Você está na página 1de 16

A

MINI PROJECT REPORT

ON

“XXXXXX Project Title XXXXXXXX”


SUBMITTED IN THE PARTIAL FULFILLMENT OF THE
REQUIREMENT FOR THE AWARD OF THE DEGREE OF

BACHELOR OF TECHNOLOGY
IN
INFORMATION TECHNOLOGY
Submitted by
XXX Student Name 1 XXXX (0000000)
XXXX Student Name 2 XXXX (00000000)
XXX Student Name 3 XXXX (00000000)

Under the esteemed guidance of


Mr. Shailendra Kumar Rawat
Assistant professor
Dept of Information Technology

Department of Information Technology

BENGAL COLLEGE OF ENGINEERING & TECHNOLOGY


Durgapur, West Bengal

i
Department of Information Technology
Bengal College of Engineering & Technology
Durgapur, West Bengal

CERTIFICATE OF APPROVAL

The project entitled “XXX Student Name 1 XXXX” submitted by XX Student Name 2 XXX
(000000), XXX Student Name 3 XXX (000000), XXX Student Name 4 XXX (000000) under
guidance of “Mr. Shailendra Kumar Rawat” is hereby approved as a creditable study of
engineering subject to warrant its acceptance as a pre-requisite to obtain the degree for which
it has been submitted. It is understood that by this approval the undersigned don’t necessarily
endorse or approve any statement made, opinion or conclusion drawn therein but approve the
project only for the purpose for which it is submitted.

__________________________
Mr. Shailendra Kumar Rawat
Assistant Professor
Department of Technology

ii
Department of Information Technology
Bengal College of Engineering & Technology
Durgapur, West Bengal

UNDERTAKING

We, XXX Student Name 1 XXX (000000), XXX Student Name 2 XXX (000000), XXX
Student Name 3 XXX (0000000), B.Tech, 4th Semester (Information Technology ), hereby
declared that our project report, entitled “XXX Project Title XXX” is our own contribution.
The work or ideas of the people which are utilized in this report has been properly
acknowledged and mentioned in the reference.

------------------------------------------
XXX Name 1XXX (0000000)
------------------------------------------
XXX Name 2 XXX (00000)
------------------------------------------
XXX Name 3 XXX (00000)

iii
ACKNOWLEDGEMENT

We would like to sincerely thank our Guide, MR. Shailendra Kumar Rawat for his

invaluable guidance, constant assistance, support endurance and constructive suggestion for

the betterment of this project report.

We would like to express our deepest appreciation all of those who provided us the

Possibility to complete this report. We are thankful to and fortunate enough to get constant

encouragement, support and guidance from all teaching staffs of Information Technology

Department which helped us in successful completion of our progress report.

Also, we would like to extend our sincere esteem to all staff in the laboratory for their timely
support.

iv
Contents

Introduction ...................................................................................................................... 1-1

Existing Conditions

2.1 Physical Layout ............................................................................................. 2-1


2.2 Traffic Signals ................................................................................................ 2-2
2.3 Traffic Volumes .............................................................................................. 2-2
2.4 Accident History ............................................................................................. 2-2

Traffic Capacity Analysis

3.1 Capacity Analysis Methodology ..................................................................... 3-1


3.2 Existing and Future “No-Build” Traffic Operations ......................................... 3-2

Proposed Improvements

4.1 General .......................................................................................................... 4-1


4.2 Intersection Geometry ................................................................................... 4-1
4.3 Pedestrian Facilities ...................................................................................... 4-1
4.4 Bicycle Facilities ............................................................................................ 4-1
4.5 Landscaping Improvements........................................................................... 4-1
4.6 Overhead Utility Relocation ........................................................................... 4-2
4.7 Abutter Impacts ............................................................................................. 4-2
4.8 Alternatives .................................................................................................... 4-2
4.9 Existing and Future “Build” Traffic Operations ............................................... 4-3

Recommendations

5.1 Recommended Alternative ............................................................................ 5-1


5.2 Preliminary Construction Cost Estimate ........................................................ 5-2

Route 30/School Street/East Plain Street

6.1 Introduction .................................................................................................... 6-1


6.2 Field Observations ......................................................................................... 6-1
6.3 Preliminary Recommendations ...................................................................... 6-1

v
Appendices

Appendix A .............................................. Public Meeting #1 - PowerPoint Presentation


Appendix B ....................................................................... Public Meeting #2 – Handout
Appendix C .............................................. Public Meeting #3 – PowerPoint Presentation
Appendix D ....................................... Board of Road Commissioners Meeting Handouts
Appendix E ..................................................................................... Public Questionnaire
Appendix F ........................................................................... Turning Movement Counts
Appendix G ........................................................................ Automatic Traffic Recorders
Appendix H ..........................................Accident History and MassHighway Crash Data
Appendix I ...........................................................................................No-Build Analysis
Appendix J ............................................................................................... Build Analysis
Appendix K ................................ Landscape Architect Memorandum for Improvements
Appendix L .................................................. Conceptual Design Alternatives #1 and #2
Appendix M Preliminary Construction Cost Estimate

vi
List of Figures

vii
ABSTRACT

viii
Introduction & Objective of the Project

ix
TOOLS/PLATFORM &
HARDWARE-SOFTWARE REQUIREMENT
SPECIFICATION

x
Functionalities of Software being used

xi
Complete Structure

xii
Snapshots

xiii
Coding

xiv
Future scope and further enhancement of the project

xv
Bibliography

xvi

Você também pode gostar