 79.03 96.35 96.021 96.55 96.221 0.8 0.3 0.36 1.2 1.397 1.299 11.90%
922 765 746 97.408 97.418 97 183 97 183 0.1212 0.2287 0.0068 25.03 0.3705 0.693 200 240 70.1 96.208 95.916 96.408 96.116 0.8 0.29 0.35 1.2 1.502 1.351 11.40%
923 746 747 97.418 97.445 73 137 276 520 0.345 0.65 0.0189 25.03 1.0539 1.969 200 240 46.86 95.916 95.721 96.116 95.921 0.8 0.39 0.47 1.502 1.725 1.613 19.00%
924 762 747 97.411 97.445 59 111 59 111 0.0737 0.1388 0.0032 14.23 0.2245 0.419 150 160 33.68 96.261 96.051 96.411 96.201 0.81 0.3 0.36 1.15 1.395 1.272 11.80%
925 747 748 97.445 97.257 186 352 521 983 0.6513 1.2287 0.0372 25.03 1.9909 3.723 200 240 155.9 95.721 95.071 95.921 95.271 0.8 0.48 0.57 1.725 2.186 1.955 26.10%
926 750 751 97.075 97.315 109 206 109 206 0.1363 0.2575 0.0079 25.03 0.4167 0.78 200 240 82.12 95.875 95.533 96.075 95.733 0.8 0.3 0.36 1.2 1.782 1.491 12.10%
927 751 752 97.315 97.611 80 152 189 358 0.2362 0.4475 0.0132 25.03 0.7219 1.356 200 240 54.32 95.533 95.307 95.733 95.507 0.8 0.35 0.43 1.782 2.304 2.043 15.80%
928 752 753 97.611 97.633 58 109 247 467 0.3088 0.5838 0.0163 25.03 0.9425 1.768 200 240 32.41 95.307 95.172 95.507 95.372 0.8 0.38 0.46 2.304 2.461 2.383 18.00%
929 753 754 97.633 97.592 50 94 297 561 0.3713 0.7013 0.0187 25.03 1.1325 2.122 200 240 25.08 95.172 95.067 95.372 95.267 0.8 0.4 0.49 2.461 2.525 2.493 19.70%
930 754 755 97.592 97.625 84 159 381 720 0.4762 0.9 0.0243 25.03 1.4531 2.724 200 240 58.07 95.067 94.825 95.267 95.025 0.8 0.43 0.52 2.525 2.8 2.662 22.30%
931 755 748 97.625 97.257 72 136 453 856 0.5662 1.07 0.0288 25.03 1.7275 3.239 200 240 46.25 94.825 94.633 95.025 94.833 0.8 0.46 0.55 2.8 2.624 2.712 24.30%
932 748 749 97.257 97.502 120 226 1094 2065 1.3675 2.5812 0.0748 25.03 4.1773 7.819 200 240 92.17 94.633 94.249 94.833 94.449 0.8 0.59 0.7 2.624 3.254 2.939 38.40%
933 757 758 97.624 97.491 73 137 73 137 0.0912 0.1713 0.0045 14.23 0.2783 0.518 150 160 46.93 96.474 96.181 96.624 96.331 0.81 0.32 0.38 1.15 1.31 1.23 13.00%
934 763 764 97.412 97.493 118 222 118 222 0.1475 0.2775 0.0087 25.03 0.4512 0.841 200 240 90.19 96.212 95.837 96.412 96.037 0.8 0.31 0.37 1.2 1.657 1.428 12.60%
935 764 758 97.493 97.491 59 112 177 334 0.2212 0.4175 0.012 25.03 0.6757 1.264 200 240 34.11 95.837 95.694 96.037 95.894 0.8 0.35 0.42 1.657 1.797 1.727 15.30%
936 758 759 97.491 97.395 124 234 374 705 0.4675 0.8813 0.0258 25.03 1.4283 2.67 200 240 96.04 95.694 95.294 95.894 95.494 0.8 0.43 0.52 1.797 2.101 1.949 22.10%
937 761 759 97.413 97.395 124 234 124 234 0.155 0.2925 0.0093 25.03 0.4743 0.887 200 240 96.16 96.213 95.812 96.413 96.012 0.8 0.31 0.37 1.2 1.583 1.392 12.90%
938 759 760 97.395 97.563 76 144 574 1083 0.7175 1.3537 0.0399 25.03 2.1924 4.101 200 240 50.34 95.294 95.085 95.494 95.285 0.8 0.49 0.59 2.101 2.479 2.29 27.40%
939 760 749 97.563 97.502 162 306 736 1389 0.92 1.7362 0.0527 25.03 2.8127 5.261 200 240 132.56 95.085 94.532 95.285 94.732 0.8 0.53 0.63 2.479 2.97 2.724 31.10%
940 749 743 97.502 98.012 124 233 1954 3687 2.4425 4.6088 0.1368 24.52 7.4643 13.963 200 250 95.82 94.249 93.865 94.449 94.065 0.78 0.68 0.81 3.254 4.146 3.7 54.00%
941 743 744 98.012 97.868 135 256 3065 5785 3.8312 7.2313 0.2132 22.77 11.7069 21.907 200 290 107.12 93.561 93.192 93.761 93.392 0.72 0.73 0.83 4.451 4.677 4.564 78.80%
942 744 60 97.868 97.878 70 133 3135 5918 3.9188 7.3975 0.2175 23.6 11.9737 22.41 200 270 44.63 93.192 93.026 93.392 93.226 0.75 0.75 0.85 4.677 4.852 4.764 77.80%
943 60 61 97.878 97.363 165 312 3495 6598 4.3688 8.2475 0.242 36.55 13.3483 24.985 250 370 136.01 92.976 92.609 93.226 92.859 0.74 0.69 0.8 4.902 4.754 4.828 60.70%
944 61 62 97.363 97.227 64 121 4307 8126 5.3837 10.1575 0.2905 35.15 16.4418 30.763 250 400 38.69 92.609 92.512 92.859 92.762 0.72 0.7 0.81 4.754 4.715 4.734 72.50%
945 62 63 97.227 97.33 102 192 5045 9517 6.3063 11.8962 0.3434 52.74 19.2621 36.032 300 470 74.73 92.462 92.303 92.762 92.603 0.75 0.69 0.8 4.765 5.027 4.896 60.70%
946 63 64 97.33 97.209 88 166 5133 9683 6.4163 12.1038 0.3493 52.74 19.5981 36.661 300 470 61.66 92.303 92.172 92.603 92.472 0.75 0.69 0.81 5.027 5.037 5.032 61.40%
947 64 65 97.209 97.13 69 129 5344 10080 6.68 12.6 0.3644 52.18 20.4044 38.164 300 480 42.92 92.172 92.082 92.472 92.382 0.74 0.69 0.81 5.037 5.047 5.042 63.50%
948 65 66 97.13 97.102 64 120 6153 11602 7.6912 14.5025 0.4171 50.63 23.4908 43.925 300 510 38.23 92.082 92.007 92.382 92.308 0.72 0.7 0.81 5.047 5.095 5.071 72.00%
949 66 67 97.102 97.128 108 203 7067 13328 8.8337 16.66 0.473 52.74 26.9742 50.453 300 470 80.41 92.007 91.836 92.308 92.136 0.75 0.75 0.85 5.095 5.292 5.193 78.30%
950 67 68 97.128 97.102 168 318 7440 14033 9.3 17.5412 0.5009 70.41 28.4009 53.125 350 600 138.68 91.786 91.555 92.136 91.905 0.73 0.69 0.8 5.342 5.547 5.444 64.90%
951 68 25 97.102 97.534 93 175 7758 14631 9.6975 18.2887 0.5236 69.83 29.6161 55.39 350 610 66.06 91.555 91.447 91.905 91.797 0.73 0.7 0.8 5.547 6.087 5.817 67.20%
952 25 26 97.534 97.462 105 197 93657 176715 117.0712 220.8937 6.5688 555.92 269.979 503.58 1000 2600 77.53 89.325 89.296 90.325 90.296 0.71 0.7 0.8 8.209 8.167 8.188 74.60%
953 777 778 97.383 97.699 69 131 69 131 0.0862 0.1637 0.0042 14.23 0.263 0.495 150 160 43.61 96.233 95.961 96.383 96.111 0.81 0.31 0.38 1.15 1.739 1.444 12.80%
954 778 779 97.699 97.797 122 231 191 362 0.2388 0.4525 0.0133 25.03 0.7296 1.371 200 240 94.53 95.911 95.517 96.111 95.717 0.8 0.35 0.43 1.789 2.281 2.035 15.90%

Page 20 of 26
Sewerage Project, Begusarai Annex -A-3: Hydraulic Design of Sewer Network
NGRBA

Link ID Start End Node Upstrem Downstream Population Population Cum Cum Flow 2011 Flow 2041 Infiltration Full Flow Design Design Diameter Slope Length Upstream Downstream Upstream Downstream Full Flow Actual Actual Upstream Downstream Average Depth of
Node Ground Ground Level 2011 2041 Population Population Flow 2011 Flow 2041 Invert Invert Crown Crown Velocity Velocity Velocity Depth Depth Depth Flow
Level 2011 2041 2011 2041
m m souls souls souls souls lps lps lps lps lps lps mm 1 in m m m m m m/s m/s m/s m m m %age
955 779 780 97.797 97.675 150 284 341 646 0.4263 0.8075 0.025 25.03 1.3038 2.448 200 240 121.36 95.517 95.011 95.717 95.211 0.8 0.42 0.51 2.281 2.664 2.472 21.10%
956 1219 1220 97.53 97.591 66 124 66 124 0.0825 0.155 0.0039 14.23 0.2514 0.469 150 160 40.06 96.38 96.13 96.53 96.28 0.81 0.31 0.37 1.15 1.461 1.306 12.40%
957 1221 1222 97.036 97.145 66 125 66 125 0.0825 0.1563 0.0039 14.23 0.2514 0.473 150 160 40.82 95.886 95.631 96.036 95.781 0.81 0.31 0.37 1.15 1.514 1.332 12.50%
958 1222 1223 97.145 97.309 71 135 137 260 0.1712 0.325 0.0083 25.03 0.5221 0.983 200 240 45.54 95.581 95.391 95.781 95.591 0.8 0.32 0.39 1.564 1.918 1.741 13.50%
959 1224 1223 97.382 97.309 66 125 66 125 0.0825 0.1563 0.0039 14.23 0.2514 0.473 150 160 40.79 96.232 95.977 96.382 96.127 0.81 0.31 0.37 1.15 1.333 1.241 12.50%
960 1223 1220 97.309 97.591 83 156 286 541 0.3575 0.6762 0.0177 25.03 1.0902 2.046 200 240 56.58 95.391 95.155 95.591 95.355 0.8 0.4 0.48 1.918 2.436 2.177 19.30%
961 1220 1205 97.591 97.606 140 264 492 929 0.615 1.1612 0.0323 25.03 1.8773 3.516 200 240 111.55 95.155 94.69 95.355 94.89 0.8 0.47 0.56 2.436 2.915 2.676 25.30%
962 1200 1201 97.415 97.573 106 201 106 201 0.1325 0.2512 0.0076 25.03 0.4051 0.761 200 240 79.11 96.215 95.885 96.415 96.085 0.8 0.3 0.36 1.2 1.688 1.444 12.00%
963 1201 1202 97.573 97.448 108 203 214 404 0.2675 0.505 0.0154 25.03 0.8179 1.53 200 240 80.51 95.885 95.55 96.085 95.75 0.8 0.37 0.44 1.688 1.898 1.793 16.80%
964 1202 1203 97.448 97.407 68 129 282 533 0.3525 0.6662 0.0195 25.03 1.077 2.018 200 240 42.48 95.55 95.373 95.75 95.573 0.8 0.4 0.48 1.898 2.034 1.966 19.20%
965 1206 1203 97.321 97.407 91 171 91 171 0.1137 0.2137 0.0062 25.03 0.3474 0.647 200 240 64.21 96.121 95.853 96.321 96.053 0.8 0.28 0.34 1.2 1.554 1.377 11.10%
966 1203 1204 97.407 97.305 78 148 451 852 0.5638 1.065 0.0307 25.03 1.722 3.226 200 240 52.19 95.373 95.156 95.573 95.356 0.8 0.46 0.55 2.034 2.15 2.092 24.20%
967 1215 1216 97.191 97.258 61 114 61 114 0.0763 0.1425 0.0034 14.23 0.2322 0.431 150 160 35.3 96.041 95.82 96.191 95.97 0.81 0.3 0.36 1.15 1.438 1.294 11.90%
968 1216 1217 97.258 97.232 70 133 131 247 0.1637 0.3087 0.0077 25.03 0.499 0.934 200 240 44.63 95.77 95.584 95.97 95.784 0.8 0.31 0.38 1.488 1.648 1.568 13.20%
969 1217 1211 97.232 97.225 63 118 194 365 0.2425 0.4562 0.0113 25.03 0.7388 1.38 200 240 37.29 95.584 95.429 95.784 95.629 0.8 0.35 0.43 1.648 1.797 1.722 15.90%
970 1218 1210 97.304 97.256 86 162 86 162 0.1075 0.2025 0.0057 14.23 0.3282 0.613 150 160 59.35 96.154 95.783 96.304 95.933 0.81 0.33 0.4 1.15 1.472 1.311 14.20%
971 1207 1208 96.936 97.27 93 175 93 175 0.1163 0.2188 0.0064 25.03 0.3551 0.663 200 240 66.19 95.736 95.46 95.936 95.66 0.8 0.28 0.34 1.2 1.81 1.505 11.20%
972 1208 1209 97.27 97.368 55 104 148 279 0.185 0.3487 0.0093 25.03 0.5643 1.056 200 240 29.8 95.46 95.336 95.66 95.536 0.8 0.33 0.39 1.81 2.032 1.921 14.00%
973 1209 1210 97.368 97.256 137 259 285 538 0.3562 0.6725 0.0197 25.03 1.0885 2.037 200 240 108.69 95.336 94.883 95.536 95.083 0.8 0.4 0.48 2.032 2.373 2.203 19.30%
974 1210 1211 97.256 97.225 54 101 425 801 0.5313 1.0013 0.0282 25.03 1.622 3.032 200 240 28.7 94.883 94.763 95.083 94.963 0.8 0.45 0.54 2.373 2.462 2.417 23.50%
975 1211 1212 97.225 97.247 54 101 673 1267 0.8413 1.5838 0.0423 25.03 2.5661 4.794 200 240 28.61 94.763 94.644 94.963 94.844 0.8 0.51 0.61 2.462 2.603 2.533 29.70%
976 1214 1212 97.249 97.247 83 156 83 156 0.1037 0.195 0.0054 14.23 0.3167 0.59 150 160 56.27 96.099 95.748 96.249 95.898 0.81 0.33 0.4 1.15 1.5 1.325 13.90%
977 1212 1213 97.247 97.263 43 82 799 1505 0.9987 1.8812 0.0495 25.03 3.0458 5.693 200 240 18.71 94.644 94.566 94.844 94.766 0.8 0.54 0.64 2.603 2.697 2.65 32.40%
978 1213 1204 97.263 97.305 45 85 844 1590 1.055 1.9875 0.0515 25.03 3.2165 6.014 200 240 20.37 94.566 94.481 94.766 94.681 0.8 0.55 0.65 2.697 2.824 2.761 33.40%
979 1204 1205 97.305 97.606 93 176 1388 2618 1.735 3.2725 0.0887 25.03 5.2937 9.906 200 240 66.78 94.481 94.203 94.681 94.403 0.8 0.63 0.75 2.824 3.403 3.113 43.70%
980 1205 780 97.606 97.675 94 178 1974 3725 2.4675 4.6563 0.1275 24.52 7.53 14.096 200 250 67.39 94.203 93.933 94.403 94.133 0.78 0.69 0.81 3.403 3.741 3.572 54.40%
981 780 781 97.675 97.666 78 147 2393 4518 2.9913 5.6475 0.1576 23.17 9.1313 17.1 200 280 52.11 93.933 93.747 94.133 93.947 0.74 0.69 0.81 3.741 3.919 3.83 63.90%
982 781 782 97.666 97.595 52 98 2445 4616 3.0563 5.77 0.1601 23.17 9.3289 17.47 200 280 26.84 93.747 93.652 93.947 93.852 0.74 0.7 0.81 3.919 3.943 3.931 64.80%
983 785 782 97.609 97.595 99 187 99 187 0.1237 0.2338 0.007 25.03 0.3782 0.708 200 240 72.39 96.409 96.108 96.609 96.308 0.8 0.29 0.35 1.2 1.487 1.344 11.60%
984 782 783 97.595 97.558 73 138 2617 4941 3.2713 6.1762 0.1717 22.77 9.9854 18.7 200 290 47.05 93.652 93.489 93.852 93.689 0.72 0.7 0.81 3.943 4.069 4.006 69.00%
985 790 791 97.264 97.314 83 156 83 156 0.1037 0.195 0.0055 14.23 0.3167 0.59 150 160 56.69 96.114 95.76 96.264 95.91 0.81 0.33 0.4 1.15 1.554 1.352 13.90%
986 791 792 97.314 97.299 50 94 133 250 0.1662 0.3125 0.0079 25.03 0.5066 0.945 200 240 24.97 95.71 95.606 95.91 95.806 0.8 0.32 0.38 1.604 1.693 1.649 13.30%
987 792 793 97.299 97.446 164 309 297 559 0.3712 0.6988 0.0208 25.03 1.1346 2.117 200 240 134.29 95.606 95.046 95.806 95.246 0.8 0.4 0.48 1.693 2.399 2.046 19.70%
988 796 797 97.179 97.309 74 140 74 140 0.0925 0.175 0.0047 14.23 0.2822 0.53 150 160 48.31 96.029 95.727 96.179 95.877 0.81 0.32 0.38 1.15 1.582 1.366 13.20%
989 797 798 97.309 97.402 116 219 190 359 0.2375 0.4488 0.0132 25.03 0.7257 1.359 200 240 88.23 95.677 95.309 95.877 95.509 0.8 0.35 0.43 1.632 2.093 1.862 15.80%
990 804 798 97.319 97.402 68 128 68 128 0.085 0.16 0.0041 14.23 0.2591 0.484 150 160 42.02 96.169 95.907 96.319 96.057 0.81 0.31 0.37 1.15 1.496 1.323 12.60%
991 798 793 97.402 97.446 75 141 333 628 0.4162 0.785 0.0219 25.03 1.2707 2.377 200 240 48.85 95.309 95.106 95.509 95.306 0.8 0.42 0.5 2.093 2.34 2.216 20.80%
992 793 794 97.446 97.57 161 305 791 1492 0.9887 1.865 0.0555 25.03 3.0218 5.651 200 240 132.09 95.046 94.496 95.246 94.696 0.8 0.54 0.64 2.399 3.074 2.737 32.30%
993 794 795 97.57 97.577 48 90 839 1582 1.0487 1.9775 0.0577 25.03 3.204 5.99 200 240 22.85 94.496 94.401 94.696 94.601 0.8 0.55 0.65 3.074 3.177 3.125 33.30%
994 795 783 97.577 97.558 105 199 944 1781 1.18 2.2262 0.0652 25.03 3.6052 6.744 200 240 78.06 94.401 94.075 94.601 94.275 0.8 0.57 0.68 3.177 3.483 3.33 35.50%
995 783 784 97.558 97.248 204 385 3765 7107 4.7063 8.8837 0.2536 36.07 14.3723 26.905 250 380 172.65 93.439 92.985 93.689 93.235 0.73 0.69 0.81 4.119 4.263 4.191 64.40%
996 786 787 97.322 97.365 59 111 59 111 0.0737 0.1388 0.0032 14.23 0.2245 0.419 150 160 33.57 96.172 95.962 96.322 96.112 0.81 0.3 0.36 1.15 1.404 1.277 11.80%
997 787 788 97.365 97.308 64 120 123 231 0.1538 0.2887 0.0069 25.03 0.4682 0.873 200 240 38.26 95.912 95.752 96.112 95.952 0.8 0.31 0.37 1.454 1.556 1.505 12.80%
998 788 784 97.308 97.248 139 262 262 493 0.3275 0.6162 0.0176 25.03 1.0001 1.866 200 240 110.33 95.752 95.293 95.952 95.493 0.8 0.39 0.47 1.556 1.955 1.755 18.50%
999 784 26 97.248 97.462 134 254 4161 7854 5.2013 9.8175 0.2814 35.15 15.8851 29.734 250 400 106.09 92.985 92.72 93.235 92.97 0.72 0.7 0.8 4.263 4.743 4.503 70.50%
1000 26 27 97.462 96.433 171 322 97989 184891 122.4862 231.1137 6.8637 552.74 282.4578 526.87 1000 2630 141.05 89.296 89.242 90.296 90.242 0.7 0.71 0.8 8.167 7.191 7.679 78.10%
1001 1184 1185 96.785 96.406 84 158 84 158 0.105 0.1975 0.0056 14.7 0.3206 0.598 150 150 57.65 95.635 95.251 95.785 95.401 0.83 0.34 0.41 1.15 1.155 1.153 13.80%
1002 1185 30 96.406 96.275 76 144 160 302 0.2 0.3775 0.0104 25.03 0.6104 1.143 200 240 50.27 95.201 94.992 95.401 95.192 0.8 0.33 0.4 1.205 1.283 1.244 14.60%

Page 21 of 26
Sewerage Project, Begusarai Annex -A-3: Hydraulic Design of Sewer Network
NGRBA

Link ID Start End Node Upstrem Downstream Population Population Cum Cum Flow 2011 Flow 2041 Infiltration Full Flow Design Design Diameter Slope Length Upstream Downstream Upstream Downstream Full Flow Actual Actual Upstream Downstream Average Depth of
Node Ground Ground Level 2011 2041 Population Population Flow 2011 Flow 2041 Invert Invert Crown Crown Velocity Velocity Velocity Depth Depth Depth Flow
Level 2011 2041 2011 2041
m m souls souls souls souls lps lps lps lps lps lps mm 1 in m m m m m m/s m/s m/s m m m %age
1003 1225 1226 97.037 96.924 87 163 87 163 0.1088 0.2037 0.0058 25.03 0.3321 0.617 200 240 60.14 95.837 95.587 96.037 95.787 0.8 0.28 0.34 1.2 1.338 1.269 10.80%
1004 1226 1227 96.924 96.891 60 113 147 276 0.1838 0.345 0.0091 25.03 0.5604 1.044 200 240 34.43 95.587 95.443 95.787 95.643 0.8 0.33 0.39 1.338 1.448 1.393 13.90%
1005 1227 1228 96.891 96.891 53 101 200 377 0.25 0.4712 0.0118 25.03 0.7618 1.426 200 240 28.29 95.443 95.325 95.643 95.525 0.8 0.36 0.43 1.448 1.566 1.507 16.20%
1006 1233 1228 97.299 96.891 135 254 135 254 0.1688 0.3175 0.0103 25.03 0.5165 0.963 200 240 106.53 96.099 95.655 96.299 95.855 0.8 0.32 0.38 1.2 1.235 1.218 13.40%
1007 1228 1229 96.891 96.894 53 100 388 731 0.485 0.9137 0.0248 25.03 1.4798 2.766 200 240 27.88 95.325 95.209 95.525 95.409 0.8 0.44 0.52 1.566 1.685 1.625 22.40%
1008 1229 1230 96.894 96.9 54 102 442 833 0.5525 1.0412 0.0276 25.03 1.6851 3.151 200 240 29.2 95.209 95.087 95.409 95.287 0.8 0.45 0.54 1.685 1.813 1.749 24.00%
1009 1243 1244 97.179 96.953 66 125 66 125 0.0825 0.1563 0.0039 14.23 0.2514 0.473 150 160 40.62 96.029 95.775 96.179 95.925 0.81 0.31 0.37 1.15 1.179 1.164 12.50%
1010 1253 1244 97.203 96.953 66 125 66 125 0.0825 0.1563 0.0039 14.23 0.2514 0.473 150 160 40.69 96.053 95.799 96.203 95.949 0.81 0.31 0.37 1.15 1.155 1.152 12.50%
1011 1244 1245 96.953 96.935 48 89 180 339 0.225 0.4237 0.01 25.03 0.685 1.281 200 240 22.62 95.725 95.631 95.925 95.831 0.8 0.35 0.42 1.229 1.305 1.267 15.40%
1012 1250 1251 96.993 96.995 65 122 65 122 0.0812 0.1525 0.0038 14.23 0.2475 0.461 150 160 38.98 95.843 95.599 95.993 95.749 0.81 0.31 0.37 1.15 1.396 1.273 12.30%
1013 1252 1251 97.182 96.995 107 203 107 203 0.1337 0.2537 0.0077 25.03 0.409 0.769 200 240 80.19 95.982 95.648 96.182 95.848 0.8 0.3 0.36 1.2 1.347 1.274 12.00%
1014 1251 1245 96.995 96.935 71 134 243 459 0.3037 0.5738 0.0159 25.03 0.9271 1.737 200 240 45.4 95.549 95.36 95.749 95.56 0.8 0.38 0.46 1.446 1.575 1.511 17.80%
1015 1245 1246 96.935 96.908 67 126 490 924 0.6125 1.155 0.0299 25.03 1.8674 3.495 200 240 41.32 95.36 95.188 95.56 95.388 0.8 0.47 0.56 1.575 1.72 1.648 25.20%
1016 1249 1246 96.892 96.908 78 148 78 148 0.0975 0.185 0.005 14.23 0.2975 0.56 150 160 52.15 95.742 95.416 95.892 95.566 0.81 0.32 0.39 1.15 1.492 1.321 13.50%
1017 1246 1247 96.908 96.903 68 129 636 1201 0.795 1.5012 0.039 25.03 2.424 4.543 200 240 42.55 95.188 95.011 95.388 95.211 0.8 0.5 0.6 1.72 1.893 1.806 28.80%
1018 1248 1247 96.893 96.903 82 154 82 154 0.1025 0.1925 0.0054 14.23 0.3129 0.583 150 160 55.49 95.743 95.396 95.893 95.546 0.81 0.33 0.4 1.15 1.507 1.329 13.80%
1019 1247 1230 96.903 96.9 61 114 779 1469 0.9737 1.8362 0.0478 25.03 2.969 5.557 200 240 35.33 95.011 94.864 95.211 95.064 0.8 0.54 0.64 1.893 2.037 1.965 32.00%
1020 1230 1231 96.9 96.93 47 88 1268 2390 1.585 2.9875 0.0775 25.03 4.8325 9.04 200 240 22.1 94.864 94.771 95.064 94.971 0.8 0.62 0.73 2.037 2.159 2.098 41.60%
1021 1232 1231 96.847 96.93 63 119 63 119 0.0787 0.1487 0.0036 14.23 0.2399 0.45 150 160 37.63 95.697 95.462 95.847 95.612 0.81 0.3 0.37 1.15 1.468 1.309 12.20%
1022 1231 31 96.93 96.926 114 214 1445 2723 1.8062 3.4037 0.0895 25.03 5.5082 10.301 200 240 86.18 94.771 94.412 94.971 94.612 0.8 0.64 0.76 2.159 2.514 2.336 44.70%
1023 1186 31 96.899 96.926 125 236 125 236 0.1563 0.295 0.0094 25.03 0.4781 0.894 200 240 96.98 95.699 95.295 95.899 95.495 0.8 0.31 0.38 1.2 1.632 1.416 12.90%
1024 1187 1188 96.929 96.963 89 168 89 168 0.1112 0.21 0.006 25.03 0.3398 0.636 200 240 62.46 95.729 95.469 95.929 95.669 0.8 0.28 0.34 1.2 1.494 1.347 11.00%
1025 1188 1189 96.963 96.983 80 151 169 319 0.2112 0.3988 0.0112 25.03 0.645 1.207 200 240 53.66 95.469 95.246 95.669 95.446 0.8 0.34 0.41 1.494 1.737 1.615 14.90%
1026 1189 32 96.983 96.948 74 139 243 458 0.3037 0.5725 0.0158 25.03 0.9271 1.733 200 240 47.85 95.246 95.046 95.446 95.246 0.8 0.38 0.46 1.737 1.902 1.819 17.80%
1027 1272 33 96.895 96.963 65 122 65 122 0.0812 0.1525 0.0038 14.23 0.2475 0.461 150 160 39.35 95.745 95.499 95.895 95.649 0.81 0.31 0.37 1.15 1.464 1.307 12.30%
1028 1234 1235 96.948 96.921 92 174 92 174 0.115 0.2175 0.0063 25.03 0.3513 0.659 200 240 65.69 95.748 95.474 95.948 95.674 0.8 0.28 0.34 1.2 1.447 1.323 11.20%
1029 1239 1240 96.926 96.938 66 125 66 125 0.0825 0.1563 0.0039 14.23 0.2514 0.473 150 160 40.64 95.776 95.522 95.926 95.672 0.81 0.31 0.37 1.15 1.417 1.283 12.50%
1030 1240 1235 96.938 96.921 50 93 116 218 0.145 0.2725 0.0063 25.03 0.4413 0.824 200 240 24.65 95.472 95.369 95.672 95.569 0.8 0.3 0.37 1.467 1.552 1.509 12.40%
1031 1241 1242 96.899 96.923 63 119 63 119 0.0787 0.1487 0.0036 14.23 0.2399 0.45 150 160 37.44 95.749 95.515 95.899 95.665 0.81 0.3 0.37 1.15 1.408 1.279 12.20%
1032 1242 1235 96.923 96.921 57 107 120 226 0.15 0.2825 0.0066 25.03 0.4566 0.854 200 240 31.32 95.465 95.335 95.665 95.535 0.8 0.31 0.37 1.458 1.586 1.522 12.60%
1033 1235 33 96.921 96.963 90 170 418 788 0.5225 0.985 0.0254 25.03 1.5929 2.98 200 240 63.4 95.335 95.07 95.535 95.27 0.8 0.45 0.54 1.586 1.893 1.739 23.30%
1034 33 32 96.963 96.948 57 107 540 1017 0.675 1.2712 0.0322 25.03 2.0572 3.846 200 240 31.56 95.07 94.939 95.27 95.139 0.8 0.48 0.58 1.893 2.009 1.951 26.50%
1035 32 31 96.948 96.926 68 127 851 1602 1.0638 2.0025 0.0521 25.03 3.2433 6.06 200 240 41.9 94.939 94.764 95.139 94.964 0.8 0.55 0.66 2.009 2.162 2.086 33.50%
1036 31 30 96.926 96.275 127 239 2548 4800 3.185 6 0.1604 22.77 9.7154 18.16 200 290 98.82 94.412 94.072 94.612 94.272 0.72 0.7 0.8 2.514 2.203 2.359 67.50%
1037 30 29 96.275 96.337 70 133 2778 5235 3.4725 6.5437 0.1751 22.39 10.5926 19.806 200 300 44.53 94.072 93.923 94.272 94.123 0.71 0.7 0.8 2.203 2.414 2.309 73.10%
1038 29 28 96.337 96.412 57 107 2835 5342 3.5438 6.6775 0.1782 22.39 10.8094 20.211 200 300 31.34 93.923 93.819 94.123 94.019 0.71 0.71 0.81 2.414 2.593 2.504 74.40%
1039 28 27 96.412 96.433 52 99 2887 5441 3.6088 6.8012 0.1808 22.39 11.007 20.585 200 300 27.29 93.819 93.728 94.019 93.928 0.71 0.71 0.81 2.593 2.705 2.649 75.50%
1040 27 34 96.433 96.914 Pumping Link
1041 1236 1237 97.162 96.972 73 137 73 137 0.0912 0.1713 0.0045 14.23 0.2783 0.518 150 160 46.77 96.012 95.72 96.162 95.87 0.81 0.32 0.38 1.15 1.252 1.201 13.00%
1042 1238 1237 96.706 96.972 94 177 94 177 0.1175 0.2212 0.0065 25.03 0.359 0.67 200 240 67.08 95.506 95.227 95.706 95.427 0.8 0.28 0.34 1.2 1.746 1.473 11.30%
1043 1237 34 96.972 96.914 143 270 310 584 0.3875 0.73 0.022 25.03 1.1845 2.212 200 240 114.52 95.227 94.749 95.427 94.949 0.8 0.41 0.49 1.746 2.165 1.955 20.10%
1044 34 35 96.914 96.939 143 271 101329 191187 126.6612 238.9837 7.0776 564.67 292.0654 544.791 1000 2520 114.8 93.949 93.904 94.949 94.904 0.72 0.72 0.82 2.965 3.035 3 79.00%
1045 1254 35 96.695 96.939 99 187 99 187 0.1237 0.2338 0.007 25.03 0.3782 0.708 200 240 72.46 95.495 95.193 95.695 95.393 0.8 0.29 0.35 1.2 1.746 1.473 11.60%
1046 1193 1194 96.834 96.892 85 160 85 160 0.1062 0.2 0.0056 14.23 0.3244 0.606 150 160 58.45 95.684 95.319 95.834 95.469 0.81 0.33 0.4 1.15 1.573 1.362 14.10%
1047 1196 1194 96.899 96.892 60 114 60 114 0.075 0.1425 0.0034 14.23 0.2284 0.431 150 160 34.92 95.749 95.531 95.899 95.681 0.81 0.3 0.36 1.15 1.361 1.255 11.90%
1048 1194 1195 96.892 96.931 48 91 193 365 0.2412 0.4562 0.0113 25.03 0.735 1.38 200 240 23.33 95.269 95.171 95.469 95.371 0.8 0.35 0.43 1.623 1.76 1.692 15.90%
1049 1197 1195 96.874 96.931 126 238 126 238 0.1575 0.2975 0.0095 25.03 0.482 0.902 200 240 98.23 95.674 95.265 95.874 95.465 0.8 0.31 0.38 1.2 1.666 1.433 13.00%
1050 1195 35 96.931 96.939 104 196 423 799 0.5288 0.9987 0.0281 25.03 1.6144 3.024 200 240 76.89 95.171 94.851 95.371 95.051 0.8 0.45 0.54 1.76 2.088 1.924 23.50%

Page 22 of 26
Sewerage Project, Begusarai Annex -A-3: Hydraulic Design of Sewer Network
NGRBA

Link ID Start End Node Upstrem Downstream Population Population Cum Cum Flow 2011 Flow 2041 Infiltration Full Flow Design Design Diameter Slope Length Upstream Downstream Upstream Downstream Full Flow Actual Actual Upstream Downstream Average Depth of
Node Ground Ground Level 2011 2041 Population Population Flow 2011 Flow 2041 Invert Invert Crown Crown Velocity Velocity Velocity Depth Depth Depth Flow
Level 2011 2041 2011 2041
m m souls souls souls souls lps lps lps lps lps lps mm 1 in m m m m m m/s m/s m/s m m m %age
1051 35 36 96.939 96.954 76 143 101927 192316 127.4087 240.395 7.1176 568.07 293.7872 548.006 1000 2490 49.79 93.904 93.884 94.904 94.884 0.72 0.73 0.82 3.035 3.07 3.052 79.00%
1052 36 37 96.954 96.907 158 299 102085 192615 127.6062 240.7687 7.13 569.21 294.244 548.86 1000 2480 129.25 93.884 93.832 94.884 94.832 0.72 0.73 0.83 3.07 3.075 3.073 78.90%
1053 37 38 96.907 96.746 74 140 102159 192755 127.6987 240.9437 7.1347 569.21 294.4568 549.258 1000 2480 48.07 93.832 93.812 94.832 94.812 0.72 0.73 0.83 3.075 2.934 3.005 79.00%
1054 1255 1256 96.785 97.061 169 319 169 319 0.2112 0.3987 0.0134 25.03 0.6472 1.21 200 240 139.39 95.585 95.004 95.785 95.204 0.8 0.34 0.41 1.2 2.057 1.628 14.90%
1055 1256 1257 97.061 96.941 54 102 223 421 0.2788 0.5263 0.0163 25.03 0.8525 1.595 200 240 29.24 95.004 94.882 95.204 95.082 0.8 0.37 0.45 2.057 2.059 2.058 17.10%
1056 1264 1257 96.898 96.941 130 245 130 245 0.1625 0.3063 0.0098 25.03 0.4973 0.929 200 240 101.46 95.698 95.275 95.898 95.475 0.8 0.31 0.38 1.2 1.666 1.433 13.20%
1057 1257 1258 96.941 96.749 67 127 420 793 0.525 0.9912 0.0301 25.03 1.6051 3.004 200 240 41.67 94.882 94.708 95.082 94.908 0.8 0.45 0.54 2.059 2.041 2.05 23.40%
1058 1265 1258 96.961 96.749 129 243 129 243 0.1612 0.3037 0.0097 25.03 0.4935 0.921 200 240 100.62 95.761 95.342 95.961 95.542 0.8 0.31 0.38 1.2 1.408 1.304 13.10%
1059 1258 1259 96.749 96.763 65 123 614 1159 0.7675 1.4488 0.0436 25.03 2.3461 4.39 200 240 39.51 94.708 94.544 94.908 94.744 0.8 0.5 0.6 2.041 2.219 2.13 28.30%
1060 1266 1267 96.912 96.915 140 264 140 264 0.175 0.33 0.0107 25.03 0.5357 1.001 200 240 111.27 95.712 95.248 95.912 95.448 0.8 0.32 0.39 1.2 1.667 1.434 13.70%
1061 1267 1268 96.915 96.755 105 199 245 463 0.3062 0.5788 0.0183 25.03 0.937 1.755 200 240 78.24 95.248 94.922 95.448 95.122 0.8 0.38 0.46 1.667 1.833 1.75 17.90%
1062 1271 1270 96.805 96.813 88 166 88 166 0.11 0.2075 0.0059 25.03 0.3359 0.628 200 240 61.67 95.605 95.348 95.805 95.548 0.8 0.28 0.34 1.2 1.465 1.333 10.90%
1063 1270 1269 96.813 96.844 75 140 163 306 0.2037 0.3825 0.0106 25.03 0.6219 1.158 200 240 48.56 95.348 95.145 95.548 95.345 0.8 0.34 0.41 1.465 1.699 1.582 14.60%
1064 1269 1268 96.844 96.755 94 177 257 483 0.3212 0.6037 0.0171 25.03 0.9808 1.828 200 240 66.89 95.145 94.867 95.345 95.067 0.8 0.39 0.46 1.699 1.888 1.794 18.30%
1065 1268 1259 96.755 96.763 61 114 563 1060 0.7037 1.325 0.0388 25.03 2.15 4.014 200 240 35.23 94.867 94.72 95.067 94.92 0.8 0.49 0.58 1.888 2.043 1.966 27.10%
1066 1259 1260 96.763 96.563 150 284 1327 2503 1.6587 3.1288 0.094 25.03 5.0703 9.48 200 240 121.31 94.544 94.038 94.744 94.238 0.8 0.62 0.74 2.219 2.525 2.372 42.70%
1067 1260 1261 96.563 96.275 102 192 1429 2695 1.7862 3.3688 0.1012 25.03 5.46 10.207 200 240 74.54 94.038 93.728 94.238 93.928 0.8 0.64 0.76 2.525 2.547 2.536 44.50%
1068 1263 1261 96.745 96.275 118 222 118 222 0.1475 0.2775 0.0087 28.13 0.4512 0.841 200 190 90.09 95.545 95.071 95.745 95.271 0.9 0.33 0.4 1.2 1.204 1.202 11.90%
1069 1261 1262 96.275 96.398 81 153 1628 3070 2.035 3.8375 0.1152 25.03 6.2202 11.628 200 240 55.09 93.728 93.498 93.928 93.698 0.8 0.66 0.78 2.547 2.9 2.724 47.90%
1070 1262 38 96.398 96.746 119 225 1747 3295 2.1837 4.1188 0.1241 25.03 6.6753 12.48 200 240 91.74 93.498 93.116 93.698 93.316 0.8 0.67 0.8 2.9 3.63 3.265 49.90%
1071 1096 1097 97.768 97.396 320 606 320 606 0.4 0.7575 0.0274 25.03 1.2274 2.3 200 240 284.58 96.568 95.382 96.768 95.582 0.8 0.41 0.5 1.2 2.014 1.607 20.50%
1072 1168 1097 96.713 97.396 162 306 162 306 0.2025 0.3825 0.0128 25.03 0.6203 1.16 200 240 132.47 95.513 94.961 95.713 95.161 0.8 0.34 0.41 1.2 2.435 1.817 14.70%
1073 1097 1089 97.396 97.096 110 208 592 1120 0.74 1.4 0.0482 25.03 2.2682 4.248 200 240 83.01 94.961 94.615 95.161 94.815 0.8 0.49 0.59 2.435 2.481 2.458 27.90%
1074 1132 1086 96.485 96.527 78 147 78 147 0.0975 0.1837 0.005 14.23 0.2975 0.556 150 160 51.75 95.335 95.012 95.485 95.162 0.81 0.32 0.39 1.15 1.515 1.332 13.50%
1075 1131 1085 96.488 96.513 94 178 94 178 0.1175 0.2225 0.0065 25.03 0.359 0.674 200 240 67.59 95.288 95.007 95.488 95.207 0.8 0.28 0.34 1.2 1.506 1.353 11.30%
1076 1098 1099 96.393 96.449 85 161 85 161 0.1062 0.2013 0.0057 14.23 0.3244 0.609 150 160 58.98 95.243 94.875 95.393 95.025 0.81 0.33 0.4 1.15 1.574 1.362 14.10%
1077 1099 1100 96.449 96.4 81 153 166 314 0.2075 0.3925 0.011 25.03 0.6335 1.188 200 240 54.75 94.825 94.596 95.025 94.796 0.8 0.34 0.41 1.624 1.804 1.714 14.80%
1078 1106 1100 96.399 96.4 76 144 76 144 0.095 0.18 0.0049 14.23 0.2899 0.545 150 160 50.31 95.249 94.935 95.399 95.085 0.81 0.32 0.39 1.15 1.465 1.308 13.40%
1079 1107 1100 97.238 96.4 142 269 142 269 0.1775 0.3363 0.011 34.01 0.5435 1.02 200 130 113.93 96.038 95.162 96.238 95.362 1.08 0.4 0.48 1.2 1.239 1.219 11.90%
1080 1100 1101 96.4 96.399 53 99 437 826 0.5462 1.0325 0.0295 25.03 1.6682 3.127 200 240 27.42 94.596 94.482 94.796 94.682 0.8 0.45 0.54 1.804 1.917 1.861 23.90%
1081 1105 1101 96.416 96.399 148 280 148 280 0.185 0.35 0.0115 25.03 0.5665 1.062 200 240 119.31 95.216 94.719 95.416 94.919 0.8 0.33 0.4 1.2 1.68 1.44 14.00%
1082 1101 1102 96.399 96.399 56 105 641 1211 0.8012 1.5138 0.0439 25.03 2.4476 4.585 200 240 30.37 94.482 94.356 94.682 94.556 0.8 0.51 0.61 1.917 2.044 1.98 29.00%
1083 1104 1102 96.517 96.399 82 155 82 155 0.1025 0.1937 0.0054 14.23 0.3129 0.587 150 160 55.84 95.367 95.018 95.517 95.168 0.81 0.33 0.4 1.15 1.382 1.266 13.80%
1084 1102 1103 96.399 96.471 81 153 804 1519 1.005 1.8988 0.0546 25.03 3.0696 5.751 200 240 54.71 94.356 94.128 94.556 94.328 0.8 0.54 0.65 2.044 2.343 2.193 32.60%
1085 1103 1085 96.471 96.513 110 207 914 1726 1.1425 2.1575 0.0625 25.03 3.49 6.535 200 240 82.49 94.128 93.784 94.328 93.984 0.8 0.56 0.67 2.343 2.729 2.536 34.90%
1086 1081 1082 96.517 96.414 177 334 177 334 0.2212 0.4175 0.0142 25.03 0.6779 1.267 200 240 147.03 95.317 94.704 95.517 94.904 0.8 0.35 0.42 1.2 1.709 1.455 15.30%
1087 1082 1083 96.414 96.488 168 317 345 651 0.4312 0.8137 0.0275 25.03 1.3213 2.469 200 240 138.29 94.704 94.128 94.904 94.328 0.8 0.42 0.51 1.709 2.36 2.035 21.20%
1088 1083 1084 96.488 96.505 109 206 454 857 0.5675 1.0712 0.0354 25.03 1.7379 3.249 200 240 82.02 94.128 93.786 94.328 93.986 0.8 0.46 0.55 2.36 2.719 2.539 24.30%
1089 1084 1085 96.505 96.513 58 108 512 965 0.64 1.2062 0.0385 25.03 1.9585 3.657 200 240 32.24 93.786 93.652 93.986 93.852 0.8 0.47 0.57 2.719 2.861 2.79 25.80%
1090 1085 1086 96.513 96.527 74 139 1594 3008 1.9925 3.76 0.1122 25.03 6.0897 11.392 200 240 47.85 93.652 93.452 93.852 93.652 0.8 0.66 0.78 2.861 3.074 2.968 47.30%
1091 1086 1087 96.527 96.571 55 104 1727 3259 2.1587 4.0738 0.1201 25.03 6.5963 12.341 200 240 29.96 93.452 93.328 93.652 93.528 0.8 0.67 0.79 3.074 3.243 3.159 49.60%
1092 1087 1088 96.571 96.916 117 220 1844 3479 2.305 4.3488 0.1287 25.03 7.0437 13.175 200 240 89.07 93.328 92.956 93.528 93.156 0.8 0.68 0.81 3.243 3.96 3.601 51.50%
1093 1088 1089 96.916 97.096 71 133 1915 3612 2.3937 4.515 0.133 24.52 7.3142 13.678 200 250 44.96 92.956 92.777 93.156 92.977 0.78 0.68 0.8 3.96 4.32 4.14 53.40%
1094 1191 1116 96.616 97.193 147 278 147 278 0.1837 0.3475 0.0114 25.03 0.5627 1.054 200 240 118.66 95.416 94.922 95.616 95.122 0.8 0.33 0.39 1.2 2.271 1.736 14.00%
1095 1128 1129 96.347 96.366 78 147 78 147 0.0975 0.1837 0.005 14.23 0.2975 0.556 150 160 51.67 95.197 94.874 95.347 95.024 0.81 0.32 0.39 1.15 1.492 1.321 13.50%
1096 1129 1111 96.366 96.24 95 179 173 326 0.2163 0.4075 0.0115 25.03 0.6603 1.234 200 240 67.92 94.824 94.541 95.024 94.741 0.8 0.34 0.41 1.542 1.699 1.62 15.10%
1097 1130 1110 96.335 96.252 87 165 87 165 0.1088 0.2062 0.0059 25.03 0.3321 0.625 200 240 60.89 95.135 94.882 95.335 95.082 0.8 0.28 0.34 1.2 1.37 1.285 10.90%
1098 1108 1109 96.297 96.252 97 183 97 183 0.1212 0.2287 0.0067 25.03 0.3705 0.693 200 240 69.93 95.097 94.806 95.297 95.006 0.8 0.29 0.35 1.2 1.446 1.323 11.40%

Page 23 of 26
Sewerage Project, Begusarai Annex -A-3: Hydraulic Design of Sewer Network
NGRBA

Link ID Start End Node Upstrem Downstream Population Population Cum Cum Flow 2011 Flow 2041 Infiltration Full Flow Design Design Diameter Slope Length Upstream Downstream Upstream Downstream Full Flow Actual Actual Upstream Downstream Average Depth of
Node Ground Ground Level 2011 2041 Population Population Flow 2011 Flow 2041 Invert Invert Crown Crown Velocity Velocity Velocity Depth Depth Depth Flow
Level 2011 2041 2011 2041
m m souls souls souls souls lps lps lps lps lps lps mm 1 in m m m m m m/s m/s m/s m m m %age
1099 1109 1110 96.252 96.252 55 104 152 287 0.19 0.3587 0.0096 25.03 0.5796 1.086 200 240 29.75 94.806 94.682 95.006 94.882 0.8 0.33 0.4 1.446 1.57 1.508 14.20%
1100 1110 1111 96.252 96.24 66 124 305 576 0.3812 0.72 0.0193 25.03 1.1631 2.179 200 240 40.02 94.682 94.515 94.882 94.715 0.8 0.41 0.49 1.57 1.725 1.648 19.90%
1101 1111 1112 96.24 96.415 151 285 629 1187 0.7862 1.4838 0.0426 25.03 2.4014 4.494 200 240 121.97 94.515 94.007 94.715 94.207 0.8 0.5 0.6 1.725 2.408 2.067 28.70%
1102 1126 1124 96.344 96.353 99 187 99 187 0.1237 0.2338 0.007 25.03 0.3782 0.708 200 240 72.41 95.144 94.842 95.344 95.042 0.8 0.29 0.35 1.2 1.511 1.355 11.60%
1103 1127 1123 96.335 96.312 93 176 93 176 0.1163 0.22 0.0064 25.03 0.3552 0.666 200 240 66.49 95.135 94.858 95.335 95.058 0.8 0.28 0.34 1.2 1.454 1.327 11.20%
1104 1121 1122 96.33 96.325 86 163 86 163 0.1075 0.2037 0.0058 14.23 0.3283 0.617 150 160 59.93 95.18 94.806 95.33 94.956 0.81 0.33 0.4 1.15 1.519 1.335 14.20%
1105 1122 1123 96.325 96.312 63 118 149 281 0.1863 0.3512 0.0094 25.03 0.5681 1.063 200 240 37.29 94.756 94.6 94.956 94.8 0.8 0.33 0.4 1.569 1.712 1.64 14.10%
1106 1123 1124 96.312 96.353 61 114 303 571 0.3788 0.7137 0.0192 25.03 1.1554 2.16 200 240 35.13 94.6 94.454 94.8 94.654 0.8 0.41 0.49 1.712 1.899 1.805 19.80%
1107 1124 1112 96.353 96.415 77 146 479 904 0.5987 1.13 0.0311 25.03 1.8274 3.421 200 240 51.41 94.454 94.24 94.654 94.44 0.8 0.46 0.56 1.899 2.175 2.037 25.00%
1108 1125 1112 96.502 96.415 108 204 108 204 0.135 0.255 0.0078 25.03 0.4128 0.773 200 240 80.82 95.302 94.965 95.502 95.165 0.8 0.3 0.36 1.2 1.45 1.325 12.10%
1109 1112 1113 96.415 96.423 56 105 1272 2400 1.59 3 0.0845 25.03 4.8545 9.085 200 240 30.46 94.007 93.88 94.207 94.08 0.8 0.62 0.73 2.408 2.543 2.475 41.70%
1110 1117 1118 97.166 96.499 125 237 125 237 0.1563 0.2962 0.0094 32.77 0.4782 0.898 200 140 97.51 95.966 95.269 96.166 95.469 1.04 0.38 0.45 1.2 1.23 1.215 11.40%
1111 1118 1119 96.499 96.416 88 166 213 403 0.2663 0.5037 0.0153 25.03 0.8141 1.527 200 240 61.61 95.269 95.012 95.469 95.212 0.8 0.37 0.44 1.23 1.404 1.317 16.80%
1112 1120 1119 96.362 96.416 58 109 58 109 0.0725 0.1363 0.0031 14.23 0.2206 0.412 150 160 32.5 95.212 95.009 95.362 95.159 0.81 0.3 0.36 1.15 1.407 1.278 11.70%
1113 1119 1113 96.416 96.423 65 123 336 635 0.42 0.7937 0.0223 25.03 1.2823 2.404 200 240 39.84 94.959 94.793 95.159 94.993 0.8 0.42 0.5 1.457 1.629 1.543 20.90%
1114 1182 1183 96.741 96.464 116 219 116 219 0.145 0.2738 0.0085 25.03 0.4435 0.83 200 240 88.38 95.541 95.172 95.741 95.372 0.8 0.3 0.37 1.2 1.291 1.246 12.50%
1115 1183 1113 96.464 96.423 59 111 175 330 0.2188 0.4125 0.0118 25.03 0.668 1.249 200 240 33.62 95.172 95.032 95.372 95.232 0.8 0.34 0.41 1.291 1.39 1.341 15.20%
1116 1113 1114 96.423 96.683 130 245 1913 3610 2.3912 4.5125 0.1284 24.52 7.3021 13.666 200 250 101.47 93.88 93.474 94.08 93.674 0.78 0.68 0.8 2.543 3.209 2.876 53.30%
1117 1114 1115 96.683 97.343 145 274 2058 3884 2.5725 4.855 0.1396 24.05 7.8571 14.705 200 260 116.28 93.474 93.027 93.674 93.227 0.77 0.68 0.8 3.209 4.317 3.763 56.50%
1118 1192 1190 96.827 96.927 60 113 60 113 0.075 0.1412 0.0033 14.23 0.2283 0.427 150 160 34.41 95.677 95.462 95.827 95.612 0.81 0.3 0.36 1.15 1.465 1.307 11.90%
1119 1190 1179 96.927 97.353 136 258 196 371 0.245 0.4638 0.0138 25.03 0.7488 1.405 200 240 108.15 95.412 94.962 95.612 95.162 0.8 0.36 0.43 1.515 2.391 1.953 16.10%
1120 1178 1180 97.517 97.413 107 203 107 203 0.1337 0.2537 0.0077 25.03 0.409 0.769 200 240 80.12 96.317 95.983 96.517 96.183 0.8 0.3 0.36 1.2 1.43 1.315 12.00%
1121 1181 1180 97.337 97.413 73 137 73 137 0.0912 0.1713 0.0045 14.23 0.2783 0.518 150 160 46.99 96.187 95.894 96.337 96.044 0.81 0.32 0.38 1.15 1.52 1.335 13.00%
1122 1180 1179 97.413 97.353 61 115 241 455 0.3012 0.5688 0.0157 25.03 0.9195 1.722 200 240 35.78 95.844 95.695 96.044 95.895 0.8 0.38 0.46 1.57 1.658 1.614 17.80%
1123 1179 1115 97.353 97.343 74 140 511 966 0.6387 1.2075 0.0341 25.03 1.9504 3.657 200 240 48.53 94.962 94.76 95.162 94.96 0.8 0.47 0.57 2.391 2.584 2.487 25.80%
1124 1115 1116 97.343 97.193 77 146 2646 4996 3.3075 6.245 0.1787 22.77 10.1012 18.914 200 290 51.32 93.027 92.85 93.227 93.05 0.72 0.7 0.81 4.317 4.344 4.33 69.60%
1125 1116 1089 97.193 97.096 176 332 2969 5606 3.7112 7.0075 0.2042 22.39 11.338 21.227 200 300 146.02 92.85 92.363 93.05 92.563 0.71 0.71 0.81 4.344 4.733 4.538 77.70%
1126 1089 1090 97.096 96.789 89 168 5565 10506 6.9562 13.1325 0.3915 51.65 21.2602 39.789 300 490 62.48 92.263 92.136 92.563 92.436 0.73 0.69 0.81 4.833 4.654 4.744 65.80%
1127 1095 1090 96.955 96.789 110 207 110 207 0.1375 0.2587 0.0079 25.03 0.4204 0.784 200 240 82.36 95.755 95.412 95.955 95.612 0.8 0.3 0.36 1.2 1.378 1.289 12.10%
1128 1090 1091 96.789 96.55 70 131 5745 10844 7.1812 13.555 0.4036 51.13 21.9474 41.069 300 500 43.93 92.136 92.048 92.436 92.348 0.72 0.7 0.8 4.654 4.502 4.578 67.90%
1129 1174 1175 96.711 96.642 75 141 75 141 0.0938 0.1762 0.0047 14.23 0.286 0.533 150 160 48.84 95.561 95.255 95.711 95.405 0.81 0.32 0.39 1.15 1.386 1.268 13.20%
1130 1176 1175 96.637 96.642 74 140 74 140 0.0925 0.175 0.0047 14.23 0.2822 0.53 150 160 48.44 95.487 95.184 95.637 95.334 0.81 0.32 0.38 1.15 1.457 1.304 13.20%
1131 1175 1177 96.642 96.593 61 115 210 396 0.2625 0.495 0.0128 25.03 0.8003 1.498 200 240 35.42 95.134 94.987 95.334 95.187 0.8 0.36 0.44 1.507 1.606 1.557 16.60%
1132 1177 1091 96.593 96.55 56 106 266 502 0.3325 0.6275 0.0158 25.03 1.0133 1.898 200 240 31.08 94.987 94.857 95.187 95.057 0.8 0.39 0.47 1.606 1.693 1.649 18.60%
1133 1091 1092 96.55 96.629 66 124 6077 11470 7.5962 14.3375 0.4233 50.63 23.2121 43.436 300 510 40.12 92.048 91.969 92.348 92.269 0.72 0.7 0.8 4.502 4.66 4.581 71.30%
1134 1092 1093 96.629 96.712 103 195 6180 11665 7.725 14.5812 0.4307 50.14 23.6057 44.174 300 520 76.33 91.969 91.822 92.269 92.122 0.71 0.7 0.8 4.66 4.89 4.775 72.90%
1135 1093 1094 96.712 96.63 135 254 6315 11919 7.8937 14.8987 0.4409 50.14 24.1222 45.137 300 520 106.5 91.822 91.617 92.122 91.917 0.71 0.7 0.8 4.89 5.013 4.951 74.20%
1136 1094 38 96.63 96.746 82 154 6397 12073 7.9962 15.0912 0.4463 50.14 24.435 45.72 300 520 55.53 91.617 91.511 91.917 91.811 0.71 0.7 0.8 5.013 5.236 5.124 75.00%
1137 38 39 96.746 96.447 72 136 110375 208259 137.9687 260.3237 7.7095 615.65 318.1391 593.438 1000 2120 46.15 90.811 90.789 91.811 91.789 0.78 0.79 0.89 5.936 5.658 5.797 78.90%
1138 39 40 96.447 96.408 131 248 110506 208507 138.1325 260.6337 7.7194 615.65 318.5175 594.145 1000 2120 103.06 90.789 90.74 91.789 91.74 0.78 0.79 0.89 5.658 5.668 5.663 79.00%
1139 1169 1170 96.712 96.593 114 216 114 216 0.1425 0.27 0.0084 25.03 0.4359 0.818 200 240 87 95.512 95.15 95.712 95.35 0.8 0.3 0.37 1.2 1.443 1.322 12.40%
1140 1170 1171 96.593 96.614 60 112 174 328 0.2175 0.41 0.0117 25.03 0.6642 1.242 200 240 34.21 95.15 95.007 95.35 95.207 0.8 0.34 0.41 1.443 1.607 1.525 15.10%
1141 1172 1171 96.527 96.614 64 121 64 121 0.08 0.1512 0.0037 14.23 0.2437 0.457 150 160 38.51 95.377 95.136 95.527 95.286 0.81 0.3 0.37 1.15 1.478 1.314 12.30%
1142 1171 1173 96.614 96.635 107 203 345 652 0.4313 0.815 0.0231 25.03 1.3169 2.468 200 240 80.27 95.007 94.673 95.207 94.873 0.8 0.42 0.51 1.607 1.963 1.785 21.20%
1143 1173 40 96.635 96.408 100 189 445 841 0.5562 1.0512 0.0302 25.03 1.699 3.184 200 240 73.17 94.673 94.368 94.873 94.568 0.8 0.45 0.55 1.963 2.04 2.002 24.10%
1144 40 41 96.408 96.856 114 215 111065 209563 138.8312 261.9537 7.758 620.05 320.1282 597.154 1000 2090 86.35 90.74 90.699 91.74 91.699 0.79 0.8 0.9 5.668 6.157 5.913 78.80%
1145 41 42 96.856 96.764 92 174 111157 209737 138.9462 262.1712 7.7643 620.05 320.3933 597.649 1000 2090 65.55 90.699 90.668 91.699 91.668 0.79 0.8 0.9 6.157 6.097 6.127 78.90%
1146 42 43 96.764 96.799 133 251 111290 209988 139.1125 262.485 7.7744 620.05 320.7774 598.366 1000 2090 104.67 90.668 90.617 91.668 91.617 0.79 0.8 0.9 6.097 6.182 6.139 79.00%

Page 24 of 26
Sewerage Project, Begusarai Annex -A-3: Hydraulic Design of Sewer Network
NGRBA

Link ID Start End Node Upstrem Downstream Population Population Cum Cum Flow 2011 Flow 2041 Infiltration Full Flow Design Design Diameter Slope Length Upstream Downstream Upstream Downstream Full Flow Actual Actual Upstream Downstream Average Depth of
Node Ground Ground Level 2011 2041 Population Population Flow 2011 Flow 2041 Invert Invert Crown Crown Velocity Velocity Velocity Depth Depth Depth Flow
Level 2011 2041 2011 2041
m m souls souls souls souls lps lps lps lps lps lps mm 1 in m m m m m m/s m/s m/s m m m %age
1147 1165 1166 96.452 96.752 127 240 127 240 0.1587 0.3 0.0096 25.03 0.4858 0.91 200 240 99.32 95.252 94.838 95.452 95.038 0.8 0.31 0.38 1.2 1.914 1.557 13.00%
1148 1167 1166 96.506 96.752 91 171 91 171 0.1137 0.2137 0.0062 25.03 0.3475 0.647 200 240 64.28 95.306 95.038 95.506 95.238 0.8 0.28 0.34 1.2 1.715 1.457 11.10%
1149 1166 43 96.752 96.799 65 122 283 533 0.3537 0.6662 0.0195 25.03 1.0808 2.018 200 240 39.06 94.838 94.676 95.038 94.876 0.8 0.4 0.48 1.914 2.124 2.019 19.20%
1150 43 44 96.799 96.769 55 103 111628 210624 139.535 263.28 7.7968 672.93 321.7505 600.177 1100 2950 29.67 90.517 90.507 91.617 91.607 0.71 0.7 0.8 6.282 6.261 6.272 73.60%
1151 1163 1164 96.718 96.729 51 95 51 95 0.0637 0.1187 0.0025 14.23 0.1937 0.359 150 160 25.63 95.568 95.407 95.718 95.557 0.81 0.28 0.34 1.15 1.321 1.236 10.90%
1152 1164 44 96.729 96.769 84 159 135 254 0.1687 0.3175 0.008 25.03 0.5143 0.961 200 240 57.75 95.357 95.117 95.557 95.317 0.8 0.32 0.38 1.371 1.652 1.511 13.40%
1153 44 45 96.769 96.799 116 219 111879 211097 139.8487 263.8712 7.8134 672.93 322.473 601.524 1100 2950 88.67 90.507 90.477 91.607 91.577 0.71 0.7 0.8 6.261 6.322 6.291 73.70%
1154 1133 1134 97.144 97.434 177 335 177 335 0.2212 0.4187 0.0142 25.03 0.678 1.27 200 240 147.52 95.944 95.329 96.144 95.529 0.8 0.35 0.42 1.2 2.104 1.652 15.30%
1155 1136 1134 97.413 97.434 67 126 67 126 0.0837 0.1575 0.004 14.23 0.2552 0.476 150 160 41.4 96.263 96.004 96.413 96.154 0.81 0.31 0.37 1.15 1.429 1.29 12.50%
1156 1134 1135 97.434 97.392 175 330 419 791 0.5238 0.9887 0.0322 25.03 1.6034 2.998 200 240 144.82 95.329 94.726 95.529 94.926 0.8 0.45 0.54 2.104 2.666 2.385 23.40%
1157 1137 1135 97.449 97.392 79 150 79 150 0.0987 0.1875 0.0051 14.23 0.3014 0.568 150 160 53.29 96.299 95.966 96.449 96.116 0.81 0.32 0.39 1.15 1.426 1.288 13.60%
1158 1135 118 97.392 97.841 90 169 588 1110 0.735 1.3875 0.0434 25.03 2.2484 4.206 200 240 63.25 94.726 94.463 94.926 94.663 0.8 0.49 0.59 2.666 3.379 3.022 27.70%
1159 1080 1079 96.449 96.561 67 127 67 127 0.0837 0.1587 0.004 14.23 0.2553 0.48 150 160 41.56 95.299 95.039 95.449 95.189 0.81 0.31 0.37 1.15 1.522 1.336 12.60%
1160 1079 1078 96.561 97.05 102 193 169 320 0.2112 0.4 0.0113 25.03 0.645 1.211 200 240 75.23 94.989 94.675 95.189 94.875 0.8 0.34 0.41 1.572 2.374 1.973 15.00%
1161 1078 1077 97.05 96.961 97 183 266 503 0.3325 0.6287 0.018 25.03 1.0155 1.904 200 240 70.13 94.675 94.383 94.875 94.583 0.8 0.39 0.47 2.374 2.578 2.476 18.70%
1162 1077 1076 96.961 97.353 116 219 382 722 0.4775 0.9025 0.0265 25.03 1.459 2.734 200 240 88.26 94.383 94.015 94.583 94.215 0.8 0.43 0.52 2.578 3.338 2.958 22.30%
1163 1076 1075 97.353 97.659 65 123 447 845 0.5587 1.0562 0.0304 25.03 1.7066 3.199 200 240 39.54 94.015 93.851 94.215 94.051 0.8 0.46 0.55 3.338 3.809 3.573 24.10%
1164 1075 118 97.659 97.841 52 98 499 943 0.6237 1.1787 0.033 25.03 1.9042 3.569 200 240 27.02 93.851 93.738 94.051 93.938 0.8 0.47 0.56 3.809 4.103 3.956 25.50%
1165 118 119 97.841 97.029 95 180 1182 2233 1.4775 2.7912 0.083 25.03 4.5155 8.457 200 240 68.43 93.738 93.453 93.938 93.653 0.8 0.6 0.72 4.103 3.576 3.84 40.10%
1166 1138 1139 97.394 97.396 60 113 60 113 0.075 0.1412 0.0033 14.23 0.2283 0.427 150 160 34.53 96.244 96.028 96.394 96.178 0.81 0.3 0.36 1.15 1.368 1.259 11.90%
1167 1146 1139 97.462 97.396 45 85 45 85 0.0562 0.1062 0.002 14.23 0.1707 0.321 150 160 20.47 96.312 96.184 96.462 96.334 0.81 0.27 0.33 1.15 1.212 1.181 10.40%
1168 1139 1140 97.396 97.208 57 107 162 305 0.2025 0.3812 0.0083 25.03 0.6158 1.152 200 240 31.3 95.978 95.847 96.178 96.047 0.8 0.34 0.4 1.418 1.361 1.389 14.60%
1169 1140 1141 97.208 96.922 61 115 223 420 0.2788 0.525 0.0118 25.03 0.848 1.587 200 240 35.71 95.847 95.699 96.047 95.899 0.8 0.37 0.45 1.361 1.223 1.292 17.10%
1170 1142 1143 97.431 97.303 60 114 60 114 0.075 0.1425 0.0034 14.23 0.2284 0.431 150 160 34.99 96.281 96.062 96.431 96.212 0.81 0.3 0.36 1.15 1.241 1.195 11.90%
1171 1147 1143 96.894 97.303 80 150 80 150 0.1 0.1875 0.0052 14.23 0.3052 0.568 150 160 53.55 95.744 95.409 95.894 95.559 0.81 0.33 0.39 1.15 1.894 1.522 13.60%
1172 1143 1144 97.303 97.464 88 166 228 430 0.285 0.5375 0.0145 25.03 0.8695 1.627 200 240 61.29 95.359 95.104 95.559 95.304 0.8 0.37 0.45 1.944 2.36 2.152 17.30%
1173 1144 1145 97.464 97.054 62 117 290 547 0.3625 0.6837 0.018 25.03 1.1055 2.069 200 240 36.43 95.104 94.952 95.304 95.152 0.8 0.4 0.48 2.36 2.102 2.231 19.40%
1174 1145 1141 97.054 96.922 83 156 373 703 0.4662 0.8787 0.0234 25.03 1.4222 2.66 200 240 56.68 94.952 94.716 95.152 94.916 0.8 0.43 0.52 2.102 2.206 2.154 22.00%
1175 1141 119 96.922 97.029 92 174 688 1297 0.86 1.6212 0.0415 25.03 2.6215 4.905 200 240 65.68 94.716 94.442 94.916 94.642 0.8 0.52 0.62 2.206 2.587 2.396 30.00%
1176 119 120 97.029 96.719 92 174 1962 3704 2.4525 4.63 0.1309 24.52 7.4884 14.021 200 250 65.8 93.453 93.19 93.653 93.39 0.78 0.69 0.81 3.576 3.53 3.553 54.20%
1177 120 121 96.719 96.734 61 116 2023 3820 2.5287 4.775 0.1343 24.05 7.7206 14.459 200 260 36.04 93.19 93.051 93.39 93.251 0.77 0.68 0.8 3.53 3.683 3.606 55.90%
1178 121 122 96.734 96.801 77 145 2100 3965 2.625 4.9562 0.1392 24.05 8.0142 15.008 200 260 50.74 93.051 92.856 93.251 93.056 0.77 0.69 0.81 3.683 3.945 3.814 57.20%
1179 1162 122 96.734 96.801 105 199 105 199 0.1312 0.2488 0.0075 25.03 0.4013 0.754 200 240 78.2 95.534 95.208 95.734 95.408 0.8 0.29 0.36 1.2 1.593 1.396 11.90%
1180 122 45 96.801 96.799 110 207 2315 4371 2.8937 5.4637 0.1548 23.17 8.836 16.546 200 280 82.6 92.856 92.561 93.056 92.761 0.74 0.69 0.8 3.945 4.238 4.092 62.50%
1181 45 46 96.799 96.824 56 106 114250 215574 142.8125 269.4675 7.9712 671.79 329.2993 614.273 1100 2960 31.17 90.477 90.467 91.577 91.567 0.71 0.7 0.8 6.322 6.357 6.339 75.20%
1182 1155 1156 96.887 96.688 61 115 61 115 0.0763 0.1437 0.0034 14.23 0.2322 0.435 150 160 35.65 95.737 95.515 95.887 95.665 0.81 0.3 0.36 1.15 1.174 1.162 12.00%
1183 1156 1157 96.688 96.69 57 107 118 222 0.1475 0.2775 0.0065 25.03 0.449 0.839 200 240 31.75 95.465 95.332 95.665 95.532 0.8 0.31 0.37 1.224 1.357 1.29 12.50%
1184 1157 1158 96.69 96.724 59 112 177 334 0.2212 0.4175 0.0098 25.03 0.6735 1.262 200 240 34.07 95.332 95.19 95.532 95.39 0.8 0.34 0.42 1.357 1.534 1.446 15.30%
1185 1161 1158 96.737 96.724 77 145 77 145 0.0962 0.1812 0.0049 14.23 0.2936 0.549 150 160 50.65 95.587 95.27 95.737 95.42 0.81 0.32 0.39 1.15 1.454 1.302 13.40%
1186 1158 1159 96.724 96.808 83 157 337 636 0.4212 0.795 0.0202 25.03 1.2839 2.405 200 240 56.9 95.19 94.953 95.39 95.153 0.8 0.42 0.5 1.534 1.855 1.694 20.90%
1187 1159 46 96.808 96.824 93 176 430 812 0.5375 1.015 0.0266 25.03 1.6391 3.072 200 240 66.77 94.953 94.675 95.153 94.875 0.8 0.45 0.54 1.855 2.149 2.002 23.70%
1188 46 47 96.824 96.613 93 175 114773 216561 143.4662 270.7012 8.0041 670.66 330.8032 617.082 1100 2970 66.13 90.467 90.445 91.567 91.545 0.71 0.7 0.8 6.357 6.169 6.263 75.60%
1189 1148 1149 96.852 96.736 92 174 92 174 0.115 0.2175 0.0063 25.03 0.3513 0.659 200 240 65.69 95.652 95.379 95.852 95.579 0.8 0.28 0.34 1.2 1.357 1.278 11.20%
1190 1149 1150 96.736 96.586 61 116 153 290 0.1912 0.3625 0.0098 25.03 0.5836 1.097 200 240 36.04 95.379 95.228 95.579 95.428 0.8 0.33 0.4 1.357 1.357 1.357 14.30%
1191 1150 1151 96.586 96.665 81 154 234 444 0.2925 0.555 0.0151 25.03 0.8926 1.68 200 240 55.26 95.228 94.998 95.428 95.198 0.8 0.38 0.45 1.357 1.667 1.512 17.50%
1192 1154 1151 96.818 96.665 93 175 93 175 0.1163 0.2188 0.0064 25.03 0.3551 0.663 200 240 65.9 95.618 95.343 95.818 95.543 0.8 0.28 0.34 1.2 1.322 1.261 11.20%
1193 1151 1152 96.665 96.668 86 162 413 781 0.5163 0.9762 0.0272 25.03 1.576 2.956 200 240 59.54 94.998 94.75 95.198 94.95 0.8 0.44 0.53 1.667 1.918 1.793 23.20%
1194 1160 1152 96.707 96.668 47 88 47 88 0.0587 0.11 0.0021 14.23 0.1783 0.332 150 160 21.68 95.557 95.421 95.707 95.571 0.81 0.28 0.33 1.15 1.247 1.199 10.50%

Page 25 of 26
Sewerage Project, Begusarai Annex -A-3: Hydraulic Design of Sewer Network
NGRBA

Link ID Start End Node Upstrem Downstream Population Population Cum Cum Flow 2011 Flow 2041 Infiltration Full Flow Design Design Diameter Slope Length Upstream Downstream Upstream Downstream Full Flow Actual Actual Upstream Downstream Average Depth of
Node Ground Ground Level 2011 2041 Population Population Flow 2011 Flow 2041 Invert Invert Crown Crown Velocity Velocity Velocity Depth Depth Depth Flow
Level 2011 2041 2011 2041
m m souls souls souls souls lps lps lps lps lps lps mm 1 in m m m m m m/s m/s m/s m m m %age
1195 1152 1153 96.668 96.641 86 163 546 1032 0.6825 1.29 0.0351 25.03 2.0826 3.905 200 240 59.82 94.75 94.501 94.95 94.701 0.8 0.48 0.58 1.918 2.14 2.029 26.70%
1196 1153 47 96.641 96.613 78 147 624 1179 0.78 1.4737 0.0401 25.03 2.3801 4.461 200 240 51.87 94.501 94.285 94.701 94.485 0.8 0.5 0.6 2.14 2.329 2.234 28.60%
1197 47 48 96.613 96.558 60 113 115457 217853 144.3212 272.3162 8.0476 670.66 332.7704 620.759 1100 2970 34.44 90.445 90.433 91.545 91.533 0.71 0.7 0.8 6.169 6.125 6.147 76.00%
1198 48 49 96.558 96.257 119 225 115576 218078 144.47 272.5975 8.0564 670.66 333.1139 621.401 1100 2970 91.52 90.433 90.402 91.533 91.502 0.71 0.7 0.8 6.125 5.855 5.99 76.10%
1199 1198 1199 96.226 96.087 148 280 148 280 0.185 0.35 0.0115 25.03 0.5665 1.062 200 240 119.33 95.026 94.528 95.226 94.728 0.8 0.33 0.4 1.2 1.558 1.379 14.00%
1200 1199 49 96.087 96.257 102 192 250 472 0.3125 0.59 0.0187 25.03 0.9562 1.789 200 240 74.66 94.528 94.217 94.728 94.417 0.8 0.38 0.46 1.558 2.04 1.799 18.10%
1201 49 50 96.257 95.691 119 224 115945 218774 144.9312 273.4675 8.0839 669.53 334.1791 623.386 1100 2980 90.91 90.402 90.372 91.502 91.472 0.7 0.7 0.8 5.855 5.32 5.587 76.40%
1202 50 51 95.691 95.609 168 317 116113 219091 145.1412 273.8637 8.0972 669.53 334.665 624.291 1100 2980 138.17 90.372 90.325 91.472 91.425 0.7 0.7 0.8 5.32 5.283 5.301 76.50%
1203 51 52 95.609 95.495 189 358 116302 219449 145.3775 274.3112 8.1125 669.53 335.2119 625.313 1100 2980 159.12 90.325 90.272 91.425 91.372 0.7 0.7 0.8 5.283 5.224 5.253 76.60%
1204 52 53 95.495 95.568 182 344 116484 219793 145.605 274.7412 8.1272 669.53 335.7384 626.295 1100 2980 152.09 90.272 90.221 91.372 91.321 0.7 0.7 0.8 5.224 5.347 5.285 76.70%
1205 53 54 95.568 95.54 151 286 116635 220079 145.7937 275.0987 8.139 669.53 336.1749 627.111 1100 2980 122.58 90.221 90.18 91.321 91.28 0.7 0.7 0.8 5.347 5.36 5.354 76.80%
1206 54 55 95.54 95.514 115 217 116750 220296 145.9375 275.37 8.1475 669.53 336.5068 627.73 1100 2980 87.71 90.18 90.15 91.28 91.25 0.7 0.71 0.8 5.36 5.364 5.362 76.90%
1207 55 56 95.514 95.503 89 168 116839 220464 146.0487 275.58 8.1535 669.53 336.7632 628.208 1100 2980 62.62 90.15 90.129 91.25 91.229 0.7 0.71 0.8 5.364 5.374 5.369 76.90%
1208 56 57 95.503 95.447 123 231 116962 220695 146.2025 275.8687 8.1627 669.53 337.1183 628.867 1100 2980 94.82 90.129 90.097 91.229 91.197 0.7 0.71 0.8 5.374 5.349 5.361 77.00%
1209 57 58 95.447 95.448 176 332 117138 221027 146.4225 276.2837 8.1768 669.53 337.6273 629.815 1100 2980 146.05 90.097 90.048 91.197 91.148 0.7 0.71 0.8 5.349 5.4 5.374 77.10%
1210 58 59 95.448 95.417 378 713 117516 221740 146.895 277.175 8.2095 669.53 338.7232 631.853 1100 2980 338.95 90.048 89.935 91.148 91.035 0.7 0.71 0.8 5.4 5.483 5.441 77.30%

Page 26 of 26
Sewerage Project, Begusarai, Annex A-4: Design of STP
NGRBA

Process Design of Sequential Batch Reactor Wastewater Treatment Plant

Project name : Sewerage Project, Begusarai Location : Wajidpur

Programme: NGRBA Capacity: 17 mld

1.0 Base Design Data


1.1 Influent Parameters
FLOW average MLD 17
PEAK FACTOR 2.25
FLOW peak MLD 38.25
BOD mg/l 300
COD mg/l 700
SS mg/l 600
Ammonia nitrogen AS N mg/l 35
Alkalinity mg/l 185
pH mg/l 7.2-7.9
TKN AS N mg/l 55
Sulphates mg/l 110
Oil & Grease mg/l 15
1.2 Outlet parameters
BOD mg/l 5
SS mg/l 10
COD mg/l 50
pH 6 to 9

2.0 Design Calculations

2.1 INLET (Receiving) CHAMBER ( for ultimate capacity)

No. of Inlet chambers No. 1


Design flow for inlet chamber MLD 25
m³/hr 2343.75
Ultimate Peak flow MLD 56.25
Retention time sec 12
Volume of inlet chamber m³ 7.8125
Liquid depth in inlet chamber m 1.5
Surface area of inlet chamber m² 5.21
Length of the chamber m 4
Width of the chamber m 1.3
Width of chamber provided m 1.5

Size :4.0m x 1.50 m x 1.5m LD

2.2 Mechanically operated coarse bar screen

Number of units 1
For present plant 1
For Future plant 0

Page 1 of 11
Sewerage Project, Begusarai, Annex A-4: Design of STP
NGRBA

Average flow per unit MLD 17


peak factor 2.25
Design flow MLD 38.3
Design flow m 3 /sec 0.44
Velocity flow through screens m/s 0.8
Area of screens 2 0.553
m
Depth of water in screens m 0.9
Angle of inclination with the horizontal degree 75
Width of opening m 0.615
Openings in screen mm clear 50
Number of openings 12
Number of bars 11
Let width of each bar be mm x 75mm 10
Total width of channel mm 710
Let width of each side be mm 20
Total width of channel mm 750
Total width of channel provided mm 850
Provided gates at the U/S & D/S of present screen channel
Let the velocity at the peak flow through the gate m/sec. 1.5
Therefore cross-sectional area of the gate = peak flow / velocity
m2 0.295
Size of the gate
Width m 0.6
Depth m 0.6
Actual surface area provided 2 0.36
m
Hence, actual velocity= flow/ actual surface area = m/sec. 1.23
Size Provided
Length (m) 10
Width (m) 0.85
Depth (m) 0.9
Quantity 1
Present 1
Future 0
F.B.(m) 0.3
2.3 Manually operated coarse bar screen

Number of units 1
Working 1
Stand-bye 0
Average flow per unit MLD 17
peak factor 2.25
Design flow MLD 38.25
Design flow m 3 /sec 0.44
Velocity flow through screens m/s 0.8
Area of screens 2 0.553
m
Depth of water in screens m 0.9
Angle of inclination with the horizontal degree 40
Width of opening m 0.615
openings mm clear 50

Page 2 of 11
Sewerage Project, Begusarai, Annex A-4: Design of STP
NGRBA

Number of openings 13
Number of bars 12
Let width of each bar be mm 10
Total width of channel mm 770
Let width of each side be mm 20
Total width of channel mm 810
Total width of channel provided mm 850
Provided gates at the U/S & D/S of channel
Let the velocity at the peak flow through the gate m/sec. 1.5
Therefore cross-sectional area of the gate = m2 0.295
Size of the gate
Width m 0.6
Depth m 0.6
Actual surface area provided m2 0.36
Hence, actual velocity= flow/ actual surface area = m/sec. 1.23
Size Provided
Length (m) 10
Width (m) 0.85
Depth (m) 0.9
Quantity 1
Working 1
Standby 0
F.B.(m) 0.3

2.3 Raw Sewage Sump

Number of units 1
Average flow MLD 17
peak factor 2.25
Therefore, peak flow MLD 38.25
Design flow m 3 /sec 0.2
Detention time, at average flow min 20
Volume required m3 236.11
Diameter to provide 5 no. pumps m 9
Area of sump m2 63.6
Depth m 4
Size : 1 No. Raw Sewage Sump of 9.0 mtr. dia x 4.00 m LD

2.4 RAW SEWAGE TRANSFER PUMPS


Average Flow m 3 /hr 708.33
Peak Flow 3 1593.75
m /hr
Pump Capacity provided Average flow 1W + 1S m 3 /hr 708.4
And lean flow 2W + 1S m 3 /hr 443.75
Pumps for peak flow one pump of 3 1595.9
m /hr
Av.flow+ 2
pumps of lean
flow

Page 3 of 11
Sewerage Project, Begusarai, Annex A-4: Design of STP
NGRBA

Head Provided m 10

PROVIDED: 2 NO pumps of 708.40 M3/HR ( 17MLD) AND 3 NO 443.75 M3/HR (10.65


MLD) SUBMERSIBLE PUMPS

Provide collecting channel above sump to receive pumped sewage


Length equal to sump diameter & width 1 mtr. Depth 1.3 mtr. Including 0.30 mtr free board.

2.5 Fine Screens Chamber

Number of units 2
Number of working units 1
Number of standby units 1
Average flow MLD 17
peak factor 2.25
Design flow/ unit MLD 38.3
Or 3 0.44
m /sec
Velocity flow through screens m/s 1.2
Area of screens m2 0.369
Depth of water in screens m 0.9
Angle of inclination with the horizontal degree 45
Width of opening m 0.45
(Width of opening = area/ depth)
Openings in screen (as per specification) mm clear 6
( as per design criteria on page II-1A-3)

Number of openings 75
(Number of opening = width of opening/ number of opening)

Number of bars 74
(Number of bars = no of opening -1)

size of each bar mm x 55mm 3


Total mm 672
width of
channel
(Width of channel = no. of opening x opening in screen + no. of bars x bar thickness)
Let width of each side be mm 12
Total width of channel mm 696
Total width of channel provided, mm 700
Size Provided
Length (m) 5.5
Width (m) 0.7
Depth (m) 0.9
Quantity 2
Working 1
Standby 1
F.B.(m) 0.3

Page 4 of 11
Sewerage Project, Begusarai, Annex A-4: Design of STP
NGRBA

Provided gates at the U/S & D/S of each channel


Let the velocity at the peak flow through the gate m/sec. 1.5
Therefore cross-sectional area of the gate = m2 0.295
Size of the gate open channel type
Width m 0.6
Depth m 0.6
Actual surface area provided m2 0.36
Hence, actual velocity= m/sec. 1.23

2.6 Grit Chamber (Detrius type)

Total no. of units 2


Number of working units 2
No. of stand by units 0
Average flow MLD 18
peak factor 2.25
Peak flow MLD 40.5
Peak flow to each grit chamber MLD 20.25
Or say 3 20250
m /day
Maximum temperature deg C 37
Minimum temperature deg C 14
Specific gravity of grit 2.65
Mean diameter of the particle mm 0.1
Kinematic vescocity,v at design temp. (18 deg. C) as per m 2 /sec. 1E-06
CPHEEO manual
STROKE'S LAW
Settling velocity Vs = {g*(Ss-1)*d2}/(18v)
2 2 9.81
Where g=acceleration deu to gravity, m/sec = m/sec.
Ss = soecific gravity of the particle 2.65
d=dia meter of the paricle, m m 0.0001

Therefore, Settling velocity Vs = m/sec. 0.0089


Reynolds number R = Vsd/v <1 0.88
Hence Stroke's law is applicable
SOR at 50% efficiency m 3 /m 2 /day 1062.42
SOR, Q/A = n*Vs/{(1-h)^(-n)-1}

Surface Overflow rate m 3 /m 2 /day 960


Area required = flow / surface loading 2 19.922
m
SWD m 0.8
Length of tank required m 4.46
Width of tank required m 4.46

Size provided Quantity 2


Working 2
Standby 0
Detail of each compartment
Length (m) 4.5

Page 5 of 11
Sewerage Project, Begusarai, Annex A-4: Design of STP
NGRBA

Width (m) 4.5


SWD(m) 0.8
F.B.(m) 0.3

Detention time sec 73.19


Hence OK > 60 sec
To maintain 60 sec. detention time the liquid depth required= Flow/ surface area provided
Therefore, actual liquid depth required m 0.66
However provided as shown above including depth required for grit storage
Volume provided m3 16.2
Area provided 2 20.25
m

grit generation =0.05m3/1000m3 of flow as per CPHEEO manual


Even though the grit is continiously rolled still 8 hrs. grit storage being provided for at
average flow
Therefore, grit generation per day = flow in m3/hr. x 8 hrs. x 0.5 / 1000
Grit generation m3 0.142
Area provided for grit storage 2 15.9
m
Depth required for grit storage m 0.009
Depth provided for grit storage m 0.05

Provided gates at the inlet of grit chamber


Let the velocity at the peak flow through the gate m/sec. 1.5
Therefore cross-sectional area of the gate = m2 0.148
Size of the gate open channel type
Width m 0.5
Depth m 0.4
Actual surface area provided m2 0.2
Hence, actual velocity= m/sec. 1.11

2.7 Parshall flume

Based on Weir & Flumes for flow measurement by P. Ackers, W. R. White, J. A.


Perkins & A. J. M. Harrison the parshall flime is designed, a copy of which is
enclosed for the reference purpose
Design flow (maximum) MLD 38.25
Or litre/sec 442.7
Based on chart,throat width selected inch 12
Width of the flume mm 304.8
Width of the channel (minimum) mm 900
However provided mm 1200
Now Q= (0.6909)*h1^1.52
h1(head of water U/S) m 0.746
h2/h1 =0.7
h2(head of water D/S) m 0.522

Depth below the crest of the parshall flume weir m 0.254


Therefore liquid depth in the parshall flume channel m 1

Page 6 of 11
Sewerage Project, Begusarai, Annex A-4: Design of STP
NGRBA

Therefore, actual velocity in the channel m/sec. 0.369

Down stream of the parshall flume will be distributed between two SBR settling tanks by
providing a distribution chamber. 3 nos. sluice gates will be installed one each at the inlet of
the SBR unit and one at the bye pass.
SIZE OF BY PASS GATE
Let the velocity at the peak flow through the gate m/sec. 1.5
Peak flow MLD 38.25
Therefore cross-sectional area of the gate = peak flow / velocity
m2 0.295
Size of the gate
Width m 0.6
Depth m 0.6
Actual surface area provided 2 0.36
m
Hence, actual velocity= m/sec. 1.23

Size of Gate at Inlet of SBR Tank

Let the velocity at the peak flow through the gate m/sec. 1.5
Peak flow MLD 38.25
Therefore cross-sectional area of the gate = m2 0.295
Size of the gate
Width m 0.6
Depth m 0.6
2
Actual surface area provided m 0.36
Hence, actual velocity= m/sec. 1.23

2.8 SBR SYSTEM (Based on C-TECH)


A Volume of Sewage treated in a day m 3 /d 17000
B Filling & Aeration Phase hrs 1.5
C Settling Phase hrs 0.75
D Decanting Phase hrs 0.75
E Total Cycle Time = B + C + D hrs 3
F No. of Cycles per day/basin = 24 / E Nos. 8
G Aeration Time/day/basin = B x F hrs 12
H No. of Basins receiving flow simultaneously Nos. 1
I No. of Basins Aerating simultaneously Nos. 1
J No. of basins Decanting simultaneously Nos. 1
K Flow Rate = A / 24 3 708.333
m /hr
L Flow rate to each Basin = K / H 3 708.333
m /hr

BASIN DIMENSIONS
A Volume of Sewage treated 3 17000
m /d
B BOD removed (Inlet BOD – Outlet BOD) ppm 295
C MLSS ppm 3500
D MLVSS ppm 2800
E F/M 0.14
F Total Volume of Basins = (A x B) / (D x E) m3 12793.4

Page 7 of 11
Sewerage Project, Begusarai, Annex A-4: Design of STP
NGRBA

G No. of Basins Provided Nos. 2


H Volume per Basin = F / G m3 6396.68
I Side Water Depth (SWD) of Basins m 4
J Width of Basins m 28.5
K Length of Basins m 57
L Volume provided Basin = I x J x K 3 6498
m
M Total Volume offered = L x G 3 12996
m
N Freeboard provided m 0.5
O Total Depth of Basin = I + N m 4.5
P Providing Recirculation Ratio 30%
Q Feed Flow to each Basin 3 708.333
m /hr
R Recirculation Flow 3 212.5
m /hr
S Capacity of Recirculation Pumps provided 3 215
m /hr

SELECTOR (ANOXIC) ZONE


A Flow Rate through each Basin m 3 /hr 920.833
B Retention Time in Selector Zone minutes 35
C Volume Required = (A x B) / 60 3 537.153
m
D No. of Selector Compartments / Basin No. 1
E SWD of Selector Compartment provided m 4
F Length of Selector Compartment provided m 28.5
G Width of Selector Compartment required m 4.712
H Width of Selector Compartment provided m 5
I Volume offered in Selector Zone = E x F x H 3 570
m

OXYGEN CALCULATIONS
A Volume of Sewage treated m 3 /d 17000
B O2 required as per Sewage Manual kg/kg BOD 1.2
C Safety Factor considered % 20
D O2 required kg/kg BOD 1.44
E 0 ppm 300
Inlet BOD5 @ 20 C
F 0 ppm 5
Outlet BOD5 @ 20 C
G BOD5 removed ppm 295
H BOD removed in a day = A x G kg/d 5015
I O2 required for above BOD Load = D x H kg/d 7221.6
J Inlet Total Kjeldhal Nitrogen assumed ppm 42
K Outlet Ammoniacal Nitrogen ppm 1
L Outlet Nitrate Nitrogen ppm 3
M NH3-N removed in a day = J – K ppm 41
N Kg O2 required per Kg of NH3-N kg/ kg NH 3 - 4.6
N
O NH3-N removed in a day = A x M kg/d 697
P O2 required for NH3-N removal = O x N kg/d 3206.2
Q Kg O2 released per Kg of Nitrate-Nitrogen during de-nitrification kg/NO 3 -N 2.86
R Kg of Nitrate-Nitrogen generated = A x J x 75% kg/d 535.5
S Kg of Nitrate Nitrogen in the Treated Sewage = A x L kg/d 51

Page 8 of 11
Sewerage Project, Begusarai, Annex A-4: Design of STP
NGRBA

T Quantity of Nitrate Nitrogen that is denitrified = R – S kg/d 484.5


U O2 released during De-nitrification = T x Q kg/d 1385.67
V Total O2 required/day = I + P – U kg/d 9042.13
W Consider Safety Factor for Aeration % 20
X Total O2 required per day considering Safety Factor = V x (1 + W) kg/d 10850.6

AIR REQUIREMENT
A Total Theoretical O2 required per day kg/d 10850.6
B Alpha 0.65
C Beta 0.9
D Standard O2 required at field conditions = A / ( B x C ) kg/d 18548
E No. of Basins Nos. 2
F Standard O2 required at field conditions per Basin =D/E kg/d/Basin 9273.98
G Standard Oxygen Transfer Efficiency (SOTE) of Diffuser per m Depth of % Submergence
/m 6
H Liquid Level in Basin during Peak Flow m 4
I Height at which Diffusers are kept m 0.3
J Effective Aeration Depth = H - I m 3.7
K SOTE for the above effective aeration depth =%GxJ 22
L Fraction of O2 in Air % 23
M Specific Gravity of Air 1.204
N Air required at field condition per basin = F / ( K x L x M )Nm 3 /d/Basin 149554

O Aeration Time per Basin per day hrs/d/Basin 12


P Air required per hour per Basin = N / O 3 12462.9
Nm /hr/Basi
n
Q Number of Operating Air Blowers per Basin Nos. 2
R Capacity of Air Blowers required = P / Q 3 6231.43
Nm /hr
S Safety Factor considered % 17
T Capacity of Air Blowers with Safety Factor = R x (1 + S) Nm 3 /hr 7290.77
U Capacity of Air Blowers offered 3 7300
Nm /hr
V No. of Basins aerating at any given time Nos. 2
W No. of Operating Blowers = Q x V Nos. 4
X No. of Standby Blowers per set of Operating Blowers Nos./Set 1
Y Number of Standby Blowers = V x X Nos. 2

SLUDGE WASTING
A Excess sludge generated kg/kg BOD 0.6
B BOD removed in a day kg/d 5015
C Excess Sludge generated per day = A x B kg/d 3009
D No. of Basins Nos. 2
E Sludge Wasted/Basin = C / D kg/d/Basin 1504.5
F No.of Cycles per day per Basin Cycles/d/ 8
Basin
G Sludge Wasted per cycle per basin = E / F kg/d 188.063
H Sludge Solids Consistency 0.80%
I Volume of Sludge Wasted per cycle per Basin m 3 /Cycle
= G / (H x 1000) 23.508
J Pump Running Time / Cycle minutes 30

Page 9 of 11
Sewerage Project, Begusarai, Annex A-4: Design of STP
NGRBA

K Pump Capacity required= (I x 60) / J m 3 /hr 47.016


I Pump Capacity provided 3 50
m /hr

2.9 CHLORINATION TANK


Volume of Sewage treated 3 17000
m /d
Treated Sewage Flow Rate 3 708.333
m /hr
HRT in Chlorination Tank minutes 30
Volume required m3 354.167
SWD provided m 3.5
Width provided m 8
Length provided m 13
Volume provided m3 364
Freeboard provided m 0.5

2.10 CHLORINATOR
Volume of Sewage treated m 3 /d 17000
Treated Sewage Flow Rate 3 708.333
m /hr
Design Chlorine Dosage ppm 3
Chlorine Dosage Rate kg/hr 2.125
Chlorinator Capacity provided kg/hr 5
No. of Working Chlorinators provided No. 1
No. of Standby Chlorinators provided No. 1

2.11 SLUDGE HANDLING SYSTEM


BIOLOGICAL SLUDGE SUMP
Biological Sludge kg/d 3009
Consistency 0.80%
Volume of Biological Sludge 3 376.125
m /d
3 15.672
m /hr
Total Volume of Sludge generated 3 376.125
m /d
m 3 /hr 15.672
Design Retention Time for Sludge Sump hrs 4
Volume required m3 62.688
SWD provided m 3
Width provided m 5.4
Length provided m 4.2
Volume provided m3 68.04
Freeboard provided m 0.5

BIOLOGICAL SLUDGE SUMP AIR BLOWER


Volume of Sludge Sump m3 68.04
Design Air Agitation requirement in Sludge Sump m 3 /hr/m 3 1
No. of working Blowers provided No. 1
Capacity of Blowers required m 3 /hr 68.04
Capacity of Blowers provided m 3 /hr 75
Number of standby Blowers provided No. 1

Page 10 of 11
Sewerage Project, Begusarai, Annex A-4: Design of STP
NGRBA

Head provided bar 0.4

BIOLOGICAL SLUDGE PUMPS


Sludge Flow Rate 3 15.672
m /hr
No. of working Pumps provided No. 2
Pump Capacity provided m 3 /hr 8
No. of standby Pumps provided No. 1
Head provided mwc 15

CENTRIFUGE FEED PUMPS & CENTRIFUGE


Sludge Flow Rate from sump 3 376.125
m /d
Consistency 0.80%
Centrifuge Running Time considered hrs 12
No. of working Pumps provided No. 1
Pump Capacity required 3 31.344
m /hr
Pump Capacity provided 3 32
m /hr
Head provided mwc 15
No. of standby Pumps provided No. 1

No. of working Centrifuge provided No. 1


Centrifuge Capacity required 3 31.344
m /hr
Centrifuge Capacity provided 3 32
m /hr
No. of standby Centrifuge provided No. 1

2.12 DWPE DOSING SYSTEM


Quantity of Sludge generated Ton/day 3.009
DWPE Dosing Rate kg/Ton of day 1.2
Solids
DWPE reqd kg/day 3.611
Hours of Operation hrs/day 5.877
DWPE Dosing Rate kg/hr 0.61
Solution Strength 0.50%
DWPE Dosing Rate LPH 122.88
No. of Working DWPE Dosing Pumps offered Nos. 1
Capacity of DWPE Dosing Pumps offered LPH 170
No. of Standby Pump offered No. 1
Volume of DWPE Dosing Tank reqd assuming 12 hours RT m3 1.475
SWD offered m 1.5
Length/Width required m 0.991
Length/Width offered m 1
Free Board provided m 0.5
Volume of DWPE Dosing Tank offered m3 1.5
No. of DWPE Dosing Tank offered 1W + 1S Nos. 2
Capacity of Agitator provided HP 1
No. of Agitators provided 1W + 1S No. 2

Page 11 of 11
Sewerage Project, Begusarai Annex A-6: Design of Pumping main
NGRBA

Economic Design of Pumping Main


Project IPS , Sewerage Project, Begusarai
Pipe No Pipe No 230

Location From: Node No 88 To: Node No 89

A Design Parameters
Design Period 30 Years Energ Charges 5 Rs/kWH
Discount Rate 10% Electro Mech Eq Cost 5000 Rs/kW
Standby Pumpsets 50% Life of EM Equipment 15 Years
Eff of Pumpsets 50% Friction Coefficient 1
Other Losses 10%
B System Parameters
i Pumping main Length 245 m
ii Static Headloss Calculations
2026 2041
RL of Start Point 95.834 95.834 m 1
RL of Delivery Point 97.704 97.704 m Minimum Water Level 87.18 m
Ht of Deliver Point AGL -1 -1 m
Residual Pressure reqd 0.00 0.00 m
Total Static Head 9.5 9.5 m

C Waste Water Flows


Initial Intermediate Design
Year 2011 2026 2041
Waste Water Flows mld 2.60 3.59 4.90
Pumping Hrs in Year Hrs 24 24 24
D Calculations
Phase I Phase II
Average Waste Water Flows mld 3.09 4.24
Average Pumping Hrs Hrs 24.00 24.00
E Cost Comparisons of Different Diameters
Parameter Unit Values for Different Diameters
Pipe Diameter mm 150 200 250 300 350
Unit Rate of Pipeline Rs/m 1544.61 1971.94 2559 3256.45 4065.74
Maximum Flow in Phase I Cum/sec 0.042 0.042 0.042 0.042 0.042
Velocity in Phase I m/s 2.35 1.32 0.85 0.59 0.43
Headloss in Phase I m 7.14 1.79 0.61 0.25 0.12
Total headloss incl Static & other m 17.38 11.50 10.20 9.81 9.66
losses in Phase I
Op Pump kW in Phase I kW 14.16 9.36 8.31 7.99 7.87
Annual Energy Consumed in Phase I Th kWH 124 82 73 70 69
Maximum Flow in Phase II Cum/sec 0.057 0.057 0.057 0.057 0.057
Velocity in Phase II m/s 3.21 1.81 1.16 0.80 0.59
Headloss in Phase II m 12.55 3.15 1.08 0.45 0.21
Total headloss incl Static & other m 23.33 12.99 10.71 10.02 9.76
Op Pump kW in Phase II kW 26 14 12 11 11
Annual Energy Consumed in Phase II Th kWH 227 127 104 98 95
Cost of Pumpset in Phase I Th Rs 106.2 70.2 62.3 59.9 59.0
Cost of Pumpset in Phase II Th Rs 195 108 89 84 81
Cost of Pipeline Th Rs 378 483 627 798 996
Cost of Pumping sets Th Rs 153 96 84 80 79
Capitalised Cost of Energy Charges Th Rs 6787 4271 3718 3550 3487
Total Cost Th Rs 7318 4851 4428 4427 4562

Page 1 of 4
Sewerage Project, Begusarai Annex A-6: Design of Pumping main
NGRBA

F Results
Location Pressure 8000 7318
2026 2041
7000
End Point,m -1.00 -1.00
6000 4851
4428 4427 4562
Str Point,m 1.15 1.36 5000
4000

The most Economic diameter for 3000


Pumping main for 30 Years is 2000
300 mm 1000
With Capitalised cost of
0
Rs 4427 Thousands
150 200 250 300 350

Page 2 of 4
Sewerage Project, Begusarai Annex A-6: Design of Pumping main
NGRBA

Economic Design of Pumping Main


Project IPS , Sewerage Project, Begusarai
Pipe No Pipe No 1040

Location From: Node No 27 To: Node No 34

A Design Parameters
Design Period 30 Years Energ Charges 5 Rs/kWH
Discount Rate 10% Electro Mech Eq Cost 5000 Rs/kW
Standby Pumpsets 50% Life of EM Equipment 15 Years
Eff of Pumpsets 50% Friction Coefficient 1
Other Losses 10%
B System Parameters
i Pumping main Length 325 m
ii Static Headloss Calculations
2026 2041
RL of Start Point 96.433 96.433 m 1
RL of Delivery Point 96.914 96.914 m Minimum Water Level 86.74 m
Ht of Deliver Point AGL -1 -1 m
Residual Pressure reqd 0.00 0.00 m
Total Static Head 9.2 9.2 m

C Waste Water Flows


Initial Intermediate Design
Year 2011 2026 2041
Waste Water Flows mld 11.21 15.50 21.16
Pumping Hrs in Year Hrs 24 24 24
D Calculations
Phase I Phase II
Average Waste Water Flows mld 13.36 18.33
Average Pumping Hrs Hrs 24.00 24.00
E Cost Comparisons of Different Diameters
Parameter Unit Values for Different Diameters
Pipe Diameter mm 400 450 500 600 700
Unit Rate of Pipeline Rs/m 4870.77 5765.9 6731 8942.35 10049
Maximum Flow in Phase I Cum/sec 0.179 0.179 0.179 0.179 0.179
Velocity in Phase I m/s 1.43 1.13 0.91 0.63 0.47
Headloss in Phase I m 1.20 0.68 0.41 0.17 0.08
Total headloss incl Static & other m 10.49 9.92 9.62 9.36 9.26
losses in Phase I
Op Pump kW in Phase I kW 36.89 34.89 33.84 32.92 32.57
Annual Energy Consumed in Phase I Th kWH 323 306 296 288 285
Maximum Flow in Phase II Cum/sec 0.245 0.245 0.245 0.245 0.245
Velocity in Phase II m/s 1.95 1.54 1.25 0.87 0.64
Headloss in Phase II m 2.10 1.19 0.72 0.30 0.14
Total headloss incl Static & other m 11.48 10.48 9.96 9.50 9.33
Op Pump kW in Phase II kW 55 50 48 46 45
Annual Energy Consumed in Phase II Th kWH 483 441 419 400 392
Cost of Pumpset in Phase I Th Rs 276.6 261.6 253.8 246.9 244.3
Cost of Pumpset in Phase II Th Rs 414 378 359 342 336
Cost of Pipeline Th Rs 1583 1874 2188 2906 3266
Cost of Pumping sets Th Rs 376 352 340 329 325
Capitalised Cost of Energy Charges Th Rs 16686 15637 15089 14605 14424
Total Cost Th Rs 18645 17863 17617 17840 18015

Page 3 of 4
Sewerage Project, Begusarai Annex A-6: Design of Pumping main
NGRBA

F Results
Location Pressure 20000 18645 17863 17617 17840 18015
2026 2041 18000
End Point,m -1.00 -1.00 16000
14000
Str Point,m -0.07 0.27 12000
10000
8000
The most Economic diameter for
6000
Pumping main for 30 Years is 4000
500 mm 2000
With Capitalised cost of 0
Rs 17617 Thousands 400 450 500 600 700

Page 4 of 4
Sewerage Scheme, Begusarai Annexure A-6: Design of Wet Well and Pumping Station
(NGRBA)

Sewerage Project, Begusarai (NGRBA)

Design of Wet Well and Pumping Station No 1

Sewage Lift Station at Begusarai Mueseum

i Pumping Main From Node 88 GL 95.834 m


To Node 89 GL 97.704 m
Length 245 m

ii Incoming Pipes

Pipe No Dia DS Crown DS Invert Average Infiltration


Level Level Flow 2041 (lps)
(lps)

229 450 89.926 89.476 35.90 1.09


84 350 89.534 89.184 19.19 0.57
55.09 1.66

iii Dry Weather Flow

Average Flow (lps) Peak Factor Infiltration Peak Flow


2011 2026 2041 2026 2041 2026 2041
29.196 40.350 55.09 2.5 2.5 1.6562 102.53 139.38

2 Mechanically operated coarse bar screen

Number of units 2.00


Working 1.00
Standby 1.00
Average flow per unit 4.90 MLD
Design flow 12.04 MLD
Design flow 0.14 m3/sec
Velocity flow through screens 0.90 m/s
Area of screens 0.15 m2
Depth of water in screens 0.60 m
Angle of inclination with the horizontal 75.00 degree
Width of opening 0.26 m
Openings in screen 25.00 mm clear
Number of openings 10.00
Number of bars 9.00
Let width of each bar be 10.00 mm x 75mm
Total width of channel 340.00 mm
Let width of each side be 20.00 mm
Total width of channel 380.00 mm
Total width of channel provided 400.00 mm
Provided gates at the U/S of screen channel
Let the velocity at the peak flow through the gate 1.20 m/sec.
Therefore cross-sectional area of the gate = peak flow / velocity
0.12 m2
Size of the gate
Width 0.34 m
Depth 0.34 m
Provide Depth 0.70
Actual surface area provided 0.24 m2

Page 1 of 4
Sewerage Scheme, Begusarai Annexure A-6: Design of Wet Well and Pumping Station
(NGRBA)

Hence, actual velocity= flow/ actual surface area = 0.59 m/sec.


Size Provided
Length (m) 6.00 m
Width (m) 0.40 m
Depth (m) 0.60 m
Quantity 2.00
Working 1.00
Standby 1.00
F.B.(m) 0.30 m

iv Volume of Wet Well

Adopting wet well capacity equal to 3.75 minutes of ultimate peak flow

Ultimate Peak flow 139.38 lps


3.75 minutes of ultimate peak flow 31.36 Cum

Adopting a depth of 1.5 m


Provide Free Board of 0.5 m
Plan Area of wet well 20.9 Sqm

Providing a Circular Wet Well, Required diameter of wet well 5.2 mtr
Adopted Diameter of wet well 6.0 mtr

Provide 1 Nos Wet Well


with Diameter 6.00 m

iv Choice of Pumps

Configuration Numbers Standby Total Type Cum/Hr


0.25 Peak Flow 4 1 5 P1 92.28

v Design of Pumps

Invert of incoming Sewer at IPS 89.184 m


Ground Level at Discharging manhole 97.704 m

Depth of Wet Well 2m

Proposed Level of Discharge 96.704 m

Total Static Lift 9.52 m

Add additional losses @ 20% for pipe & pipe fittings 1.904 m

Total Head 11.424 m


Say 12 m

S No Flow Head Efficiency Number Standby kW Adopted


Cum/hr
1 92.28 12 50% 4 1 6.0 9.3
46.5 kW

Page 2 of 4
Sewerage Scheme, Begusarai Annexure A-6: Design of Wet Well and Pumping Station
(NGRBA)

Sewerage Project, Begusarai (NGRBA)

Design of Wet Well and Pumping Station No 2

Sewage Lift Station at Gayatri Shakti Peeth

i Pumping Main From Node 27 GL 96.433 m


To Node 34 GL 96.914 m
Length 325 m

ii Incoming Pipes

Pipe No Dia DS Crown DS Invert Average Infiltration


Level Level Flow 2041 (lps)
(lps)

1000 1000 90.242 89.242 231.1 6.86


1039 200 93.928 93.728 6.8 0.18
237.93 7.04

iii Dry Weather Flow

Average Flow (lps) Peak Factor Infiltration Peak Flow


2011 2026 2041 2026 2041 2026 2041
126.097 174.269 237.93 2.25 2.25 7.0445 399.15 542.39

2 Mechanically operated coarse bar screen

Number of units 2.00


Working 1.00
Standby 1.00
Average flow per unit 21.17 MLD
Design flow 46.86 MLD
Design flow 0.54 m3/sec
Velocity flow through screens 0.90 m/s
Area of screens 0.60 m2
Depth of water in screens 0.90 m
Angle of inclination with the horizontal 75.00 degree
Width of opening 0.67 m
Openings in screen 25.00 mm clear
Number of openings 26.00
Number of bars 25.00
Let width of each bar be 10.00 mm x 75mm
Total width of channel 900.00 mm
Let width of each side be 20.00 mm
Total width of channel 940.00 mm
Total width of channel provided 1000.00 mm
Provided gates at the U/S of screen channel
Let the velocity at the peak flow through the gate 1.20 m/sec.
Therefore cross-sectional area of the gate = peak flow / velocity
0.45 m2
Size of the gate
Width 1.00 m
Depth 0.45 m
Provide Depth 1.00
Actual surface area provided 1.00 m2

Page 3 of 4
Sewerage Scheme, Begusarai Annexure A-6: Design of Wet Well and Pumping Station
(NGRBA)

Hence, actual velocity= flow/ actual surface area = 0.54 m/sec.


Size Provided
Length (m) 6.00 m
Width (m) 1.00 m
Depth (m) 0.90 m
Quantity 2.00
Working 1.00
Standby 1.00
F.B.(m) 0.30 m

iv Volume of Wet Well

Adopting wet well capacity equal to 3.75 minutes of ultimate peak flow

Ultimate Peak flow 542.39 lps


3.75 minutes of ultimate peak flow 122.04 Cum

OK
Adopting a depth of 2m
Provide Free Board of 0.5 m
Plan Area of wet well 61.0 Sqm

Providing a Circular Wet Well, Required diameter of wet well 8.8 mtr
9.0 mtr

Provide 1 Nos Wet Well


with Diameter 9.00 m

iv Choice of Pumps

Configuration Numbers Standby Total Type Cum/Hr


0.25 Peak Flow 4 1 5 P1 359.23

v Design of Pumps

Invert of incoming Sewer at IPS 89.242 m


Ground Level at Discharging manhole 96.914 m

Depth of Wet Well 2.5 m

Proposed Level of Discharge 95.914 m

Total Static Lift 9.172 m

Add additional losses @ 20% for pipe & pipe fittings 1.8344 m

Total Head 11.0064 m


Say 13 m

S No Flow Head Efficiency Number Standby kW Adopted


Cum/hr
1 359.23 13 50% 4 1 25.4 30.0
150 kW

Page 4 of 4
Sewerage Project, Begusarai Annexure A-7 : Structural Design of Sewer
NGRBA

Sewerage Project, Begusarai under NGRBA

Structural Design of Sewers & Selection of Economic Combination of Pipe Class & Bedding Type

Backfill Soil Type Num 4 Pipe Diameter 200 mm


Nomenclature Damp Clay Ht above Invert 2000 mm
Unit Wt 1920 Kg/Cum
Impact Factor 1.5
Concentrated Load 6500 Kg (for Highway Traffic)
Trench Side Offset 250 mm
Length of Conduit 1m
Soil Type for Cd 4
Factor of Safety 1.5 Nomenclature Ordinary Maximum for Clay

Water Load 25.13 Kg

Ht of Soil Pipe Design Bedding Types Load Factor Supporting Result Cost Most
above Pipe Strength Economical
Top (mm)
1800 TEBT 1766 H/Bd 2.40 L/2H 0.28 Granular 1.9 2237 UNSAFE 399.4
NP2 BT(mm) 25 Cd 1.7824 Bc/2H 0.07 Concrete Cradle -PCC 2.8 3297 SAFE 468.0
OD(mm) 250 Load Wc 1925 Cs 0.035 Concrete Cradle-RCC-0.4% 3.4 4003 SAFE 574.9
TW(mm) 750 Load Wsc 337 Total Load 2287 Concrete Cradle-RCC-1.0% 4.8 5651 SAFE 1088.0
1800 TEBT 2175 H/Bc 2.37 L/2H 0.28 Granular 1.9 2755 SAFE 441.4
NP3 Pipe
NP3 BT(mm) 30 Cd 1.7648 Bc/2H 0.07 Concrete Cradle -PCC 2.8 4060 SAFE 510.0 with
OD(mm) 260 Load Wc 1957 Cs 0.036 Concrete Cradle-RCC-0.4% 3.4 4930 SAFE 616.9 Granular
Bedding
TW(mm) 760 Load Wsc 350 Total Load 2332 Concrete Cradle-RCC-1.0% 4.8 6960 SAFE 1130.0
1800 TEBT 3690 H/Bc 2.37 L/2H 0.28 Granular 1.9 4674 SAFE 520.4
NP4 BT(mm) 30 Cd 1.7648 Bc/2H 0.07 Concrete Cradle -PCC 2.8 6888 SAFE 589.0
OD(mm) 260 Load Wc 1957 Cs 0.036 Concrete Cradle-RCC-0.4% 3.4 8364 SAFE 695.9
TW(mm) 760 Load Wsc 350 Total Load 2332 Concrete Cradle-RCC-1.0% 4.8 11808 SAFE 1209.0

Page 1 of 13
Sewerage Project, Begusarai Annexure A-7 : Structural Design of Sewer
NGRBA

Sewerage Project, Begusarai under NGRBA

Structural Design of Sewers & Selection of Economic Combination of Pipe Class & Bedding Type

Backfill Soil Type Num 4 Pipe Diameter 250 mm


Nomenclature Damp Clay Ht above Invert 4000 mm
Unit Wt 1920 Kg/Cum
Impact Factor 1.5
Concentrated Load 6500 Kg (for Highway Traffic)
Trench Side Offset 250 mm
Length of Conduit 1m
Soil Type for Cd 4
Factor of Safety 1.5 Nomenclature Ordinary Maximum for Clay

Water Load 39.27 Kg

Ht of Soil Pipe Design Bedding Types Load Factor Supporting Result Cost Most
above Pipe Strength Economical
Top (mm)
3750 TEBT 1883 H/Bd 4.69 L/2H 0.13 Granular 1.9 2385 UNSAFE 458.9
NP2 BT(mm) 25 Cd 2.7055 Bc/2H 0.04 Concrete Cradle -PCC 2.8 3515 SAFE 540.6
OD(mm) 300 Load Wc 3325 Cs 0.010 Concrete Cradle-RCC-0.4% 3.4 4268 SAFE 664.3
TW(mm) 800 Load Wsc 98 Total Load 3462 Concrete Cradle-RCC-1.0% 4.8 6026 SAFE 1240.0
3750 TEBT 2250 H/Bc 4.63 L/2H 0.13 Granular 1.9 2850 UNSAFE 542.9 NP2 Pipe
NP3 BT(mm) 30 Cd 2.6884 Bc/2H 0.04 Concrete Cradle -PCC 2.8 4200 SAFE 624.6 with
Concrete
OD(mm) 310 Load Wc 3387 Cs 0.010 Concrete Cradle-RCC-0.4% 3.4 5100 SAFE 748.3 Cradle -PCC
TW(mm) 810 Load Wsc 101 Total Load 3527 Concrete Cradle-RCC-1.0% 4.8 7200 SAFE 1324.0 Bedding
3750 TEBT 3825 H/Bc 4.63 L/2H 0.13 Granular 1.9 4845 SAFE 627.9
NP4 BT(mm) 30 Cd 2.6884 Bc/2H 0.04 Concrete Cradle -PCC 2.8 7140 SAFE 709.6
OD(mm) 310 Load Wc 3387 Cs 0.010 Concrete Cradle-RCC-0.4% 3.4 8670 SAFE 833.3
TW(mm) 810 Load Wsc 101 Total Load 3527 Concrete Cradle-RCC-1.0% 4.8 12240 SAFE 1409.0

Page 2 of 13
Sewerage Project, Begusarai Annexure A-7 : Structural Design of Sewer
NGRBA

Sewerage Project, Begusarai under NGRBA

Structural Design of Sewers & Selection of Economic Combination of Pipe Class & Bedding Type

Backfill Soil Type Num 4 Pipe Diameter 300 mm


Nomenclature Damp Clay Ht above Invert 6000 mm
Unit Wt 1920 Kg/Cum
Impact Factor 1.5
Concentrated Load 6500 Kg (for Highway Traffic)
Trench Side Offset 250 mm
Length of Conduit 1m
Soil Type for Cd 4
Factor of Safety 1.5 Nomenclature Ordinary Maximum for Clay

Water Load 56.55 Kg

Ht of Soil Pipe Design Bedding Types Load Factor Supporting Result Cost Most
above Pipe Strength Economical
Top (mm)
5700 TEBT 2022 H/Bd 6.63 L/2H 0.09 Granular 1.9 2561 UNSAFE 605.3
NP2 BT(mm) 30 Cd 3.1590 Bc/2H 0.03 Concrete Cradle -PCC 2.8 3774 UNSAFE 707.2
OD(mm) 360 Load Wc 4486 Cs 0.005 Concrete Cradle-RCC-0.4% 3.4 4583 UNSAFE 855.6
TW(mm) 860 Load Wsc 51 Total Load 4594 Concrete Cradle-RCC-1.0% 4.8 6470 SAFE 1521.0
5700 TEBT 2325 H/Bc 6.48 L/2H 0.09 Granular 1.9 2945 UNSAFE 726.3
NP4 Pipe
NP3 BT(mm) 40 Cd 3.1325 Bc/2H 0.03 Concrete Cradle -PCC 2.8 4340 UNSAFE 828.2 with
OD(mm) 380 Load Wc 4658 Cs 0.006 Concrete Cradle-RCC-0.4% 3.4 5270 SAFE 976.6 Granular
Bedding
TW(mm) 880 Load Wsc 54 Total Load 4768 Concrete Cradle-RCC-1.0% 4.8 7440 SAFE 1642.0
5700 TEBT 3960 H/Bc 6.48 L/2H 0.09 Granular 1.9 5016 SAFE 798.3
NP4 BT(mm) 40 Cd 3.1325 Bc/2H 0.03 Concrete Cradle -PCC 2.8 7392 SAFE 900.2
OD(mm) 380 Load Wc 4658 Cs 0.006 Concrete Cradle-RCC-0.4% 3.4 8976 SAFE 1048.6
TW(mm) 880 Load Wsc 54 Total Load 4768 Concrete Cradle-RCC-1.0% 4.8 12672 SAFE 1714.0

Page 3 of 13
Sewerage Project, Begusarai Annexure A-7 : Structural Design of Sewer
NGRBA

Sewerage Project, Begusarai under NGRBA

Structural Design of Sewers & Selection of Economic Combination of Pipe Class & Bedding Type

Backfill Soil Type Num 4 Pipe Diameter 350 mm


Nomenclature Damp Clay Ht above Invert 6000 mm
Unit Wt 1920 Kg/Cum
Impact Factor 1.5
Concentrated Load 6500 Kg (for Highway Traffic)
Trench Side Offset 250 mm
Length of Conduit 1m
Soil Type for Cd 4
Factor of Safety 1.5 Nomenclature Ordinary Maximum for Clay

Water Load 76.97 Kg

Ht of Soil Pipe Design Bedding Types Load Factor Supporting Result Cost Most
above Pipe Strength Economical
Top (mm)
5650 TEBT 2169 H/Bd 6.18 L/2H 0.09 Granular 1.9 2747 UNSAFE 726.9
NP2 BT(mm) 32 Cd 3.0740 Bc/2H 0.04 Concrete Cradle -PCC 2.8 4049 UNSAFE 894.2
OD(mm) 414 Load Wc 4931 Cs 0.006 Concrete Cradle-RCC-0.4% 3.4 4916 UNSAFE 1117.3
TW(mm) 914 Load Wsc 60 Total Load 5067 Concrete Cradle-RCC-1.0% 4.8 6941 SAFE 2016.0
5650 TEBT 2516 H/Bc 5.65 L/2H 0.09 Granular 1.9 3187 UNSAFE 1089.9 NP4 Pipe
NP3 BT(mm) 75 Cd 2.9596 Bc/2H 0.04 Concrete Cradle -PCC 2.8 4697 UNSAFE 1257.2 with
Concrete
OD(mm) 500 Load Wc 5682 Cs 0.007 Concrete Cradle-RCC-0.4% 3.4 5703 UNSAFE 1480.3 Cradle -PCC
TW(mm) 1000 Load Wsc 72 Total Load 5832 Concrete Cradle-RCC-1.0% 4.8 8051 SAFE 2379.0 Bedding
5650 TEBT 4470 H/Bc 5.65 L/2H 0.09 Granular 1.9 5662 UNSAFE 1113.9
NP4 BT(mm) 75 Cd 2.9596 Bc/2H 0.04 Concrete Cradle -PCC 2.8 8344 SAFE 1281.2
OD(mm) 500 Load Wc 5682 Cs 0.007 Concrete Cradle-RCC-0.4% 3.4 10132 SAFE 1504.3
TW(mm) 1000 Load Wsc 72 Total Load 5832 Concrete Cradle-RCC-1.0% 4.8 14304 SAFE 2403.0

Page 4 of 13
Sewerage Project, Begusarai Annexure A-7 : Structural Design of Sewer
NGRBA

Sewerage Project, Begusarai under NGRBA

Structural Design of Sewers & Selection of Economic Combination of Pipe Class & Bedding Type

Backfill Soil Type Num 4 Pipe Diameter 400 mm


Nomenclature Damp Clay Ht above Invert 7000 mm
Unit Wt 1920 Kg/Cum
Impact Factor 1.5
Concentrated Load 6500 Kg (for Highway Traffic)
Trench Side Offset 250 mm
Length of Conduit 1m
Soil Type for Cd 4
Factor of Safety 1.5 Nomenclature Ordinary Maximum for Clay

Water Load 100.53 Kg

Ht of Soil Pipe Design Bedding Types Load Factor Supporting Result Cost Most
above Pipe Strength Economical
Top (mm)
6600 TEBT 2318 H/Bd 6.85 L/2H 0.08 Granular 1.9 2936 UNSAFE 829.5
NP2 BT(mm) 32 Cd 3.1966 Bc/2H 0.04 Concrete Cradle -PCC 2.8 4327 UNSAFE 1030.5
OD(mm) 464 Load Wc 5704 Cs 0.005 Concrete Cradle-RCC-0.4% 3.4 5254 UNSAFE 1291.4
TW(mm) 964 Load Wsc 49 Total Load 5853 Concrete Cradle-RCC-1.0% 4.8 7418 SAFE 2305.0
6600 TEBT 2874 H/Bc 6.29 L/2H 0.08 Granular 1.9 3640 UNSAFE 1228.5 NP4 Pipe
NP3 BT(mm) 75 Cd 3.0946 Bc/2H 0.04 Concrete Cradle -PCC 2.8 5365 UNSAFE 1429.5 with
Concrete
OD(mm) 550 Load Wc 6551 Cs 0.006 Concrete Cradle-RCC-0.4% 3.4 6514 UNSAFE 1690.4 Cradle -PCC
TW(mm) 1050 Load Wsc 58 Total Load 6710 Concrete Cradle-RCC-1.0% 4.8 9197 SAFE 2704.0 Bedding
6600 TEBT 5080 H/Bc 6.29 L/2H 0.08 Granular 1.9 6435 UNSAFE 1264.5
NP4 BT(mm) 75 Cd 3.0946 Bc/2H 0.04 Concrete Cradle -PCC 2.8 9483 SAFE 1465.5
OD(mm) 550 Load Wc 6551 Cs 0.006 Concrete Cradle-RCC-0.4% 3.4 11515 SAFE 1726.4
TW(mm) 1050 Load Wsc 58 Total Load 6710 Concrete Cradle-RCC-1.0% 4.8 16256 SAFE 2740.0

Page 5 of 13
Sewerage Project, Begusarai Annexure A-7 : Structural Design of Sewer
NGRBA

Sewerage Project, Begusarai under NGRBA

Structural Design of Sewers & Selection of Economic Combination of Pipe Class & Bedding Type

Backfill Soil Type Num 4 Pipe Diameter 450 mm


Nomenclature Damp Clay Ht above Invert 6000 mm
Unit Wt 1920 Kg/Cum
Impact Factor 1.5
Concentrated Load 6500 Kg (for Highway Traffic)
Trench Side Offset 250 mm
Length of Conduit 1m
Soil Type for Cd 4
Factor of Safety 1.5 Nomenclature Ordinary Maximum for Clay

Water Load 127.23 Kg

Ht of Soil Pipe Design Bedding Types Load Factor Supporting Result Cost Most
above Pipe Strength Economical
Top (mm)
5550 TEBT 2427 H/Bd 5.44 L/2H 0.09 Granular 1.9 3074 UNSAFE 1008.1
NP2 BT(mm) 35 Cd 2.9109 Bc/2H 0.05 Concrete Cradle -PCC 2.8 4530 UNSAFE 1245.7
OD(mm) 520 Load Wc 5815 Cs 0.008 Concrete Cradle-RCC-0.4% 3.4 5501 UNSAFE 1547.2
TW(mm) 1020 Load Wsc 78 Total Load 6020 Concrete Cradle-RCC-1.0% 4.8 7766 SAFE 2683.0
5550 TEBT 3234 H/Bc 5.05 L/2H 0.09 Granular 1.9 4096 UNSAFE 1371.1
NP4 Pipe
NP3 BT(mm) 75 Cd 2.8096 Bc/2H 0.05 Concrete Cradle -PCC 2.8 6037 UNSAFE 1608.7 with
OD(mm) 600 Load Wc 6527 Cs 0.009 Concrete Cradle-RCC-0.4% 3.4 7330 SAFE 1910.2 Granular
Bedding
TW(mm) 1100 Load Wsc 90 Total Load 6744 Concrete Cradle-RCC-1.0% 4.8 10349 SAFE 3046.0
5550 TEBT 5530 H/Bc 5.05 L/2H 0.09 Granular 1.9 7005 SAFE 1407.1
NP4 BT(mm) 75 Cd 2.8096 Bc/2H 0.05 Concrete Cradle -PCC 2.8 10323 SAFE 1644.7
OD(mm) 600 Load Wc 6527 Cs 0.009 Concrete Cradle-RCC-0.4% 3.4 12535 SAFE 1946.2
TW(mm) 1100 Load Wsc 90 Total Load 6744 Concrete Cradle-RCC-1.0% 4.8 17696 SAFE 3082.0

Page 6 of 13
Sewerage Project, Begusarai Annexure A-7 : Structural Design of Sewer
NGRBA

Sewerage Project, Begusarai under NGRBA

Structural Design of Sewers & Selection of Economic Combination of Pipe Class & Bedding Type

Backfill Soil Type Num 4 Pipe Diameter 500 mm


Nomenclature Damp Clay Ht above Invert 6000 mm
Unit Wt 1920 Kg/Cum
Impact Factor 1.5
Concentrated Load 6500 Kg (for Highway Traffic)
Trench Side Offset 250 mm
Length of Conduit 1m
Soil Type for Cd 4
Factor of Safety 1.5 Nomenclature Ordinary Maximum for Clay

Water Load 157.08 Kg

Ht of Soil Pipe Design Bedding Types Load Factor Supporting Result Cost Most
above Pipe Strength Economical
Top (mm)
5500 TEBT 2574 H/Bd 5.14 L/2H 0.09 Granular 1.9 3260 UNSAFE 1118.1
NP2 BT(mm) 35 Cd 2.8339 Bc/2H 0.05 Concrete Cradle -PCC 2.8 4805 UNSAFE 1395.6
OD(mm) 570 Load Wc 6229 Cs 0.009 Concrete Cradle-RCC-0.4% 3.4 5834 UNSAFE 1740.7
TW(mm) 1070 Load Wsc 87 Total Load 6473 Concrete Cradle-RCC-1.0% 4.8 8237 SAFE 3005.0
5500 TEBT 3593 H/Bc 4.78 L/2H 0.09 Granular 1.9 4551 UNSAFE 1583.1
NP4 Pipe
NP3 BT(mm) 75 Cd 2.7337 Bc/2H 0.06 Concrete Cradle -PCC 2.8 6707 UNSAFE 1860.6 with
OD(mm) 650 Load Wc 6941 Cs 0.010 Concrete Cradle-RCC-0.4% 3.4 8144 SAFE 2205.7 Granular
Bedding
TW(mm) 1150 Load Wsc 99 Total Load 7197 Concrete Cradle-RCC-1.0% 4.8 11498 SAFE 3470.0
5500 TEBT 6120 H/Bc 4.78 L/2H 0.09 Granular 1.9 7752 SAFE 1656.1
NP4 BT(mm) 75 Cd 2.7337 Bc/2H 0.06 Concrete Cradle -PCC 2.8 11424 SAFE 1933.6
OD(mm) 650 Load Wc 6941 Cs 0.010 Concrete Cradle-RCC-0.4% 3.4 13872 SAFE 2278.7
TW(mm) 1150 Load Wsc 99 Total Load 7197 Concrete Cradle-RCC-1.0% 4.8 19584 SAFE 3543.0

Page 7 of 13
Sewerage Project, Begusarai Annexure A-7 : Structural Design of Sewer
NGRBA

Sewerage Project, Begusarai under NGRBA

Structural Design of Sewers & Selection of Economic Combination of Pipe Class & Bedding Type

Backfill Soil Type Num 4 Pipe Diameter 600 mm


Nomenclature Damp Clay Ht above Invert 8000 mm
Unit Wt 1920 Kg/Cum
Impact Factor 1.5
Concentrated Load 6500 Kg (for Highway Traffic)
Trench Side Offset 250 mm
Length of Conduit 1m
Soil Type for Cd 4
Factor of Safety 1.5 Nomenclature Ordinary Maximum for Clay

Water Load 226.19 Kg

Ht of Soil Pipe Design Bedding Types Load Factor Supporting Result Cost Most
above Pipe Strength Economical
Top (mm)
7400 TEBT 2832 H/Bd 6.22 L/2H 0.07 Granular 1.9 3587 UNSAFE 1469.6
NP2 BT(mm) 45 Cd 3.0813 Bc/2H 0.05 Concrete Cradle -PCC 2.8 5286 UNSAFE 1854.8
OD(mm) 690 Load Wc 8378 Cs 0.006 Concrete Cradle-RCC-0.4% 3.4 6419 UNSAFE 2315.8
TW(mm) 1190 Load Wsc 58 Total Load 8662 Concrete Cradle-RCC-1.0% 4.8 9062 SAFE 3920.0
7400 TEBT 4311 H/Bc 5.83 L/2H 0.07 Granular 1.9 5461 UNSAFE 2080.6 NP4 Pipe
NP3 BT(mm) 85 Cd 2.9992 Bc/2H 0.05 Concrete Cradle -PCC 2.8 8047 UNSAFE 2465.8 with
Concrete
OD(mm) 770 Load Wc 9288 Cs 0.007 Concrete Cradle-RCC-0.4% 3.4 9772 SAFE 2926.8 Cradle -PCC
TW(mm) 1270 Load Wsc 65 Total Load 9579 Concrete Cradle-RCC-1.0% 4.8 13795 SAFE 4531.0 Bedding
7400 TEBT 6940 H/Bc 5.83 L/2H 0.07 Granular 1.9 8791 UNSAFE 2407.6
NP4 BT(mm) 85 Cd 2.9992 Bc/2H 0.05 Concrete Cradle -PCC 2.8 12955 SAFE 2792.8
OD(mm) 770 Load Wc 9288 Cs 0.007 Concrete Cradle-RCC-0.4% 3.4 15731 SAFE 3253.8
TW(mm) 1270 Load Wsc 65 Total Load 9579 Concrete Cradle-RCC-1.0% 4.8 22208 SAFE 4858.0

Page 8 of 13
Sewerage Project, Begusarai Annexure A-7 : Structural Design of Sewer
NGRBA

Sewerage Project, Begusarai under NGRBA

Structural Design of Sewers & Selection of Economic Combination of Pipe Class & Bedding Type

Backfill Soil Type Num 4 Pipe Diameter 700 mm


Nomenclature Damp Clay Ht above Invert 6000 mm
Unit Wt 1920 Kg/Cum
Impact Factor 1.5
Concentrated Load 6500 Kg (for Highway Traffic)
Trench Side Offset 250 mm
Length of Conduit 1m
Soil Type for Cd 4
Factor of Safety 1.5 Nomenclature Ordinary Maximum for Clay

Water Load 307.88 Kg

Ht of Soil Pipe Design Bedding Types Load Factor Supporting Result Cost Most
above Pipe Strength Economical
Top (mm)
5300 TEBT 3053 H/Bd 4.08 L/2H 0.09 Granular 1.9 3867 UNSAFE 1731.8
NP2 BT(mm) 50 Cd 2.5121 Bc/2H 0.08 Concrete Cradle -PCC 2.8 5699 UNSAFE 2237.4
OD(mm) 800 Load Wc 8151 Cs 0.013 Concrete Cradle-RCC-0.4% 3.4 6920 UNSAFE 2820.0
TW(mm) 1300 Load Wsc 131 Total Load 8590 Concrete Cradle-RCC-1.0% 4.8 9770 SAFE 4797.0
5300 TEBT 5030 H/Bc 3.87 L/2H 0.09 Granular 1.9 6371 UNSAFE 2566.8
NP4 Pipe
NP3 BT(mm) 85 Cd 2.4373 Bc/2H 0.08 Concrete Cradle -PCC 2.8 9389 SAFE 3072.4 with
OD(mm) 870 Load Wc 8783 Cs 0.015 Concrete Cradle-RCC-0.4% 3.4 11401 SAFE 3655.0 Granular
Bedding
TW(mm) 1370 Load Wsc 142 Total Load 9234 Concrete Cradle-RCC-1.0% 4.8 16096 SAFE 5632.0
5300 TEBT 7830 H/Bc 3.87 L/2H 0.09 Granular 1.9 9918 SAFE 2971.8
NP4 BT(mm) 85 Cd 2.4373 Bc/2H 0.08 Concrete Cradle -PCC 2.8 14616 SAFE 3477.4
OD(mm) 870 Load Wc 8783 Cs 0.015 Concrete Cradle-RCC-0.4% 3.4 17748 SAFE 4060.0
TW(mm) 1370 Load Wsc 142 Total Load 9234 Concrete Cradle-RCC-1.0% 4.8 25056 SAFE 6037.0

Page 9 of 13
Sewerage Project, Begusarai Annexure A-7 : Structural Design of Sewer
NGRBA

Sewerage Project, Begusarai under NGRBA

Structural Design of Sewers & Selection of Economic Combination of Pipe Class & Bedding Type

Backfill Soil Type Num 4 Pipe Diameter 800 mm


Nomenclature Damp Clay Ht above Invert 8000 mm
Unit Wt 1920 Kg/Cum
Impact Factor 1.5
Concentrated Load 6500 Kg (for Highway Traffic)
Trench Side Offset 250 mm
Length of Conduit 1m
Soil Type for Cd 4
Factor of Safety 1.5 Nomenclature Ordinary Maximum for Clay

Water Load 402.12 Kg

Ht of Soil Pipe Design Bedding Types Load Factor Supporting Result Cost Most
above Pipe Strength Economical
Top (mm)
7200 TEBT 3236 H/Bd 5.14 L/2H 0.07 Granular 1.9 4099 UNSAFE 2260.7
NP2 BT(mm) 50 Cd 2.8346 Bc/2H 0.06 Concrete Cradle -PCC 2.8 6041 UNSAFE 2942.2
OD(mm) 900 Load Wc 10667 Cs 0.008 Concrete Cradle-RCC-0.4% 3.4 7335 UNSAFE 3696.6
TW(mm) 1400 Load Wsc 80 Total Load 11149 Concrete Cradle-RCC-1.0% 4.8 10355 UNSAFE 6211.0
7200 TEBT 5748 H/Bc 4.83 L/2H 0.07 Granular 1.9 7281 UNSAFE 3288.7 NP4 Pipe
NP3 BT(mm) 95 Cd 2.7483 Bc/2H 0.07 Concrete Cradle -PCC 2.8 10730 UNSAFE 3970.2 with
Concrete
OD(mm) 990 Load Wc 11715 Cs 0.009 Concrete Cradle-RCC-0.4% 3.4 13029 SAFE 4724.6 Cradle -PCC
TW(mm) 1490 Load Wsc 88 Total Load 12205 Concrete Cradle-RCC-1.0% 4.8 18394 SAFE 7239.0 Bedding
7200 TEBT 8910 H/Bc 4.83 L/2H 0.07 Granular 1.9 11286 UNSAFE 3936.7
NP4 BT(mm) 95 Cd 2.7483 Bc/2H 0.07 Concrete Cradle -PCC 2.8 16632 SAFE 4618.2
OD(mm) 990 Load Wc 11715 Cs 0.009 Concrete Cradle-RCC-0.4% 3.4 20196 SAFE 5372.6
TW(mm) 1490 Load Wsc 88 Total Load 12205 Concrete Cradle-RCC-1.0% 4.8 28512 SAFE 7887.0

Page 10 of 13
Sewerage Project, Begusarai Annexure A-7 : Structural Design of Sewer
NGRBA

Sewerage Project, Begusarai under NGRBA

Structural Design of Sewers & Selection of Economic Combination of Pipe Class & Bedding Type

Backfill Soil Type Num 4 Pipe Diameter 900 mm


Nomenclature Damp Clay Ht above Invert 6000 mm
Unit Wt 1920 Kg/Cum
Impact Factor 1.5
Concentrated Load 6500 Kg (for Highway Traffic)
Trench Side Offset 250 mm
Length of Conduit 1m
Soil Type for Cd 4
Factor of Safety 1.5 Nomenclature Ordinary Maximum for Clay

Water Load 508.94 Kg

Ht of Soil Pipe Design Bedding Types Load Factor Supporting Result Cost Most
above Pipe Strength Economical
Top (mm)
5100 TEBT 3420 H/Bd 3.38 L/2H 0.10 Granular 1.9 4332 UNSAFE 2813.8
NP2 BT(mm) 55 Cd 2.2453 Bc/2H 0.10 Concrete Cradle -PCC 2.8 6384 UNSAFE 3678.0
OD(mm) 1010 Load Wc 9830 Cs 0.018 Concrete Cradle-RCC-0.4% 3.4 7752 UNSAFE 4609.3
TW(mm) 1510 Load Wsc 178 Total Load 10516 Concrete Cradle-RCC-1.0% 4.8 10944 SAFE 7678.0
5100 TEBT 6467 H/Bc 3.19 L/2H 0.10 Granular 1.9 8192 UNSAFE 4144.8
NP4 Pipe
NP3 BT(mm) 100 Cd 2.1636 Bc/2H 0.11 Concrete Cradle -PCC 2.8 12072 SAFE 5009.0 with
OD(mm) 1100 Load Wc 10635 Cs 0.020 Concrete Cradle-RCC-0.4% 3.4 14659 SAFE 5940.3 Granular
Bedding
TW(mm) 1600 Load Wsc 193 Total Load 11337 Concrete Cradle-RCC-1.0% 4.8 20694 SAFE 9009.0
5100 TEBT 9940 H/Bc 3.19 L/2H 0.10 Granular 1.9 12591 SAFE 4900.8
NP4 BT(mm) 100 Cd 2.1636 Bc/2H 0.11 Concrete Cradle -PCC 2.8 18555 SAFE 5765.0
OD(mm) 1100 Load Wc 10635 Cs 0.020 Concrete Cradle-RCC-0.4% 3.4 22531 SAFE 6696.3
TW(mm) 1600 Load Wsc 193 Total Load 11337 Concrete Cradle-RCC-1.0% 4.8 31808 SAFE 9765.0

Page 11 of 13
Sewerage Project, Begusarai Annexure A-7 : Structural Design of Sewer
NGRBA

Sewerage Project, Begusarai under NGRBA

Structural Design of Sewers & Selection of Economic Combination of Pipe Class & Bedding Type

Backfill Soil Type Num 4 Pipe Diameter 1100 mm


Nomenclature Damp Clay Ht above Invert 7000 mm
Unit Wt 1920 Kg/Cum
Impact Factor 1.5
Concentrated Load 6500 Kg (for Highway Traffic)
Trench Side Offset 250 mm
Length of Conduit 1m
Soil Type for Cd 4
Factor of Safety 1.5 Nomenclature Ordinary Maximum for Clay

Water Load 760.27 Kg

Ht of Soil Pipe Design Bedding Types Load Factor Supporting Result Cost Most
above Pipe Strength Economical
Top (mm)
5900 TEBT 3825 H/Bd 3.41 L/2H 0.08 Granular 1.9 4845 UNSAFE 4006.7
NP2 BT(mm) 65 Cd 2.2595 Bc/2H 0.10 Concrete Cradle -PCC 2.8 7140 UNSAFE 5323.9
OD(mm) 1230 Load Wc 12984 Cs 0.017 Concrete Cradle-RCC-0.4% 3.4 8670 UNSAFE 6685.4
TW(mm) 1730 Load Wsc 162 Total Load 13906 Concrete Cradle-RCC-1.0% 4.8 12240 UNSAFE 11099.0
5900 TEBT 7900 H/Bc 3.22 L/2H 0.08 Granular 1.9 10007 UNSAFE 5761.7
NP4 Pipe
NP3 BT(mm) 115 Cd 2.1793 Bc/2H 0.11 Concrete Cradle -PCC 2.8 14747 UNSAFE 7078.9 with
OD(mm) 1330 Load Wc 14013 Cs 0.018 Concrete Cradle-RCC-0.4% 3.4 17907 SAFE 8440.4 Granular
Bedding
TW(mm) 1830 Load Wsc 175 Total Load 14948 Concrete Cradle-RCC-1.0% 4.8 25280 SAFE 12854.0
5900 TEBT 12060 H/Bc 3.22 L/2H 0.08 Granular 1.9 15276 SAFE 7334.7
NP4 BT(mm) 115 Cd 2.1793 Bc/2H 0.11 Concrete Cradle -PCC 2.8 22512 SAFE 8651.9
OD(mm) 1330 Load Wc 14013 Cs 0.018 Concrete Cradle-RCC-0.4% 3.4 27336 SAFE 10013.4
TW(mm) 1830 Load Wsc 175 Total Load 14948 Concrete Cradle-RCC-1.0% 4.8 38592 SAFE 14427.0

Page 12 of 13
Sewerage Project, Begusarai Annexure A-7 : Structural Design of Sewer
NGRBA

Sewerage Project, Begusarai under NGRBA

Structural Design of Sewers & Selection of Economic Combination of Pipe Class & Bedding Type

Backfill Soil Type Num 4 Pipe Diameter 1400 mm


Nomenclature Damp Clay Ht above Invert 7000 mm
Unit Wt 1920 Kg/Cum
Impact Factor 1.5
Concentrated Load 6500 Kg (for Highway Traffic)
Trench Side Offset 250 mm
Length of Conduit 1m
Soil Type for Cd 4
Factor of Safety 1.5 Nomenclature Ordinary Maximum for Clay

Water Load 1231.50 Kg

Ht of Soil Pipe Design Bedding Types Load Factor Supporting Result Cost Most
above Pipe Strength Economical
Top (mm)
5600 TEBT 3825 H/Bd 2.76 L/2H 0.09 Granular 1.9 4845 UNSAFE 6486.0
NP2 BT(mm) 65 Cd 1.9647 Bc/2H 0.14 Concrete Cradle -PCC 2.8 7140 UNSAFE 8643.8
OD(mm) 1530 Load Wc 15545 Cs 0.023 Concrete Cradle-RCC-0.4% 3.4 8670 UNSAFE 10790.3
TW(mm) 2030 Load Wsc 222 Total Load 16999 Concrete Cradle-RCC-1.0% 4.8 12240 UNSAFE 17659.0
5600 TEBT 7900 H/Bc 2.63 L/2H 0.09 Granular 1.9 10007 UNSAFE 9390.0 NP4 Pipe
NP3 BT(mm) 115 Cd 1.9013 Bc/2H 0.15 Concrete Cradle -PCC 2.8 14747 UNSAFE 11547.8 with
Concrete
OD(mm) 1630 Load Wc 16562 Cs 0.024 Concrete Cradle-RCC-0.4% 3.4 17907 UNSAFE 13694.3 Cradle -PCC
TW(mm) 2130 Load Wsc 236 Total Load 18029 Concrete Cradle-RCC-1.0% 4.8 25280 SAFE 20563.0 Bedding
5600 TEBT 12060 H/Bc 2.63 L/2H 0.09 Granular 1.9 15276 UNSAFE 10600.0
NP4 BT(mm) 115 Cd 1.9013 Bc/2H 0.15 Concrete Cradle -PCC 2.8 22512 SAFE 12757.8
OD(mm) 1630 Load Wc 16562 Cs 0.024 Concrete Cradle-RCC-0.4% 3.4 27336 SAFE 14904.3
TW(mm) 2130 Load Wsc 236 Total Load 18029 Concrete Cradle-RCC-1.0% 4.8 38592 SAFE 21773.0

Page 13 of 13
Sewerage Project, Begusarai Annex A-8: General Abstarct of Cost
NGRBA

Sewerage Project, Begusarai under NGRBA

GENERAL ABSTRACT OF COST

S.NO. PARTICULARS AMOUNT (Rs.)

1 PART--"A"
Earthwork, Timbering and Baricadding 66,620,215

2 PART--"B"
Providing and Laying of Sewer lines with bedding works 112,287,407

3 PART--"C"
Construction of Manholes, Ventshafts and uPVC pipe laying 174,553,032

4 PART--"D"
Dismentalling and Restoration of Roads, structure and Railway & 43,619,667
NH crossing by Trenchless technology etc

5 PART--"E"
E. Miscellaneous Items like encasing, equipments for flushing of 16,849,448
sewer lines etc

6 PART--"F"
Provision for 2 nos pumping station, rising main and pumping 35,579,658
machineries and for dedicated HT & LT feeders.

7 PART--"G"
Provision for STP (Sequential Batch Reactor) 17 MLD in PHASE I 167,000,000
for population of 2026 including SCADA

8 TOTAL "A" to "G" 616,509,427

9 PART--"H"
Provision for Land Acquisition 22,100,000

10 PART--"I"
Centage charges @ 8.0% (excluding land acquisition cost) 49,320,754

GRAND TOTAL 687,930,181


SAY RS. Crores 68.79
Sewerage Project, Begusarai Annex A-9 : Cost Estimates
NGRBA

SEWERAGE PROJECT, BEGUSARAI


PROVIDING, LAYING, JOINTING, TESTING AND COMMISSIONING OF RCC SEWER SYSTEM
(LATERALS, BRANCH AND MAIN SEWERS) AND ALL ANCILIARY WORKS, UPVC PIPES
INCLUDING CONSTRUCTION OF MANHOLES, AND RESTORATION OF ROADS ETC. IN DIFFERENT
ZONES OF BEGUSARAI, BIHAR

S.No. Description Unit Qty. Rate Amount


1 3 4 5 6 7
(A) Earthwork, Timbering and Baricadding
1 Providing Barricading for Trenches using 8 inch dia Metre 43970 53 2,330,410
wooden ballies as vertical post, atleast 1.50m above
ground level and atleast 30 cm below ground leve at a
spacing of 2 m. Two rows of 8 inch dia wooden ballies
as horizontal members securely tied to the vertical
posts with cross ballies as bracings.

2 Earth work in excavation in foundation trenches or


drains (not excoding 1.5 m in width or 10 sqm on
plan) including dressing of sides and ramming of
bottoms, lift upto 1.5, including getting out the
excavated soil and disposal of surplus excavated soil
as directed, within a lead of 50m.

in All kinds of soil 82.55


upto 1.5 m deep Cum 182497 69 12,592,293
>1.5m and upto3.0m deep Cum 95809 87 8,335,383
>3.0m and upto 4.5m deep Cum 55408 108 5,984,064
>4.5m and upto 6.0m deep Cum 32759 126 4,127,634
>6m deep and upto 7.5m deep Cum 17286 162 2,800,332
>7.5m deep and upto 9.0m deep Cum 3055 208 635,440
b Same as above in soil mixed with kanker and -
boulders
upto 1.5 m deep Cum 2030 79 160,370
>1.5m and upto3.0m deep Cum 2035 103 209,605
i >3.0m and upto4.5m deep Cum 2917 130 379,210
ii >4.5m and upto6.0m deep Cum 1725 153 263,925
iii >6m deep and 7.5m deep Cum 910 194 176,540
iv >7.5m deep and upto 9.0 m deep Cum 161 245 39,445
3 Disposal of extra excavated earth /Surplus -
excavated material: Add extra for transportation
of extra/ surplus excavated material for dumping
and leveling the same as directed by engineer.

i lead above 50 m to 1 km Cum 11,780.00 36 424,080


ii lead above 1 km to 2 km Cum 11,780.00 43 506,540
iii lead above 2 km to 3 km Cum 11,780.00 51 600,780
iv lead above 3 km to 4 km Cum 11,780.00 59 695,020
v lead above 4 km to 5 km Cum 11,780.00 66 777,480
4 Close timbering in case of shafts, wells, cesspits, -
manholes and the like including strutting, shoring and
packing cavities (wherever requered) complete
(Measurements to be taken of the face area timbered

Depth not exceeding 1.5 Sqm 25244 80 2,019,520


Depth exceeding 1.5 but not exceeding 3 mtr. Sqm 24002 84 2,016,168
Depth exceeding 3 but not exceeding 4.5 mtr. Sqm 9851 88 866,888

Page 1 of 11
Sewerage Project, Begusarai Annex A-9 : Cost Estimates
NGRBA

S.No. Description Unit Qty. Rate Amount


1 3 4 5 6 7
Depth exceeding 4.5 but not exceeding 6.0 mtr. Sqm 4648 92 427,616
Depth exceeding 6.0 but not exceeding 7.5 mtr. Sqm 1818 96 174,528
Depth exceeding 7.5 but not exceeding 9.0 mtr. Sqm 187 101 18,887
5 Extra for planking, stuffing and packing materials for Sqm 3288 1,066 3,505,008
cavities (in close timbering) if required to be left
permanently in position (Face area of timber
permanently left to be measured

6 Open timbering in case of shafts, wells, cesspits, -


manholes and the like including strutting, shoring and
packing cavities (wherever requered) complete
(Measurements to be taken of the face area timbered

Depth not exceeding 1.5 Sqm 100976 34 3,433,184


Depth exceeding 1.5 but not exceeding 3 mtr. Sqm 96006 36 3,456,216
Depth exceeding 3 but not exceeding 4.5 mtr. Sqm 39402 38 1,497,276
Depth exceeding 4.5 but not exceeding 6.0 mtr. Sqm 18589 41 762,149
Depth exceeding 6.0 but not exceeding 7.5 mtr. Sqm 7272 44 319,968
Depth exceeding 7.5 but not exceeding 9.0 mtr. Sqm 747 48 35,856
7 Extra for planking, stuffing and packing materials for Sqm 13150 536 7,048,400
cavities (in open timbering) if required to be left
permanently in position (Face area of timber
permanently left to be measured

TOTAL A 66,620,215.00

B. Providing and Laying of Sewer lines with bedding works


8 Providing at the site, lowering and laying in trenches ,
aligning and jointing of RCC pipes NP2, NP3 & NP4
class (with s/s ends) as per IS 458-2003) (amended
upto date) at all depth with Rubber gaskets
(EPDM/SBR) for sewer lines as per IS : 5382
(including cost of rubber gaskets, lubricants) as per
drawing, sectional testing of the sewer pipe line
(including cost of conveyance of water of site) etc.
complete as per specification and / or as directed by
Engineer.

150 MM Dia. RCC NP3 Pipe RM 7,761 365 2,832,809


200 MM Dia. RCC NP3 Pipe RM 37,539 431 16,179,451
450 MM Dia. RCC NP3 Pipe RM 719 1,675 1,204,710
500 MM Dia. RCC NP3 Pipe RM 151 1,743 263,664
600 MM Dia. RCC NP3 Pipe RM 115 2,487 286,005
700 MM Dia. RCC NP3 Pipe RM 505 2,890 1,458,352
900 MM Dia. RCC NP3 Pipe RM 312 4,342 1,356,832
1000 MM Dia. RCC NP3 Pipe RM 560 5,034 2,821,507
1100 MM Dia. RCC NP3 Pipe RM 2,700 5,974 16,129,800
200 MM Dia. RCC NP4 Pipe RM 27,025 480 12,972,000
250 MM Dia. RCC NP4 Pipe RM 1,802 522 940,644
300 MM Dia. RCC NP4 Pipe RM 2,051 762 1,562,969
350 MM Dia. RCC NP4 Pipe RM 1,996 1,434 2,862,264
400 MM Dia. RCC NP4 Pipe RM 893 1,581 1,411,833
450 MM Dia. RCC NP4 Pipe RM 134 1,703 227,368
500 MM Dia. RCC NP4 Pipe RM 605 1,893 1,145,265
600 MM Dia. RCC NP4 Pipe RM 806 2,961 2,386,566
1000 MM Dia. RCC NP4 Pipe RM 406 6,374 2,586,442
1100 MM Dia. RCC NP4 Pipe RM 1,735 7,397 12,830,984
-

Page 2 of 11
Sewerage Project, Begusarai Annex A-9 : Cost Estimates
NGRBA

S.No. Description Unit Qty. Rate Amount


1 3 4 5 6 7
8A Providing, lowering, laying, aligning, fixing in position -
and jointing at all levels/ depths ISI marked HDPE
pipes of PE-100 grade for sewer line in trenches in
complete including all material, labour, testing and
commissioning, as per drawing, sectional testing of
the sewer pipe line (including cost of conveyance of
water of site) etc. complete as per specification and /
or as directed by Engineer.
For providing sewer line in narrow lanes of the town.

160 mm Dia HDPE pipe RM 17,133 883 15,128,262


BEDDING AND ALLIED WORKS -
9 Providing Granular Bedding having width = outer dia. -
Of pipe(Bc)+ 500mm, thickness below pipe = 0.25 Bc
or 100mm (whichever is higher) and haunching = 0.5
Bc, with graded hard crusher broken stone of 100%
passing through 20 mm sieve, 20% to 50% passing
10

160mm dia. HDPE Pipe in Granular Bedding RM 17133 72 1,233,562


150mm dia. RCC Pipe in Granular Bedding RM 7761 72 558,801
200mm dia. RCC Pipe in Granular Bedding RM 64564 84 5,423,376
250mm dia. RCC Pipe in Granular Bedding RM 1802 95 171,190
300mm dia. RCC Pipe in Granular Bedding RM 2051 109 223,574
350mm dia. RCC Pipe in Granular Bedding RM 668 149 99,514
400mm dia. RCC Pipe in Granular Bedding RM 333 169 56,277
500mm dia. RCC Pipe in Granular Bedding RM 756 210 158,760
600mm dia. RCC Pipe in Granular Bedding RM 748 264 197,472
1000mm dia. RCC Pipe in Granular Bedding RM 748 516 385,808
1100mm dia. RCC Pipe in Granular Bedding RM 4435 581 2,576,514
-
10 Providing and laying PCC M15 grade (using -
mechinical concrete mixer) using 20 mm graded hard
crusher broken stone aggregate, laying in layers of
not more than 15 cm thick for Bedding having width =
outer dia. of pipe(Bc)+ 200mm or 1.25 Bc (whichever
is higher)
150mm dia RCC Pipe in PCC Bedding RM - 145 -
-
11 Providing and laying RCC M15 grade (using -
mechinical concrete mixer) with 0.4% steel
reinforcement, using 20 mm graded hard crusher
broken stone aggregate, laying in layers of not more
than 15 cm thick for Bedding having width = outer dia.
of pipe(Bc)+ 200mm or 1.25 Bc (whichever is higher),
thickness below pipe = 0.25 Bc or 100mm (whichever
is higher) and haunching = 0.25 Bc, for RCC pipes of
following sizes, including reinforcement, compaction,
curing, form work, etc. complete as per drawing and
or as directed by Engineer.

350mm dia RCC Pipe in RCC Bedding RM 1,328 636 844,608


400mm dia RCC Pipe in RCC Bedding RM 560 744 416,558
450mm dia RCC Pipe in RCC Bedding RM 853 860 733,356
600mm dia RCC Pipe in RCC Bedding RM 173 1,314 227,322
700mm dia RCC Pipe in RCC Bedding RM 505 1,661 838,174
900mm dia RCC Pipe in RCC Bedding RM 312 2,654 829,348
1000mm dia RCC Pipe in RCC Bedding RM 219 3,319 725,467
-

Page 3 of 11
Sewerage Project, Begusarai Annex A-9 : Cost Estimates
NGRBA

S.No. Description Unit Qty. Rate Amount


1 3 4 5 6 7
12 Providing and laying granular bedding in layers on not -
more than 15 cm thick, for bedding having width =
outer dia. Of pipe(Bc)+ 500mm, thickness below pipe
= 0.25 Bc or 100mm (whichever is higher) and
haunching = 0.5 Bc, with and RCC M15 grade (using
mechinical concrete mixer) with 1.0% steel
reinforcement using 20 mm graded hard crusher
broken stone aggregate to cover pipe having width =
outer dia. Of pipe(Bc)+ 200mm or 1.25 Bc (whichever
is higher), thickness over pipe = 0.25 Bc or 100mm
(whichever is higher) for RCC pipes of following sizes
including reinforcement, compaction, curing, form
work, etc. complete as per drawing and or as directed
by Engineer
150mm dia RCC Pipe in RCC Arch Bedding RM - 591 -

TOTAL B 112,287,407.14

C. Construction of Manholes, Ventshafts and uPVC pipe laying upto consumer


13 Providing and constructing of brick masonry circular Nos. 2201 9,250 20,359,242
manholes of “Type A” with internal dia 0.9m and depth
upto 1.65m having 230mm thick brick masonry wall in
cement sand mortar 1:4 including concreting PCC M-
10 grade (1:4:8) for 225 mm thick foundation including
curing compaction and form work etc. complete, PCC
M15 for benching and channel portion, RCC M20 for
200mm thick cover slab including reinforcement, PCC
M20 for fixing the manhole frame and cover using
stone aggregate 20 mm nominal size, 20 mm thick
inside and outside plaster in CM 1:3, inside plaster
finished with floating coat of neat cement, vata in
CM1:1 around pipe entering and leaving the manhole
and also at the junction of masonary and concrete
slab, providing and fixing of CI foot steps of approved
make at every 0.3 m height fixed in CM1:3, supplying
and fixing heavy duty SFRC manhole frame and cover
as per IS 12592 (Part I and II)

having clear opening of 560mm, including refilling of -


Jhiri, including curing, watering, ramming, hydro
testing of manhole, conveyance and cost of water,
and dewatering complete as directed by the
Engineer.(Rate for depth 0.9 m)
14 Providing and constructing extra depth of manhole Mtr. 825 3,009 2,482,425
"Type-A" for depth beyond 0.90 m and upto 1.65 m
with sewer brick masonary including 20mm plaster
inside and outside as per drawing and direction of
Engineer.

Page 4 of 11
Sewerage Project, Begusarai Annex A-9 : Cost Estimates
NGRBA

S.No. Description Unit Qty. Rate Amount


1 3 4 5 6 7
15 Providing and constructing of brick masonry circular Nos. 1459 16,174 23,603,802
manholes of “Type B” with internal dia 1.2m and depth
upto 2.5m having 230mm thick brick masonry wall
upto 1.5m, 345mm thick from 1.5m to 2.5m in cement
sand mortar 1:4 including concreting PCC M-10 grade
(1:4:8) for 225 mm thick foundation including curing
compaction and form work etc. complete, PCC M15
for benching and channel portion, RCC M20 for
200mm thick cover slab including reinforcement, PCC
M20 for fixing the manhole frame and cover using
stone aggregate 20 mm nominal size, 20 mm thick
inside and outside plaster in CM 1:3, inside plaster
finished with floating coat of neat cement, vata in
CM1:1 around pipe entering and leaving the manhole
and also at the junction of masonary and concrete
slab, providing and fixing of CI foot steps of approved
make at every 0.3 m height fixed in CM1:3, supplying
and fixing heavy duty SFRC manhole frame and cover
as per IS 12592 (Part I and II) having clear opening of
560mm,

including refilling of Jhiri, including curing, watering, -


ramming, hydro testing of manhole, conveyance and
cost of water, and dewatering complete (Rate for
depth 1.7 m) as directed by the Engineer.
16 Providing and constructing extra depth of manhole Mtr. 584 5,250 3,066,000
"Type-B" for depth beyond 1.70 m and upto 2.50 m
with sewer brick masonary including 20mm plaster
inside and outside as per drawing and direction of
Engineer.
17 Providing and constructing of brick masonry circular Nos. 1254 21,314 26,727,756
manholes of “Type C” with internal dia 1.5m and
depth upto 5m having 230mm thick brick masonry
wall upto 1.5m, 345mm thick from 1.5m to 2.5m and
460 from 2.5m to 5m in cement sand mortar 1:4
including concreting PCC M-10 grade (1:4:8) for 225
mm thick foundation including curing compaction and
form work etc. complete, PCC M15 for benching and
channel portion, RCC M20 for 200mm thick cover slab
including reinforcement, PCC M20 for fixing the
manhole frame and cover using stone aggregate 20
mm nominal size, 20 mm thick inside and outside
plaster in CM 1:3, inside plaster finished with floating
coat of neat cement, vata in CM1:1 around pipe
entering and leaving the manhole and also at the
junction of masonary and concrete slab, providing and
fixing of CI foot steps of approved make at every 0.3
m height fixed in CM1:3, supplying and fixing heavy
duty SFRC manhole frame and cover as per IS 12592
(Part I and II) having clear opening of 560mm,

including refilling of Jhiri, including curing, watering, -


ramming, hydro testing of manhole, conveyance and
cost of water, and dewatering complete (Rate for
depth 2.6 m) as directed by the Engineer.

Page 5 of 11
Sewerage Project, Begusarai Annex A-9 : Cost Estimates
NGRBA

S.No. Description Unit Qty. Rate Amount


1 3 4 5 6 7
18 Providing and constructing extra depth of manhole 1505 8,176 12,304,880
"Type-C" for depth beyond 2.60 m and upto 5.0 m
with sewer brick masonary including 20mm plaster
inside and outside as per drawing and direction of
Engineer.

19 Providing and constructing of brick masonry circular Nos. 324 71,847 23,278,428
manholes of “Type D” with internal dia 1.8m and
depth upto 9m having 230mm thick brick masonry
wall upto 1.5m, 345mm thick from 1.5m to 2.5m,
460mm from 2.5m to 5m and 575mm from 5.0m to
9.0m in cement sand mortar 1:4 including concreting
PCC M-10 grade (1:4:8) for 225 mm thick foundation
including curing compaction and form work etc.
complete, PCC M15 for benching and channel
portion, RCC M20 for 200mm thick cover slab
including reinforcement, PCC M20 for fixing the
manhole frame and cover using stone aggregate 20
mm nominal size, 20 mm thick inside and outside
plaster in CM 1:3, inside plaster finished with floating
coat of neat cement, vata in CM1:1 around pipe
entering and leaving the manhole and also at the
junction of masonary and concrete slab, providing and
fixing of CI foot steps of approved make at every 0.3
m height fixed in CM1:3, supplying and fixing heavy
duty SFRC manhole frame and cover as per IS 12592
(Part I and II) having clear opening of 560mm,

including refilling of Jhiri, including curing, watering, -


ramming, hydro testing of manhole, conveyance and
cost of water, and dewatering complete (Rate for
depth 5.1 m) as directed by the Engineer.
20 Providing and constructing extra depth of manhole Mtr. 615 11,905 7,321,575
"Type-D" for depth beyond 5.10 m and upto 9.0 m
with sewer brick masonary including 20mm plaster
inside and outside as per drawing and direction of
Engineer.
21 Providing and constructing of RCC M20 grade cast-in- -
situ circular manholes of “Type E” with internal dia
1.4m and depth upto 3.5m having 150mm thick RCC
M20 wall, including 350 mm thick RCC M20 grade
base slab (foundation), PCC M15 for benching and
channel portion, PCC M20 for 200mm thick cover
slab, PCC M20 250mm thick for fixing the manhole
frame and cover , vata in CM1:1 around pipe entering
and leaving the manhole, providing and fixing of CI
foot steps of approved make at every 0.3 m height
fixed in CM1:3, supplying and fixing heavy duty SFRC
manhole frame and cover as per IS 12592 (Part I and
II) having clear opening of 560mm, including refilling
of Jhiri, including curing, watering, ramming, hydro
testing of manhole, conveyance and cost of water,
and dewatering complete as directed by the Engineer.

Manhole dia Int. 1.4 Nos. 20 47,742 954,840


Manhole dia Int. 1.5 Nos. 12 50,885 610,620
Manhole dia Int. 1.55 Nos. 17 52,270 888,590
Manhole dia Int. 1.75 Nos. 8 59,375 475,000
Manhole dia Int. 2.0 Nos. 7 68,259 477,813

Page 6 of 11
Sewerage Project, Begusarai Annex A-9 : Cost Estimates
NGRBA

S.No. Description Unit Qty. Rate Amount


1 3 4 5 6 7
-
22 Providing and constructing of RCC M20 grade cast-in- -
situ circular manholes of “Type F” with internal dia
1.4m and depth upto 8m having 150mm thick RCC
M20 wall, including 350 mm thick RCC M20 grade
base slab (foundation), PCC M15 for benching and
channel
Manhole dia Int. 1.4 Nos. 23 51,545 1,185,535
Manhole dia Int. 1.5 Nos. 17 54,381 924,477
Manhole dia Int. 1.55 Nos. 19 55,140 1,047,660
Manhole dia Int. 1.75 Nos. 8 61,819 494,552
Manhole dia Int. 2.0 Nos. 5 69,584 347,920
23 Providing, fixing and erecting precast RCC M20 Vent Nos. 87.0 28,879 2,512,473
shaft with cowl, 125mm and 225mm internal and
external dia. resp. at top, 300 and 450 mm internal
and external dia. At bottom and 9.0 m over all length,
bottom 1.175 m below ground level, fixed in a pit

23a Construction of brick chamber for house connection in Each 6014 5,016 30,166,224
narrow lanes and for property connection with internal
dia 450 mm and depth upto 900 mm (Clear depth)
with 200 mm thick PCC M10 in foundation, 75 mm
thick PCC M15 flooring in slope, 230 mm thick brick
masonary in CM 1:4, 20 mm thick inside and outside
plastering with Cm 1:3 neat coat of cement inside with
560 mm dia SFRC MD manhole cover and frame
embeded in 200 mm thick PCC M20 grade concrete,
refilling of jhiri with watering and ramming complete as
per approved drawing and /or directed by engineer.
Note: Only excavation work will be measured and paid
separately.

24 Providing at the site, lowering and laying in trenches , RM 77390 198 15,323,220
aligning and jointing of uPVC pipes of class III
(4kg/cm2) of dia 100 mm and as per specification
with rubber ring with socket and spigot
joint(EPDM/SBR) for all depths including well graded
granular bedding with offset 300 mm for pipe length
as per drawing and specification including hydraulic
field testing and commissioning etc. complete as
directed by Engineer.

TOTAL OF C 174,553,032.03

D. Dismentalling and Restoration of Roads, structure and Railway & NH crossing by Trenchless tecnology etc
25 Dismantling of structures (Dismantling of existing -
structures like culverts, bridges, retaining walls and
other structure comprising of masonry, cement
concrete, wood work, steel work, including T&P and
scaffolding wherever necessary, sorting the
dismantled material, disposal of unserviceable
material and stacking the serviceable material with all
lifts and lead of 1000 metres)

Dismantling Cement Concrete -


By mechanial means -
Cement Concrete grade M15 & M20 cum 300 347 104,100
RCC M20 and above cum 200 523 104,600
Dismantling Brick / Tile Work -

Page 7 of 11
Sewerage Project, Begusarai Annex A-9 : Cost Estimates
NGRBA

S.No. Description Unit Qty. Rate Amount


1 3 4 5 6 7
In Cement mortar cum 200 169 33,800
In mud mortar cum 1568 134 210,112
Dismantling Stone Masonry -
Rubble Stone masonry in cement mortar cum 250 169 42,250
26 Dismantling of Flexible Pavements (Dismantling of -
flexible pavements and disposal of dismantled
materials up to a lead of 1000 metres, stacking
serviceable and unserviceable materials separately)

By manual means -
Bituminous Courses Cum 1125.5 351 395,051
Granular courses Cum 3849 267 1,027,683
By mechanial means -
Bituminous Courses Cum 300 209 62,700
27 Dismantling of Cement concrete pavement Cum 2281 952 2,171,512
(Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to
pieces not exceeding 0.02 cum in volume and stock
pilling at designated locations and disposal of
dismantled materials up to a lead of 1000 metres,
stacking serviceable and unserviceable material
separately)

28 Dismantling Kerb stone (Dismantling kerb stone by metre 2500 11 27,500


manual means and disposal of dismantled materials
with all lifts and up to a lead of 1000 metres)

29 Removal of Telephone/ Electric Poles and Lines each 150 74 11,100


(Removal of telephone/ Electric poles including
excavation and dismantling of foudnation concrete
and lines under the supervision of concerned
department, disposal with all lifts and up to a lead of
1000 metres and stacking the serviceable and
unserviceable material separately)
30 Granular sub base with close graded Material (Table: -
400-1)
Plant Mix method (Construction of granular sub base -
by providing close graded material, mixing in a
mechanical mix plant at OMC, carriage of mixed
Material to work site, spreading in uniform layers with
motor grader on prepared surface and compacting
with vibratory power roller to achieve the desired
density, complete as per clause 401)
for Grading - II Material Cum 4277 754 3,224,858
31 Water Bound Mecadam (providing, laying spreading -
and compacting stone aggregates of specific sizes of
water bound mecadam specification including
spreading in uniform thickness, hand packing rolling
with vibratory roller 8-10 tonnes/Smooth 3 wheeled
Steel Roller in stages to proper grade and camber,
applying and brooming requisite type of screening
binding Materials to fill up the interstices of coarse
aggregate, watering and compacting to the required
density.)

By mechanical means -
Grading II (Using Screening Crushable type such as -
Moorum or Gravel)
Using Screening Crushable type such as Moorum or Cum 1711 710 1,214,810
Gravel (with Vibratory Roller)

Page 8 of 11
Sewerage Project, Begusarai Annex A-9 : Cost Estimates
NGRBA

S.No. Description Unit Qty. Rate Amount


1 3 4 5 6 7
Grading III (Using Screening Crushable type such as -
Moorum or Gravel)
Using Screening Crushable type such as Moorum or Cum 2138 771 1,648,398
Gravel (with Vibratory Roller)
32 Open - Graded Premix Surfacing (Providing Laying -
and rolling of open - graded premix surfacing of 20
mm thickness composed of 13.2 mm to 5.6 mm
aggregates either using penetration grade bitumen or
cut back or emulsion to required line, grade and level
to serve as wearing course on a previously prepared
base, including meaning in a suitable plant, laying and
rolling with a smooth wheeled roller 8-10 tonne
capacity, finished to required level and grades.)

Case I: Mechanical methond using Penetration grade Sqm 28510 113 3,221,630
Bitumen and HMP of appropriate capacity not less
than 75 tonnes/hour
33 Prime coat (Providing and applying primer coat with Sqm 28510 24 684,240
bitumen emulsion on prepared surface of granualr
Base including clearing of road surface and sparying
primer at the rate of 0.60 kg/sqm using mechanical
means.)
34 Tack coat - providing and applying tack coat with Sqm 28510 9 256,590
bitumen emulsion using emulsion pressure distributor
at the rate of 0.20 kg per sqm on the prepared
bituminous / granular surface cleaned with
mechanical broom.
35 Seal Coat (providing and laying seal coat sealing the -
voids in a bituminous surface laid to the specified
levels, grade and cross fall using Type A and B seal
coats)
Case II: Type B (Providing and laying of premix sand Sqm 28510 46 1,311,460
seal coat with HMP of appropriate capacity not less
than 75 tonnes/ hours using crushed stone chipping
6.7 mm size and penetration bitumen of suitable
grade.)
36 Providing and laying in position specified grade of -
reinforced cement concrete excluding the cost of
centring, shuttering, finishing and reinforcement - All
works upto plinth level for road restoration works

a) 1:1.5:3(1 cement : 1.5 coarse sand : 3 graded stone cum 3593 3,186 11,447,298
aggregate 20 mm nominal size)
37 Febrication supply of plain ended MS pipe made from kg 66560 105 6,988,800
MS sheet strips of relevent IS : specification of
approved thicness by welding , lowring ,lying ,alligning
,fixing in position at all levels M.S. pipe upto1500mm
dia. (minimum thickness MS sheet as approved by
Engineer in charge)

Page 9 of 11
Sewerage Project, Begusarai Annex A-9 : Cost Estimates
NGRBA

S.No. Description Unit Qty. Rate Amount


1 3 4 5 6 7
38 Pushing M.S. casing pipe by trenchless method by per m 180 32,985 5,937,300
hydraulic jacking and smooth controlled pushing dia. Per
method under running traffic conditions as per N.H. m
standards including including carrying out survey length
work at the job site for determining underground cable
trenches like telephone, power cable, water & sanitary
lines and resistivity test for finding the soil strata using
necessary equipments for completion of work,
mobilising of machineries and specialized crew at the
job site, etc. complete in all respects, including driving
in all type of soils including excavation of Driven pit
and Exit pit with proper protection at the three sides
with shoring sheets & ISMB's. Providing and casting
M.S. cutting edges for front sheild and constructing
thrust bed at designated level as directed by the
Engineer,

necessary de-watering and providing concrete -


foundations at the base of the Driven pit, crane for
handling of pipes & any pther machinary, tool &
tackels required, construction of temporary works as
per requirement and as approved by N.H. authorities
and the Engineer-in-charge.
39 Providing, laying & jointing testing and commissioning -
of new HDPE pipe( conforming to relevent IS) line by
suitable method by pushing pipe by trenchless
technology at stipulated levels and gradients suitable
for gravity flow. The work shall be carried out
complete as per specifivations & direction of Enginner
Incharge
160 mm internal dia RM 65 18,150 1,179,750
200 mm internal dia RM 50 21,780 1,089,000
300 mm internal dia RM 45 27,225 1,225,125
TOTAL OF D 43,619,666.50

E. Miscellaneous Items like encasing, equipments for flushing of sewer lines etc
40 Empting of septic tank/soakage well etc, disposing of each 3055 3,695 11,288,225
sludge within a lead of 5km and taking out sewage
including refilling with local earth, ramming and
compaction in layers, cleaning of site.

Page 10 of 11
Sewerage Project, Begusarai Annex A-9 : Cost Estimates
NGRBA

S.No. Description Unit Qty. Rate Amount


1 3 4 5 6 7
40A Providing, arranging, managing, maintaining 500 sq. Months 24 18,150 435,600
ft. well furnished office with three tables, 10 chairs,
two steel alimirah, one latest new computer with laser
printer & operator, with telephone connection & broad
band connection facility sufficient number of display
boards, etc. fully furnished office to the satisfaction of
the Engineer in charge including Electrical, Water
expenses etc. complete, including well equipped
Laboratory. For execution of this item the date of start
shall be considered only when the Contractor has
actually rented/ constructed the required premises
established the office and lab as per requirement.
This item shall remain valid only for 30 months
maximum, no additional payment shall be made for
whatsover reason even if time extension if provided or
date of completion is extended. This office, laboratory
including furniture and all other equipment shall be
property of contractor after completion of Project. The
office shall be maintained till completion of work
without any extra payment.

41 Jettting machine Each 1 2,662,000 2,662,000


42 Tractor & tractor trolley with water tanker with Each 2 484,000 968,000
required pump
43 Providing and laying in position cement concrete of -
specified grade excluding the cost of centring and
shuttering all work upto plinth level.
1:2:4 (1 cement : 2 coase sand : 4 graded aggregate -
20 mm nominal size)
For encasing of DI/RCC Pipes Cum 362.56 2,677 970,573

44 Centring and shuttering including strutting, propping -


etc. and removal of form for:-
Foundations, footing bases of columns etc. for mass Sqm 750 85 63,750
concrete

45 Pumping out water caused by springs, tidal or river KL 13180 35 461,300


seepage, broken water mains or drains and the like

TOTAL OF E 16,849,448.12
TOTAL OF A + B + C + D +E 413,929,769

Page 11 of 11
Sewerage Project, Begusarai Annex A-9 : Cost Estimates
NGRBA

CONSTRUCTION, TESTING AND COMMISSIONING OF SEWAGE PUMPING STATIONS AND ALL ANCILIARY
WORKS INCLUDING ALL MECHANICAL & ELECTRICAL WORKS IN DIFFERENT ZONES OF BEGUSARAI,
BIHAR.

S. Description Unit Rate


Qty Amount (Rs)
No. (Rs)
1 2 3 4 5
(A): EARTH WORKS 0.8333
1 Providing Barricading for Trenches using 8 inch dia wooden ballies as 550.00 53 29,150
vertical post, atleast 1.50m above ground level and atleast 30 cm below
ground leve at a spacing of 2 m. Two rows of 8 inch dia wooden ballies as
horizontal members securely tied to the vertical posts with cross ballies as
bracings.
2 Providing and Fixing Minimum 0.63mm thick GI corrugated sheets 80.00 43 3,440
(minimum width of each sheet shall be 60 cm) for covering the barricading
in one/ two rows one above another and painting in red and white stripes as
per the specifications and directions of the Engineer Incharge with proper
fixing arrangements with GI limpet washers nuts and bolts. (Note : The rate
to be quoted for covering of barricading for both the sides of trench etc)

3 Excavation for depth upto 1.5 m below ground level for laying sewers,
manholes, gully pits, chambers sumps etc.in ordinary soil (earth sand loam
and clay) including dressing levelling refilling in trenches in 20 cm layers
watering sand ramming the same including removal of surplus earth and
other dismanteled materials upto distance of 50 m from the centre of
trenches
upto 1.5 m deep 1100.00 69 75,900
>1.5m and upto3.0m deep 850.00 87 73,950
>3.0m and upto 4.5m deep 480.00 108 51,840
>4.5m and upto 6.0m deep 390.00 126 49,140
>6m deep and upto 7.5m deep 310.00 162 50,220
>7.5m deep and upto 9.0m deep 240.00 208 49,920
>9.0m deep and upto 10.5m deep 200.00 263 52,600
b Same as above in soil mixed with kanker and boulders
upto 1.5 m deep 40.00 79 3,160
>1.5m and upto3.0m deep 40.00 103 4,120
>3.0m and upto4.5m deep 30.00 130 3,900
>4.5m and upto6.0m deep 20.00 153 3,060
>6m deep and 7.5m deep 20.00 194 3,880
>7.5m deep and upto 9.0 m deep 20.00 245 4,900
>9.0m deep and upto 10.5m deep 20.00 300 6,000
4 Disposal of extra excavated earth /Surplus excavated material: Add extra
for transportation of extra/ surplus excavated material for dumping and
leveling the same as directed by engineer.
i lead above 50 m to 1 km 110.00 36 3,960
ii lead above 1 km to 2 km 110.00 43 4,730
iii lead above 2 km to 3 km 140.00 51 7,140
iv lead above 3 km to 4 km 140.00 59 8,260
v lead above 4 km to 5 km 60.00 66 3,960
5 Close timbering in case of shafts, wells, cesspits, manholes and the like
including strutting, shoring and packing cavities (wherever requered)
complete (Measurements to be taken of the face area timbered
Depth not exceeding 1.5 200.00 80 16,000
Depth exceeding 1.5 but not exceeding 3 mtr. 200.00 84 16,800
Depth exceeding 3 but not exceeding 4.5 mtr. 240.00 88 21,120
Depth exceeding 4.5 but not exceeding 6.0 mtr. 240.00 92 22,080
Depth exceeding 6.0 but not exceeding 7.5 mtr. 270.00 96 25,920
Depth exceeding 7.5 but not exceeding 9.0 mtr. 290.00 101 29,290
Depth exceeding 9.0but not exceeding 10.5 mtr. 300.00 105 31,500
6 Providing, driving and retrieving sheet pile in trenches/wells including stiffening by 1080.00 388 419,040
ISMC 100, and dewatering wherever necessary including all welding and fabrication
(measurement to be taken of the face area protected)
Grand Total A 1,074,980.00
Page 1 of 10
Sewerage Project, Begusarai Annex A-9 : Cost Estimates
NGRBA

(B): CIVIL WORKS


7 Providing and laying in position cement concrete of specified grade 20.00 2130 42,600
excluding the cost of centring and shuttering - All work upto plinth level
:1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm
nominal size).
8 Providing and laying in position specified grade of reinforced cement
concrete excluding the cost of centring, shuttering, finishing and
reinforcement - All work upto plinth level
8.1 1:1:2 (1 cement : 1 coarse sand : 2 graded stone aggregate 20 mm nominal 210.00 4389 921,690
size). (As per design mix)
9 Reinforced cement concrete work in walls (any thickness), including
attached pilasters, buttresses, plinth and string courses, fillets, columns,
pillars, piers, abutments, posts and struts etc. upto two stories excluding
cost of centring, shuttering, finishing and reinforcement :
9.1 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm 90.00 3186 286,740
nominal size)
10 Reinforcement for R.C.C. work at all levels including straightening, cutting, 21540.00 65 1,400,100
bending, placing in position and binding all complete- Thermo-Mechanically
Treated bars.
11 Centring and shuttering at all levels including strutting, propping etc. and
removal of form for : Centering & shuttering with steel sheets including
strutting, propping, bracing bothways with wooden members and removal of
formwork for rafts, walls etc below plinth level.
a Walls (any thickness) including attached pilasters, buttresses, plinth and 1570.00 127 199,390
string courses etc.
b Suspended floors, roofs, landings, balconies and access platform. 320.00 114 36,480
c Lintels, beams, plinth beams, girders, bressumers and cantilevers. 320.00 88 28,160
d Columns, Pillars, Piers, Abutments, Posts and Struts. 400.00 162 64,800
12 Brick work with F.P.S. bricks of class designation 100 in superstructure 760.00 2448 1,860,480
above plinth level upto two stories in all shapes and sizes in :Cement
mortar 1:4 (1 cement : 4 coarse sand)
12A 20 mm cement plaster of mix :1:4 (1 cement : 4 fine/ coarse sand) 560.00 92 51,520
12B White washing with lime to give an even shade:New work (three or more 560.00 6 3,360
coats)
13 Providing and fixing T-iron frames for doors, windows and ventilators of 80.00 63 5,040
mild steel Tee-sections, joints mitred and welded with 15x3 mm lugs 10cm
long embedded in cement concrete blocks 15x10x10 cm of 1:3:6 (1 cement
: 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) or with
wooden plugs and screws or with dash fastener or rawl plugs and screws or
with fixing clips or with bolts and nuts as require including fixing of
necessary butt hinges and screws and applying a priming coat of approved
steel primer.
Providing and fixing aluminium work for doors, windows, ventilators and
partitions with extruded built up standard tubular sections/ appropriate Z
sections and other sections of approved make conforming to IS: 733 and IS
: 1285, fixed with rawl plugs and screws or with fixing clips, or with
expansion hold fasteners including necessary filling up of gaps at junctions,
at top, bottom and sides with required PVC/neoprene felt etc. Aluminium
sections shall be smooth, rust free, straight, mitred and jointed mechanically
wherever required including cleat angle, Aluminium snap beading for
glazing / panelling, C.P. brass / stainless steel screws, all complete as per
architectural drawings and the directions of Engineer-in-charge. (Glazing
and panelling to be paid for separately) :

For shutters of doors, windows & ventilators including providing and fixing
hinges/ pivots and making provision for fixing of fittings wherever required
including the cost of PVC / neoprene gasket required (Fittings shall be paid
for separately).
a Anodised aluminium (anodised transparent or dyed to required shade 100.00 354 35,400
according to IS: 1868, Minimum anodic coating of grade AC 15)

Page 2 of 10
Sewerage Project, Begusarai Annex A-9 : Cost Estimates
NGRBA

14 Providing and fixing glazing in aluminium door, window, ventilator shutters


and partitions etc. with PVC/ neoprene gasket etc. complete as per the
architectural drawings and the directions of engineer-in-charge . (Cost of
aluminium snap beading shall be paid in basic item) :

a With float glass panes of 4.0 mm thickness 10.00 604 6,040


15 Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6mm 10.00 1773 17,730
angle iron and 3mm M.S. gusset plates at the junctions and corners, all
necessary fittings complete, including applying a priming coat of approved
steel primer-Using flats 30x6mm for diagonal braces and central cross
piece
16 Supplying and fixing rolling shutters of approved make, made of required 30.00 1343 40,290
size M.S. laths interlocked together through their entire length and jointed
together at the end by end locks mounted on specially designed pipe shaft
with brackets, side guides and arrangements for inside and outside locking
with push and pull operation complete including the cost of providing and
fixing necessary 27.5cm long wire springs grade No.2 and M.S. top cover of
required thickness for rolling shutters- 80x1.25mm M.S. laths with 1.25 mm
thick top cover.
17 Providing and fixing ball bearing for rolling shutters 10.00 391 3,910
18 Brick work with F.P.S. bricks of class designation 100 in foundation and
plinth in:
a Cement mortar 1:6 (1 cement : 6 coarse sand) 30.00 2046 61,380
19 Brick work with F.P.S. bricks of class designation 100 in superstructure
above plinth level upto two stories in all shapes and sizes in :
Cement mortar 1:6 (1 cement : 6 coarse sand) 40.00 2261 90,440
19A 20 mm cement plaster of mix :
1:4 (1 cement : 4 fine/ coarse sand) 110.00 92 10,120
20 Extra for providing mechanical device chain and crank operation for 30.00 545 16,350
operating rolling shutters- Exceeding 10.00 sqm and upto 16.80 sqm in the
area.
21 G.I Barbed wire Fencing 1.2 metre high Providing and fixing 1.2 metres 240.00 200 48,000
high GI barbed wire fencing with 1.8 m angle iron posts 40 mm x 40 mm x 6
mm placed every 3 metres center to center founded in M15 grade cement
concrete, 0.6 metre below ground level, every 15th post, last but one end
post and corner post shall be strutted on both sides and end post on one
side only and provided with 9 horizontal lines and 2 diagonals interwoven
with horizontal wires, fixed with GI staples, turn buckles etc complete as per
clause 807 (Quantity taken from Drawing)
22 Lettering and figuring with enamel paint of approved quality, shade and size 8000.00 1 8,000
on the walls and/or as specified such as name, year of construction etc on
an area of three sq.m at each pump house site as per direction of Engineer.

23 Steel work weldede in built up section/ framed work including cutting, 1000.00 61 61,000
hoisting fixing in position and applying a priming coat of approved steel
primer using structiral steel etc. as required
In gratings, frames, guard bar, ladders, gates.
24 Providing and fixing square bars or the flats welded to windows, ventilators 40.00 63 2,520
etc. complete as per design and drawing including cutting, welding and
fabrication with priming coat of red oxide and painting with approved paint

25 Providing and fixing 6 mm thick chequered plate over the cable trench and 40.00 2656 106,240
at specified locations including cutting, fixing in position, welding angle
holdfasts and applying a priming coat of approved steel primer etc
complete.

Page 3 of 10
Sewerage Project, Begusarai Annex A-9 : Cost Estimates
NGRBA

26 Providing and laying integral cement based water proofing treatment


including preparation of surface as required for treatment of roofs,
balconies, terraces etc consisting of following operations: a) Applying a
slurry coat of neat cement using 2.75 kg/sqm. of cement admixed with
water proofing compound conforming to IS. 2645 and approved by
Engineer-in-charge over the RCC slab including adjoining walls upto
300mm height including cleaning the surface before treatment. b) Laying
brick bats with mortar using broken bricks/brick bats 25 mm to 115mm size
with 50% of cement mortar 1:5 (1 cement : 5 coarse sand) admixed with
water proofing compound conforming to IS : 2645 and approved by
Engineer-in-charge over 20 mm thick layer of cement mortar of mix 1:5 (1
cement :5 coarse sand ) admixed with water proofing compound
conforming to IS : 2645 and approved by Engineer-in-charge to required
slope and treating similarly the adjoining walls upto 300 mm height
including rounding of junctions of walls and slabs c)

After two days of proper curing applying a second coat of cement slurry
using 2.75kg/ sqm of cement admixed with water proofing compound
conforming to IS : 2645 and approved by Engineer-in-charge. d) Finishing
the surface with 20 mm thick jointless cement mortar of mix 1:4 (1 cement
:4 coarse sand) admixed with water proofing compound conforming to IS :
2645 and approved by Engineer-in-charge including laying glass fibre cloth
of approved quality in top layer of plaster and finally finishing the surface
with trowel with neat cement slurry and making pattern of 300x300 mm
square 3mm deep. e) The whole terrace so finished shall be flooded with
water for a minimum period of two weeks for curing and for final test. All
above operations to be done in order and as directed and specified by the
Engineer-in-Charge :
a With average thickness of 120mm and minimum thickness at khurra as 65 70.00 387 27,090
mm.
27 Providing laying cement concrete (1:4:8) including curing compaction etc 60.00 1753 105,180
complete using stone aggregate 40mm nominal size (crusher broken)200
mm thick as base course after proper compaction, leveling / dressing for
construction of road at all pumping stations with 3.75m width

28 Providing and laying M20 grade cement concrete in CC work for roads etc 30.00 2677 80,310
including curing, compaction, finishing and making good the joints,to
required camber /super elevation as per clasue no.602 and 112 of MoRTH

Grand Total B 5,620,360.00


(C): Pipe WORKS
29 Providing, lowering, laying in trenches, aligning, fixing in position and
jointing Ductile Iron (DI) ISI marked K-7 grade S&S pipes as per IS:8329-
2000 (amended upto date), with internal cement mortar lining for potable
water with rubber ring (EPDM/SBR) joints as per IS: 5382-1985 (excluding
special accessories) complete including all material, labour, hydraulic
testing and commissioning as per Technical Specifications and as per
direction of Engineer.
300mm Dia 295 3941 1,162,595
500 mm dia 375 8145 3,054,375
29A Carting laying and jointing of following sizes of pipes into the trenches
including the cost of all jointing materials labours and T&P testing etc.
complete pipes
Dia DI class K-7
300mm Dia 295 153 45,135
500 mm dia 375 319 119,625
30 Providing , lowering , laying, aligning, fixing in position at and jointing at all
level / depths S&S standard specials with rubber ring (EPDM/SBR) joint as
per IS:5382-1985 such as tees, bends, tapers, caps etc. with in trenches in
DI pipe line complete including in all material, labour, testing and
commissioning along with pipe line as per Technical Specifications and as
per direction of engineer.
a Special flanged DI K-7(up to 300mm dia) 590 96 56,640

Page 4 of 10
Sewerage Project, Begusarai Annex A-9 : Cost Estimates
NGRBA

b Special flanged DI K-7(above 300mm dia) 1,125 111 124,875


31 Providing and constructing of brick masonry circular manholes of “Type B” 2 16492 32,984
with internal dia 1.2m and depth upto 2.5m having 230mm thick brick
masonry wall upto 1.5m, 345mm thick from 1.5m to 2.5m in cement sand
mortar 1:4 including concreting PCC M-10 grade (1:4:8) for 225 mm thick
foundation including curing compaction and form work etc. complete, PCC
M15 for benching and channel portion, RCC M20 for 200mm thick cover
slab including reinforcement, PCC M20 for fixing the manhole frame and
cover using stone aggregate 20 mm nominal size, 20 mm thick inside and
outside plaster in CM 1:3, inside plaster finished with floating coat of neat
cement, vata in CM1:1 around pipe entering and leaving the manhole and
also at the junction of masonary and concrete slab, providing and fixing of
CI foot steps of approved make at every 0.3 m height fixed in CM1:3,
supplying and fixing heavy duty SFRC manhole frame and cover as per IS
12592 (Part I and II) having clear opening of 560mm, including refilling of
Jhiri, including curing, watering, ramming, hydro testing of manhole,
conveyance and cost of water, and dewatering complete
as directed by the Engineer.

31a Providing and constructing extra depth of manhole "Type-B" for depth 4 5292 21,168
beyond 1.70 m and upto 2.50 m with sewer brick masonary including 20mm
plaster inside and outside as per drawing and direction of Engineer.

32 Providing and constructing of brick masonry circular manholes of “Type C” 2 21724 43,448
with internal dia 1.5m and depth upto 5m having 230mm thick brick
masonry wall upto 1.5m, 345mm thick from 1.5m to 2.5m and 460 from
2.5m to 5m in cement sand mortar 1:4 including concreting PCC M-10
grade (1:4:8) for 225 mm thick foundation including curing compaction and
form work etc. complete, PCC M15 for benching and channel portion, RCC
M20 for 200mm thick cover slab including reinforcement, PCC M20 for
fixing the manhole frame and cover using stone aggregate 20 mm nominal
size, 20 mm thick inside and outside plaster in CM 1:3, inside plaster
finished with floating coat of neat cement, vata in CM1:1 around pipe
entering and leaving the manhole and also at the junction of masonary and
concrete slab, providing and fixing of CI foot steps of approved make at
every 0.3 m height fixed in CM1:3, supplying and fixing heavy duty SFRC
manhole frame and cover as per IS 12592 (Part I and II) having clear
opening of 560mm, including refilling of Jhiri, including curing, watering,
ramming, hydro testing of manhole, conveyance and cost of water, and dewatering complete as
directed byand
32a Providing the Engineer.
constructing extra depth of manhole "Type-C" for depth 2 8220 16,440
beyond 2.60 m and upto 5.0 m with sewer brick masonary including 20mm
plaster inside and outside as per drawing and direction of Engineer.

Grand Total C 4,677,285.00


(IV): Mechancial Works
33 Supply delivery at site with necessary packing, receiving, unloading,
shifting, storing, installation, testing and commissioning of submerssible
type non-clog sewage pumps with motors, coupling,guide rails ,lifting
chains, and all accessories including fully atomatic starter and cables etc.
complete as per specifications.
(I) Pumping Station-1
(a) P1 :9.3 KW 5 353320 1,766,600
(II) Pumping Station-2
(a) P1 :30 KW 5 880880 4,404,400

34 Providing Lowering Laying, aling, fixing in postion in pipe line, manually


operated CI D/F Sluice valves of approved make (IS: 14846 Amended upto
date) PN 1.0 class of following dia complete (excluding jointing and jointing
material) including all material, labour, testing and commissioning along
with pipe line as per Technical Specifiactions and as per direction of
Engineer.
(I) Pumping Station-1
150 NB 5 25410 127,050

Page 5 of 10
Sewerage Project, Begusarai Annex A-9 : Cost Estimates
NGRBA

300 NB 1 82280 82,280

(II) Pumping Station-2


300 NB 5 82280 411,400
500 NB 1 326700 326,700

35 Providing ,lowering, laying,alying ,fixing in position and jointing in pipe line,


dual plate check valve as per API:594 andAPI :598 of PN 1.0 rating of
following dia (excluding jointing and material), including all material, labour,
testing, and commissioning as per Technical Specification and as per
direction of Engineer.
(I) Pumping Station-1
150 NB 5 24805 124,025
(II) Pumping Station-2
300 NB 5 81675 408,375

36 Providing, lowering, laying, aligning, fixing in position and jointing CI


dismantling joint (suitable for sluice valves etc.) as per IS specifications
complete of the following sizes including all jointing material, cost of all
labour, testing and commissioning as per Technical Specifications and as
per direction of Engineer.
(I) Pumping Station-1
150 NB 5 12038 60,190
300 NB 1 19209 19,209

(II) Pumping Station-2


300 NB 5 19209 96,045
500 NB 1 27443 27,443

37 Providing, lowering, laying, aligning, fixing in position at all level/ depths CI 1,400 65 91,000
Class - B double flanged specials as per IS : 7181 in trenches complete
(excluding jointing) including all material, labour,
testing and commissioning along with pipe line as per Technical
Specifications and as per direction of Engineer.
38 Supply, delivery at site with necessary packing, unloading, shifting, storing,
installation and commissioning of Exhaust Fan conforming to IS:2312
complete with exhaust cowl & bird screen as per specifications.
0.37 kW, 1400 rpm 4 3146 12,584
39 Supply delivery at site with necessary packing, unloading, shifting, storing,
installation and commissioning of Mechanically cleaned Coarse Bar Screen
with all accessories complete as per specification but not limited to

For all pumping stations


1.0 m (w) x 0.9 m (h) 2 786500 1,573,000
40 Supply delivery at site with necessary packing, unloading, shifting, storing,
installation and commissioning of thimble mounted CI Sluice Gates
conforming to IS:13349/AWWA C501 with all accessories complete as per
specification
0.90 m square 4 181500 726,000
41 Supply delivery at site with necessary packing, unloading, shifting, storing,
installation and commissioning of travelling trolley with chain pulley block
etc . at following pumping stations as per Specification.
2.0 MT Capacity 2 193600 387,200
42 Supply, delivery at site installation and commissioning of Mechanical Float 2 11132 22,264

chord type level indicator will all accessories complete as per specifications
43 Providing and fixing hand rail of approved size by welding etc. to steel 1,500 82 123,000
ladder railing, balcony railing and staircase railing including applying a
priming coat of approved steel primer- with GI Pipes
44 Providing, lowering, laying, aligning, fixing in position in pipe line, Kinetic
Double Air Valve as per IS: 14845 of following dia (excluding jointing and
jointing material) including all material, labour, testing and commissioning
as per Technical Specifications and as per direction of Engineer

Page 6 of 10
Sewerage Project, Begusarai Annex A-9 : Cost Estimates
NGRBA

b 100 mm dia 4 14988 59,952


Grand Total D 10,848,717.00
(V): Electrical & instrumentation Works
45 Construction of transformer platform 2M x 2M x 2M height from ground 4 10285 41,140
including excavation with 300 mm. thick dry stone kharanja in bottom & 150
mm. thick PCC 1:4:8 on kharanja . Platform will be constructed from R.R.
stone masonary in cement mortar 1:6 with cement laster 20 mm thick on
sides and 100 mm PCC of grade M 15 on top of platform size
2000mmX2000mm complete in all respect.
46 Supply, erection, testing & commissioning of 11/0.433 KV Distribution
transformer complete in all respect as required including necessary
hardwares.
160 KVA , DYn11, ONAN , ±2x2.5% taps 1 617100 617,100
63 KVA , DYn11, ONAN , ±2x2.5% taps 1 375100 375,100
47 SITC of self healing MPP/MP type shunt caopacitor ( banks) conforming to
IS 13340-41/ IEC:831- 1 &2 in existing panel or parralel with load terminals,
the capacitor shall be fitted with discharge registor, pressure sensitive
disconnector( PSD) & shall have dissipation factor less tha 0.0025 at 50 HZ
and total wattage loss less than 0.5 W/ KVAR including making connection
with suitable capcity connectors/ cbles testing as required
a Heavy duty three phase 440V, 50 HZ capacitor( bank) 40 661 26,440
48 Suply, erection, testing & commissioning of 415Volt, 3 ph, 4 wire, 50 Hz (50 2 423500 847,000
KA for 1 second) Non drawout, self standing, single front, floor mounted
type Power cum Motor control centre with aluminium bus bar, IP-54
enclosure (as per single line diagram) 1 no. incoming and 5 nos outgoing
49 P&F Recessed/ Surface mounting heavy duty horizontal type sheet steel
Distribution board phophatised/ powder painted complete with copper bus
bar, shorting link , neutral link, earth link and din bar, conforming to IS13032
& IS8623 including making internal DB terminations with copper lugs ,
testing etc. as required.
Single door (single phase)
a 6 Way 2 708 1,416
50 P&F 240/415 V MCB of breaking capacity not less than 10 KA (B/ C/ D
tripping characteristic) ISI marked IS 8828(1996)]/ conforming to IEC 60898
in existing
board/sheets including making connections with lugs, testing etc. as
required.
a 6 A to 32 A rating 12 212 2,544
51 P&F 240/415 V isolator conforming to IS:13947-III/ IEC 60947-3 on existing
board / sheet including making connections with lugs , testing etc. as
required.
a Double pole isolator 30 A / 40 A rating 2 376 752
Lighting fixtures/ lamps
52 P & F IP-65 protected street light luminaire on existing bracket suitable for
HPSV/ MH LAMP, made out from powder coated single piece die cast
aluminium housing, electrochemically brightened and anodized POT optics
aluminium reflector, heat resistant and toughened glass cover and
accessories like copper ballast, electronic ignitor, capacitor, holder prewired
up to terminal block etc. as required including making connection testing
etc. as required (without lamp)
a 1 x 150 Watt 6 6559 39,354
53 P & F industrial fluorescent tube fitting with reflector fabricated from CRCA
sheet and finished with powder coating / vitreous enamelled complete with
accessories like (OCCB, starter, starter seat)/ EB, condensor,rotor holder,
terminal block duly prewired with copper conductor including making
connection, testing etc. as required.( without tube) IP 65
a 2 x 36 Watts 4 1924 7,696

Page 7 of 10
Sewerage Project, Begusarai Annex A-9 : Cost Estimates
NGRBA

54 P & F strip type fluorscent tube fitting fabricated from (CRCA sheet and
finished with powder coating / stove enamelled paint)/(extruded non
corrosive UV resist EP channel) complete with accessories like (OCCB,
starter, starter seat)/ EB, rotor holder, terminal block duly prewired with
copper conductor including making connection, testing etc. as required. (
without tube)
a 1 X 36 Watts with OCCB 8 389 3,112
55 P & F High pressure sodium vapour/ High pressure mercury vapour/ Metal
halide/ Halogen lamp as required.
a HPSV tubular lamp-150 Watt 6 745 4,470
56 P & F Fluorscent tube rod in existing fixtures as required
a 36/40 Watts 16 68 1,088
57 Wiring of light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq.
mm FR PVC insulated unsheathed flexible copper conductor 1.1 kV grade
and 1.5 sq.mm FR PVC insulated unsheathed flexible copper earth
conductor 1.1 kV grade (IS:694) of approved make in surface / recessed ISI
marked medium duty PVC conduit & it's accessories, round tiles,18 SWG
M.S. box with earth terminal, screwless cage connectors for neutral looping
in switch board & falce ceiling point, 6 A switch, 3.0 mm thick phenolic
laminated sheet, zinc plated / brass screws, cup washers, making
connections, testing etc. as required.
a Short point (up to 3 mtr.) 10 270 2,700
b Medium point (up to 6 mtr.) 10 478 4,780
c Long point (up to 10 mtr..) 10 700 7,000
58 Wiring for 3 pin 15 A power plug point with 4 Sq. mm PVC insulated copper
conductor cable (IS:694) and approved make, including 16 SWG surface
galvanised steel conduit pipe including laying of bare copper conductor of
size 2.24 mm dia, conduit fittings,3 pin 15 A , socket outlet,15 amp
swtich,earthing the third pin ,18 SWG metal box 3 mm sunmica sheet the
bakelite base, making connections etc. as required
a Long Point (up to 10 Mtr.) 6 1043 6,258
59 Wiring of 3 pin 5 amp. light plug point with 1.5 sq. mm FR PVC insulated
unsheathed flexible copper conductor 1.1 kV grade and 1.5 sq.mm FR PVC
insulated unsheathed flexible copper earth conductor 1.1 kV grade(IS:694)
of approved make in surface / recessed ISI marked medium duty PVC
conduit & it's accessories, 18 SWG M.S. box with earth terminal, screwless
cage connectors for neutral looping in switch board & falce ceiling point, 6
A switch, 6 A socket, 3.0 mm thick phenolic laminated sheet, zinc plated /
brass screws, cup washers, making connections, testing etc. as required.
a On board 2 99 198
b Short point (up to 3 mtr.) 2 332 664
c Medium point (up to 6 mtr.) 2 539 1,078
d Long point (up to 10 mtr..) 2 762 1,524
60 Supply and fixing of pole overhang of 1 meter made of steel tube as per IS 14 509 7,126
2713-1980 (part I & II )of 76.1mm OD x 3.25mm thick with required nipple
complete with painting etc as reqd. suitable for luminaries

61 P & Laying XLPE insulated IS:7098/II/85 of Group1 and approved make


H.T.cable for working voltage 11 K.V.Earthed direct in ground including
excavation of 30cmx100cm size trench, 25cm layer of river sand, IInd class
bricks covering, refilling earth, compaction of earth, making necessary
connection testing etc.as required of size.
a 3/C - 35 sq.mm. 60 944 56,640
b 3/C - 50 sq.mm. 60 1071 64,260
c 3/C - 70 sq.mm. 28 1162 32,536

Page 8 of 10
Sewerage Project, Begusarai Annex A-9 : Cost Estimates
NGRBA

62 Providing & making heat shrinkable type indoor/outdoor/straight through


terminations/joint kit of Group1 and approved make suitable for XLPE
insulated 11 KV cable, with required components, prepration of cable
ends,testing etc. as required of following sizes . Make Raychem/ABB
a 3/C - 70/ sq.mm. - Indoor 2 13194 26,388
b 3/C - 50 sq.mm. 2 12493 24,986
c 3/C - 35 sq.mm. 2 12493 24,986
d 3/C - 70/ sq.mm. - Outdoor 2 21897 43,794
e 3/C - 50 sq.mm. 2 20774 41,548
f 3/C - 35 sq.mm. 2 20774 41,548
63 P/Laying XLPE insulated & P.V.C. sheathed cable of 1.1 KV grade with
aluminium conductor Armoured of
IS:7098-I approved make in ground as per IS:1255 including excavation of
30cmx75cm size trench, 25 cm thick under layer of sand,IInd class bricks
covering, refilling earth,compaction of earth, making necessary connection,
testing etc. as required of size.
a 3.5/C -150 sq.mm. 60 846 50,760
64 Providing and Laying PVC insulated PVC Sheathed cables of 1.1 KV grade
with copper conductor in ground as per IS 1255 including excavation of 30
cmx75 cm size trench 25 cm thick under layer of sand and iind class bricks
a 5/C -2.5 sq.mm. 170 217 36,890
65 Supplying and making one end termination with heavy duty single
compression brass gland SIBG type, aluminium lugs duly crimped with
crimping tool, PVC tape etc for following size of Armoured PVC insulated &
PVC sheathed/ XLPE aluminium conductor cable of 1100 volt grade as
required of size
a 3 C x 70.0 sq.mm 12 149 1,788
b 3.5 C x 150.0 sq.mm 6 397 2,382
66 Plate Earthing as per IS:3043 with G.I. Earth plate of size 600mm x 600mm 14 2355 32,970
x 6.0mm by embodying 3 to 4 mtr. below the ground level with 20 mm dia.
G.I. 'B' class watering Pipe including all accessories like nut, bolts, reducer
,nipple, wire meshed funnel, and C.C. finished chamber covered with
hinged type with locking arrangement C.I. Cover, C.I. Frame of size300mm
x 300mm complete with alternate layers of salt and coke/charcoal, testing of
earth resistance as required.
67 S & Laying following size earth wire/strip in horizontal or
vertical run in ground/surface/recess including riveting,
soldering, saddles, making connection etc. as required.
a 08 swg G.I wire 132 9 1,188
b 25mm x 3mm G.I. Strip 80 43 3,440
68 Providing & Laying GI pipe 125mm dia B- Class ( for crossing of cable 10 1452 14,520
along road / way etc.)
69 P & F of Industrial plug and socket conforming to IEC 60309-1/2 made out 2 182 364
of self extinguishing engineering
polymer / polyamide, nickel plated brass sleeve and pins, socket with
shutter including making connection
etc as reqd.
69a Surface mounted socket
i 63 A 5 pin 2 2710 5,420
69b Plug top
i 63 A 5 pin 2 2087 4,174
70 SF of rubber matting with one side corrugated as per IS specification
a 1.1 KV, 12 mm thick, 2 1044 2,088
b 11 KV, 25 mm thick, 2 2227 4,454
71 S&F off load change over switch four pole/2 pole, 230/ 415 V ,conforming
to IS:13947 P-III in sheet steel enclosure complete with connections with
lugs, testing etc. as required in the following rating:
a 200 A four pole 2 8893 17,786

Page 9 of 10
Sewerage Project, Begusarai Annex A-9 : Cost Estimates
NGRBA

72 Supply, delivery at site with necessary packing, receiving, unloading,


storing, installation, testing and commissioning totally enclosed silent(Noice
free ) Diesel Generator set, Trolly mounted suitable for 415 volts 3 phase
50 Hz of the under mentioned rating conforming to pollution control boards
norm and standards (as per specification) complete with its control panel
and battery,fuel tank etc.
(I) Pumping Station 1
(a) 63 KVA 1 1222100 1,222,100
(II) Pumping Station- 2
(a) 100 KVA 1 1657700 1,657,700

INSTRUMENTATION WORKS
73 Supply, delivery at site with necessary packing, receiving, unloading,
storing, installation, loop wiring, calibration, testing and commissioning of
conductivity type level switch suitable for two point switching with all
required components and associate
a All pumping stations 6 30250 181,500
74 Supply, delivery at site with necessary packing, unloading, shifting, storing,
installation and commissioning of 150 mm dia Pressure Gauge complete
with all accessories as per specifications.
a All pumping stations 6 3261 19,566
75 Provision for dedicated feeder for pump houses and treatment plant
a LT feeder per km length 10 484000 4,840,000
b HT Feeder 4 726000 2,904,000
Grand Total E 13,358,316.00
Total (i+ii+iii+iv+v) 35,579,658.00

Page 10 of 10
Sewerage Project, Begusarai Annex A-11 : O Cost
NGRBA

Sewerage Scheme Begusarai


NGRBA Programme
Operation & Maintenance Cost & Cash Flow Statement

S.No. Particulars Details Unit 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
1 A Capital Investment
2 i Sewer Network Lac Rs 657 4202 350
3 a Civil Works Lac Rs 640 4097 341
4 b Mechnical Works Lac Rs 16 105 9
5 ii Sewage Treatment Plant Lac Rs 211 1347 112
6 a Civil Works Lac Rs 84 539 45
7 b Mechnical Works Lac Rs 126 808 67
8 iii Total Lac Rs 867 5549 462
9 B Flow
10 i Population Souls 120030 122597.1 125219 127898 130634 133428 136282 139197 142174 145215 148322 151494 154735 158044 161425 164878 168404 172007 175686
11 ii LPCD Liter per Day 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135 135
12 iii Water Supply Cum/Day 16204 16551 16905 17266 17636 18013 18398 18792 19194 19604 20023 20452 20889 21336 21792 22258 22735 23221 23718
13 iv WW Production Cum/Day 12963 13240 13524 13813 14108 14410 14718 15033 15355 15683 16019 16361 16711 17069 17434 17807 18188 18577 18974
14 v Infiltration Cum/Day 709 709 709 709 709 709 709 709 709 709 709 709 709 709 709 709 709 709 709
15 vi Total Wastewater Cum/Day 13673 13950 14233 14522 14818 15120 15428 15743 16064 16393 16728 17071 17421 17778 18143 18516 18897 19286 19683
16 C Energy Charges
17 i Sewer Network
18 a Pumps No 1 Flow lps 31 32 32 33 34 34 35 36 36 37 38 39 40 41 41 42 43 44 45
19 b Head m 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12
20 c Power, kWH kWH 174 178 182 186 189 194 198 202 206 210 215 220 224 229 234 239 244 249 254
21 d Annual Energy Charges Rs Lacs 3.18 3.25 3.32 3.39 3.46 3.53 3.61 3.68 3.76 3.84 3.92 4.01 4.09 4.18 4.27 4.36 4.45 4.54 4.64
22 a Pumps No 2 Flow lps 133 136 139 142 145 148 151 154 158 161 164 168 171 175 179 183 186 190 194
23 b Head m 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13
24 c Power, kWH kWH 815 832 849 868 886 905 924 944 964 984 1005 1026 1048 1071 1093 1117 1140 1164 1189
25 d Annual Energy Charges Rs Lacs 14.86 15.18 15.50 15.83 16.17 16.51 16.86 17.22 17.59 17.96 18.34 18.73 19.13 19.54 19.95 20.38 20.81 21.25 21.70
26 Total Energy Charges Sewer Network 18.04 18.43 18.82 19.22 19.63 20.04 20.47 20.91 21.35 21.80 22.27 22.74 23.22 23.72 24.22 24.73 25.26 25.80 26.34
27 ii Sewage Treatment Plant
28 a Coarse Screen 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04
29 b Fine Screen 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07
30 c Degritter 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18
31 d Others 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18
32 e Lift Station Flow lps 151 155 158 162 165 169 172 176 180 184 188 192 197 201 205 210 215 219 224
33 Head m 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15
34 Power, kWH kWH 1068 1091 1115 1140 1165 1191 1217 1244 1272 1300 1329 1358 1388 1419 1451 1483 1515 1549 1583
35 Annual Energy Charges Rs Lacs 19.48 19.91 20.36 20.81 21.27 21.74 22.22 22.71 23.21 23.73 24.25 24.79 25.34 25.90 26.47 27.06 27.66 28.27 28.90
36 Total Energy Charges STP 19.96 20.39 20.83 21.28 21.74 22.21 22.69 23.19 23.69 24.20 24.73 25.26 25.81 26.37 26.95 27.53 28.13 28.74 29.37
37 iii Total Energy Charges 38.00 38.82 39.65 40.50 41.37 42.26 43.16 44.09 45.04 46.00 46.99 48.00 49.04 50.09 51.17 52.27 53.39 54.54 55.71
38 D Salary Charges
39 i Sewer Network
40 a Supervisors 4.8 4.8 4.8 4.8 4.8 4.8 4.8 4.8 4.8 4.8 4.8 4.8 4.8 4.8 4.8 4.8 4.8 4.8 4.8
41 b Labour,Sweepers 8.64 8.64 8.64 8.64 8.64 8.64 8.64 8.64 8.64 8.64 8.64 8.64 8.64 8.64 8.64 8.64 8.64 8.64 8.64
42 c Drivers 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6
43 Total Sewer network 17.04 17.04 17.04 17.04 17.04 17.04 17.04 17.04 17.04 17.04 17.04 17.04 17.04 17.04 17.04 17.04 17.04 17.04 17.04
44 ii Pumping Stations

Page 1 of 4
Sewerage Project, Begusarai Annex A-11 : O Cost
NGRBA

S.No. Particulars Details Unit 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
45 a Pump Driver 5.76 5.76 5.76 5.76 5.76 5.76 5.76 5.76 5.76 5.76 5.76 5.76 5.76 5.76 5.76 5.76 5.76 5.76 5.76
46 b Helper 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6
47 Total Sewer network 9.36 9.36 9.36 9.36 9.36 9.36 9.36 9.36 9.36 9.36 9.36 9.36 9.36 9.36 9.36 9.36 9.36 9.36 9.36
48 iii Sewage Treatment Plant
49 a Plant Supervisor Cum Chemist 4.8 4.8 4.8 4.8 4.8 4.8 4.8 4.8 4.8 4.8 4.8 4.8 4.8 4.8 4.8 4.8 4.8 4.8 4.8
50 b Pump Driver/Operator 8.64 8.64 8.64 8.64 8.64 8.64 8.64 8.64 8.64 8.64 8.64 8.64 8.64 8.64 8.64 8.64 8.64 8.64 8.64
51 c Lab Assistant 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
52 d Labour 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4
53 e Security Guard 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8
54 Total Treatment Plant 21.6 21.6 21.6 21.6 21.6 21.6 21.6 21.6 21.6 21.6 21.6 21.6 21.6 21.6 21.6 21.6 21.6 21.6 21.6
55 Total Network + STP 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48
56 E Repaur & Maintenance Charges
57 i on Civil Works 11.49 11.49 11.49 11.49 11.49 11.49 11.49 11.49 11.49 11.49 11.49 11.49 11.49 11.49 11.49 11.49 11.49 11.49 11.49
58 ii on Mechanical Works 11.32 11.32 11.32 11.32 11.32 11.32 11.32 11.32 11.32 11.32 11.32 11.32 11.32 11.32 11.32 11.32 11.32 11.32 11.32
59 iii Total 22.82 22.82 22.82 22.82 22.82 22.82 22.82 22.82 22.82 22.82 22.82 22.82 22.82 22.82 22.82 22.82 22.82 22.82 22.82
60 F Chemical Charges
61 i Chemical Charges 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60
62 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60
63 G Flushing Charges
64 i Flushing Charges 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65
65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65
66 H Total O&M Charges
67 Annual O&M Charges 116.07 116.88 117.71 118.56 119.43 120.32 121.23 122.15 123.10 124.07 125.06 126.07 127.10 128.15 129.23 130.33 131.46 132.60 133.78
68 Discounted O&M Charges 116.07 106.26 97.28 89.08 81.57 74.71 68.43 62.68 57.43 52.62 48.21 44.19 40.50 37.12 34.03 31.20 28.61 26.24 24.06
69 I Annual Revenue
70 Sewer Charges per Cum 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10
71 Wastewater Volume Daily 13673 13950 14233 14522 14818 15120 15428 15743 16064 16393 16728 17071 17421 17778 18143 18516 18897 19286 19683
72 Annual Revenue 104.80 106.93 109.10 111.31 113.58 115.89 118.25 120.67 123.13 125.65 128.22 130.85 133.53 136.27 139.07 141.93 144.85 147.83 150.87
73 Discounted Revenues 104.80 97.20 90.16 83.63 77.58 71.96 66.75 61.92 57.44 53.29 49.43 45.86 42.55 39.47 36.62 33.98 31.52 29.25 27.14
74 J Results
75 Total O&M Charges
76 Total Revenue
77 Discounted O&M Charges
78 Discounted Revenues

Page 2 of 4
Sewerage Project, Begusarai Annex A-11 : O Cost
NGRBA

Sewerage Scheme Begusarai


NGRBA Programme
Operation & Maintenance Cost & Cash Flow Statement

S.No. Particulars Details Unit 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042
1 A Capital Investment
2 i Sewer Network Lac Rs
3 a Civil Works Lac Rs
4 b Mechnical Works Lac Rs
5 ii Sewage Treatment Plant Lac Rs
6 a Civil Works Lac Rs
7 b Mechnical Works Lac Rs
8 iii Total Lac Rs
9 B Flow
10 i Population Souls 179444 183282 187202 191207 195297 199474 203741 208099 212550 217096 221740 226483
11 ii LPCD Liter per Day 135 135 135 135 135 135 135 135 135 135 135 135
12 iii Water Supply Cum/Day 24225 24743 25272 25813 26365 26929 27505 28093 28694 29308 29935 30575
13 iv WW Production Cum/Day 19380 19794 20218 20650 21092 21543 22004 22475 22955 23446 23948 24460
14 v Infiltration Cum/Day 709 709 709 709 709 709 709 709 709 709 709 709
15 vi Total Wastewater Cum/Day 20089 20504 20927 21360 21801 22252 22713 23184 23665 24156 24657 25169
16 C Energy Charges
17 i Sewer Network
18 a Pumps No 1 Flow lps 46 47 48 49 50 51 52 53 54 56 57 58
19 b Head m 12 12 12 12 12 12 12 12 12 12 12 12
20 c Power, kWH kWH 260 265 271 277 283 289 295 301 307 314 320 327
21 d Annual Energy Charges Rs Lacs 4.74 4.84 4.94 5.05 5.16 5.27 5.38 5.49 5.61 5.73 5.85 5.97
22 a Pumps No 2 Flow lps 199 203 207 211 216 221 225 230 235 240 245 250
23 b Head m 13 13 13 13 13 13 13 13 13 13 13 13
24 c Power, kWH kWH 1214 1240 1267 1294 1321 1349 1378 1407 1437 1468 1499 1531
25 d Annual Energy Charges Rs Lacs 22.16 22.64 23.12 23.61 24.11 24.62 25.14 25.68 26.22 26.78 27.35 27.93
26 Total Energy Charges Sewer Network 26.90 27.48 28.06 28.66 29.27 29.89 30.52 31.17 31.83 32.51 33.20 33.91
27 ii Sewage Treatment Plant
28 a Coarse Screen 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04
29 b Fine Screen 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07
30 c Degritter 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18
31 d Others 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18
32 e Lift Station Flow lps 229 234 240 245 250 256 261 267 273 279 285 292
33 Head m 15 15 15 15 15 15 15 15 15 15 15 15
34 Power, kWH kWH 1618 1654 1691 1728 1766 1806 1846 1886 1928 1971 2014 2059
35 Annual Energy Charges Rs Lacs 29.53 30.19 30.86 31.54 32.24 32.95 33.68 34.43 35.19 35.97 36.76 37.58
36 Total Energy Charges STP 30.01 30.66 31.33 32.01 32.71 33.43 34.16 34.90 35.66 36.44 37.24 38.05
37 iii Total Energy Charges 56.91 58.14 59.39 60.67 61.98 63.31 64.68 66.07 67.50 68.95 70.44 71.96
38 D Salary Charges
39 i Sewer Network
40 a Supervisors 4.8 4.8 4.8 4.8 4.8 4.8 4.8 4.8 4.8 4.8 4.8 4.8
41 b Labour,Sweepers 8.64 8.64 8.64 8.64 8.64 8.64 8.64 8.64 8.64 8.64 8.64 8.64
42 c Drivers 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6
43 Total Sewer network 17.04 17.04 17.04 17.04 17.04 17.04 17.04 17.04 17.04 17.04 17.04 17.04
44 ii Pumping Stations

Page 3 of 4
Sewerage Project, Begusarai Annex A-11 : O Cost
NGRBA

S.No. Particulars Details Unit 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042
45 a Pump Driver 5.76 5.76 5.76 5.76 5.76 5.76 5.76 5.76 5.76 5.76 5.76 5.76
46 b Helper 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6
47 Total Sewer network 9.36 9.36 9.36 9.36 9.36 9.36 9.36 9.36 9.36 9.36 9.36 9.36
48 iii Sewage Treatment Plant
49 a Plant Supervisor Cum Chemist 4.8 4.8 4.8 4.8 4.8 4.8 4.8 4.8 4.8 4.8 4.8 4.8
50 b Pump Driver/Operator 8.64 8.64 8.64 8.64 8.64 8.64 8.64 8.64 8.64 8.64 8.64 8.64
51 c Lab Assistant 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
52 d Labour 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4 5.4
53 e Security Guard 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8
54 Total Treatment Plant 21.6 21.6 21.6 21.6 21.6 21.6 21.6 21.6 21.6 21.6 21.6 21.6
55 Total Network + STP 48 48 48 48 48 48 48 48 48 48 48 48
56 E Repaur & Maintenance Charges
57 i on Civil Works 11.49 11.49 11.49 11.49 11.49 11.49 11.49 11.49 11.49 11.49 11.49 11.49
58 ii on Mechanical Works 11.32 11.32 11.32 11.32 11.32 11.32 11.32 11.32 11.32 11.32 11.32 11.32
59 iii Total 22.82 22.82 22.82 22.82 22.82 22.82 22.82 22.82 22.82 22.82 22.82 22.82
60 F Chemical Charges
61 i Chemical Charges 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60
62 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60
63 G Flushing Charges
64 i Flushing Charges 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65
65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65 6.65
66 H Total O&M Charges
67 Annual O&M Charges 134.98 136.20 137.46 138.73 140.04 141.38 142.74 144.14 145.56 147.02 148.50 150.02
68 Discounted O&M Charges 22.07 20.25 18.57 17.04 15.64 14.35 13.17 12.09 11.10 10.19 9.36 8.60
69 I Annual Revenue
70 Sewer Charges per Cum 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10 2.10
71 Wastewater Volume Daily 20089 20504 20927 21360 21801 22252 22713 23184 23665 24156 24657 25169
72 Annual Revenue 153.98 157.16 160.41 163.72 167.11 170.57 174.10 177.71 181.39 185.15 189.00 192.92
73 Discounted Revenues 25.18 23.36 21.68 20.11 18.66 17.32 16.07 14.91 13.84 12.84 11.91 11.06
74 J Results
75 Total O&M Charges 4070.07
76 Total Revenue 4475.92
77 Discounted O&M Charges 1292.73
78 Discounted Revenues 1307.48

Page 4 of 4
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

REVISED GUIDE LINES FOR PREPARATION OF DPRs


FOR
CONSERVATION OF RIVERS & LAKES

CHAPTER I : INTRODUCTION

1.1 The National River Conservation Directorate in the Ministry of Environment &
Forests had prescribed guidelines for the preparation of the Project Feasibility
and the Detailed Project Reports under the National River Conservation Plan.
Since then a number of developments have taken place including the
resolutions passed by the National River Conservation Authority (NRCA) in its
meeting held in March 2001 (Annexure I). It has therefore, been decided to
issue new guidelines for the preparation of Detailed Project Reports under the
National River Conservation Plan and the National Lake Conservation Plan
consolidating the decisions taken from time to time. Since the proposals in
future will be considered on the basis of DPRs only, PFR are not to be
submitted to the NRCD and so the guidelines for preparing the PFRs are not
being issued. These guidelines supercede earlier guidelines and should be
followed.

1.2 The DPR should consist of

1.2.1 A review of the status of the river/lake system


1.2.2 Identification of degraded stretches & towns responsible for it.
1.2.3 Selection of Towns in order of priority where conservation works should
be taken up and the justification for their selection.
1.2.4 Collection of information about the river/lake and basin/ catchment
useful for system and component design.
1.2.5 Investigation carried out for DPR Preparation
1.2.6 Design of System and components
1.2.7 Human, physical and financial resources required for Operation &
Maintenance and the manner in which they will be ensured.
1.2.8 Plan for Public Awareness & Public participation:
1.2.9 Plan for HRD and Capacity Building

Page 1 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

1.2.10 Plan for project management & dealing with institutional issues
identified
1.2.11 Plan to finance the project
1.2.12 Monitoring & Evaluation plan
1.2.13 Cost Estimates of DPRs with drawings and specifications
1.2.14 Any other item considered relevant and useful.

CHAPTER II : STATUS OF THE RIVER/LAKE SYSTEM & SELECTION OF TOWNS

2. Priority lists of rivers/lakes and towns/cities

While the causes of degradation of rivers and lakes are many, the towns and cities
on their banks with beaming population and industry are the most significant
sources of degradation of rivers, lakes and seas. In view of the limited
resources available, it is not possible to take up all degraded rivers and lakes
for conservation together. It is, therefore, necessary to prepare lists indicating
priority of river/lakes and also of the cities/towns where conservation
programmes would be taken up in the X plan.

In order to select the river / lakes and cities / towns and arrange them in order of
priority for this programme, studies are required to be made based on the relevant
data / information. After the river / lake system has been studied and the major
sources of degradation identified, the cities on the banks responsible for their
severe degradation components need to be collected for preparing the DPR.

Collection of data/information

The following information of river/lake and basin/catchment is useful:

Area of the basin / catchment of the river/lake.


Topography
Climate including rainfall,
Land Use

Agriculture,
Forests,
Mining
Residential, commercial and industrial

Page 2 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

Status of Ground Water development and use


Dams and diversion works
Discharge figures if the water body is gauged
Abstraction of water
Morphology and hydrology of the water body
Water quality of the water body in its different reaches
Aquatic life present in the water body in different stretches of the water
body
Traditional and current uses to which the water body is put in different
reaches
Economic, culture and religious significance of the water body and the
towns located on it.
Towns with population exceeding one hundred thousand located on
the river. For each such town

2.3.14.1. Population in last census,


2.3.14.2. Status of water supply,
2.3.14.3. Sewerage,
2.3.14.4. Drainage,
2.3.14.5. Garbage and bio-medical waste and
2.3.14.6. Industrial effluent disposal.

Use of Available Sources

The above data may be collected from available sources and


presented in figures, charts and maps along description in brief.

If some of the information is not available or not adequate, fresh


studies should be undertaken only if it is felt that in the absence of the
missing information, the work of selecting the river/lake and the cities
cannot be done.

2.5 Use of modern tools GIS

2.5.1 If there are easily accessible facilities attempt should be made to use
remote sensing and present the spatial information in Geographical
Information System (GIS) format.
Page 3 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

2.6 Criteria for Selecting a river/lake for Conservation:

A lake/river may be selected for conservation under the NRCP/NLCP if

2.5.1 the water body-river, lake or the sea - - is so degraded that it cannot
be put to its traditional and desired use
2.5.2 the people are strongly aware of the degradation
2.5.3 they highly value the restoration of the water body

2.7 Criteria for selecting towns for taking up Conservation of rivers and lakes

Works may be proposed in a town if

2.7.1 The town is located on the bank of river or lake or is a coastal town.
2.7.2 The population of the town is at least one lakh.
2.7.3 The water body (river/lake) is highly degraded and cannot be put to its
traditional/designated use because of
2.7.3.1 Discharge of domestic waste water/industrial waste
2.7.3.2 municipal solid waste
2.7.3.3 other non-point sources of pollution

2.7.4 The flood plain is heavily encroached

2.7.5 Wrong land use in violation of the Master Plan leading to heavy soil
erosion and sediment transport to the water body.

2.7.6 There is high level of awareness about the city being the major cause
of degradation of the water body leading to the demand from the
residents of the town to take up conservation measures.

2.7.7 The citizens are willing to demonstrably raise additional resources and
make financial contribution of a minimum of 10% of the project cost
and to meet the recurring expenses of O& M and other heads.

2.7.8 The local body is willing to make its contribution and take
responsibility for preparing and implementing the project and carrying
out O&M at its own cost.

2.7.9 The residents of the town, the local body and the State Government
together are willing to contribute a minimum of 30% of the project cost,
out of which the citizens are willing to contribute a minimum of 10% of
the project cost.

Page 4 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

CHAPTER III ; INVESTIGATIONS FOR DPR PREPRARATION

3.1 The following information / data of the town selected are required:

3.1.1 Demographic data may be collected pertaining to the five preceding


decades including current ward-wise data. The populations may be
projected for the base and other relevant points of time using the
census data, the potential for growth of population in each ward,
scope of additional construction in the Master Plan and other relevant
available data.

3.1.2 Economic, social and cultural information may be obtained from the
gazetteer, plan documents prepared for submission to the State
Planning Board or the State Government and other sources.

3.1.3 General topography and Land Use Pattern

3.1.4 Hydro-geological including geo-hydrological and Geotechnical

3.1.5 Storm Water

3.1.6 Water Supply Status of the town

3.1.7 Sewerage Supply Status of the town

3.1.8 Quantity and quality of waste water- sewage and sullage- in drains
outfalling into the river

3.1.9 Municipal Solid Waste

3.1.10 Water quality upstream and down stream of the town and discharge
of the water body

3.1.11 Flora and Fauna

3.1.12 Non Point Sources of Pollution

3.1.11.1 Dairies
3.1.11.2 Motor Garages
3.1.11.3 Cattle wallowing
3.1.11.4 Open area and bank side defecation
3.1.11.5 Dead body and carcass dumping
3.1.11.6 Indiscriminate dumping of garbage in nearby banks and
open areas.

Page 5 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

3.1.13 River front facilities– to improve aesthetics and reduce pollution / bank
erosion.
3.1.14 Industrial effluent
3.1.15 Industrial Solid Waste:
3.1.16 Bio medical Waste & other hazardous waste

3.2 Additional Data Required For Coastal towns:

3.2.1 Tidal incursion and mangroves


3.2.2 Coast Line
3.2.3 Coastal Zone Management Plan

3.3 Additional Data Required For Towns On The Bank Of A Lake:

3.3.1 Bathymetry Of Lake


3.3.2 Water spread in different months and area encroached
3.3.3 Defining the Catchment Area
3.3.4 Land Use in the Catchment, identifying areas that yield sediment,
3.3.5 Discharge measurement of all inflows into and outflows from the lake,
3.3.6 Peak Flood Flow into the lake
3.3.7 Characterisation of the discharge flowing into the lake.
3.3.8 Water quality in selected sampling points chosen on the basis of
sources of pollution of the lake. The water quality parameters chosen
should include, in addition to the usual ones, sediment content by size,
nutrient (Phosphorous and Nitrogen), pesticides if the return flow
agricultural fields joins the streams feeding the lake and thermal profile
i.e., temperature at different depths.

3.3.9 Sediment analysis particularly for Phosphorous and Nitrogen content

3.3.10 Hydro-biology of the lake:: Macrophytes, Animal communities, Zoo


benthos, Zoo plankton.

3.4 Land Use, Contour, Drainage & Thematic Maps:

3.4.1 Satellite imagery can give the current land use map of the city and the
catchment. The State Remote Sensing Agency, if it is in a position to do
so, could be asked to prepare it using the most recent available
imagery covering the area within municipal limits and extending 10
Page 6 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

Kms beyond the municipal limits. It may also be asked to procure the
maps prepared by the National Remote Sensing Agency (NRSA) under
their Natural Resources Information System, the map of the municipal
body and the Master Plan of the city should also be collected.
However, if it is difficult or time consuming to get these inputs from the
NRSA or the State Remote Sensing Agency, the map of the municipal
body and the local Development Authority may be used.

3.4.2 The contour interval in the maps of the Survey of India (SOI) is large.
Contour map of the city with at the most 5m contour interval should be
obtained. If there is no such map a survey may have to be done
particularly of the area where sewers have to be laid or pumping
stations to be constructed.

3.4.3 Deviations in land use with respect to that shown in the Master Plan
and encroachments should be indicated in the map.

3.4.4 Drainage map should be prepared if not already existing.

3.4.5 Tentative/provisional sites available for treatment plants, pumping


stations and disposal works etc. should be identified and marked on
the map.

3.4.6 Thematic maps may be prepared to the extent feasible and


considered useful for the project.

3.5 Hydro-geological:

3.5.1 Meteorological data

3.5.2 Ground water depth and its seasonal fluctuation affecting


construction, sewer infiltration and structural design,

3.5.3 Soil Bearing Capacity and type of Strata expected to be encountered


in construction up to anticipated depths

3.6 Water Supply Status of the town:

3.6.1 Details of sources of discharge: quality, change in levels of


underground and surface water supply sources, along with their
locations on the city map.

3.6.2 Discharge available from each water supply source.

3.6.3 Ward-wise per capita water supply in lpcd- present and expected after
works under constructions and planned are completed.

Page 7 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

3.6.4 Plan showing water supply works, existing and under construction and
future plans for augmentation of water supply in the town may be
collected.

3.6.5 Brief description of water supply status of the town along with
completion plans of the existing works

3.6.6 A copy of the water supply master plan/major estimates prepared


earlier should be obtained.

3.7 Sewerage Status of the towns:

3.7.1 Ward-wise arrangements in the households for the disposal of toilet


waste water.

3.7.1.1 Areas / streets covered with sewers


3.7.1.2 Areas / streets covered with Septic tanks and soakage pits
discharging into street drains

3.7.2 Details of sewerage works in the town including completion plan of


sewers, intermediate pumping stations, MPS, rising mains, STPs, showing
diameters/lengths/gradients of sewers, levels, capacities, duties of
pumping plants etc.

3.7.3 Out falls and drains / Sewers leading to the outfalls should be plotted
on a drainage map of the towns.

3.7.4 A copy of the sewerage master plan / major DPRs prepared earlier.

3.8 Domestic pollution:

3.8.1 No. of drains carrying the domestic sewerage, polluting the water body

3.8.2 Actual field survey to be conducted, for at least one month during dry
weather to assess pollution load quantitatively and qualitatively. Actual
present flows to be measured at the point of outfall into the water
body. The pollutants, BOD, COD, Nitrogen, Phosphorous, Chlorides, Ph,
temperature, colour, odour, total suspended solids, volatile suspended
solids and faecal coliforms are also to be measured. The sample should
be flow proportional and composited taken once a week for diurnal
variation on hourly basis. For this purpose, considering a four week
months, three samples to be taken on week days, whereas the fourth
sample to be taken on an off day i.e. Sunday.

3.9 Storm Water:

Page 8 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

3.9.1 Strom water drains may be marked on the city plan.

3.9.2 Catchment areas of each nala to be marked on the city map showing
ground levels, so that populations contributing wastewater to the nala
could be ascertained.

3.10 Municipal Solid Waste (MSW)

3.10.1 The survey and investigation for MSW may be done in accordance with
the guidelines given as Annexure III

3.11 Water quality and discharge of the water body:

3.11.1 Collect data about the quantity of flow/discharge from the CWC or
the Deptt. Of Irrigation for as long a period as it is available.

3.11.2 Water quality -- BOD, COD, Ph, Temperature, Suspended Sediment,


Heavy metals, Pesticides - - of the water body and its identified
tributaries the stretches of the river within the limits of the town,
upstream and downstream of the town concerned for a period of 10
years or for such period as the data is available, to be obtained from
the records of SPCB, CPCB and CWC.

3.12 Flora and Fauna:

3.12.1 Data to be obtained from the Botanical Survey Of India, Zoological


Survey Of India, State Pollution Control Board / Central Pollution Control
Board and (local University in case any research has been done).

3.12.2 Information on endangered and rare flora and fauna may be


obtained. Endangered flora and fauna may need protection by way
of restoration / conservation programme.

3.12.3 In case this information is not available or will take a long time to
obtain, the DPR should not be held back and submitted without this
information. The information should be collected later.

3.13 Coastal Towns:

3.13.1 Water quality and discharge in case of coastal towns.

Page 9 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

3.13.2 Additional data relating to tidal incursion and mangroves to be


collected.

3.14 Non Point Sources of Pollutions:

3.14.1 Dairies

3.14.1.1 Quantification of dairy waste


3.14.1.2 Present locations and disposal points to be marked on the city
plan
3.14.1.3 Present treatment methods being employed

3.14.2 Dhobighats

3.14.2.1 Nos., locations to be marked on the city plan


3.14.2.2 Number of dhobis in each ghat,
3.14.2.3 Clothes washed and

3.14.3 Sites reserved in the master plan for location of dairies and dhobi ghats

3.14.4 Motor Garages

3.14.4.1 number and their locations on the city map


3.14.4.2 quantification of the washing from the garages
3.14.4.3 average no. of vehicles being washed per day
3.14.4.4 disposal sites of washing may be marked on the city map
3.14.4.5 sites reserved for the activity in the Master Plan

3.14.5 Cattle wallowing

3.14.5.1 Locations of cattle wallowing


3.14.5.2 Number of Cattle wallowing &

3.14.6 Carcass Disposal

3.14.6.1 Locations of carcass disposal


3.14.6.2 Number of carcasses disposed of per day
3.14.6.3 Sites reserved for carcass disposal in the master plan

3.14.7 Low cost sanitation

3.14.7.1 Identification and marking on map of open spaces being used


for open defecation
3.14.7.2 A survey to estimate the number of persons using each such
space per day.
3.14.7.3 Location of community latrines in the city and the number of
seats in each site.
Page 10 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

3.14.7.4 Estimate of number of dwelling units in the city which do not


have a latrine.
3.14.7.5 No. of dwelling units in the city which have only the dry pit
latrine.
3.14.7.6 Details of activities already taken up under low cost sanitation
programme of the Social Welfare Department and other state
agencies
3.14.7.7 Identification of places where community toilets need to be
set up, including the number of seats at each location. One
seat can be assumed to cover 50 persons.

3.14.8 Crematoria:

3.14.8.1 Wood based-their number-show locations on the city map


3.14.8.2 Electric- their number – show location on the city map
3.14.8.3 Others- their number- show location on the city map
3.14.8.4 The number of bodies being burnt at each burning ghat
during the last five years may be collected.
3.14.8.5 If under GAP or the NRAP, electric and wood based
crematoria have been set up in the state, before deciding
about the number and location of further crematoria to be
constructed, the performance and acceptance of different
type of crematoria may be ascertained.
3.14.8.6 Identification of places where additional crematoria need to
be set up, including the number required.

3.14.9 River front facilities:

3.14.9.1 Identification of river ghats being used for bathing.


3.14.9.2 Identification of improvements required in bathing ghats.
3.14.9.3 Identification of new ghats to be constructed.

3.14.10 Plantation:

The plantation work may be planned in accordance with the


guidelines given as Annexure IV

3.15 Industrial Pollution Including Hazardous And Toxic Waste

3.15.1 The responsibility of ensuring that the industrial waste is safely disposed
of in accordance with law is that of the respective industrial unit. The
control and monitoring of pollution from industrial wastes is the
Page 11 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

responsibility of the State Pollution Control Board. The State Pollution


Control Board is to ensure that the generators of industrial waste
dispose it of, as prescribed in law and that the standards prescribed
are observed. The SPCB may be asked to furnish the following
information:

3.15.1.1 The number of industrial units in different wards and industrial


areas.

3.15.1.2 Grossly polluting units-number, quantity & quality of solid


waste

3.15.1.3 The points where the industrial, hazardous and bio-medical


wastes are treated.

3.15.1.4 The points where the industrial, hazardous and bio-medical


wastes are disposed of.

3.15.1.5 The points where the industrial, hazardous and bio-medical


wastes are being mixed with the municipal wastes- effluents in
sewers, solid waste in MSW. The points should be shown in the
city map.

3.15.1.6 Its quantity and quality at those points should also be


obtained. The information- quantity and quality- about
different types of wastes such as MSW, industrial hazardous
and biomedical should be obtained in disaggregated from
separately for liquid and solid.

3.15.1.7 Existing arrangement for handling and treatment of Toxic,


Hazardous, bio-medical/hospital wastes be indicated.

3.15.1.8 Number of hospitals, nursing homes and other units


generating bio-medical waste. They may be plotted on the
map showing land utilization.

3.15.1.9 Indicate sites reserved for treatment of bio-medical waste in


the master plan.

3.15.2 The SPCB may be requested to review its performance and resources
and if there is need, prepare a plan to enhance its capacity to ensure
effective control and management of pollution in the town/city where
the conservation measures are proposed.

Page 12 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

CHAPTER IV: DESIGN OF SYSTEM AND COMPONENTS

4.1 Type of Schemes: The system to improve the environment of the city may
consist of sub-systems or schemes that relate to

4.1.1 Sewage collection, treatment, re-use / disposal

4.1.2 Low cost sanitation

4.1.3 Crematoria

4.1.4 Other non point sources of pollution

4.1.5 River Front Development Works

4.1.6 Watershed/Catchment Treatment:

4.1.7 Municipal Solid Waste (MSW)

4.1.8 Bio- medical waste

4.1.9 Human Resources Development

4.1.10 Institutional Strengthening

4.2 System Design:

4.2.1 Objective: The DPR should be prepared to achieve clearly spelt


objective in terms of abatement of pollution from various sources of
pollution and of environment improvement. There should be
performance parameters of each components and the system as a
whole so that the effectiveness can be monitored and evaluated.

4.2.2 Alternative System: Feasible alternative systems, keeping in view the


existing infrastructure in the town should be prepared.

4.2.3 Sub-system alternatives for major components such as Sewage and


MSW should include the alternatives of Centralised Systems and
Decentralised systems.

4.2.4 Techno economic evaluation should be carried out on life cycle


analysis of major components. This analysis should include capitalized
annual O & M costs less revenue from resource recovery, recycling, by-
product utilization. Interest on the Net Present Values (NPV) of the
alternative systems considered. Ease of O & M, time required to
construct and achieve the desired project objectives & costs of
Page 13 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

mitigation of any adverse environmental impacts to be loaded on the


costs assigned for the alternatives., human, physical, electrical and
other forms of energy, other pros and cons, reliability and long term
sustainability should also be given appropriate weightages. On such an
evaluation, the best option should be selected.
4.2.4.1 The summary of the above analysis shall form an important
component of the draft DPR for public consultation before
finalisation.

4.3 Design Criteria:

4.3.1 Sewage

4.3.1.1 It is not desirable for a town with piped water supply and
flushing system to discharge the sewage from the dwelling unit
directly in to street drain. If such a situation exists in a town or
some of its parts alternatives for good sanitation including low
cost sanitation should be worked out and what ever is
practically feasible should be a part of the plan.

4.3.1.2 Sewers, sewage pumping stations and Sewage Treatment


Plants proposed under river action plan would ultimately
become a part of the town’s sewerage and sewage treatment
facility. This aspect should be kept in mind while planning the
project so that these works when executed in the town under
town’s sewerage scheme match with the facilities built under
river action plan.

4.3.2 Design Periods

Base year—The year of expected commissioning of the project shall be


taken as the base year for design of various components of the
projects. Design periods of various components may be adopted as
under:

Table: Design Periods For Various Components of The Project

S.No. Component Design Clarification


Period from
base year
1 Land 30 Land will be required to add STPs.
acquisition Accordingly, land should be acquired
2 Sewer system 30
3 SPS – civil 30 Cost of civil works is economical for full
works design period.

Page 14 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

4 Pumps 15 Considering modular approach


5 STP 10 Construction may be done with a modular
approach in a phased manner as the
population grows.
6 Rising mains 30 In case of low velocities, dual rising mains to
be examined
7 Effluent 30 Provision of design capacities in the initial
disposal stages itself is economical.
8 LCS Required as of base year
9 Crematoria Required as per assessment
10 RFD Required as per assessment
11 MSW Requirement as per assessment

4.3.3 Design population

Design population is to be worked out for each zone on a critical


appraisal of the latest demographic data and projected population in
the city master plan. New colonies that may come up in future should
also be catered for. It should be ensured that the laws require the
colonizer to provide conveyance and treatment of all wastes before
discharge in to municipal drain/sewer.

Due to paucity of financial resources, at present it is proposed to limit


the conservation programme to towns having the census population of
the year 2001 as 1 lac or more. However, in case of cultural, tourism or
religious importance of a town having a lower population, it can be
included if on certain occasions large floating population converges.

4.3.4 Sewers

Sewers shall be designed as per latest Manual on Sewerage and


Sewage Treatment, issued by the Ministry of Urban Development, Govt.
of India

4.3.5 Interception factor

Generally 80% of water supply is expected to reach sewers. However to


have a correct assessment of the waste reaching sewers, actual flow
measurements of major drains be carried out for over a month. After
knowing the contributory population of the drains and water supply
rate, sewage interception factor shall be worked out.

4.3.6 Interception works

Page 15 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

Nala tapping works shall be constructed on the course of a Nala, so as


to intercept the dry weather flow flowing through the nala, and divert it
into the nearby sewer.

4.4 Sewage Pumping Stations

4.4.1 Preference may be given to submersible pumps wherever, feasible,


they being cheaper and operation friendly.
4.4.2 Configuration of sewage pumps

Where rising main is long Peak flow/2 pumps 3 nos.


Non peak flow pumps 4 2 nos.
Where rising main is short Peak flow/4 pumps 5 nos. 1 standby

Page 16 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

4.5 Sewage Treatment Plants

4.5.1 Land for STPs

The provision of land for STPs including sewage pumping station may be
made as follows:

S. No Process Land required (acre/mld)


1 Activated Sludge/ Trickling filter 0.5
2 Aerated lagoon 1.2
3 Stabilisation pond 2.5
4 Agro-forestery (Karnal Technology) 3.75 to 6.25 depending on
the nature of soil
5 U.A.S.B. 0.42

Land provision is to be made for the ultimate requirements in case of STPs, SPS
and SWM, but for the present requirement in case of crematoria, bating ghats etc.

Effluent Standards

S. Parameters For discharge on land For discharge into water


No.
1 BOD (mg/l) <100 <30
2 SS (mg/l) <200 <50
3 Faecal coliform Desirable Max. Desirable Max.
permissible permissible
1000 10000 1000 10000

4.6 Technology

Technology option should be based on the cost benefit analysis of various


options to achieve the desired standards and the most economic one
selected.

Possibility of utilizing bioremediation techniques for lake conservation shall be


considered depending upon its feasibility.

Page 17 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

4.7 Low cost sanitation: There may be schemes of the Government of India and
the State Governments both for supporting Community Toilets and individual
toilets. Those schemes should be integrated with the schemes of town:

4.7.1 Community Toilets

4.7.1.1 Guidelines given as Annexure II may be followed in this


regard.

4.8 Other non point sources of pollution

The components mentioned below should become a part of the integrated


project of river cleaning.

4.8.1 River front development

Bathing facilities in shape of pucca or kutcha ghats exist near the


banks of rivers. Due to lack of maintenance or otherwise, some of these
facilities have become defunct and need renovation. At some places,
the existing facilities are very much inadequate and need to be
supplemented. The river may also need strengthening like bund
renovation, new bund, stone pitching etc. In lakes there are places for
rowing boats.

Provision of such renovation and new facilities shall be made in


consultation with the state irrigation department and the district
authorities.

4.8.2 Crematoria

Improved Wood based crematoria have been provided in a large


number of towns under Ganga Action Plan on the plans developed by
NRCD. These may be adopted and may be modified as per local
conditions, availability of land and some other problems in the use of
such crematoria constructed earlier were encountered.

Electric crematoria have also have been constructed at some placaes


under Ganga Action Plan have faced the problem of power. These
may, however, be provided in big towns, where the availability of
power & trained staff for maintenance in ensured.

4.8.3 Storm water drains

Strom water drains carry sullage and sewage also where sewerage
facilities are inadequate or where due to unsatisfactory O& M of the
Page 18 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

system, broken sewer lines discharge into drains. Nala tapping works
shall be constructed on the course of nalas, so as to intercept the city
weather flow through them, divert it to the sewer and prevent it from
entering into the river or lake.

4.8.4 Catchment Treatment And Afforestation

The data that needs to be collected is already given in Chapter III. A


study of this data will suggest the works, which need to be undertaken
to prevent soil erosion, which finally flows in to the waterbody causing
many problems. The types of works that may be required to be done
include:

4.8.4.1 Vegetative or non structural works such as:

4.8.4.1.1 Silvipasture and agro-forestry


4.8.4.1.2 Pasture development,
4.8.4.1.3 Afforestation
4.8.4.1.4 Horticulture
4.8.4.1.5 Crop improvement
4.8.4.1.6 Trenching,
4.8.4.1.7 Demonstration

4.8.4.2 Engineering or Structural Measures:

4.8.4.2.1 Loose boulder check dam


4.8.4.2.2 Gabion Check dam
4.8.4.2.3 Contour stone wall
4.8.4.2.4 Stabilisation of degraded area

4.8.4.3 Training and Evaluation

4.8.4.4 Institutional Strengthening

4.8.4.5 Note: The above activities are required to be undertaken in a


watershed in a rural setting. Since we are dealing with the
catchment area of a town, the catchment is likely to be in the
process of urbanization. The effort should be to take up works,
which would check soil erosion from areas that are very prone
to erosion. Vegetative works should be preferred. The
adherence to the Master Plan in land use is important.

4.8.5 Solid Waste Management

Page 19 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

The design and management of Municipal Solid Waste may be done in


accordance with the guidelines given as Annexure III.

Page 20 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

CHAPTER V : OPERATION & MAINTENANCE

5.1 Operation and Maintenance in all its facets is the responsibility of the local
body aided and supported by State government. A firm commitment will be
given by the local body that it agrees to bear the entire cost of O & M. The
State Government shall give an undertaking that it will ensure that assets are
properly operated and maintained and any short fall in resources will be met
by them. The agency for O & M of the assets created will also be clearly
mentioned in the DPR.

5.2 It is necessary to accurately assess the financial and other resources required
for effective and efficient O & M. The resources required and associated
costs are:

5.2.1 Energy – Electricity and diesel to be used in standby Generating Set- to


meet the contingency of electric failure.

5.2.2 Man Power,


5.2.3 Consumables
5.2.4 Inventory of Spares
5.2.5 Tools and Plants
5.2.6 Preventive maintenance
5.2.7 Repairs of civil, electrical and mechanical works
5.3 Research and Development

5.3.1 Monitoring
5.3.2 Evaluation
5.3.3 Other problem solving
5.4 The feasibility of involving private sector in O & M should be considered. In
some states it has been found to be economical and effective.

5.5 A detailed plan for raising the resources for Operation & Maintenance shall
become part of the project proposal.

5.6 The operation and maintenance manual of the various plants, structures,
labs, etc. should be prepared.

5.7 In case it is decided to carry out O & M departmentally, staff required for O &
M of sewage pumping stations, STP etc. may be adopted as per Annex II.

Page 21 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

5.8 Timely availability of land for the facilities & assured uninterrupted power
supply for the electrical equipment shall be ensured for the chosen
alternative system in consultation with local bodies.

5.9 Revenue generation estimate from the sale/use of by-products of the STPs,
garbage utilization plants including recycling & resources recovery shall be a
factor for prioritising the best alternative.

5.10 Resources Mobilisation For O & M

5.10.1 Resource Recovery,

5.10.1.1 Sale of treated sewage for use in irrigation and industry


5.10.1.2 Sale of sludge for agriculture
5.10.1.3 Composting of organic portion of MSW by vermiculture and
other methods,
5.10.1.4 Generation of electricity in STPs,
5.10.1.5 Water and sewage cess
5.10.1.6 Fair assessment, levy and recovery of property tax
5.10.1.7 House connection charges
5.10.1.8 Fines on Polluters
5.10.1.9 Taxes from pilgrim/tourist/floating population visiting the town
5.10.1.10 Undertaking plantation on municipal lands
5.10.1.11 Other sources of recovery

5.10.2 Government Contribution: If adequate funds are not raised from


‘resource recovery’ mentioned above, the shortfall of the funds
required for O & M should be promised by the State Government.

Page 22 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

CHAPTER VI : PUBLIC AWARENESS. & PUBLIC PARTICIPATION:

6.1 In the light of experience gained in the implementation of development


programmes since independence and particularly from the Ganga Action
Plan, it is now recognised that programmes for conservation of water bodies
and town improvement can succeed only if

6.1.1 the communities are aware that

6.1.1.1 there is need for conservation programme and that they will
benefit from it.
6.1.1.2 There are costs involved in such programmes and part of the
burden will have to be borne by them,

6.1.2 The communities are effectively involved in all the stages of the project
cycle from conceptualisation, to preparation, to finalisation, to
implementation and finally O & M.

6.2 Hence Public Awareness & Public Participation should be a front-end activity
of the project unlike the present practice of it being the last priority.

6.3 The entire programme of conservation should be conceived, formulated,


implemented, monitored and evaluated in close consultation with the stake
holding communities following the approach of “Participatory Appraisal’.

6.4 Issues involved in the conservation of the water body need to be identified
and the programme will need to focus on them. The objective of the
Awareness Plan will be determined by the issues identified.

6.5 Agency that will plan, implement and coordinate the Awareness Campaign
should be identified. With a view to focus on issues relating to protection and
improvement and cleaning of rivers/lakes, a massive program of environment
education and awareness is imperative. Centre and states may launch this
campaign through a program of volunteers called NATIONAL GREEN
VOLUNTEERS.

6.6 Detailed guidelines for Core and Non-core schemes are given as Annexure VI

Page 23 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

CHAPTER VII : HRD AND CAPACITY BUILDING

7.1 A project has to undergo through the following phase:


7.1.1 Project planning,
7.1.2 Project preparation
7.1.3 Project implementation,
7.1.4 Monitoring evaluation

7.2 It involves the following aspects


7.2.1 Scientific and technical
7.2.2 Social,
7.2.3 Financial & Economic,
7.2.4 Institutional
7.2.5 Administrative,
7.2.6 Legal

7.3 Successful project management will need the manpower with diverse skills,
physical and financial resources to deal with all the aspects mentioned
above in all the phases of the project.

7.4 Human Resources Development will deal with appropriate skill development
in the organisations involved in the planning, design and management of the
project. The main activities are listed below:

7.4.1 Identify training needs

7.4.2 Identify institutes where education/training can be organised.

7.4.3 Well staffed and equipped Engineering Institutions, which have an


interest in the subject, may be asked to develop training modules. They
should be involved on a long-term basis so that they develop expertise
in the aspects of this programme. They should be involved in various
aspects and activities of the programme.

Page 24 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

CHAPTER VIII : PROJECT MANAGEMENT & INSTITUTIONAL ISSUES

8.1 Selection of mode of implementation. Of the three alternative modes of


implementing the project in vogue, mentioned below, depending upon the
circumstances prevailing, the mode should be selected. The DPR should
mention why the specific mode has been chosen.

8.1.1 Departmental,
8.1.2 Project Management Agency
8.1.3 A combination of above

8.2 Institutional Issues:

8.2.1 In Conservation & Management there are a number of institutions


dealing with activities including:

8.2.1.1 Policy, strategy and programme formulation and their


implementation
8.2.1.2 Supply of services
8.2.1.3 Development,
8.2.1.4 Management,
8.2.1.5 Regulation and enforcement,
8.2.1.6 Coordination with national, state and local organisations.

8.2.2 Overlap in roles of a involved institutions:

8.2.2.1 The role of three bodies is very crucial. They are:


8.2.2.1.1 Municipality which is responsible for sanitation in the
town,

8.2.2.1.2 City Development Authority which regulates the new


colonies

8.2.2.1.3 State Pollution Control Board, which is responsible for


ensuring compliance by industry of the standards,
prescribed under the Environmental Protection Act for
effluent, solid waste and air emissions.

8.2.2.2 Many times there is an overlap in the roles of several bodies


with the result that the efficiency with which the function should
be performed suffers. The state Government needs to resolve
such overlaps. The role of each institution involved needs to be
very clearly specified.

Page 25 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

8.2.2.3 The institutions that are involved in the conservation


programme of the town suffer from weaknesses. The DPR
should identify such areas needing improvement.

CHAPTER IX : FINANCING

9.1 The National River Conservation Authority (NRCA) has decided that the
Financing pattern of schemes of the NRCD for the conservation of rivers and
lakes will be as follows:-

9.1.1 Government of India (NRCD) to bear 70% of the project cost,

9.1.2 States and the local bodies to bear 30% of project cost of which Share
of the public shall be a minimum of 10%.

9.1.3 O & M shall be a part of the project and the costs thereon shall be
borne entirely by the state and the local bodies for which additional
resources have to be demonstrably raised and committed to O & M.

9.1.4 The Local Bodies may raise loans from Financial Institutions such as
HUDCO to contribute their share,

9.1.5 If for any reason such as delay, wrong design or estimation, omission of
items, inflation etc., there is cost overrun in any project, the central
share in the total cost will be limited to the ceiling amount approved by
the CCEA. Balance, if any, is to be borne by the respective state
Government. It is, therefore, necessary to prepare the DPR accurately
after investigation and survey and taking all factors into account that
can influence the cost of the project.

9.2 The State Governments should make all efforts to obtain larger plan
allocations for such programmes.

9.3 The contribution of 10 % from the beneficiaries and stakeholders can be


raised in one or more of the following forms.

9.3.1 additional development charges, water and sewage cess


9.3.2 fair assessment, levy and recovery of property tax
9.3.3 house connection charges
9.3.4 contribution from Development Funds of local MPs and MLAs
9.3.5 Fines on polluters
Page 26 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

9.3.6 Taxes from pilgrim/tourist/floating population visiting the town


9.3.7 Donation from industry, business associations, voluntary agencies such
as Rotary and Lion’s clubs and philanthropists.
9.3.8 Any other mode.

9.4 It will be seen that the Integrated Project will include cost elements, many of
which will not be financed by the NRCD. The NRCD will clarify which of the
elements will be financed by it and which ones not financed by it.

9.5 The DPR should state how the finance would be raised for those items in the
DPR that will not be considered for financing by the NRCD.

Page 27 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

CHAPTER X : MONITORING & EVALUATION

10.1 The improvements in the water body and the environment of the town will
have to be monitored and evaluated after the implementation of the
project.

10.2 The conservation Programme is expected to yield results, which should be


quantified in the DPR to the extent, it is feasible to do so. Other results will
have to be qualitative.

10.3 Depending upon the items of works taken up, a programmes of monitoring
should be developed and it should be assigned to a well-equipped
laboratory in a University or the SPCB. The expenses on the monitoring should
be estimated and should form a part of the funds required for O & M.

10.4 After the project has been fully implemented, it is necessary to evaluate the
project. Funds should be provided for this purpose also.

Page 28 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

CHAPTER XI : COST ESTIMATES AND GENERAL REQUIREMENTS OF DPRS

11.1 COST ESTIMATES:

11.1.1 Based on survey and investigation, data collection and design criteria,
detailed estimates may be prepared, under the following subheads:

11.1.1.1 Land Acquisition


11.1.1.2 Interception & Diversion Including Internal Sewers
11.1.1.3 Sewage Treatment
11.1.1.4 Low cost sanitation
11.1.1.5 Crematoria
11.1.1.6 Abatement of Non Point Sources of Pollution
11.1.1.7 River Front Development Works
11.1.1.8 Watershed / Catchment Treatment and Plantation
11.1.1.9 Municipal Solid & Biomedical Waste management
11.1.1.10 Tools & Plant For The Maintenance of the Works
11.1.1.11 Operation & Maintenance
11.1.1.12 Monitoring & Evaluation
11.1.1.13 Any other identified scheme
11.1.1.14 Awareness and Public Participation
11.1.1.15 Human Resources Development
11.1.1.16 Institutional Development & Strengthening

11.2 DPRs – General Requirements

11.2.1 Earlier Project Feasibility Reports were entertained along with proposals
for works under the National River Conservation Plan. However, the
experience has been that actual costs have been very different from
those sanctioned on the basis of PFRs. It has now been decided that
hence forth only DPRs will be entertained.

11.2.2 DPRs shall be a comprehensive document prepared in accordance


with these guidelines. They should contain all relevant information,
collected and surveyed data, designs of system and components,

Page 29 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

justifying chosen system and scheme, components thereof and


establishing that the cost shown is optimal, specifications, drawings.
They should be documents worked out to details to invite tenders.

11.2.3 If feasible, the spatial data collected should be put in GIS format.

11.2.4 There should be separate volumes for major items such as I & D, STPs,
LCS etc. In case I & D scheme becomes too large, DPRs may be
prepared zone wise. Intermediate pumping stations, if any shall form
part of I & D scheme. The main pumping station, which is the last
pumping station before STP, shall form part of STP scheme.

11.2.5 DPRs shall be prepared on computer. Along with hard copies, a copy
of the floppy/ disc shall be submitted to NRCD.

11.2.6 Salient features of the DPR should be given at the beginning of the
DPR to have an idea of the DPR at a glance.

11.2.7 Schedule for submission, approval, implementation and completion


shall be detailed.

11.2.8 Scheme-wise quarterly fund requirements from the local body, State
and Central Government should also be given.

11.2.9 Bar charts /CPM / PERT networks based on realistic time schedule of
completion of different activities shall be enclosed with the DPRs,
indicating the work breakdown structures details and critical path for
large schemes.

11.2.10 CPHEEO/ CPWD/ ISS/ Local PWD specifications, whichever applicable,


may be followed for construction of works.

11.2.11 Cost estimates to be based on current local schedule of rates for


standard items of works & market rates for proprietary equipment.

11.2.12 Necessary escalation in costs due to inflation during project


implementation period shall be incorporated on a justified rationale.

11.2.13 Centage charges: A provision of 8% would be allowed towards


project preparation, contingency, supervision, etc. on base cost
estimate. In the case of states where the centage on works is higher
that 8%, the balance will be provided by the State Governments.
These charges will not be applicable on the cost of land, taxes etc. if
any

11.3 Check List:


Page 30 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

The checklist given in Annexure VII contains important steps that should be
taken in prescribing the DPR. It may be filled up and enclosed with the DPR.

11.4 Completion Reports:

It should be borne is mind that after the completion of the works, completion
reports will have to be submitted in the formats given in Annexure VIII.

Page 31 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

ANNEXURE I

RESOLUTIONS ADOPTED AT THE XTH MEETING OF THE


NRCA – MARCH’2001 – PM IN CHAIR.

1. While river cleaning would need to be given a much higher priority, it is also
essential that resources are not spread thinly. The focus, therefore, has to be
on large towns, which are gross polluters,

2. In case of works already completed, assets need to be maintained and also


continuously operated /utilised for which funds must be earmarked by the
States. The states/ UTs must meet the O & M costs which on an average is
around 5% of the capital cost.

3. A holistic and integrated approach shall be adopted by addressing not only


river pollution but also other components like internal sewerage, solid waste
disposal, low cost toilets etc.

4. The cost of works shall be shared between the central and states/local
bodies, public on 70: 30 basis. The public shall contribute not less that 10% of
the cost.

5. A detailed plan for recovery/ operation maintenance cost shall become


part-of the project proposal in future.

6. Because of delay in implementation, there is a cost overrun in many


schemes. The central share in the total cost will be limited to the ceiling
amount approved by the CCEA. Balance, if any, is to be borne by the
respective State Government.

7. Approved works must be completed first and where states/UTs have not
been responsive enough and such works have been pending for more than
two years because of non-action by states, a committee of secretaries
consisting of Secretary ministry of environment & Forests, secretary finance,
secretary planning Commission and chief secretary of the concerned state
shall review the necessity of such schemes.

8. National lake conservation plan shall receive the same priority as the rivers.

9. Mobilisation of resources/funds will need special attention. Plan outlays would


need to be enhanced substantially so that gap between fund requirements
and outlay is bridged

10. Coastal towns would get special attention because it has been observed
that sewage, solid waste, bio-medical waste and the like are dumped into
sea. Prioritisation of coastal towns for taking up such works may be done

Page 32 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

from the angle of mangroves, promotion of eco-tourism, cultural and religious


importance of the place and like.

11. With a view to focus on issues relating to protection and improvement and
cleaning of rivers/lakes, a massive program of environment education and
awareness is imperative. Central and states to launch this campaign through
a programme of volunteers called “National Green Volunteers”.

Page 33 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

ANNEXURE II

GUIDELINES FOR PREPARATION OF SCHEMES OF LOW


COST SANITATION (LCS)

1. Community Toilets

• In localities where all individual dwelling units do not have their own toilets,
community toilets should be constructed. 10,15 and 20 seated toilets may be
provided depending upon the space and number of users.

• Separate toilets complexes for men and women may be considered.

• Plinth area for these types of LCS units will be as under:

S.NO. Type Maximum Plinth Area (sq.m.)


1 10 seated 80
2 15 seated 125
3 20 seated 150

The above areas are proposed keeping in view the facility available for
cleanliness, hygienic condition and environment and user friendly.

2. Sizes

For all types of LCS blocks, two urinal for gents, two bathrooms one each for
ladies and gents, one guardroom and one counter shall be provided.

The sizes may be adopted as under with a tolerance of 10%

S. NO. Component Size (sq.m.)


1 Bath room 1.2 x 1.5
2 Guard room 3.0 x 3.0
3 Counter 3.0 x 1.2

3. WC Enclosure

Its size shall be 0.9 x 1.2 m (tolerance of 10%). Doorframes could be


fabricated out of pressed MS/ GI sheet or other cheaper material, which is
locally available with size 0.75 x 1.8 m. Brass material shall not be used at any
place.

Ordinary glazed tiles or mosaic may be provided upto 1 metre height


skriting. Floor shall be of P.C.C. Shutter of the door shall be 1.5 feet less than

Page 34 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

the height of the frame. In the rear side, precast RCC jali may be used for
proper vantilation.

4. Water Supply

WCs shall be pour flush type. Water tap may be provided in WC


enclosure keeping in view the local requirement/ practice. The taps in WCs &
Bathrooms shall be self-closing type of CI material. Overhead storage tank
should be provided. The capacities of the OHT shall be as follows:

S.No. Type Maximum Capacity


1 10 seater 4000 litres
2 15 seater 6000 litres
3 20 seater 8000 litres

5. Disposal System
The LCS units shall be provided with septic tank followed by soakpit.
These units shall be properly designed. However, if the sewer line exists near
such units, it should be directly connected to the sewer line.

If the sewer line is situated away from the LCS unit, a comparison
between the cost of sewer line and septic tank etc. should be carried out to
adopt the least cost solution.

6. Bio Gas
At one or two locations, biogas generation package for 20 seater
toilets shall be prepared and tried for revenue generation.

7. Norm for Usage Of Toilets


As the norm for usage of such toilets is 50 persons per seat, therefore,
the number of users for 10-seater complex shall be 500.

Siting of Toilet Complexes


The location of toilet complexes should be identified after proper
investigation and survey & with the involvement of the beneficiaries, so that
the availability of the number of users is ensured for full utilisation of the
facility.

9 Operation and Maintenance


In order to keep the toilets in proper hygienic conditions, agencies for
operation and maintenance, should be carefully identified for their
sustainability. Revenue generation for operation and maintenance of the
toilet complexes shall be an integral part of the scheme.

Page 35 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

10. Individual toilets


The owners of Dwelling units not owning toilets should be encouraged
to construct their own toilets. For the poor there may be state schemes of
subsidy and loan. The poor should be helped to avail themselves of such
schemes. Institutional finance may be arranged for the others.

11. Recommendatory nature of LCS Guide Lines:

These guidelines are recommendatory in nature. Actual designs may


vary keeping in view local conditions.

ANNEXURE III

GUIDELINES FOR PREPARATION OF SCHEMES OF SOLID WASTE


MANAGEMENT UNDER RIVER PLAN

A. EXISTING FACILITIES FOR SOLID WASTE MANAGEMENT

The proposal should contain the following information / data for the analysis
of existing facilities:

1 GARBAGAE DATA:

Per Capita generation, quality (physical and analysis), zone wise quantity
generated in respect of Municipal, Industrial/Hospital and Hazardous waste
per day, present mode of dumping (burning/scientific method), problem in
sewer/drain due to chokage etc. have to be elaborated.

2 HANDLING FACILITY:

Existing mode of collection, transportation and disposal of solid waste and


effectiveness in terms of equipment, manpower etc. has to be elaborated.
The location of collection and disposal sites has to be shown on map.

3 FUNDING:

Source of fund/assistance received by the Municipality for meeting the cost


of personnel, fuels and other operation and maintenance cost being
incurred may be indicated.

4 EFFICACY AND SUSTAINABILITY:

Whether the present system is efficacious, sustainable and cost effective may
be elaborated.

Page 36 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

5 RECYCLING AND WASTE MINIMISATION:

Does the existing system have provision of minimising waste at source,


segregation of inert material, recycling, treatment, and scientific disposal &
energy and revenue generation? If so, are their any plans notified by the
Authority and steps taken thereof? This has to be elaborated.

6 HAZARDOUS AND TOXIC WASTE MANAGMENT:

Existing arrangement for handling of Toxic and Hazardous/Hospital waste, if


any, has also to be indicated. It may be also noted that wastes of these kinds
have to be tackled by enforcing laws and Acts and would not form part of
solid waste management scheme.
B. PROPOSED SYSTEM :

1. Quantification :

Quantification of solid waste generation corresponding to design year has to


be supported with presents status in terms of per capita generation and other
sources if anticipated any. The exercise has to be carried out zone wise.

2. Quality/Analysis of Wastes:

Composition of waste like plastic, street rubble, construction waste, glass,


metal, wood stone etc. and compostable material in terms of percentage
has to mentioned. Report of High Power Committee, Planning Commission,
GOI may be referred for this. Analysis for obtaining calorific value of garbage
has also to be done. This is essential for planning of utilisation of solid waste on
mass scale.

3. Collection, Transportation and Disposal:

Justification for proposing various movable equipments, proposed number &


capacity and carrying capacity per day for collection and transportation
have to be described. Efforts have to be made to minimise such number of
mechanical equipments for optimisation of recurring cost. For this, the existing
facilities to handle the waste should be taken into account and only
additional facilities necessary to be included in the proposal. Methods of
disposal of various kinds of constituent materials of solid waste i.e.,
compostable and biodegradable materials, inert materials etc. have to be
separately proposed and described.

4. Cost Economy and Planning:

While designing the management system, cost economy with regard to


decentralised planning of disposal, minimisation of waste at source,

Page 37 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

economically viable method for collection, transportation and disposal have


to the followed and justified in the report.

5. Scientific Disposal and Treatment:

The method of disposal/treatment of solid waste must be scientific and


environment friendly. Proper design of landfill site has to be done to avoid
any detrimental impact on the environment and locality. Leachate from solid
waste has also to be treated if so warranted. Vermicasting, Composting,
Palletisation etc. may be explored for treatment of waste.

6. Optimisation of Transportation Cost:

Minimal transportation cost has to be achieved by using transportation


model for entire town. This will reduce the burden of vehicles required for
transportation of Garbage. Model followed by Ahmadabad municipality
may be studied and if found feasible, may be replicated.
7 Resources Recovery:

Provision may be made for resource recovery by ways of recycling, energy


generation, sale of manure and reclaiming the dumping site. A note on this
delineating feasibility, planning and marketing strategy has to be inserted in
the DPR.

8 Budget for Operation and Maintenance:

In view of the fact the management system has to be made dynamic with
constant financial support from the State Govt., estimated annual recurring
expenditure on personnel, fuel, repair and maintenance cost etc. and source
of funding, annual budget provision etc. for at least five years from the
commissioning of the scheme have to be worked out. Income generation
plan if any proposed by the authority may also be indicated together with its
viability. Creating facility should not become liability for the municipality at a
later date due to paucity of fund. Therefore this aspect is mandatory and
integral part of scheme.

9 Privatization:

In order to have efficient management system, the entire system or a part of


it may be entrusted upon private parties. This could be done keeping in view
the services of the existing staff. A report on this has to be submitted after
proper study. Attempts should at least be made to privatise transportation of
waste to the extent possible.

10 Assistance from State Govt.

Page 38 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

Whether the concerned municipality or local Body has referred the problem
or inadequacy of solid waste handling to the Deptt. Of Urban development
of the state govt. at any point of time seeking financial and technical
assistance and the outcome thereof.

Land Cost

Provision for cost of land for filling purpose may be included in the estimate.

JUSTIFICATION OF SCHEME UNDER RIVER CONSTRUCTION PLAN AND OVER ALL


PLAN:

The state Government/ implementing agency has to furnish an over all plan
of management of solid waste of the entire town/city. Funds will be
considered for relevant portion of the scheme related to pollution abatement
of river only.

Establish link of pollution of river with proposed solid waste management


scheme and give justification for its inclusion as pollution abatement scheme.
It has also to be indicated that how much of the total scheme is relevant for
taking up under River conservation plan. The rest will eventually be the
responsibility of the state Government/local authority.

ANNEXURE IV

GUIDE LINE FOR PLANTATION UNDER NATIONAL RIVER ACTION PLAN

1 Objectives

1.1 To improve the aesthetics of the project area

1.2 To check riverbank erosion.

1.3 In the case of lakes to check erosion of the catchment and inflow of
sediment into the lake

2 Where to plant ?

2.1 Campuses of STPs, Pumping Stations, Lifting Stations, along Effluent


Channels, Pathways and areas around Crematoria, areas around
Bathing Ghats and Low Cost Sanitation Facilities etc.

2.2 River banks under the project area.


Page 39 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

2.3 In the case of lakes erosion prone areas in the catchment

2.4 A map of the areas proposed to be taken up under the project will
form a part of the project document

3 What Species to be planted?

3.1 These are essentially to be avenue / aesthetic plantations and hence


suitable local flowering tree species in consultation with local people
and with active participation of NGOs who are working in that area
may be selected.

3.2 In case of plantations around STPs, Pumping Stations and along Effluent
Channels, tall plants having dense foliage shall be planted.

4 Implementing agency

4.1 In the states, to take up plantation is the responsibility of the State


Forest Department. As they are expected to have the requisite
expertise and infrastructure, they may be given the first preference to
take up works under these guidelines.

4.2 If the State Forest Departments on account of their prior commitments


is not in a position to implement these works or the concerned State
Governments take decisions otherwise, these works can be assigned to
alternative agencies.

Financial Norms For Plantation

4.3 Estimates to include provisions for maintenance for a period of 3 years


including the planting year.

4.4 No barbed wire fencing or expensive tree guards will be permissible


unless proper justification is given. Low cost vegetative fencing should
be encouraged.

4.5 Employment of watchmen for the purposes of protection will not be


allowed.

4.6 Appropriate mechanism must be evolved for maintenance and


protection of the plantations taken up under these guidelines by
resorting to the concepts of social fencing with the involvement of
NGOs, Paryavaran Vahinis, Eco-clubs, Forest Protection Committees,

Page 40 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

Panchayati Raj Institutions etc. This mechanism must be indicated in


DPR.

Records to be maintained

The implementing agency will be required to meticulously maintain requisite


documents like plantation registers including treatment map, measurement
books, accounts etc. It will also diligently maintain every six months, the
survival percentage of the plantations.

Evaluation

Works taken up will be monitored / evaluated by experts to be selected from


the panel maintained for the purpose in the Ministry. Visit of these evaluators
will take place once every year (November-January) to each project and
assessment of work will basically be done with reference to the calendar of
operations submitted along with the project proposal.

Page 41 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

ANNEXURE V

Norms for Staff & Staff Quarters Required on Sewage Pumping Stations & STPs

1. Sewage Pumping Stations

Staff Required Installed Installed Installed Capacity


Capacity Capacity >500 HP
150-300 HP 300-500 HP
J.E. ½ 1 1
Pump Mechanics 1 1½ 1½
Electricians 1 1 1
Pump Operators 1x3 1x3 1x3
Beldars 1x2 1x3 2x3
Sweepers 1x1 1x1 1x1
Staff
Quarters
Required for
Operating Staff
Pump Operators Type B Type B Type B
1 1 1

Beldars Type A Type A Type A


1 1 2
Pump Mechanics Type B
1
Electricians Type B
1
Total 2 2 5

2. Sewage Treatment Plants (ASP / Biofiltration)

Staff Types of 10 mld 40 mld 80 mld 120 mld


staff Qts.
Quarters Required
Beldars A 4 4 6 8
Operators B 2 4 4 6
Electrician class 1 B 1 1 1 1
Pump C - 1 1 1
mechanic/Fitters
class 1
J.E. C - 1 1 1
A.E. D - - 1 1
Operators (Power B - 2 2 2

Page 42 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

Plant)
Sub-total 7 11+2 14+2 18+2
Oxidation Pond
Beldars A 2 2
Aerated Lagoons
Beldars A 2 2
Operators B 2 2
UASB Treatment
Plants
Operators B 1+1 1+1 1+1 1+1
Staff Types of 10 mld 40 mld 80 mld 120 mld
staff Qts.
Sweepers A 1 1 1 1
Watchmen/Gatemen A 1 1 1 1
Electrician cum B 1 1 1 1
Mechanic
Chemists*** B 1 1 1 1
J.E.** C 1 1 1 1
A.E.(Civil) D - 1 1 1
EE(Civil) - - - - -

Note: * Operators’ quarter for Power Package


** One J.E. would look after more UASB Plants in a town
*** One Chemist would look after more UASB Plants in a town with a single
laboratory.

Covered Areas for Different Categories of Residential Accommodation


(Area as per CPWD norms)

Personnel Type Plinth Area


Sweepers, Watchmen A 34.20 sq.m.
Operators, Electricians & B 45.60 sq.m.
Chemists
J.Es. C 62.70 sq.m.
A.Es. D 86.00 sq.m.

Guide Lines For Staff Quarters

1. No staff quarters are necessary for the IPS and MPS, if the installed capacity is
less than 150 HP.
2. The staffing pattern for STP has been taken as per the guidelines of the Expert
Committee set up by NRCD for the above purpose.

Page 43 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

3. Number and type of quarters for different capacities any types of treatment
plants have been worked out taking into consideration the operating staff in
shifts. Quarters have also been proposed for minimum maintenance staff in
large pumping stations and STPs.
4. Only a few supervisory staff at large STPs are to be considered for staff
quarters at the site of treatment plant.
5. The pay scales and type of accommodation are based as per norms laid
down by the Ministry of Urban Development.
6. If the land is not available at the site of MPS for construction of staff quarters,
these quarters can be constructed at the site of treatment plant.
7. Staff quarters are not to be treated as rent-free.
8. 20% of the operating staff in shifts is to be provided quarters in the vicinity of
STP.
9. States can adopt their own eligibility norms for different categories of staff,
provided the variations are not too large.

REQUIREMENT OF PERSONEEL FOR STPs

Designation Activated sludge High Rate Filtration Oxidation Ditch Oxidation Pond Aerated Lagoon
Process/UASB
Ex Engineer - - 1 1 - - 1 1 - - 1 1 - - - - - - - -
(Project Manager)
AE(E&M)Asstt. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Manager
AE(Civil)Astt. - - - 1 - - - 1 - - - 1 - - - - - - - 1
Manager
JE(E&M)Junior 4 4 6 6 4 4 6 6 4 4 6 6 - - - - 4 4 4 4
Manager
JE(Civil)Junior - - 1 2 - - 1 2 1 1 1 2 1 1 1 1 1 1 1 2
Manager
Fitter(Mech)Ist 1 1 2 2 1 1 2 2 1 1 2 2 - - - - - - 1 1
Class
Electn, Ist class 1 1 2 3 1 1 1 2 1 1 2 2 - - - - 1 1 2 2
Fitter, 2nd class - - 1 1 - - 1 1 - - 1 1 1 1 1 1 1 1 1 1
Electn, 2nd class 1 1 2 2 1 1 2 2 1 1 2 2 1 1 1 1 1 1 2 2
Gardener 1 1 2 2 1 1 2 2 1 1 2 2 1 1 2 2 1 1 2 2
Driver - - 1 1 - - 1 1 - - 1 1 - - - - - - 1 1
Cleaner - - 1 1 - - 1 1 - - 1 1 - - - - - - 1 1
Jr. Accountant 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
UDC, Senior Astt. 1 1 1 2 1 1 1 2 1 1 1 2 1 1 1 1 1 1 1 1
LDC/Typist Junior 1 1 2 3 1 1 2 3 1 1 2 3 1 1 2 2 1 1 1 2
Astt.
Peon 1 1 2 3 1 1 2 3 1 1 2 3 - - 1 1 1 1 1 2
Jr. Steno - - 1 1 - - 1 1 - - 1 1 - - - - - - - -
Chemist - - 1 1 - - 1 1 - - 1 1 - - - - - - - -
Asst. Chemist - - 1 1 - - 1 1 - - 1 1 - - - - - - 1 1
Lab Astt. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Lab Attendant. 1 2 2 2 1 2 2 2 1 2 2 2 1 1 1 1 1 1 1 1
Sweeper 1 1 2 2 1 1 2 2 1 1 2 2 1 1 2 2 1 1 2 2
Welder cum - - 1 1 - - 1 1 - - 1 1 - - - - - - - -
Balcksmith
Operators 12 16 19 19 12 16 19 19 8 8 12 12 - - 1 1 4 4 4 4
Labour (Beldars) 28 44 54 73 28 44 53 72 21 28 48 52 11 20 36 50 10 14 27 34

Page 44 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

ANNEXURE VI

GUIDELINES FOR PUBLIC AWARENESS AND PUBLIC PARTICIPATION IN


NATIONAL RIVER ACTION PLAN SCHEMES OF THE MINISTRY OF
ENVIRONMENT AND FORESTS

1. INTRODUCTION:

It appears to be a turning point in the philosophy and programmes of NRCD to


think loudly in terms of the importance and need of community awareness and
community action for ensuring the desired success to the non-core schemes of
National River Conservation Programme through people’s participation.
Unfortunately, even after a huge expenditure of thousands of millions of
rupees, the out come of most of the activities undertaken to implement the
ambitious projects like Ganga and Yamuna Action Plan and now National
River Conservation Programme has been far below the expectation of the
nation. There may be different opinions of the casual factors responsible for
such alarming situation. The fact however, remains that much of the
disappointing experience or poor performance of the projects like these can
be attributed to the fact that from the very beginning there has not been any
sincere or systematic effort to involve community at any stage of the execution
of the programme. The obvious result is that the general public for whom the
whole exercise was planned so ambitiously always remained to be an
indifferent on-looker. At times, the target beneficiaries contributed to the
problem of river pollution because of number of ‘human factors’. Although,
they did not do it deliberately, yet the fact remains that it was done because
of the lack of proper awareness about the casual factors of river pollutions and
also the dangers of the hazards of polluted river water, which is gradually
turning into a slow poison. Hardly any meaningful effort has even been made
to motivate the process to contribute their share to the efforts of keeping rivers
off pollution. For example, number of hardware provisions were made to check
the “human casual factors” of river pollution but there was rarely any
systematic effort to educate the masses on the recommended practices for
the proper use and maintenance of such facilities of toilet complexes, bathing
ghats, crematoria, river bank structures, sewage systems, etc. It is shocking to
note that not even ten percent of the total budgetary provision of NRCP has
ever been made on software aspects. The outcome has been the same as
could be expected under such conditions. It is heartening to note that NRCD
has now realised the importance of community awareness/people’s
participation in general and software components of the programme in
particular. It may be pertinent to point out that the working of NRCP cannot be
improved unless at least twenty five percent of budget provision is made for
software programme. Some of the measures, which may be suggested to
create meaningful community awareness and ensure fruitful participation of
the masses for the success of National River Action Plan, are detailed below:
Page 45 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

2. GUIDELINES FOR NON-CORE SCHEMES VIZ LOW-COST TOILET


ELECTRIC/WOOD BASED CREMATORIA, BATHING GHATS, PLANTATION
ACTIVITIES, SOLID WASTE MANAGEMENT, ETC.

Target Groups

2.1.1 Local influential/Community leaders,

2.1.2 Local NGOs,

2.1.3 School teachers and students,

2.1.4 Elite groups and organisations like Rotary Club, Lions club, Associations
and forums of writers and artists, etc.,

2.1.5 Religious leaders and priests,

2.1.6 Representatives of Industry and Commerce,

2.1.7 Leaders of trade unions and organisations like safai karamchari sanghs,

2.1.8 Leaders of teachers and students associations,

2.1.9 Representatives of political parties including the elected office bearers


and members of
local bodies,

2.1.10 Members of legislative assemblies, legislative councils and parliament


representative of the local constituencies,

2.1.11 Representatives of media viz. Editors/correspondents of local press and


key functionaries of local radio and TV stations,

2.1.12 Grassroot level functionaries of Municipalities and state government


departments like public health, forestry, Jal Nigam, PWD, etc.,

2.2 Action Points for Community Awareness

Holding of locality wise meetings and group discussions with local


influentials, Whereby the extent of river pollution, the related physical
and human factors, the consequent health hazards and the possible
remedial measures are highlighted through the talks and technical

Page 46 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

presentations by the experts and social workers (Action: Identified NGO


of reputation).

Motivating local influentials to play a leading role in promoting


environmental sanitation and community health, particularly
prevention of river pollution (Action: Identified NGO of reputation).

Page 47 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

Motivating and advising local NGOs to participate in outlining execution and


follow up efforts of community action plans for ensuring a clean and healthy
community life in general and protection of river water quality in particular (Action:
Identified NGO of reputation).

Promoting schools as models of clean living and healthy environments and


training school teachers and students as motivators and informal change agents for
involving families and communities in clean river programmes in general and
maintenance of toilets/bathing ghats/crematoria in particular (Action: Identified
NGO with excellent track record of having rendered specialised services in the
area).

Motivating school management programmes/events administrative and


teaching faculty to organise special programmes for checking river pollution and
plantation of trees on the river banks (Action: Identified NGO and the functionaries
of the Department of Forestry).

Motivate the local influentials i.e. leading businessmen, industrialists, office


bearers of elite clubs like Rotary, Lions, Junior chamber of Commerce, local
chapters of FICCI/CII, to undertake or sponsor such activities as solid and liquid
waste management services through an effective strategy of public-private
partnership for improving sanitation conditions of the towns located at river banks
and also for joint efforts for controlling river pollution from industrial effluents. They
can be fruitfully motivated to sponsor the plantations on river banks and adopting a
certain planted area for protection and preservation (Action: NGO of reputation
and duly motivated group of local influentials).

Awaken, educate, organise and motivate religious leaders and priests to


participate actively in river pollution control through such efforts as educating the
masses, checking the dumping of temple waste on the river bank and throwing of
half burnt or unburnt dead bodies into the river (Action: NGO of reputation).

Motivate the office bearers of trade unions and other professional organisations
like the teachers and students associated to win public support for their cause by
rendering some fruitful service to the society. While doing so they may give highest
priority to community health promotional measures like river pollution control and
conservation of the quality of river water (Action: NGO of reputation).

Motivate local MLAs and MPs and leaders of political parties to participate
actively in the promotional efforts of community involvement for protecting river
against the hazards of pollution-an effort, which shall pay them abundantly through
the building of positive public opinions. They should also be motivated to form local
level all party organisations/ forums to promote the measures of river pollution
control. In addition, they should be motivated to take keen interest in the proper
utilisation of the funds provided for river pollution. In addition, they should be
persuaded to play effective liaison between the government and the people to
ensure the timely completion of different programmes and activities undertaken by
Page 48 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

the Directorate of National River Conservation Programme (Action: NGO having a


sound background of linkages with the legislative and political leaders).

Motivate leading persons representing local press and electronic media infact,
they need to be properly educated and encouraged to be conscious of their
social commitment and social obligations. They should also be convinced that
socially conscious media shall always be aptly recognised and enormously
rewarded through the creation of a sound base of enlightened clientele group
which in the long run will help them through the image building process.
Accordingly, the editors and correspondents of local press, the officers and key
functionaries of coverage to the aspect of river pollution control measures through
the active involvement of the people (Action: NGOs of repute having a sound
organisation infrastructure of public relations unit).

Awaken, educate and encourage the grassroot level functionaries belonging to


such departments of state govt. as local bodies like, public health, sewerage,
forestry, water supply, public works, electricity, industry, tourism etc. to take special
interest in the activities which are directly related to the aspect of river pollution
control. They should be particularly motivated to be more conscious of their
commitment and obligation to ensure the purity of river water so that the future of
the present and coming generations of the society and so also the members of
their own community is safe-guarded against the health hazards. (Action: NGO
having the background of specialised contribution to the area concerned).

FOR CORE SCHEMES VIZ SEWERAGE NETWORK, SEWAGE


TREATMENT PLANTS, PUMPS, ETC.

2.3.1 Target Groups :

2.3.1.1 Community at large,


2.3.1.2 Business and industrial establishments.
2.3.1.3 Local municipality corporation,
2.3.1.4 Grass-root level organisation like panchayats,
2.3.1.5 Charitable trusts and religious organisation,
2.3.1.6 NGOs,
2.3.1.7 Educational, Research and Technical Institutions
2.3.1.8 Local MLAs/MPs and representatives of political parties,
2.3.1.9 Grass-root functionaries of civic bodies and concerned
department of the state government,

2.3.1.10 Media agencies and individuals etc.,

Page 49 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

2.3.2 Action Points

2.3.2.1 As nalas are the major casual factors of river pollution


because of factors such as lack of adequate sewerage
network, implanned growth of cities, slum settlements, non-
existence of civic sense etc., there is a need to:

2.3.2.2 Estimate awareness deficits and fill them up through


awareness campaigns,

2.3.2.3 Facilitate setting up of wardwise sanitation committees as


‘sanitation watch and ward societies’/action groups,

2.3.2.4 Launch a mass campaign for educating and motivating local


community and families about the need to have, on site
sanitation facility like community toilet complexes at the
public places and household toilets at the family level,

2.3.2.5 Ensure the active participation of the business and industrial


establishments of the area through their contribution to the
area of liquid and waste management, including the steps to
check the industrial waste effluents being allowed to mix with
river water, (Action: Reputed NGO having a sound
background of expertise and experience).

2.3.2.6 Facilitate promotion of urban farming and social forestry by


persuading the local business and industrial establishments to
undertake or sponsor these activities. These efforts should be
supported by technological innovations and intervention for
the fruitful adoption of the use of sewage water in urban
farming and social forestry so as to have the double
advantage of maximising the yield of farm and forestry
produce and also to check the rivers pollution from sewage
water, NRCD should sponsor pilot projects for promoting
forestry on community waste land lying unused in the vicinity
of river banks. The success models developed through such
projects will attract private entrepreneurs to take up this
activity as an income generating pre-position. (Action:
Specialised NGOs, NRCD and City Corporations).

2.3.2.7 Facilitate and motivate the community to cooperate and


segregate the waste at source. This being a highly specialised
job has to be entrusted to a known NGO having a good track
record of contribution to this area. The NGO has to share
information on available technologies for recycling of waste
Page 50 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

with the local traders/manufactures associations educating


and convincing them of the economic viability. For this, the
success models have to be identified for fruitful replication.
Such efforts need to be specially supported by NRCD through
adequate funding. (Action: Known NGO, NRCD, and
Industrial/business houses).

2.3.2.8 With a view to check the regular flow of industrial effluents


waste in to the river generally through the nalas, there is a
need to create community pressure on the pollutant units, as
well as civic authorities to play their positive role. There is
however, need to support those efforts by organising
experience/information sharing professional meets on the
available technologies of industrial effluents/waste
management. While adopting this line of action, it has to be
well understood that the basic principle of waste
management is to add ‘value to the waste’ and this principle
is applicable at all levels, be it be individual household or big
industrial houses. The success model or recycling of hotel
waste (Banglore) needs to be widely replicated. Similar
success models working in the areas of civic sanitation and
hospital waste management need to be properly identified
and promoted for wider replication (Action: Eminent, expert
and experienced NGO).

2.3.2.9 Core schemes have to be re-organised in order to ensure


people’s participation in making the available facilities and
service really meaningful. This has to be done through the
provision and placement of community awareness and
action at a higher order of priority. Unfortunately, so far there
has not been any serious move from the side of government.
Consequently, the masses in general, continue to regard
these programmes as routine activities of the government
with which they are hardly concerned.

2.3.2.10 It has to be well understood that even the core scheme


activities, which are mostly of hardware type, need software
support to involve community sincerely and systematically.
The fact remains that people shall remain indifferent and
apathetic towards the effective functioning of these services
so long their participation in carrying on these public assets is
not ensured in words and sprit.
Page 51 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

2.3.2.11 Also, it has to be realised that there has to be a proper


strategy and support system for a meaningful involvement of
the community. This can only be done by highly specialised
agency which has to be assigned the software aspect of
awakening, educating and motivating people to consider
every asset or facility created under core schemes as their
own and hence to offer their voluntary support and
involvement for the success of the programme. (Action:
NRCD-NGO partnership to achieve the desired goal).

Page 52 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

ANNEXURE VIII-A

COMPLETION REPORT
(General Abstract of Cost)

1. Name of the scheme:


2. Sanctioned Amount:
3. Date of sanction:
4. Date of Scheduled start:
5. Date of actual start:
6. Date of Scheduled Completion:
7. Date of actual completion
8. Actual Expr.

SI. Sub- As per sanctioned As executed Variation Reasons Cost as Escalation Escalat
No head/ Estimate for per Due to Due to
compo Variation executed variation price
nent quantity & in variatio
Rates as quantity Col. 8-
Item Qty A Item Qty A Savin Excess per Col. 12 Col.5-
m m g (+) (-) sanctioned Col. 5 Col. 13
t. t. Estimate

1 2 3 4 5 6 7 8 9 10 11 12 13 14

Certified (1) That there has been no material deviations from the sanctioned
plans and specifications other than those approved by the
competent authority.
(2) That the works have been completed as per specifications and
completion drawings enclosed
(3) That the site has been cleared of all malba, rubbish and surplus
materials, contractors’ hutments and his materials etc.

Page 53 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

ANNEXURE VIII-B

COMPLETION REPORT

Name of the Scheme: Details of variations in the scope


of work

Component/Sub-head:

Sl. Description As per sanctioned Estimate As executed Variation


No of item of
work
Qty Unit Rate Amt. Qty Unit Rate Amt. Saving E
(+) (

1 2 3 4 5 6 7 8 9 10 11 12

Page 54 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

Ministry of Environment & Forests

UTILISATION CERTIFICATE

(To be sent in duplicate to the Ministry of Environment & Forests)


for the financial year (Form____________ to _________________)

1. Title of the Project/Scheme:

2. Name of the Organisation:

3. Principal Investigator:

4. Ministry Of Environment And Forests


letter No. and date of
sanctioning the project :

5. Amount brought forward from the previous


financial year quoting Ministry of Environment
and Forests letter no. and date on which the authority
to carry forward the said amount was given :

6. Amount received from Ministry


of Environment & Forests, during
the financial year (please give
No. and date of sanctions
Showing the amount paid)

7. Total amount that was available for


expenditure (including commitment)
incurred during the Financial Year
(S. No. 5+S. No. 6)

8. Actual Expenditure (Excluding


commitments) incurred during the financial year:

9. Unspent balance refunded if any


(Please give details of cheque
no. etc.)

10. Balance amount available at the end of the


financial year:

Page 55 of 56
Sewerage Project, Begusarai Annex A-13 : NRCD Guidelines for preparation of DPRs
NGRBA

11. Amount allowed to be carried forward to the next financial year vide
letter no. and date:

Certified that the expenditure of Rs. ______________________ (Rupees


__________________ ) mentioned against column 8 was actually incurred on the
Project / Scheme for the purpose for which it was sanctioned and balance amount
is available on __________________ .

(Signature of (Signature of (Signature of


Head
Principal Investigator) Registrar/ Accounts Officer) of the
Organisation)

ACCEPTED AND COUNTERSIGNED

COMPETENT AUTHORITY
MINISTRY OF ENVIRONMENT AND FORESTS

Page 56 of 56