A. TENAGA
1. Pekerja OH 0.0700 102,960.00 7,207.20
2. Tukang OH 0.0140 109,920.00 1,538.88
3. Mandor OH 0.0070 118,880.00 832.16
4.
B. BAHAN
1. Galian tanah biasa <1m m3 0.0100 52,100.00 521.00
2. Kansteen 10 x 20 x 40 cm m1 2.5000 50,880.00 127,200.00
3.
4.
5.
6.
7.
C. PERALATAN
1. Perlengkapan Ls 1.0000 2,500.00 2,500.00
2.
A. TENAGA
1. Pekerja OH 0.3500 102,960.00 36,036.00
2. Tukang OH 0.0700 109,920.00 7,694.40
3. Mandor OH 0.0350 118,880.00 4,160.80
4.
B. BAHAN
1. Galian tanah biasa > 1m max.2 m m3 0.9420 109,400.00 103,054.80
2. Buis beton d = 100 cm, h = 50 cm Bh 3.0000 53,000.00 159,000.00
3. Pekerjaan Plat atau tangga site mix camp 1 :2:3 Unit 0.4522 3,816,100.00 1,725,640.42
4.
5.
6.
7.
C. PERALATAN
1. Perlengkapan Ls 1.0000 2,500.00 2,500.00
2.
A. TENAGA
1. Pekerja OH 0.3500 102,960.00 36,036.00
2. Tukang OH 0.0700 109,920.00 7,694.40
3. Mandor OH 0.0350 118,880.00 4,160.80
4.
B. BAHAN
1. Topi uskup Tebal 6 cm m2 1.1000 72,080.00 79,288.00
2. Abu Bata (Filler) m3 0.0550 190,800.00 10,494.00
3.
4.
5.
6.
7.
C. PERALATAN
1. Perlengkapan Ls 1.0000 2,500.00 2,500.00
2.
A. TENAGA
1. Pekerja OH 0.3500 102,960.00 36,036.00
2. Tukang OH 0.0700 109,920.00 7,694.40
3. Mandor OH 0.0350 118,880.00 4,160.80
4.
B. BAHAN
1. Paving Block K-250 Tebal 6cm Type Bata m2 1.1000 40,280.00 44,308.00
2. Abu Bata (Filler) m3 0.0550 190,800.00 10,494.00
3.
4.
5.
6.
7.
C. PERALATAN
1. Perlengkapan Ls 1.0000 2,500.00 2,500.00
2.
A. TENAGA
1. Pekerja OH 0.0500 102,960.00 5,148.00
2. Tukang OH 0.0500 109,920.00 5,496.00
3.
4.
B. BAHAN
1. Saklar setara broco set 1.0000 22,260.00 22,260.00
2.
3.
4.
5.
6.
7.
C. PERALATAN
1. Perlengkapan Ls 1.0000 2,500.00 2,500.00
2.
A. TENAGA
1. Pekerja OH 0.0500 102,960.00 5,148.00
2. Tukang OH 0.0500 109,920.00 5,496.00
3.
4.
B. BAHAN
1. Saklar setara broco set 1.0000 22,260.00 22,260.00
2.
3.
4.
5.
6.
7.
C. PERALATAN
1. Perlengkapan Ls 1.0000 2,500.00 2,500.00
2.
A. TENAGA
1. Pekerja OH 0.0500 102,960.00 5,148.00
2. Tukang OH 0.0500 109,920.00 5,496.00
3.
4.
B. BAHAN
1. Stop kontak setara broco set 1.0000 25,440.00 25,440.00
2.
3.
4.
5.
6.
7.
C. PERALATAN
1. Perlengkapan Ls 1.0000 2,500.00 2,500.00
2.
PERKIRAAN
NO KETERANGAN SATUAN
KUANTITAS
A. TENAGA
1. Pekerja OH 0.1000
2. Tukang OH 0.2000
3.
4.
B. BAHAN
1. Pre Treatment /Cleaning m2 1.0000
2. Curbing Sudut m1 0.4000
3. Bahan Waterproofing Coating Setara Aqua Proof kg 0.5000
4.
5.
6.
7.
C. PERALATAN
1. Perlengkapan Ls 1.0000
2.
on (setara Aquaproof)
102,960.00 10,296.00
109,920.00 21,984.00
33,920.00 33,920.00
25,440.00 10,176.00
51,940.00 25,970.00
2,500.00 2,500.00
104,846.00
10,484.60
115,330.60
115,300.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PERKIRAAN
NO KETERANGAN SATUAN
KUANTITAS
A. TENAGA
1. Pekerja OH 0.0700
2. Tukang OH 0.0090
3.
4.
B. BAHAN
1. Cat Meni kg 0.2000
2. Plamir kg 0.1500
3. Cat dasar kg 0.1700
4. Cat penutup 2 kali kg 0.2600
5. Kuas bh 0.0100
6. Tiner kg 0.03
7. Ampelas lbr 0.2
C. PERALATAN
1.
2.
102,960.00 7,207.20
109,920.00 989.28
19,080.00 3,816.00
30,740.00 4,611.00
50,880.00 8,649.60
45,283.20 11,773.63
12,720.00 127.20
6,890.00 206.70
6,529.60 1,305.92
38,686.53
3,868.65
42,555.19
42,500.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PERKIRAAN
NO KETERANGAN SATUAN
KUANTITAS
A. TENAGA
1. Pekerja OH 0.0200
2. Tukang OH 0.0630
3. Mandor OH 0.0030
4.
B. BAHAN
1.
2. Cat Dasar setara vinilex ltr 0.1000
3. Cat Penutup setara Vinilex ltr 0.2600
4. Amplas bh 0.5000
5. Roll Cat bh 0.0500
6.
7.
C. PERALATAN
1.
2.
102,960.00 2,059.20
109,920.00 6,924.96
118,880.00 356.64
50,880.00 5,088.00
55,120.00 14,331.20
6,529.60 3,264.80
27,560.00 1,378.00
33,402.80
3,340.28
36,743.08
36,700.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
A. TENAGA
1. Pekerja OH 0.0200 102,960.00
2. Tukang OH 0.0630 109,920.00
3. Mandor OH 0.0030 118,880.00
4.
B. BAHAN
1. Plamur kg 0.1000 38,160.00
2. Cat Dasar setara Dulux ltr 0.1000 61,480.00
3. Cat Penutup setara Dulux ltr 0.2600 82,680.00
4. Amplas bh 0.5 6,529.60
5. Roll Cat bh 0.05 27,560.00
6.
7.
C. PERALATAN
1.
2.
JUMLAH HARGA
(Rp)
2,059.20
6,924.96
356.64
3,816.00
6,148.00
21,496.80
3,264.80
1,378.00
45,444.40
4,544.44
49,988.84
49,900.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
A. TENAGA
1. Pekerja OH 0.0200 102,960.00
2. Tukang OH 0.0630 109,920.00
3. Mandor OH 0.0030 118,880.00
4.
B. BAHAN
1. Plamur kg 0.1000 38,160.00
2. Cat Dasar setara vinilex ltr 0.1000 50,880.00
3. Cat Penutup setara Vinilex ltr 0.2600 55,120.00
4. Amplas bh 0.5 6,529.60
5. Roll Cat bh 0.05 27,560.00
6.
7.
C. PERALATAN
1.
2.
setara Vinilex
JUMLAH HARGA
(Rp)
2,059.20
6,924.96
356.64
3,816.00
5,088.00
14,331.20
3,264.80
1,378.00
37,218.80
3,721.88
40,940.68
40,900.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
A. TENAGA
1. Pekerja OH 0.1000 102,960.00
2. Tukang OH 0.2000 109,920.00
3. Mandor OH 0.0050 118,880.00
4.
B. BAHAN
1. GRC motif kayu 20 cm x 12 mm m1 1.2000 93,280.00
2. Paku berbagai ukuran kg 0.0500 15,052.00
3.
4.
5.
6.
7.
C. PERALATAN
1.
2.
JUMLAH HARGA
(Rp)
10,296.00
21,984.00
594.40
111,936.00
752.60
145,563.00
14,556.30
160,119.30
160,100.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PERKIRAAN
NO KETERANGAN SATUAN
KUANTITAS
A. TENAGA
1. Jasa Pembuatan List Plank kayu Ls 1.0000
2.
3.
4.
B. BAHAN
1. Papan kayu kamper m3 0.0068
2. Paku berbagai ukuran kg 0.0500
3. Finishing kayu Ls 1.0000
4.
5.
6.
7.
C. PERALATAN
1. Alat Bantu Ls 1.0000
2. Dudukan Baja ringan m1 1.0000
40,000.00 40,000.00
6,678,000.00 45,410.40
15,052.00 752.60
20,000.00 20,000.00
1,500.00 1,500.00
18,000.00 18,000.00
125,663.00
12,566.30
138,229.30
138,200.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
A. TENAGA
1. Pekerja OH 0.1500 102,960.00 15,444.00
2. Tukang OH 0.0600 109,920.00 6,595.20
3. Mandor OH 0.0080 118,880.00 951.04
4.
B. BAHAN
1. Genteng bubung Glazur m1 4.0000 10,812.00 43,248.00
2.
3.
4.
5.
6.
7.
C. PERALATAN
1.
2.
A. TENAGA
1. Pekerja OH 0.1500 102,960.00
2. Tukang OH 0.0600 109,920.00
3. Mandor OH 0.0080 118,880.00
4.
B. BAHAN
1. Genteng Glazur m2 14.0000 4,770.00
2.
3.
4.
5.
6.
7.
C. PERALATAN
1.
2.
JUMLAH HARGA
(Rp)
15,444.00
6,595.20
951.04
66,780.00
89,770.24
8,977.02
98,747.26
98,700.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
A. TENAGA
1. Pekerja OH 0.1500 102,960.00
2. Tukang OH 0.0500 109,920.00
3. Mandor OH 0.0080 118,880.00
4.
B. BAHAN
1. Allumunium Foil 1 Muka 1,2 x 60 m m2 0.8333 9,010.00
2.
3.
4.
5.
6.
7.
C. PERALATAN
1.
2.
JUMLAH HARGA
(Rp)
15,444.00
5,496.00
951.04
7,508.03
29,399.07
2,939.91
32,338.98
32,300.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PERKIRAAN
NO KETERANGAN SATUAN
KUANTITAS
A. TENAGA
1. Jasa Pemasangan Ls 1.0000
2.
3.
4.
B. BAHAN
1. Rangka atap Baja Ringan Zincalume C 0,75 x 75 mm m2 1.0500
2.
3.
4.
5.
6.
7.
C. PERALATAN
1.
2.
45,000.00 45,000.00
137,800.00 144,690.00
189,690.00
18,969.00
208,659.00
208,600.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
A. TENAGA
1. Jasa Pengeboran Air "sampai ketemu air bersih" Ls 1.0000 2,000,000.00
2.
3.
4.
B. BAHAN
1. Mesin Air Jet Pump 250 W Unit 1.0000 1,250,000.00
2. Tralis besi Set 1.0000 450,000.00
3.
4.
5.
6.
7.
C. PERALATAN
1.
2.
2,000,000.00
1,250,000.00
450,000.00
3,700,000.00
370,000.00
4,070,000.00
4,070,000.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
A. TENAGA
1.
2.
3.
4.
B. BAHAN
1. Water Torn 500 L(Penguin) Unit 1.0000 720,800.00 720,800.00
2.
3.
4.
5.
6.
7.
C. PERALATAN
1. Perlengkapan Ls 1.0000 2,500.00 2,500.00
2.
PERKIRAAN
NO KETERANGAN SATUAN
KUANTITAS
A. TENAGA
1.
2.
3.
4.
B. BAHAN
1. Galian Tanah Biasa m3 4.5000
2. Pasir Urug m3 0.2140
3. Lantai Kerja Beton K-100 m3 0.3000
4. Pekerjaan dinding bata merah a.d.1:5 m2 15
5. Pekerjaan Plat atau Tangga Site Mix Camp. 1:2:3 m3 0.315
6. Pas.Ijuk kg 5.4
7. Urugan kerikil 3/5 m3 1.05
C. PERALATAN
1. Perlengkapan Ls 1.0000
2.
52,100.00 234,450.00
400,700.00 85,749.80
609,200.00 182,760.00
103,000.00 1,545,000.00
3,816,100.00 1,202,071.50
2,332.00 12,592.80
215,731.20 226,517.76
2,500.00 2,500.00
3,491,641.86
349,164.19
3,840,806.05
3,840,800.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
A. TENAGA
1. Pekerja OH 0.0100 102,960.00
2. Tukang OH 0.1000 109,920.00
3. Mandor OH 0.0050 118,880.00
4.
B. BAHAN
1. Floor Drain allumunium Bh 1.0000 49,820.00
2.
3.
4.
5.
6.
C. PERALATAN
1. Perlengkapan Ls 1.0000 2,500.00
2.
Stainless steel
JUMLAH HARGA
(Rp)
1,029.60
10,992.00
594.40
49,820.00
2,500.00
64,936.00
6,493.60
71,429.60
71,400.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
A. TENAGA
1. Pekerja OH 0.0100 102,960.00
2. Tukang OH 0.1000 109,920.00
3. Mandor OH 0.0050 118,880.00
4.
B. BAHAN
1. Kran Air (Alloy Brass) 1/2 Inch Bh 1.0000 68,900.00
2. Seal tape Unit 0.0250 4,770.00
3.
4.
5.
6.
C. PERALATAN
1. Perlengkapan Ls 1.0000 2,500.00
2.
JUMLAH HARGA
(Rp)
1,029.60
10,992.00
594.40
68,900.00
119.25
2,500.00
84,135.25
8,413.53
92,548.78
92,500.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
A. TENAGA
1. Pekerja OH 0.0360 102,960.00
2. Tukang OH 0.0600 109,920.00
3. Mandor OH 0.0020 118,880.00
4.
B. BAHAN
1. Pipa PVC Wavin standard dia 3 inch AW m1 1.2000 15,688.00
2.
3.
4.
5.
6.
C. PERALATAN
1. Perlengkapan Ls 1.0000 2,500.00
2.
JUMLAH HARGA
(Rp)
3,706.56
6,595.20
237.76
18,825.60
2,500.00
31,865.12
3,186.51
35,051.63
35,000.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
A. TENAGA
1. Pekerja OH 0.0360 102,960.00
2. Tukang OH 0.0600 109,920.00
3. Mandor OH 0.0020 118,880.00
4.
B. BAHAN
1. Pipa PVC Wavin standard dia 2 inch AW m1 1.2000 10,812.00
2.
3.
4.
5.
6.
C. PERALATAN
1. Perlengkapan Ls 1.0000 2,500.00
2.
JUMLAH HARGA
(Rp)
3,706.56
6,595.20
237.76
12,974.40
2,500.00
26,013.92
2,601.39
28,615.31
28,600.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
A. TENAGA
1. Pekerja OH 0.0360 102,960.00
2. Tukang OH 0.0600 109,920.00
3. Mandor OH 0.0020 118,880.00
4.
B. BAHAN
1. Pipa PVC Wavin standard dia 3/4 inch AW m1 1.2000 7,208.00
2.
3.
4.
5.
6.
C. PERALATAN
1. Perlengkapan Ls 1.0000 2,500.00
2.
JUMLAH HARGA
(Rp)
3,706.56
6,595.20
237.76
8,649.60
2,500.00
21,689.12
2,168.91
23,858.03
23,800.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
A. TENAGA
1. Pekerja OH 0.0360 102,960.00
2. Tukang OH 0.0600 109,920.00
3. Mandor OH 0.0020 118,880.00
4.
B. BAHAN
1. Pipa PVC Wavin standard dia 1/2 inch AW m1 1.2000 5,035.00
2.
3.
4.
5.
6.
C. PERALATAN
1. Perlengkapan Ls 1.0000 2,500.00
2.
JUMLAH HARGA
(Rp)
3,706.56
6,595.20
237.76
6,042.00
2,500.00
19,081.52
1,908.15
20,989.67
20,900.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PERKIRAAN
NO KETERANGAN SATUAN
KUANTITAS
A. TENAGA
1. Jasa Pembuatan Pagar Kayu Ls 1.0000
2.
3.
4.
B. BAHAN
1. Papan Kayu kamper m3 0.0220
2. Paku berbagai ukuran kg 0.2250
3. Finishing kayu Ls 1.0000
4.
5.
6.
C. PERALATAN
1. Alat Bantu Ls 1.0000
2.
450,000.00 450,000.00
6,678,000.00 146,916.00
15,052.00 3,386.70
45,000.00 45,000.00
1,500.00 1,500.00
646,802.70
64,680.27
711,482.97
711,400.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
A. TENAGA
1. Tukang Listrik OH 0.1000 109,920.00 10,992.00
2. Pembantu Instalator OH 0.2500 102,960.00 25,740.00
3.
4.
B. BAHAN
1. Lampu Philips Essential 18 Watt Bh 1.0000 50,880.00 50,880.00
2. Lampu Tradisional Betawi Bh 1.0000 475,000.00 475,000.00
3.
4.
5.
6.
7.
C. PERALATAN
1. Alat Bantu Ls 1.0000 1,500.00 1,500.00
2.
A. TENAGA
1. Tukang Listrik OH 0.1000 109,920.00 10,992.00
2. Pembantu Instalator OH 0.2500 102,960.00 25,740.00
3.
4.
B. BAHAN
1. Lampu Philips Essential 18 Watt Bh 1.0000 50,880.00 50,880.00
2. Downlight 4 " Panasonic NLP72332(Silver Crom) Bh 1.0000 48,760.00 48,760.00
3.
4.
5.
6.
7.
C. PERALATAN
1. Alat Bantu Ls 1.0000 1,500.00 1,500.00
2.
A. TENAGA
1. Tukang Listrik OH 0.1000 109,920.00 10,992.00
2. Pembantu Instalator OH 0.2500 102,960.00 25,740.00
3.
4.
B. BAHAN
1. Lampu Philips Essential 18 Watt Bh 1.0000 50,880.00 50,880.00
2. Fitting plafon besar Lux (Broco Gracio 12101) Bh 1.0000 25,440.00 25,440.00
3.
4.
5.
6.
7.
C. PERALATAN
1. Alat Bantu Ls 1.0000 1,500.00 1,500.00
2.
A. TENAGA
1. Tukang Listrik OH 0.1050 109,920.00 11,541.60
2. Pembantu Instalator OH 0.2306 102,960.00 23,742.58
3. Mandor OH 0.0050 118,880.00 594.40
4.
B. BAHAN
1. Kabel Listrik NYM 300/500 V, eterna, 2 x 2,5 mm2 m1 5.0000 12,465.60 62,328.00
2. Klem t = 4 mm Pack 0.0500 12,720.00 636.00
3. Pipa PVC wavin standart dia 1/2 inch AW m1 4.0000 5,035.00 20,140.00
4.
5.
6.
7.
C. PERALATAN
1. Alat Bantu Ls 1.0000 1,500.00 1,500.00
2.
A. TENAGA
1. Tukang Listrik OH 0.1050 109,920.00 11,541.60
2. Pembantu Instalator OH 0.2306 102,960.00 23,742.58
3. Mandor OH 0.0050 118,880.00 594.40
4.
B. BAHAN
1. Kabel Listrik NYM 300/500 V, eterna, 2 x 2,5 mm2 m1 5.0000 12,465.60 62,328.00
2. Klem t = 4 mm Pack 0.0500 12,720.00 636.00
3. Pipa PVC wavin standart dia 1/2 inch AW m1 4.0000 5,035.00 20,140.00
4.
5.
6.
7.
C. PERALATAN
1. Alat Bantu Ls 1.0000 1,500.00 1,500.00
2.
A. TENAGA
1.
2.
3.
4.
B. BAHAN
1. Pasang Baru PLN Va 1300.0000 1,696.00 2,204,800.00
2.
3.
4.
5.
6.
7.
C. PERALATAN
1. Biaya Lain-lain Ls 1.0000 120,000.00 120,000.00
2.
A. TENAGA
1.
2.
3.
4.
B. BAHAN
1. Pasang Baru PLN Va 900.0000 1,696.00 1,526,400.00
2.
3.
4.
5.
6.
7.
C. PERALATAN
1. Biaya Lain-lain Ls 1.0000 120,000.00 120,000.00
2.
A. TENAGA
1. Pekerja OH 0.0600 102,960.00 6,177.60
2. Tukang OH 0.0600 109,920.00 6,595.20
3. Mandor OH 0.0030 118,880.00 356.64
4.
B. BAHAN
1. Gypsum profil l = 7 cm btg 1.0500 7,950.00 8,347.50
2. Tepung Gypsum kg 0.1500 3,869.00 580.35
3.
4.
5.
6.
7.
C. PERALATAN
1. Alat Bantu Ls 1.0000 1,500.00 1,500.00
2.
A. TENAGA
1. Pekerja OH 0.3000 102,960.00 30,888.00
2. Tukang OH 0.2500 109,920.00 27,480.00
3. Mandor OH 0.0150 118,880.00 1,783.20
4.
B. BAHAN
1. Hollow 4 x 4 cm btg 0.7500 82,680.00 62,010.00
2. Hollow 2 x 4 cm, t = 1,2 btg 0.5000 76,320.00 38,160.00
3. Drywall Screw 25 mm x 0,83 pc(s) 24.3056 1,060.00 25,763.94
4. Calcium cilicate t=6mm setara GRC Lembar 0.3640 82,680.00 30,095.52
5. Jointing Coumpound UB-10/20/888/CCL 20 kg /bag (s) bag(s) 0.0190 47,700.00 906.30
6. UB Tape 75 m/roll(s) roll(s) 0.0160 16,960.00 271.36
7.
C. PERALATAN
1. Alat Bantu Ls 1.0000 1,500.00 1,500.00
2.
A. TENAGA
1. Pekerja OH 0.3500 102,960.00 36,036.00
2. Tukang kayu OH 1.0500 109,920.00 115,416.00
3. Mandor OH 0.0180 118,880.00 2,139.84
4.
B. BAHAN
1. Balok 5x10 (kayu kamper) m3 0.0145 6,042,000.00 87,609.00
2. Kaca 5 mm m2 0.3300 107,060.00 35,329.80
3. Cat kayu coklat standart ls 1.0000 38,160.00 38,160.00
4.
5.
6.
7.
C. PERALATAN
1. Alat Bantu Ls 1.0000 1,500.00 1,500.00
2.
A. TENAGA
1. Pekerja OH 0.3500 102,960.00 36,036.00
2. Tukang kayu OH 1.0500 109,920.00 115,416.00
3. Mandor OH 0.0180 118,880.00 2,139.84
4.
B. BAHAN
1. Balok 5x10 (kayu kamper) m3 0.0238 6,042,000.00 143,799.60
2. Papan rangka daun 3 x 20 cm (kayu kamper) m3 0.0198 9,964,000.00 197,287.20
3. kayu krepyak (kayu kamper) m3 0.0044 6,678,000.00 29,383.20
4. Grendel jendela uk.3 cm standart set 1.0000 91,160.00 91,160.00
5. Engsel daun jendela ukuran 3 standart set 2.0000 42,400.00 84,800.00
6. Hak angin samping set 1.0000 29,680.00 29,680.00
7. Cat kayu coklat standart ls 1.0000 38,160.00 38,160.00
C. PERALATAN
1. Alat Bantu Ls 1.0000 1,500.00 1,500.00
2.
A. TENAGA
1. Pekerja OH 0.3500 102,960.00
2. Tukang kayu OH 1.0500 109,920.00
3. Mandor OH 0.0180 118,880.00
4.
B. BAHAN
1. Balok 5x10 (kayu kamper) m3 0.0330 6,042,000.00
2. Reng 2 x 3 cm (kayu kamper)-4m m1 9.5700 68,900.00
3. Triplek 3 mm m3 3.6960 71,020.00
4. Handle pintu standart set 1.0000 93,280.00
5. Selinder anak kunci standart set 1.0000 103,880.00
6. Grendel pintu 6 cm standart set 1.0000 91,160.00
7. Engsel daun pintu ukuran 4 standart set 1.0000 47,700.00
8. cat kayu coklat standar ls 1.0000 38,160.00
9. seng 0,25 m2 1.8480 16,960.00
C. PERALATAN
1. Alat Bantu Ls 1.0000 1,500.00
2.
JUMLAH HARGA
(Rp)
36,036.00
115,416.00
2,139.84
199,386.00
659,373.00
262,489.92
93,280.00
103,880.00
91,160.00
47,700.00
38,160.00
31,342.08
1,500.00
1,681,862.84
168,186.28
1,850,049.12
1,850,000.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
A. TENAGA
1. Pekerja OH 0.7000 102,960.00
2. Tukang kayu OH 2.1000 109,920.00
3. Mandor OH 0.0360 118,880.00
4.
B. BAHAN
1. Balok 5x10 (kayu kamper) m3 0.0396 6,042,000.00
2. Papan rangka daun 3 x 20 cm (kayu kamper) m3 0.0700 9,964,000.00
3. kayu krepyak (kayu kamper) m3 0.0305 6,678,000.00
4. Handle pintu standart set 1.0000 93,280.00
5. Selinder anak kunci standart set 1.0000 103,880.00
6. Grendel pintu 6 cm standart set 1.0000 91,160.00
7. Engsel daun pintu ukuran 4 standart set 2.0000 47,700.00
8. cat kayu coklat standar ls 1.0000 38,160.00
9.
C. PERALATAN
1. Alat Bantu Ls 1.0000 1,500.00
2.
JUMLAH HARGA
(Rp)
72,072.00
230,832.00
4,279.68
239,263.20
697,480.00
203,679.00
93,280.00
103,880.00
91,160.00
95,400.00
38,160.00
1,500.00
1,870,985.88
187,098.59
2,058,084.47
2,058,000.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
A. TENAGA
1. Pekerja OH 1.0000 102,960.00
2.
3.
4.
B. BAHAN
1. Logo kota tangsel 50x50 cm set 1.0000 850,000.00
2. Huruf timbul h = 15 cm Hrf 14.0000 25,000.00
" BALAI WARGA RW --"
C. PERALATAN
1. Alat Bantu Ls 1.0000 1,500.00
2.
h= 15 cm (stainless steel)
JUMLAH HARGA
(Rp)
102,960.00
850,000.00
350,000.00
1,500.00
1,304,460.00
130,446.00
1,434,906.00
1,434,900.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
A. TENAGA
1. Pekerja OH 1.1000 102,960.00
2. Tukang Batu OH 0.3000 109,920.00
3. Mandor OH 0.1600 118,880.00
4.
B. BAHAN
1. Kloset duduk standart set 1.0000 1,855,000.00
2.
3.
4.
5.
6.
C. PERALATAN
1. Alat Bantu Ls 1.0000 1,500.00
2.
JUMLAH HARGA
(Rp)
113,256.00
32,976.00
19,020.80
1,855,000.00
1,500.00
2,021,752.80
202,175.28
2,223,928.08
2,223,900.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
A. TENAGA
1. Pekerja OH 0.7000 102,960.00
2. Mandor OH 0.0350 118,880.00
3.
4.
B. BAHAN
1. Keramik 20x25 cm Standar (tekstur) m2 1.0500 86,920.00
2. semen kg 9.3000 -
3. Pasir Pasang m3 0.0450 286,200.00
4.
5.
6.
C. PERALATAN
1. Alat Bantu Ls 1.0000 1,500.00
2.
JUMLAH HARGA
(Rp)
72,072.00
4,160.80
91,266.00
-
12,879.00
1,500.00
181,877.80
18,187.78
200,065.58
200,000.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
A. TENAGA
1. Pekerja OH 0.7000 102,960.00
2. Mandor OH 0.0350 118,880.00
3.
4.
B. BAHAN
1. Keramik 20x20 cm Standar(No tekstur) m2 1.0600 92,220.00
2. semen kg 10.4000 -
3. Pasir Pasang m3 0.0450 286,200.00
4.
5.
6.
C. PERALATAN
1. Alat Bantu Ls 1.0000 1,500.00
2.
h gading (tekstur)
JUMLAH HARGA
(Rp)
72,072.00
4,160.80
97,753.20
-
12,879.00
1,500.00
188,365.00
18,836.50
207,201.50
207,200.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PERKIRAAN
NO KETERANGAN SATUAN
KUANTITAS
A. TENAGA
1. Pekerja OH 0.7000
2. Mandor OH 0.0350
3.
4.
B. BAHAN
1. Keramik 40x40 cm Standar(No tekstur) m2 1.0400
2. semen kg 9.8000
3. Pasir Pasang m3 0.0450
4.
5.
6.
C. PERALATAN
1. Alat Bantu Ls 1.0000
2.
102,960.00 72,072.00
118,880.00 4,160.80
103,880.00 108,035.20
- -
286,200.00 12,879.00
1,500.00 1,500.00
198,647.00
19,864.70
218,511.70
218,500.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
A. TENAGA
1. Pekerja OH 0.1838 102,960.00
2. Tukang Batu OH 0.0525 109,920.00
3. Mandor OH 0.0026 118,880.00
4.
B. BAHAN
1. Semen/ mortar untuk plesteran dan acian kg 16.0000 -
2.
3.
4.
5.
6.
C. PERALATAN
1.
2.
jenis mortar)
JUMLAH HARGA
(Rp)
18,924.05
5,770.80
309.09
25,003.94
2,500.39
27,504.33
27,500.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
A. TENAGA
1. Pekerja OH 0.3000 102,960.00
2. Tukang Batu OH 0.1500 109,920.00
3. Mandor OH 0.0150 118,880.00
4.
B. BAHAN
1. Semen kg 4.4160 -
2. Pasir pasang m3 0.0270 286,200.00
3.
4.
5.
6.
C. PERALATAN
1. Alat Bantu Ls 1.0000 1,500.00
2.
cian 1: 5
JUMLAH HARGA
(Rp)
30,888.00
16,488.00
1,783.20
-
7,727.40
1,500.00
58,386.60
5,838.66
64,225.26
64,200.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
A. TENAGA
1. Pekerja OH 0.2100 102,960.00
2. Tukang Batu OH 0.0900 109,920.00
3. Mandor OH 0.0090 118,880.00
4.
B. BAHAN
1. Bata ringan setara Hebel m3 0.1010 663,560.00
2. Semen / mortar (PM-110) kg 4.6120 -
3.
4.
5.
6.
C. PERALATAN
1. Alat Bantu Ls 1.0000 1,500.00
2.
m (setara hebel)
JUMLAH HARGA
(Rp)
21,621.60
9,892.80
1,069.92
67,019.56
-
1,500.00
101,103.88
10,110.39
111,214.27
111,200.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
A. TENAGA
1. Pekerja OH 0.3000 102,960.00
2. Tukang Batu OH 0.1000 109,920.00
3. Mandor OH 0.0150 118,880.00
4.
B. BAHAN
1. Bata Merah standart (5x11x22cm) bh 70.0000 508.80
2. Semen kg 9.6800 -
3. Pasir pasang m3 0.0450 286,200.00
4.
5.
6.
C. PERALATAN
1. Alat Bantu Ls 1.0000 1,500.00
2.
JUMLAH HARGA
(Rp)
30,888.00
10,992.00
1,783.20
35,616.00
-
12,879.00
1,500.00
93,658.20
9,365.82
103,024.02
103,000.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PERKIRAAN
NO KETERANGAN SATUAN
KUANTITAS
A. TENAGA
1. Tukang Besi OH 1.4000
2.
3.
4.
B. BAHAN
1. Pekerjaan Beton Site Mix Camp. 1:2:3 Tanpa Pompa m2 1.1000
2. Besi Tulangan polos kg 105.0000
3. Kawat bendrat kg 3.0000
4. Kayu Kelas III (kayu lokal) 2 x pakai m3 0.2500
5. Paku 5 cm -12 cm kg 3.0000
6. Minyak Bekisting liter 1.2000
7. Balok kayu kelas II (borneo) 2 x pakai m3 0.1050
8. Plywood tebal 12 mm -2x pakai lbr 2.5000
9. Dolken Kayu Galam Dia(8-10) cm panjang 4 m btg 14.0000
9.
C. PERALATAN
1. Alat Bantu Ls 1.0000
2.
109,920.00 153,888.00
629,800.00 692,780.00
7,950.00 834,750.00
11,872.00 35,616.00
2,862,000.00 715,500.00
13,250.00 39,750.00
5,830.00 6,996.00
3,710,000.00 389,550.00
91,160.00 227,900.00
26,500.00 371,000.00
1,500.00 1,500.00
3,469,230.00
346,923.00
3,816,153.00
3,816,100.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PERKIRAAN
NO KETERANGAN SATUAN
KUANTITAS
A. TENAGA
1. Tukang Besi OH 2.1000
2.
3.
4.
B. BAHAN
1. Pekerjaan Beton Site Mix Camp. 1:2:3 Tanpa Pompa m2 1.1000
2. Besi Tulangan polos kg 136.5000
3. Kawat bendrat kg 4.5000
4. Kayu Kelas III (kayu lokal) 2 x pakai m3 0.4000
5. Paku 5 cm -12 cm kg 4.0000
6. Minyak Bekisting liter 2.0000
7. Plywood tebal 12 mm -2x pakai lbr 3.5000
8. Dolken Kayu Galam Dia(8-10) cm panjang 4 m btg 20.0000
9.
C. PERALATAN
1. Alat Bantu Ls 1.0000
2.
109,920.00 230,832.00
629,800.00 692,780.00
7,950.00 1,085,175.00
11,872.00 53,424.00
2,862,000.00 1,144,800.00
13,250.00 53,000.00
5,830.00 11,660.00
91,160.00 319,060.00
26,500.00 530,000.00
1,500.00 1,500.00
4,122,231.00
412,223.10
4,534,454.10
4,534,400.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PERKIRAAN
NO KETERANGAN SATUAN
KUANTITAS
A. TENAGA
1. Tukang Besi OH 1.4000
2.
3.
4.
B. BAHAN
1. Pekerjaan Beton Site Mix Camp. 1:2:3 Tanpa Pompa m2 1.1000
2. Besi Tulangan polos kg 294.0000
3. Kawat bendrat kg 4.5000
4. Kayu Kelas III (kayu lokal) 2 x pakai m3 0.4000
5. Paku 5 cm -12 cm kg 4.0000
6. Minyak Bekisting liter 2.0000
7. Plywood tebal 12 mm -2x pakai lbr 3.5000
8. Dolken Kayu Galam Dia(8-10) cm panjang 4 m btg 20.0000
9.
C. PERALATAN
1. Alat Bantu Ls 1.0000
2.
109,920.00 153,888.00
629,800.00 692,780.00
7,950.00 2,337,300.00
11,872.00 53,424.00
2,862,000.00 1,144,800.00
13,250.00 53,000.00
5,830.00 11,660.00
91,160.00 319,060.00
26,500.00 530,000.00
1,500.00 1,500.00
5,297,412.00
529,741.20
5,827,153.20
5,827,100.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PERKIRAAN
NO KETERANGAN SATUAN
KUANTITAS
A. TENAGA
1. Tukang Besi OH 2.1000
2.
3.
4.
B. BAHAN
1. Pekerjaan Beton Site Mix Camp. 1:2:3 Tanpa Pompa m2 1.1000
2. Besi Tulangan polos kg 294.0000
3. Kawat bendrat kg 3.0000
4. Kayu Kelas III (kayu lokal) 2 x pakai m3 0.3200
5. Paku 5 cm -12 cm kg 3.2000
6. Minyak Bekisting liter 1.6000
7. Plywood tebal 12 mm -2x pakai lbr 2.8000
8. Dolken Kayu Galam Dia(8-10) cm panjang 4 m btg 16.0000
9.
C. PERALATAN
1. Alat Bantu Ls 1.0000
2.
109,920.00 230,832.00
629,800.00 692,780.00
7,950.00 2,337,300.00
11,872.00 35,616.00
2,862,000.00 915,840.00
13,250.00 42,400.00
5,830.00 9,328.00
91,160.00 255,248.00
26,500.00 424,000.00
1,500.00 1,500.00
4,944,844.00
494,484.40
5,439,328.40
5,439,300.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PERKIRAAN
NO KETERANGAN SATUAN
KUANTITAS
A. TENAGA
1. Tukang Besi OH 2.1000
2.
3.
4.
B. BAHAN
1. Pekerjaan Beton Site Mix Camp. 1:2:3 Tanpa Pompa m2 1.1000
2. Besi Tulangan polos kg 294.0000
3. Kawat bendrat kg 4.5000
4. Kayu Kelas III (kayu lokal) 2 x pakai m3 0.4000
5. Paku 5 cm -12 cm kg 4.0000
6. Minyak Bekisting liter 2.0000
7. Plywood tebal 12 mm -2x pakai lbr 3.5000
8. Dolken Kayu Galam Dia(8-10) cm panjang 4 m btg 20.0000
9.
C. PERALATAN
1. Alat Bantu Ls 1.0000
2.
109,920.00 230,832.00
629,800.00 692,780.00
7,950.00 2,337,300.00
11,872.00 53,424.00
2,862,000.00 1,144,800.00
13,250.00 53,000.00
5,830.00 11,660.00
91,160.00 319,060.00
26,500.00 530,000.00
1,500.00 1,500.00
5,374,356.00
537,435.60
5,911,791.60
5,911,700.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PERKIRAAN
NO KETERANGAN SATUAN
KUANTITAS
A. TENAGA
1. Tukang Besi OH 1.4000
2.
3.
4.
B. BAHAN
1. Pekerjaan Beton Site Mix Camp. 1:2:3 Tanpa Pompa m2 1.1000
2. Besi Tulangan polos kg 220.5000
3. Kawat bendrat kg 3.0000
4. Kayu Kelas III (kayu lokal) 2 x pakai m3 0.3200
5. Paku 5 cm -12 cm kg 3.2000
6. Minyak Bekisting liter 1.6000
7. Plywood tebal 12 mm -2x pakai lbr 2.8000
8. Dolken Kayu Galam Dia(8-10) cm panjang 4 m btg 16.0000
9.
C. PERALATAN
1. Alat Bantu Ls 1.0000
2.
109,920.00 153,888.00
629,800.00 692,780.00
7,950.00 1,752,975.00
11,872.00 35,616.00
2,862,000.00 915,840.00
13,250.00 42,400.00
5,830.00 9,328.00
91,160.00 255,248.00
26,500.00 424,000.00
1,500.00 1,500.00
4,283,575.00
428,357.50
4,711,932.50
4,711,900.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
A. TENAGA
1. Pekerja OH 1.6050 102,960.00
2. Tukang Batu OH 0.2050 109,920.00
3. Mandor OH 0.0780 118,880.00
4.
B. BAHAN
1. Semen kg 230.0000 -
2. Pasir pasang m3 0.5200 286,200.00
3. Kerikil 1-5 m3 0.7800 215,731.20
4. Air ltr 215.0000 265.00
5.
6.
C. PERALATAN
1. Alat Bantu Ls 1.0000 1,500.00
2.
Tanpa Pompa
JUMLAH HARGA
(Rp)
165,250.80
22,533.60
9,272.64
-
148,824.00
168,270.34
56,975.00
1,500.00
572,626.38
57,262.64
629,889.01
629,800.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
A. TENAGA
1. Pekerja OH 1.2000 102,960.00
2. Tukang Batu OH 0.2000 109,920.00
3. Mandor OH 0.0600 118,880.00
4.
B. BAHAN
1. Semen kg 230.0000 -
2. Pasir pasang m3 0.6379 286,200.00
3. Kerikil 1-5 m3 0.7607 215,731.20
4. Air ltr 200.0000 265.00
5.
6.
C. PERALATAN
1. Alat Bantu Ls 1.0000 1,500.00
2.
JUMLAH HARGA
(Rp)
123,552.00
21,984.00
7,132.80
-
182,566.98
164,106.72
53,000.00
1,500.00
553,842.50
55,384.25
609,226.75
609,200.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
A. TENAGA
1. Pekerja OH 0.1920 102,960.00 19,768.32
2. Mandor OH 0.0190 118,880.00 2,258.72
3.
4.
B. BAHAN
1.
2.
3.
4.
5.
6.
C. PERALATAN
1. Alat Bantu Ls 1.0000 1,500.00 1,500.00
2.
A. TENAGA
1. Pekerja OH 0.3000 102,960.00 30,888.00
2. Mandor OH 0.0100 118,880.00 1,188.80
3.
4.
B. BAHAN
1. Pasir Urug m3 1.2000 275,600.00 330,720.00
2.
3.
4.
5.
6.
C. PERALATAN
1. Alat Bantu Ls 1.0000 1,500.00 1,500.00
2.
A. TENAGA
1. Pekerja OH 0.9000 102,960.00 92,664.00
2. Mandor OH 0.0450 118,880.00 5,349.60
3.
4.
B. BAHAN
1.
2.
3.
4.
5.
6.
C. PERALATAN
1. Alat Bantu Ls 1.0000 1,500.00 1,500.00
2.
A. TENAGA
1. Pekerja OH 0.4000 102,960.00 41,184.00
2. Mandor OH 0.0400 118,880.00 4,755.20
3.
4.
B. BAHAN
1.
2.
3.
4.
5.
6.
C. PERALATAN
1. Alat Bantu Ls 1.0000 1,500.00 1,500.00
2.
A. TENAGA
1. Pekerja OH 0.5000 102,960.00
2. Tukang Kayu OH 0.2500 109,920.00
3. Mandor OH 0.0050 118,880.00
4.
B. BAHAN
1. Multiplek (uk. 122 x 244 cm) 6 mm Lbr 0.1995 139,213.33
2. Digital printing 60 x 90 cm Lbr 0.5400 26,500.00
3. Kayu kaso 5/7 (meranti) m3 0.0228 3,604,000.00
4. Paku Segala Ukuran kg 0.1000 15,052.00
5.
6.
C. PERALATAN
1. Alat Bantu Ls 1.0000 1,500.00
2.
JUMLAH HARGA
(Rp)
51,480.00
27,480.00
594.40
27,773.06
14,310.00
82,171.20
1,505.20
1,500.00
206,813.86
20,681.39
227,495.25
227,400.00
FORMULIR STANDAR
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
A. TENAGA
1. Pekerja OH 0.1000 102,960.00
2. Tukang Kayu OH 0.1000 109,920.00
3. Mandor OH 0.0050 118,880.00
4.
B. BAHAN
1. Kayu Kaso 5/7 (Meranti) m3 0.0120 3,604,000.00
2. Paku biasa 2"-5" kg 0.0200 13,250.00
3. Kayu papan 3/20 borneo m3 0.0070 3,816,000.00
4.
5.
6.
C. PERALATAN
1. Alat Bantu Ls 1.0000 1,500.00
2.
emasangan Bowplang
JUMLAH HARGA
(Rp)
10,296.00
10,992.00
594.40
43,248.00
265.00
26,712.00
1,500.00
93,607.40
9,360.74
102,968.14
102,900.00
DAFTAR HARGA SATUAN UPAH
1. Pekerja OH 102,960.00
2. Pembantu Instalator OH 102,960.00
3. Instalator OH 109,920.00
4. Tukang OH 109,920.00
5. Tukang Kayu OH 109,920.00
6. Tukang Batu OH 109,920.00
7. Tukang Gali OH 109,920.00
8. Mandor OH 118,880.00
9. Tukang besi OH 109,920.00
10. Tukang Listrik OH 109,920.00
DAFTAR HARGA SATUAN BAHAN