Você está na página 1de 1

LLOREDA S.A.

LAS FLORES

SUBESTACIÓN
PI
ELÉCTRICA
ÑA
BAÑO
Old boiler room Transformer room
SUBESTACIÓN
DE GAS

Muelle
viejo
TK 9 TK-8 TK-7 TK-6 TK-5 TK-4 TK-3 TK-1
4514 m3 TK 2
Ø25 m
Ø16.20 M Ø16.20 M Ø16.20 M Ø16.20 M Ø16.20 M Ø16.20 M 1314 m3 Ø16.20 M
H 9.2 m H 18.00 M H 18.00 M H 18.00 M H 18.00 M H 18.00 M H 18.00 M Heating coil H 18.00 M
Ø16 m 3
3617 m3 3617 m3 3617 m3 3617 m3 3617 m3 3617 m3 H 6.54 m 3617 m
HEATING COIL HEATING COIL HEATING COIL HEATING COIL HEATING COIL HEATING COIL HEATING COIL

bgf<bfb<dbdbd

DOSING
UNIT
NEW
FEED
WATER
TANK
BOILER
AREA

WATER
STEAM

TREATMENT
BOILER

B-001
P.318.03

PLANT
P.315.01
P.315.02
P.315.03
P.316.01
P.318.02

P.316.02
P.316.03
P.317.01
P.317.03
P.317.02
P.318.01
FLASH
TANK

LOADING BAY #1 LOADING BAY #2


WEIGHBRIDGE
MODEL 7560
METTLER TOLEDO PIT-800-1
WALL FOR DEMOLITION
ELECTRICAL
PIT-800-2 (BY OTHERS)
SUBSTATION PI
CANAL DESAGUE DE AGUAS LLUVIAS AL RIO
ÑA
(BY OTHERS)
R R.E. R.E. R.E.
CCM R P18
R P1 P2 P2 P2 P2 P2 P2
9 0 1 2 3 4

PORTON
BOMBA PLANTA R 5
ELECTRICA R
CONTRAINCENDIO SUBESTACION
ELECTRICA 1
Almacen

Boiler room BASURA


PO R
TK-511
#1 ST Ø11.0 M

MAGDALENA RIVER
E
NEW AREA TK 510

alberca
VIA 40

TK 606
TK 605 H 18.90 M
Seguridad
Cuarto de

TK 708 TK 706 1750 m3 1750 m3


PO 623 m3
229 m3
Ø5.7 m
TK 612 TK 602
603 m3
UNLOADING BAY Heating coil
ST Ø8.4 m 1574 m3 598 m3 1556 m3 HEATING COIL

TOMAS 220V
E
H 11.24 m
H 8.99 m
Ø10.79 m Ø8.4 m Ø10.8 m Heating coil PALM OIL Ø11 m
Inspectores

Ø8.39 m H 19 m
Sala de

LAVAOJOS H 17.22 m H 10.8 m H 16.9 m


Cuarto de
Gas

H 11 m
TK 608 TK 607 TK-512 TK
PSI
0-200

281 m3 281 m3
Cafeteria

Wastewater
Ø11.0 M
LOADING BAY

CANAL
64 m3

lindero
Parqueadero

Ø5.7 m Ø5.7 m TK 704


Muestras

Ø3.9 m
Sala de

H 11 m H 11 m 635 m3 H 18.90 M TK 509


H 5.5 m

TK 611 TK 604 TK 707 Heating coil 1750 m 3


Garita

TANK 1750 m3
1571 m3 346 m3 1556 m3 Ø8.4 m HEATING COIL Heating coil
TK 610 TK 609 Ø10.79 m Ø7.7 m Ø10.8 m H 11.5 m
PIT-500 A JETTY
Ø11 m
322 m3 252 m3 H 17.19 m H 7.4 m H 16.9 m TANK
LAVAOJOS Ø8.3 m Ø5.9 m P-309.01 H 19 m
PIT 700 TANK PIT-500 B
H 5.9 m H 9.22 m P-309.02
Enfermeria

CPO Backup pump


1150 gpm
P.309.03
Sala de
Espera

P-309.06 (BY OTHERS)


TK buffer
3 m3
Recepcion

Hombres
Baño
Cafetin

RAMPLA
PASARELA
Damas
Baño
Acondic.
Cuarto
Aire

P.310.03
P.310.04
P.311.03
DE PO
PO FE S
Expo pipeline
Oficina

Expo pipeline

ILUMINACION
LAVAOJOS ST NS TV TE
P30 P29 POSTE BASURA TOMAS 220V P26 TOMAS 220V
A
Oficina

TOMAS 220V
PO C.E.
C.E.
E
ST C.E.
TOMAS 220V
C.E.
C.E.
R.E. R.E.

E
Descanso de
conductores
Oficina

POSTE PI
TK-210 TANK TK buffer
JA
ÑA
Pabellon
Principal

3 m3
Oficina

Matera

UL

TK 306 TK 305 TK 304 TK 303


Ø8.20 M PIT-200 A
Oficina

TK 302 TK 301 H 11.7 M P.305.03

CANAL
1145 m3 970 m3 1230 m3 1220 m3 TK-209
Oficina

Bascula
Oficina

TK 307 1220 m3 1207 m3 618 m³ P.305.04


Matera

Heating coil
Informatica

Heating coil Heating coil Heating coil TK 114 TK 113


Sala

#1 2778 m3 Heating coil Heating coil Ø14.20 M HEATING COIL P.305.05 TK 115

CA
ge Ø10.76 m Ø10.6 m Ø10.8 m Ø10.7 m 2800 m3 2800 m3

NA
Heating coil Ø10.7 m Ø10.7 m P.305.06 2800 m3 PI
Bascula 1

rid H 18.0 M

L
b # 2 H 12.6 m H 11 m H 13.4 m H 13.5 m
ÑA
Ø15 m Heating coil Heating coil
igh ge H 13.5 m H 13.3 m TK-211 P.PKO NOTE 7 Heating coil
Oficina

Oficina

2800 m 3
Bascula 2

e rid
Gerencia

W H 15.7 m Ø14.2 m Ø14.2 m


hb HEATING COIL
Ø8.20 M Ø14.2 m
eig H 11.7 M H 18.2 m H 18.2 m H 18.2 m
Cuarto
Util

PORTON
618 m³

REGILLA
Induccion
Sala de

Matera

HEATING COIL
Porteria

TK buffer
3 m3
Sala Porteria

R
BASURA R G
NEW WEIGHBRIDGE R
R
R AR
IT
A

PORT
R
PULMON

ON
PO
ST PO TOMAS 220V
TK AIRE
COMPRIMIDO
3 m3 R
P13 P12 P12 SUBESTACION E ST
P1 R.E.
R.E. ELECTRICA 2 C.E. E PO TOMAS 220V
PO
TOMAS 220V Boiler room
CALDERA 2
5 R.E.
P14
R.E. R.E.
R.E. R.E. R.E. ST #2
E R.E. C.E. ST R
R.E.
E
CERCA
ELECTRICAL PORTO
N

SUBSTATION 3
(AREA EXISTING TO INTERVENE)
SIAPE

PI
PROMIN LTDA. ÑA

ED

FO
SU
S.A.S.

R
IS
COMMENTS

Você também pode gostar