A-POR PESO
PESO TOTAL
EN TUBERIA
CAPACIDAD DEL CAMION EN TUBOS / VIAJE ML
Tub. 1/2" 2,500.00 U 10,234.13
Tub. 3/4" 2,000.00 U 2,986.78
Tub, 1" 2,360.00 U 4,345.75
Tub,1 1/2" 1,690.00 U 216.50
Tub 2:" 994.00 U 604.00
Tub, 3" 470.00 U 10.00
Tub 4": 259.00 U 393.00
Tub 6" 150.00 U
Tub 8" 100.00 U
Tub 10" 80.00 U
TUBERIA F. G. 1/2" 400.00 U 63.00
TUBERIA FºGº ISO-I 3/4" 325.00 U 36.75
TUBERIA FºGº ISO-I 1" 175.00 U 21.00
TUBERIA FºGº ISO-I 1 1/2" 130.00 U 21.00
Tub 6'; CSN 160.00 U
Tub 8'; CSN 80.00 U
PESO TOTAL
PESO.TOTAL
60,858.31
5,247.51
10,499.80
2,224.62
3,280.00
3,000.00
325.22
800.00
659.48
0.00
57,057.00
143,951.93
UBICACIÓN:
SECTOR PANCHUMAYO
DISTRITO: ECHARATE
PROVINCIA: LA CONVENCION
DEPARTAMENTO: CUSCO
RUTAS
DISTANCIA REAL FACTOR DISTANCIA VIRTUAL
DE A
ECHARATE PANCHUMAYO 30 1.46 43.83
COSTO APLICADO
RUTA DIST. VIRTUAL PESO (KG) COSTO NORMAL COSTO FRV COSTO TOTAL COSTO (KG)
ECHARATE-PANCHUMAYO 43.83 5000 293.71 615.58 909.29 0.182
El flete se ha calculado en base al decreto supremo Nro 049-2002-MTC "Metodologia de determinacion de costo
de Transporte de pasajeros en Omnibus y de carga en camion" que utliza factores de distancia virtual y proporcion
para el calculo respectivo (ANEXO III KM/VIRTUAL PARA TRANSP CARGA )