Project : PRP - 4
BROAD CONSIDERATIONS
1. For Offshore scope our offer is limited to Topside Modification work only.
6. Hydro test at site will be limited to top-side work only. Scope will not
get extended to pipe-line testing.
Project : PRP - 4
14. Our invoices will be payable along with GST prevailing at the time
of invoicing.
STRUCTURAL
Sr Offshore
Platform Material WORK – Deck
No. "φ
Extension (MT)
1 IU CS / CS NACE 90 0.5
2 IQ CS / CS NACE 385 12
4 NP CS / CS NACE 207 10
Any quantum above the quantities mentioned will individually attract unit rates.