Você está na página 1de 24

ANALYSIS OF RATE FOR EXPANSION JOINT (28 RFT).

1. Angle iron size 6”x6”x5/8”.


2x28x24.17x0.4536 = 613.96 Kg
@ Rs. 50/- P.Kg = Rs. 30698/-
2. M.S steel plate.
1.5” thick.
2x28x0.5x61.2x0.4536 = 777.29 Kg
@ Rs. 90/- P.Kg = Rs. 69956/-
0.5” thick
2x28x4.5/12 x20.4x0.4536 = 194.32 Kg
@ Rs. 40/- P.Kg = Rs. 7773/-
3. 2” outer dia stainless steel nut sleeve 1’ c/c welded to anchor.
2x28 = 56 Nos.
@ Rs. 200/-Each = Rs. 11200/-
4. Nut bolts 1” dia 4” long.
2x28 = 56 Nos.
@ Rs. 50/- Each = Rs. 2800/-
5. ½” dia anchor bars at 1’ c/c welded to anchor plate.
2x28x3x0.668x0.4536 = 50.90 Kg
@ Rs. 5161.30 %Kg = Rs. 2627/-
6. S/F elastoramic neoprene pad sheet.
2x28x5”x0.5” = 140 Cu. Inch
2x28x(1.875” + 1”)x3.142 = 45.45 Cu. Inch
2x4 Total = 185.45 Cu. Inch
@ Rs. 16.25 P.Cu.inch = Rs. 3014/-
7. Welding of sleeve anchor bars rib complete job.
2x28 = 1 Job
@ Rs.2500/- P,Job = Rs. 2500/-
8. Drilling hole of M.S steel plate.
3” dia = 1.5” thick
2x28 = 56 Nos.
@ Rs. 400/- Each = Rs. 22400/-
1.25” dia = 0.5” thick
2x2x28 = 112 Nos.
@ Rs. 200/- Each = Rs. 22400/-
Total = Rs. 175368/-
Add 25% contractor profit & overhead charges except item No. 5,7,8 = Rs. 31360/-
Total = Rs. 206728/-
Rate Per Rft = 206728/28 = Rs. 7383.14

Say = Rs. 7383/- P.Rft

Sub Divisional Officer,


Provincial R.C Sub Division,
Gujrat.
1 /conversion/tmp/scratch/421271195.doc
2 /conversion/tmp/scratch/421271195.doc
3 /conversion/tmp/scratch/421271195.doc
ANALYSIS OF RATE FOR CONSTRUCTION OF P.C.C CHUTES.

1- Excavation for structure.


1x45x6x1 = 270 Cft @ Rs. 4413.10 %0 Cft = Rs. 1192/-

2- P.C.C (1:4:8) in foundation.


1x45x6x1/2 = 135 Cft @ Rs. 11622.02 % Cft = Rs.15690/-

3- PCC 1:2:4 plain as per design section.


1x45x6x1/3 = 90 Cft @ Rs. 23414.70 % Cft = Rs.21073/-

4- Cement plaster ½” thick in 1:3.


1x45x6 = 270 Sft @ Rs. 1642.97 % Sft = Rs.4436/-
Total =Rs42391/-

Say =Rs.42400/-

Sub Divisional Officer,


Provincial Highway Sub Division,
Gujrat

4 /conversion/tmp/scratch/421271195.doc
ANALYSIS OF RATE FOR STEEL HAND RAILING AS PER DRAWING I/C PAINTING WITH
ALUMINIUM QUANTITY OF ONE SIDE.

1- Excavation for structure.


1x45x6x1 = 270 Cft @ Rs. 1592.25 %0 Cft = Rs. 429.90

2- P.C.C (1:4:8) in foundation.


1x45x6x1/2 = 135 Cft @ Rs. 5732.19 % Cft = Rs.7738.43

3- PCC 1:2:4 plain as per design section.


1x45x6x1/3 = 90 Cft @ Rs. 10330.38 % Cft = Rs.9297.34

4- Cement plaster ½” thick in 1:2.


1x45x6 = 270 Sft @ Rs. 773.37 % Sft = Rs.2088.09
Total =Rs19553.78

Say =Rs. 19554/-

Sub Divisional Officer,


Provincial R.C Sub Division,
Gujrat

5 /conversion/tmp/scratch/421271195.doc
ANALYSIS OF RATE FOR PIPE RAILING AS PER DRAWING ON BRIDGES.

UNIT = 16.25 Rft

1- Iron post size 4”x4”x3/8”.


4x4.33 = 17.32 Rft
17.32x7.93x0.4536 = 62.30 Kg @ Rs. 35/- P.Kg = Rs. 2181/-

2- P/L G.I pipe 3” heavy quality.


3x16.25 = 48.75 Rft
2x2.67 = 5.34 Rft
Total = 54.09 Rft @ Rs. 250/- P.Rft = Rs. 13523/-

3- T 3” dia. = 2 Nos. @ Rs. 75/- Each = Rs. 150/-

4. Elbow 3” dia. = 4 Nos. @ Rs. 75/- Each = Rs. 300/-

5. Anchor bore ½” dia.


4x0.75x0.668x0.4536 = 0.91 Kg @ Rs. 5181.55 %Kg = Rs. 47/-

6. 3 No. holes from 4 No. angle irons 3” dia pipe.


3x4 = 12 Rft @ Rs. 200/- P.Rft = Rs. 2400/-

7. Welding of anchor bar and other. = 1 Job. @ Rs. 500/- P.Job = Rs. 500/-

8. Painting black and yellow 3 coats.


16.25x3.5 = 56.88 Sft @ Rs. 967.30 %Sft = Rs. 550/-

Total = Rs.19651/-
Add 25% overhead/contractor profit on all items except item No. 5-8. = Rs. 4039/-
Total = Rs. 23690/-

Rate P.Rft = 23690/16.25 = Rs1457.84

Say =Rs. 1458/-

Sub Divisional Officer,


Provincial R.C Sub Division,
Gujrat

6 /conversion/tmp/scratch/421271195.doc
ANALYSIS OF RATE FOR STEEL RAILING AS PER DRAWING ON BRIDGES.
UNIT = 160 Rft
A. Material.
1- Iron post size 3”x3”x1/4”.
2x24x4-2” = 199.68 Rft
199.68x4.89x0.4536 = 472.91 Kg @ Rs. 35/- P.Kg = Rs. 15502/-

2- Channel size 5”x2 ½”x1/4”. = 160 Rft


160x10.22x0.4536 = 741.722 Kg@ Rs. 43/- P.Kg = Rs. 31894/-

3- Flat plate 4 ½”x3/8”. = 160 Rft


160x4 ½”x3/8” = 1.875 Cft
1.875x222.26 = 416.73 Kg @ Rs. 38/- P.Kg = Rs. 15836/-

4. Square bar ¾”x3/4”.


21x23x2-9” = 1328.25 Rft
1.912x1328.25x0.4536 = 1151.96 Kg @ Rs. 43/- P.Kg = Rs. 49534/-

5. Flat iron 2 ½”x1/2”. = 154.5 Rft


2 ½”x1/2”x154.5 = 1.342 Cft
1.342x222.26 = 298.27 Kg @ Rs. 38/- P.Kg = Rs. 11334/-

6. Flat base plate 5”x5”x1/2”. = 24 Nos.


24x5”x5”x1/2” = 0.174 Cft
0.174x222.26 = 38.67 Kg @ Rs. 397.50 P.Kg = Rs. 1450/-

7. Welding charges. = 160 Rft @ Rs. 50/- P.Rft = Rs. 8000/-

8. Carriage of material to site of work.= 1 Job @ Rs. 500/- P.Job = Rs. 500/-

9. Generator charges. = 1 Job @ Rs. 1000/- P.Job = Rs. 1000/-

Total =Rs135050/-

Add 25% overhead/contractor profit on item No. 1 to 6. = Rs. 31388/-


Total =Rs 166438/-

Rate P.Rft = 166438/160 =Rs. 1040.24

Say =Rs. 1040/-

Sub Divisional Officer,


Provincial R.C Sub Division,
Gujrat

7 /conversion/tmp/scratch/421271195.doc
ANALYSIS OF RATE FOR 3” DIA G.I PIPE RAILING FIXED ON R.C.C BARRIER
COMPRISING OF BASE PLATE WITH U-SHAPED STEEL BARS #6 WITH 4”X8”&3/8”
THICK BASE PLATE AND VERTICLE SUPPORT @ 8’ C/C OF MS PLATE ¾” THICK 12”
HEIGHT FOR FIXING G.I PIPE 3” AND AS APPROVED BY THE ENGINEER INCHARGE.

Take 100Rft for Analysis purpose.


UNIT = P.RFT
A- Material.
M.S Deformed Bars (grade 40).
1- Lugs ¾” dia @ 5’ c/c.
4x19x1.25 = 95 Rft
(100/5.5+1)
@ 1.504Lbs/Rftx0.4536 = 64.81 Kg
@ Rs. 5181.55%Kg = Rs. 3358/-
2- M.S flat / plate (3/4” thick) @ 5-5’ c/c.
Vertical.
(0.479+0.667)x0.76x0.062 = 0.026 Cft
2
Top
Area of top portion.
22 x(0.479+0.479)x0.062 = 0.005 Cft
7x4 2
Base Plate
0.33x0.67x0.0625 = 0.0138 Cft
(3/48)
Total = 0.0453 Cft
19x0.0453 = 0.86 Cft
@ 490.00Lbs/Cftx0.4536 = 191.30 Kg
@ Rs. 4600/- %Kg = Rs. 8800/-
(Heavy steel work rate (web rate)
P/F G.I pipe 3” dia medium quality for railing.
1x100 = 100 Rft @ Rs. 250/-P.Rft = Rs. 25000/-
B. Labour.
Labour for cutting circular hole 3” dia i/c cost of filling
& Grinding etc.
1x19 = 19 Nos. @ Rs. 50/- Each = Rs. 950/-

Extra cost for welding MS plate with ¾” dia MS bar


Lugs and fixing base plate in position.
1x19 = 19 Nos. @ Rs. 200/- Each = Rs. 3800/-
Total = Rs. 41908/-
Add 25% contractor profit except item No. 1. = Rs. 9638/-
Total = Rs. 51546/-
Rate for Per Rft 51533/100 = Rs.515.46
Say = Rs. 515/-

Sub Divisional Officer,


8 /conversion/tmp/scratch/421271195.doc Provincial R.C Sub Division,
Gujrat
UNIT RATE ANALYSIS FOR ELECTRICAL WORKS (PROVIDING AND FIXING OF
DOUBLE ARM STREET LIGHT POLE COMPLETE IN ALL RESPECT).

Sr. Description Unit Qty. Rate Amount


No.
1 2 3 4 5 6
Part “A”
1 P/F double arm tubular pole (base plate to Each 1 13155/- 13155/-
top post light) 10.64 meter hot dip
galvanized and welded with base plate and
stiffener as per drawing with window and
locking arrangement.
2 P.F 250watt sodium light complete with Each 2 15000/- 30000/-
chowk i/c light holder shade and glass
fitting (Philips) complete in all respect.

3 P/F circuit breaker (big size) Each 2 650/- 1300/-

4 P/L 2 core 2.5 MM2 P.V.C insulated P. 26 30/- 780/-


sheathed cable (Newage Pakistan pioneer Meter
cable in pole)

5 Footing plate in pole foundation with J-bolt Each 1 No. 1490/- 1490/-
and nuts i/c ring of steel bat and PVC pipe
6 Rft.

6 Earthing of pole. No 1 No 1639.85 1639.85

7 S/E 4 core 10MM2 (Extra) in crossing P. 6.10 688.30 4198/-


(Armoured cable) Meter

8 P/F main switch i/c box. Each 1 No 349.36 349.36

9 S/E of 4 cores 10MM2 P.V.C insulated Each 48 688.30 33038/-


P.V.C sheathed copper conductor 600-1000
graded cable (Newage Pakistan Pioneer
cable) armoured Cable.
Total Part “A” 85950/-
Part “B”
1 Road lightening control penal. Each 2 No 9070/- 18140/-
Total Part “B” 18140/-
18140/82 221/-
Total of Part “A” and “B” 85950 + 221 86171/-
1 No. of electric pole complete. 86200/-

Executive Engineer,
Sub Divisional Officer,
Provincial Highway Division,
Provincial R.C Sub Division,
Gujrat.
Gujrat

9 /conversion/tmp/scratch/421271195.doc
UNIT RATE ANALYSIS FOR ELECTRICAL WORKS (PROVIDING AND FIXING OF
SINGLE ARM STREET LIGHT POLE COMPLETE IN ALL RESPECT.

Sr. Description Unit Qty. Rate Amount


No.
1 2 3 4 5 6
Part “A”
1 P/F single arm tubular pole (base plate to Each 1 12494/- 12494/-
top post light) 10.64 meter hot dip
galvanized and welded with base plate and
stiffener as per drawing with window and
locking arrangement.
2 P.F 250watt sodium light complete with Each 1 15000/- 15000/-
chowk i/c light holder shade and glass
fitting (Philips) complete in all respect.

3 P/F circuit breaker (big size) Each 2 650/- 1300/-

4 P/L 2 core 2.5 MM2 P.V.C insulated P. 26 30/- 780/-


sheathed cable (Newage Pakistan pioneer Meter
cable in pole)

5 Footing plate in pole foundation with J-bolt Each 1 No. 1490/- 1490/-
and nuts i/c ring of steel bat and PVC pipe
6 Rft.

6 Earthing of pole. No 1 No 1639.85 1639.85

7 S/E 4 core 10MM2 (Extra) in crossing P. 6.10 688.30 4198/-


(Armoured cable) Meter

8 P/F main switch i/c box. Each 1 No 349.36 349.36

9 S/E of 4 cores 10MM2 P.V.C insulated Each 48 688.30 33038/-


P.V.C sheathed copper conductor 600-1000
graded cable (Newage Pakistan Pioneer
cable) armoured Cable.
Total Part “A” 70289/-
Part “B”
1 Road lightening control penal. Each 2 No 9070/- 18140/-
Total Part “B” 18140/-
18140/42 432/-
Total of Part “A” and “B” 59089 + 432 70721/-
1 No. of electric pole complete. 70700/-

Executive Engineer,
Sub Divisional Officer,
Provincial Highway Division,
Provincial R.C Sub Division,
Gujrat.
Gujrat
10 /conversion/tmp/scratch/421271195.doc
RATE ANALYSIS FOR ELECTRICAL WORKS.

Unit = P.No

Luminaire complete fitting 250watt high pressure


sodium vapour tamp, glass refractor, aluminum
reflector, ballast p.f. correction capacitor etc.

A. Material.

Luminaire complete fitting 250watt high pressure


sodium vapour tamp, glass refractor, aluminum
reflector, ballast p.f. correction capacitor etc. = Rs. 11500/-

B. Labour.

Carriage to site and unloading etc. = Rs. 100/-

Installation including end connections, sunrise,


Testing and commissioning. = Rs. 400/-
Total = Rs. 12000/-
Contractors profit and over head charges @ 25%. = Rs. 3000/-
Total = Rs. 15000/-

Sub Divisional Officer,


Provincial R.C Sub Division,
Gujrat

11 /conversion/tmp/scratch/421271195.doc
ANALYSIS OF RATE FOR TUBELAR POLE UNIT OF UNIT PER NUMBER.

1. M.S pipe 5 mm thick 5” dia 3.89 Meter @Rs: 1031.25 P-M Rs: 4012/-
Overlap =3” =0.25/3.28 0.076m @Rs: 1031.35 P-M Rs: 78/-
2. M.S pipe 5 mm thick 4” dia 2.439 Meter@Rs: 846.90 P-M Rs: 2066/-
Overlap =2x3” =0.5/3.28 0.152 M @Rs: 846.90 P-M Rs: 129/-
3. M.S pipe 3 mm thick 3” dia 1.829 Meter@Rs: 461.85 P-M Rs: 845/-
Overlap =2x3” =0.25/3.28 0.152 M @Rs: 461.85 P-M Rs: 70/-
4. M.S pipe 3 mm thick 2” dia 2.14 Meter @Rs: 308.95 P-M Rs: 661/-
Overlap =2x3” =0.25/3.28 0.076 M @Rs: 308.95 P-M Rs: 23/-
5. Hot dip galvanizing L-S @Rs: 3000 P-No Rs: 3000/-
6. Base Plate 3/4” thick 1x1 1 Sft @24Lbs P-Sft
24 Lbs / 10.88 Kg 10.88 @Rs: 5171.75% Kg Rs: 563/-
2.204

7. Stiffener 3/4" thick 4x1/2x6”x9”= 0.75 Sft @ 24 LbsP-Sft


18.Lbs / 8.16 Kg @ Rs: 5171.75%Kg Rs: 422/-
2.204

8. Welding of pole with


Base plate and stiffener L.S @ Rs: 350 Rs: 350/-

9. Providing window with


Locking arrangement L.S @Rs: 275 Rs: 275/-

Total Rs: 12494/-

Sub Divisional Officer


Provincial R.C Sub Division
Gujrat.

12 /conversion/tmp/scratch/421271195.doc
ANALYSIS OF RATE FOR FOUNDATION OF POLE UNIT P.NO.

1. Footing plate ½” thick 12”x12”. = 0.0417 Cft


0.0417Cftx224 = 9.341 Kg @Rs: 5171.75 %Kg Rs: 483/-

2. Welding of plate with bolts. = L.S @Rs: 300/- Rs: 300/-

3. J. Bolt 3/4” dia 4x2 = 8 Rft 1.503Lbs/P.Rft


12.024Lbs/5.45 Kg = 5.45 Kg @Rs: 4765.35 %Kg Rs: 259/-

4. Cost of nuts 4x2 = 8 Nos. @Rs: 30/-Uint Each Rs: 240/-

5. P/ laying P.V.C pipe 1 ½” dia

2x3 = 6 Rft @Rs: 34.6 P.Rft Rs: 208/-


Total Rs: 1490/-

Sub Divisional Officer


Provincial R.C Sub Division
Gujrat.

13 /conversion/tmp/scratch/421271195.doc
ANALYSIS OF RATE FOR TUBELAR POLE UNIT OF UNIT PER NUMBER.

1. M.S pipe 5 mm thick 5” dia 3.89 Meter @Rs: 1031.25 P-M Rs: 4012/-
Overlap =3” =0.25/3.28 0.076m @Rs: 1031.35 P-M Rs: 78/-

2. M.S pipe 5 mm thick 4” dia 2.439 Meter@Rs: 846.90 P-M Rs: 2066/-
Overlap =2x3” =0.5/3.28 0.152 M @Rs: 846.90 P-M Rs: 129/-
3. M.S pipe 3 mm thick 3” dia 1.829 Meter@Rs: 461.85 P-M Rs: 845/-
Overlap =2x3” =0.25/3.28 0.152 M @Rs: 461.85 P-M Rs: 70/-
4. M.S pipe 3 mm thick 2” dia 4.28Meter @Rs: 308.95 P-M Rs: 1322/-
Overlap =2x3” =0.25/3.28 0.076 M @Rs: 308.95 P-M Rs: 23/-

5. Hot dip galvanizing L-S @Rs: 3000 P-No Rs: 3000/-

6. Base Plate 3/4” thick 1x1 1 Sft @24Lbs P-Sft

24 Lbs / 10.88 Kg 10.88 @Rs: 5171.75% Kg Rs: 563/-


2.204

7. Stiffener 3/4" thick 4x1/2x6”x9”= 0.75 Sft @ 24 LbsP-Sft


18.Lbs / 8.16 Kg @ Rs: 5171.75%Kg Rs: 422/-
2.204
8. Welding of pole with
Base plate and stiffener L.S @ Rs: 350 Rs: 350/-

9. Providing window with


Locking arrangement L.S @Rs: 275 Rs: 275/-

Total Rs: 13155/-

Sub Divisional Officer


Provincial R.C Sub Division
Gujrat.

14 /conversion/tmp/scratch/421271195.doc
ANALYSIS OF RATE FOR CONSTRUCTION OF P.C.C CHUTES.

1- Excavation for structure.


1x41x6x1 = 246 Cft @ Rs. 1592.25 %0 Cft = Rs. 391.69

2- P.C.C (1:4:8) in foundation.


1x41x6x1/2 = 123 Cft @ Rs. 5732.19 % Cft = Rs.7050.59

3- PCC 1:2:4 plain as per design section.


1x41x6x1/3 = 82 Cft @ Rs. 10330.38 % Cft = Rs.8470.91

4- Cement plaster ½” thick in 1:2.


1x41x6 = 246 Sft @ Rs. 773.37 % Sft = Rs.1902.49
Total =Rs17815.68
Say =Rs. 17816/-

Sub Divisional Officer,


Provincial R.C Sub Division,
Gujrat

15 /conversion/tmp/scratch/421271195.doc
ANALYSIS OF RATE FOR LOAD TEST FOR BRIDGE PILE FOR 1000 TONS.

1). Excavation for structure.


2x30x6-6”x5 = 1950 Cft
2x8x7-6”x5 = 600 Cft
Total = 2550 Cft @ Rs. 1955.25 %0Cft = Rs. 4986/-

2). P.C.C 1:4:8 in foundation.


2x30x6-6”x1 = 390 Cft
2x8x7-6”x1 = 120 Cft
Total = 510 Cft @ Rs. 4774.55 %Cft = Rs. 24350/-

3). 1st class brickwork in 1:3 cement sand mortar.


i). Secondary beam.
2x30x5 ¼ x1/2 = 158 Cft
2x30x4-7/8x1/2 = 146 Cft
2x30x4 ½ x5 =1350Cft
ii). Main beam footing.
2x7 ½ x6 ¾ x1/2 = 51 Cft
2x7-1/8x6-3/8x1/2 = 45 Cft
2x6-3/4x6x2 = 162 Cft
Total =1912Cft @ Rs. 8131.71 %Cft = Rs. 155478/-

4). Providing / errection of girders.


i). Main Girder.

Size (30x2x1) = 2 Nos.


2 Nos. for 15 days @ Rs. 600/- P.day = Rs. 18000/-
ii). Secondary Girder.
Size (30x2x8/12) = 18 Nos.
For 15 days @ Rs. 400/- P.day = Rs. 108000/-

5). P/F shuttering plates.


30x30 = 900 Sft
15 days @ Rs. 15/- Sft/day = Rs. 202500/-

6). Providing /Filling shingle gravel 60 Kg/Cft P.bag).


1000x1000 = 1000000/60 = 16667 Cft @ Rs. 1609.20 %Cft = Rs. 268205/-

7). Cost of empty bags @ 1.5Cft per bag.= 11112 Nos. @ Rs. 15/- Each = Rs. 166680/-

8). Labor for filling bags.


11112/ bags
11112/60 = 185.20 Nos. @ Rs. 165/- P.day = Rs. 30558/-

16 /conversion/tmp/scratch/421271195.doc
9). P/F steel bars of ½” dia around the corner of plates
and around the bags.
180x20x0.668 = 2405 Lbs
76x36x0.668 = 1828 Lbs
Total = 4233 Lbs
4233x0.4536 = 1920 Kg @ Rs. 5181.55 %Kg = Rs. 99486/-

10). Crain charges 20 tons capacity. = 31.75 days


or 254 hours = 254 hours @ Rs. 806/- P.Hour = Rs. 204724/-

11). Jack, Micro gauge, magnet stand, pump / delivery pump. = Rs. 50000/-

12). Reference beam 30’. = 2 Nos.


15 days 2 Nos. @ Rs. 600/- P.day = Rs. 18000/-

Total = Rs1350964/-
Add 25% contractor profit/ over head charges on item No. 4,5,7,8,10,12. = Rs. 184616/-
Total =Rs1535580/-

Credit of Material.

1. Brickbats. = 1912 Cft @ Rs. 750/- %Cft = Rs. 14340/-

2. Steel. = 1920 Kg @ Rs. 25/- P.Kg = Rs. 48000/-

3. Gravel. = 16667 Cft @ Rs. 1609.20 %Cft = Rs. 268205/-

4. Empty bags. = 11112 Nos. @ Rs. 8/- Each = Rs. 88896/-


Total = Rs. 419441/-
(-) = 419441/-
Net = 1116139/-
Say = 1116000/-

Sub Divisional Officer, Executive Engineer,


Provincial R.C Sub Division, Provincial Highway Division,
Gujrat. Gujrat.

17 /conversion/tmp/scratch/421271195.doc
ANALYSIS OF SIDE DRAIN

1- Excavation for structure.


1x10x3 ½ x2 ½ = 88 Cft @ Rs. 3251 % 0Cft = Rs. 286/-

2- P.C.C (1:6:12) in foundation.


1x10x3 ½ x1/4 = 8.75 Cft @ Rs. 8479.35 % Cft = Rs. 742/-

3- 1st class brick work in foundation


plinth in 1:3 cement sand mortar.
2x10x3/4x2 = 30 Cft @ Rs. 17490.85 % Cft = Rs.5247/-

4- Cement plaster ½” thick in 1:3.


2x10x2 = 40 Sft @ Rs. 1379.70 % Sft = Rs. 552/-

5- P.C.C (1:2:4) plain.


Top 2x10x3/4x2/12 = 2.50 Cft
Bed 1x10x2x2 ½” = 4.16 Cft
Total = 6.66 Cft @ Rs. 19394.75% Cft = Rs. 1292/-
Total = Rs.8119/-

Rate P. Rft = 8119/10 = Rs. 811.90


Say = Rs. 812/-

Sub Divisional Officer,


Provincial Highway Sub Division No.II,
Gujrat

18 /conversion/tmp/scratch/421271195.doc
ANALYSIS OF RATE FOR CONSTRUCTION OF 2’ SPAN
R.C.C. SLAB CULVERT WITH 44’ ROADWAY.

1). Excavation for structure in all type of soil.


1x46x7.5x2 = 690 Cft
@ Rs.1905.75 %oCft = Rs. 1315/-
2). P.C.C. 1:6:12 in foundation
1 ½ “ to 2” gauge .
1x46x7.5x1 = 345 Cft
@ Rs. 4482.50 % Cft = Rs. 15465/-
3). Ist class brick work in 1:3 cement sand mortar
over the building upto 10’ height ( Page -58/4(i)
Abutment
2x44x2.25x1 = 198 Cft
2x44x 1’-10 ½”x1 = 165 Cft
2x44x 1.5x1 = 132 Cft
2x44x 0.75x 0.75 = 50 Cft
1x44x2x3/8 = 33 Cft
Total = 578 Cft
@ Rs. 8091.75 % Cft = Rs. 46770/-

4). Reinforcement Cement concrete 1:2:4 in slab Type-C

1x44x3 ½ x8” = 103 Cft


W/G 2x3 ½ x1x1 =7.00 Cft
Total = 110 Cft
@ Rs.147.25 P.Cft = Rs. 16198/-
6). Fabrication of mild steel bars for reinforcement
deformed bars .
110 x 5.36x0.4536 = 267 Kg
@ Rs.5161.30 %-Kg = Rs. 13781/-
Total = Rs. 93529/-
Say = Rs. 93529/-

Sub Divisional Officer

Provincial R.C Sub Division

Gujrat

19 /conversion/tmp/scratch/421271195.doc
ANALYSIS OF RATE FOR CONSTRUCTION OF 4’ SPAN
R.C.C. SLAB CULVERT WITH 44’ ROADWAY

1). Excavation for structure in all type of soil.


1x46x11x3’ = 1518 Cft
@ Rs.1905.75 %oCft = Rs. 2893/-
2). P.C.C. 1:6:12 in foundation
1 ½ “ to 2” gauge .
1x46x11x1 = 506 Cft
@ Rs.4482.50 % Cft = Rs. 22681/-
3). Ist class brick work in 1:3 cement sand mortar
over the building upto 10’ height ( Page -58/4(i)
Abutment
2x44x3x1 = 264 Cft
2x44x 2’-7 ½”x1 = 231 Cft
2x44x 2-3 x1 = 198 Cft
2x44x 1 -10 ½ x 1 = 165 Cft
1x44x1.520X1 = 132 Cft
Curtain wall
2x44x6”x9” = 33 Cft
Flooring
1x44x4x3/8 = 66 Cft
Total =1089Cft
@ Rs. 8091.75 % Cft = Rs. 88119/-

4). Reinforcement Cement concrete 1:2:4 in slab Type-C

Main 1x44x6x9” = 198 Cft


@ Rs.147.25 P.Cft = Rs. 29156/-
6). Fabrication of mild steel bars for reinforcement
deformed bars .
198 x 8.68x0.4536 = 780 Kg
@ Rs.5161.30 %-Kg = Rs. 40258/-
Total = Rs. 183107/-
Say = Rs. 183107/-

Sub Divisional Officer

Provincial R.C Sub Division


Gujrat

20 /conversion/tmp/scratch/421271195.doc
ANALYSIS OF RATE FOR CONSTRUCTION OF 10’ SPAN CULVERTS
HAVING 44’ CLEAR ROADWAY.
1). Excavation for structure in all type of soil.
1x50x18.50x3’-6” = 3238 Cft
Wing. 4x4x 6x4.50 = 432 Cft
Total = 3670 Cft
@ Rs.1905.75 %0Cft = Rs. 6994/-
2). P.C.C. 1:6:12 in foundation

1x50x18.50x1-6” = 1388 Cft


Wing wall 4x4x5x1-6” = 120 Cft
Total = 1508 Cft
@ Rs. 4482.50% Cft = Rs. 67596/-
3). Ist class brick work in 1:3 cement sand mortar
Over the building upto 10’ height (Page -58/4(i)
Abutment
1st step 2x48x 3-9”x 1 = 360 Cft
2nd step 2x48x3.375x1 = 324 Cft
3rd step 2x48x 3x 1 = 288 Cft
4th step 2x48x 2-7 ½ x1 = 252 Cft
5th step 2x48x2-3”x 1 = 216 Cft
6th step 2x48x1-10” x1 = 181 Cft
7th step 2x48x1-6”x1 = 144 Cft
Wing Wall
1st step 4x3x 3.375x 1 = 41 Cft
2nd step 4x3x3x 1 = 36 Cft
3rd step 4x3x2-7 ½ x 1 = 32 Cft
4th step 4x3x 3x2-3” = 81 Cft
5th step 4x11.12x 1.87x1 = 83 Cft
Curtain Wall
2x48x3/8x1 = 36 Cft
Parapet 2x13x0.9x1-4 ½ = 27 Cft
Floor 1x48x10x3/8” =180 Cft
Total = 2281 Cft
@ Rs. 8091.75 % Cft = Rs. 184573/-
4). Fabrication of mild steel bars for reinforcement
Deformed bars.
Qty. as per item No. 5 = 696 Cft
Wt. Of steel. 8.83 Lbs/ P. Cft = 2788 Kg
@ Rs. 5161.30 %Kg = Rs. 143897/-

5. PCC 1:2:4 for RCC work.


1x48x12x1-1” = 624 Cft
Bed 2x48x1-6”x0-6” = 72 Cft
Total = 696 Cft
@ Rs. 147.25P. Cft = Rs. 102486/-
Total = Rs. 505546/-
Rate for 44’ roadway = (505546/48)x44 = Rs. 463417/-

21 /conversion/tmp/scratch/421271195.doc
Sub Divisional Officer
Provincial R.C Sub Division
Gujrat

ANALYSIS OF RATE FOR CONSTRUCTION OF NEW JERSEY BARRIER

1- PCC 1:4:8 in foundation.


1x2x0.5 = 1 Cft @ Rs. 5328.15 % Cft = Rs. 53.28

2- PCC 1:2:4 type “C” for RCC work.


1x2x2 = 4 Cft
1x2+0.75x1 = 1.375 Cft
2
1x1.5x0.75 = 1.125 Cft
Total = 6.50 Cft @ Rs. 147.25 P. Cft = Rs. 957.12

3- F/Placing deformed steel bars.


6.50x5x0.4536 = 15 Kg @ Rs. 5499.86 % Kg = Rs. 824.97

4- Painting 3 coats on surface.


2x(2+1.17+1.5+0.375) = 10.098 Sft @ Rs. 967.30 % Sft = Rs. 97.68
Total = Rs. 1882.28
Say = Rs. 1882.28P. Rft

Sub Divisional Officer

Provincial R.C Sub Division

Gujrat

22 /conversion/tmp/scratch/421271195.doc
ANALYSIS OF RATE FOR W-BEAM GUARD RAIL
Unit = 100 Rft
A- Fabrication and supply to site.

1- W-beam Rail fabricated from SWG No. 10


steel sheet i/c the cost of machining etc
complete in all respect.
100’long @ 3.25 Kg/Rft 325 91.50 = 29738/-

2. 3”x6”x1/4”, I section Rolled Steel posts to be


erected at 6-3” c/c = 17 Nes. Each 4-6” long @
3.25Kg/Rft
17x4.5x3.25 = 248.625 248.625 100 = 24863/-

3. Spacer blocks of 3”x6”x1/4” thick I-section each


1-2” long
17x1.17x3.25 = 64.6425 64.6425 100 = 6464/-

4. Galvanizing to the above material upto 70Microns


325+248.62+64.64 =838.26Kg 838.26 70 = 58678/-

5. End piece fabricated & galvanized 1 6000 = 6000/-

6. Hard ware (nut bolts & washers) duly chromium


plated / galvanized
20Kg 20 130 = 2600/-

7. PCC 1:2:4 for foundation block of post


1-6”x1-6”x2
4.50Cft 4.50 23414.70= 1054/-

8. Transportation of the ready articles from


Factory 658 10 = 6580/-
Sub Total A = 135977/-
B- Labour
Digging pits for foundation of the specified size
Place post in true alignment
Pour concrete in the foundation
Fix rail by nuts & bolts in the alignment @ 20% of
Sub Total A = 27195/-
Total = 163172/-
Add 20% contractor profit & overhead charges except item7 = 32424/-
Total = 195596/-

23 /conversion/tmp/scratch/421271195.doc
Rate P.Rft = 195596/100 = 1955.96
Say = Rs. 1956/- P.Rft

Sub Divisional Officer